HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT

FEDERICO DEGETAU FEDERAL OFFICE BUILDING

CONSTRUCTION DOCUMENTS OVERVIEW

PRE-BID MEETING – JUNE 15TH, 2016

DEGETAU FEDERAL OFFICE BUILDING

BID DOCUMENTSBID FORM
BASE SCOPEBASE
BID ALTERNATE 1OPTION N1
BID OPTION A1OPTION N2a
BID OPTION A2OPTION N2b
BID OPTION 1OPTION N3a
BID OPTION 2aOPTION N4
BID OPTION 2bOPTION N5
BID OPTION 3OPTION N6a
BID OPTION 4OPTION N6b
BID OPTION 5OPTION N6c
BID OPTION 6
BID OPTION 7
ALTERNATE MAGISTRATE COURTS BID PACKAGE

CERTAIN PORTIONS OF BID DOCUMENT BASE SCOPE, ALTERNATE 1 AND BID OPTION 1 ARE ALSO INCORPORATED INTO BID FORM BASE SCOPE

PROJECT OVERVIEW

PROJECT SCOPE CONSISTS OF:

MAGISTRATES COURTS RENOVATION (4TH FL) BID PACKAGE

RE-ROOFING OF FOB

BASE SCOPE

REPLACEMENT/REPAIR OF FOB LIGHTNING PROTECTION

SIGNAGE PACKAGE FOR FOB FLOORS 4-7

COMPLETION OF USCH AND LINK MODERNIZATION, AND FOB SIGNAGE FLOORS B-3 ARE A SEPARATE CONTRACT, HOWEVER DUE TO SHARED CHILLER PLANT, ELECTRICAL AND BUILDING ACCESS, SOME INTERFACE REQUIRED.

DEGETAU FEDERAL OFFICE BUILDING

OPTION N1

CONNECTION OF USDC THERMAFUSERS

OPTION N2a & N2b 2a – RAINHARVESTING CISTERN FOR CT MAKE-UP 2b – COMPLETE SUPPLEMENTAL MAKE-UP WELL OPTION N3a

OPTION N4

COMPLETE GRID-TIE SOLAR PV SYSTEM AT FOB ROOF

RENOVATION OF EAST RESTROOMS FLOORS 5-7

OPTION N5

6a – INSTALL NEW 7TH FLOOR MECH. EQUIP. AND ASSOC. WORK

OPTIONS N6

6b – NEW AIR RISERS FLOORS 4-7 6c – RENOVATION AND VAV CONVERSION OF 7TH FLOOR

4TH FLOOR

ROOF

1st FLOOR USDC

7thFL MERs & cores SWING 2nd and 3rd SWING 1st and 3rd

E. BASEMENT MER

4-6th floor cores

PROJECT OVERVIEW - BASE SCOPE

RENOVATION OF 4 COURTROOMS

RENOVATION OF 4 CHAMBER SUITES AND ASSOCIATED SPACES

RENOVATION OF JURY ROOMS

RENOVATION OF PUBLIC CORE AND CORRIDORS & SUPPORT SPACES

RENOVATION OF 4TH FLOOR EAST RESTROOM

NEW MER, MECHANICAL UPGRADES AT E. BASEMENT, RISERS UPGRADES TO AC-FOW-B-3

RELOCATION OF FCC (MINIMAL SPACE RENOV.)

FLOORS B -3, INCLUDING BASEMENT MERs RENOVATED IN PREVIOUS PROJECT – COURTS TO SWITCH OVER FROM OLD 7TH FLOOR CAV SYSTEMS TO NEW BASEMENT VAV SYSTEM

REMOVE CEILINGS

INSTALL NEW HVAC, FP AND INFRASTRUCTURE

INSTALL NEW CEILINGS AND LIGHTING FIXTURES

OTHER INTERIOR RENOVATIONS SUCH AS DOORS, HARDWARE, PAINT AND SOME FLOORING

COURTS RENOVATION SCOPE:

DEMOLITION/ABATEMENT

PHASED PROJECT & TURNOVER – REMAINDER OF BUILDING WILL REMAIN CONTINOUSLY OCCUPIED AND IN USE THROUGHOUT CONSTRUCTION

HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT

DEGETAU FEDERAL OFFICE BUILDING

JUDGE’S CHAMBER SWING SPACE

RE-ROOF FOB

REPLACE/REPAIR LIGHTNING PROTECTION

PROJECT OVERVIEW - PHASING

PHASED PROJECT SUGGESTED WORK SEQUENCE:

INSTALL TEMPORARY HVAC AT 4TH FLOOR RESTROOM

PHASE 1 (Completion Milestone 210 days from NTP):

RENOVATE 1ST FLOOR OFFICES AND RELOCATE FCC (NOT SHOWN HERE)

TENANT MOVES – JUDGE TO SWING CHAMBER, SHUTDOWN COURTROOM

RETURN JUDGE TO RENOVATED SPACE, REOPEN COURTROOM

CONSTRUCT MAGISTRATE SWING SPACE AT 3RD FLOOR

DEGETAU FEDERAL OFFICE BUILDING

PHASES 3A–3D (Comp. Milestone 730 days from NTP):

RENOVATE CHAMBER SUITE, COURTROOM, JURY ROOM (AS APPLICABLE) & ASSOCIATED MER UPGRADES AT PHASE 3A RENOVATE CORE & RESTROOM AND COMPLETE RISER SWITCHOVER AT LAST SUBPHASE 3D, REMOVE TEMPORARY HVAC

REPEAT (3) TIMES FOR EACH CHAMBER/CR PAIR

PHASE 2 - SKIPPED

REROOF AND REPLACE LIGHTNING PROTECTION AT ANY POINT (CONCURRENTLY, NOT SHOWN HERE)

DEFINED IN BID DOCUMENTS “ALTERNATE MAGISTRATE COURTS BID PACKAGE”

ROOF: “BID OPTION 6”

LIGHTNING PROTECTION: “BID OPTION 7”

PROJECT OVERVIEW - OPTION N1

SCOPE: CONNECT APPROXIMATELY 110 VAV DIFFUSERS INSTALLED IN PREVIOUS PROJECT TO EXISTING BUILDING DDC BAS

LOCATED IN 1ST FLOOR USDC SPACE – WILL BE OCCUPIED SO ALL WORK AT NIGHT AND CLEANED EACH DAY.

INSTALL HEATERS, CONTROLLERS @ DIFFUSERS, CONTROL WIRING, ADDITIONAL BAS CARDS/PANELS AND (2) POINTS PER DIFFUSER.

PROGRAM INTO EXISTING BAS – SEE DIV. 23 BAS SPEC FOR MORE INFORMATION

DEFINED IN BID DOCUMENTS AS “BID OPTION 5”

PROJECT OVERVIEW - OPTION N2a & N2b

DEGETAU FEDERAL OFFICE BUILDING

OPTION N2a: CONSTRUCT A CONCRETE RAINWATER HARVESTING CISTERN NEAR SOUTHEAST ENTRANCE (SITE/LAWN AREA) SITE WORK – AREA PROTECTION, CLEARING AND GRADING, EXCAVATION, SHORING/SHEET PILING.

CONCRETE CAST-IN PLACE CISTERN APPROX. 30’ X 20’ – TWO COMPARTMENTS (ONE WET ONE DRY) INSTALL PLUMBING BOOSTER PUMP, FILTRATION SYSTEM, AND COMPLETE INTERIOR NPW PIPING – TIE-IN TO COOLING TOWER MAKE-UP SYSTEM – REQUIRES OPENING OF SHAFT FROM 4-7 FL.

STORES RAINWATER FROM ROOF STORMWATER SYSTEM FOR RE-USE IN COOLING TOWER MAKE-UP

COMPLETE TEST-WELL (SCREEN CASING AND CAP) TO PROVIDE FUNCTIONING WELL TO PROVIDE SUPPLEMENTAL MAKE-UP WATER TO CISTERN SUBMERSIBLE PUMP, METER VAULT, PIPING, CONTROL PANEL, ADJUSTMENT OF TOWER TREATMENT

OPTION N2b: IN ADDITION TO OPTION N2a (CISTERN) COMPLETE A MAKE-UP WATER WELL DEFINED IN BID DOCUMENTS AS “BID OPTION 2a AND 2b”

PROJECT OVERVIEW - OPTION N3a

DEGETAU FEDERAL OFFICE BUILDING

COMPLETE SOLAR PHOTOVOLTAIC SYSTEM

ARRAY TO BE MOUNTED ON EXISTING STEEL SUPPORT STRUCTURE.

BASIS OF DESIGN SYSTEM PROVIDED – CONTRACTOR TO HIRE A SOLAR INTEGRATOR TO COMPLETE INSTALLATION ACCORDING TO PERFORMANCE SPECIFICATION PROVIDE ARRAY, WIRING, INVERTERS – GRID TIE TO EXISTING SUBSTATIONS VIA BUS DUCTS GRID-TIE 105 kW SOLAR PV SYSTEM

INCLUDE PERMITTING AND INTERCONNECTION COORDINATION WITH PREPA

STRING SIZING AND ANY STRUCTURAL CONNECTION OF ARRAY TO SUPERSTRUCTURE

DEFINED IN BID DOCUMENTS AS “BID OPTION 3”

PROJECT OVERVIEW - OPTION N4

DEGETAU FEDERAL OFFICE BUILDING

BUILDING SIGNAGE ON FOB FLOORS 4 - 7

NOTE: SIGNAGE WORK ON FLOORS B-3 ARE PART OF THE ONGOING WORK FOR THE NAZARIO CONSTRUCTION CONTRACT. THE WORK OF THIS OPTION SHALL BE COORDINATED WITH THE B-3 SIGNAGE.

PROVIDE WAY-FINDING AND BUILDING LOBBY SIGNAGE IN PUBLIC CORES AND CORRIDORS ON FOB FLOORS 4 - 7

PROJECT OVERVIEW - OPTION N5

DEGETAU FEDERAL OFFICE BUILDING

RENOVATION OF THE EAST RESTROOMS ON FLOORS 5, 6 AND 7

DEMOLISH CEILINGS FOR 5TH 6TH AND 7TH FLOOR RESTROOMS AND REPLACE WITH NEW CEILINGS AND LIGHTING. THIS WORK IS DEFINED UNDER “BID ALTERNATE 1” FOR THE 5TH AND 6TH FLOORS AND “BASE SCOPE” FOR THE 7TH FLOOR IN THE BID DOCUMENTS.

DEMOLISH AND REPLACE PLUMBING FIXTURES, TOILET PARTITIONS, TILING AND FINISHES AT THE 5TH, 6TH AND 7TH FLOOR EAST RESTROOMS. PLUMBING FIXTURE AND FINISH WORK IS DEFINED UNDER “BID OPTION 1” IN THE BID DOCUMENTS.

A DUCTWORK ALLOWANCE IS PROVIDED UNDER SECTION “UNIT PRICES” TO ACCOMMODATE ADAPTING EXISTING EXHAUST DUCTWORK TO THE NEW CEILING LAYOUT.

NOTE: RENOVATIONS FOR THE 4TH FLOOR EAST RESTROOM IS NOT PART OF OPTION N5 (TO BE DONE WITH MAGISTRATE COURTS, SEE BASE SCOPE ABOVE. RENOVATIONS FOR THE 7TH FLOOR WEST RESTROOM IS NOT PART OF OPTION N5 (OPTION N6a BELOW).

PROJECT OVERVIEW - OPTIONS N6a,b,c

DEGETAU FEDERAL OFFICE BUILDING

OPTION N6a: INSTALL OF NEW 7TH FL MECH. EQUIP. AND ASSOC.WORK DUCTWORK MODIFICATIONS IN 7TH FLOOR TENANT AREAS TO ADAPT CAV DISTRIBUTION TO NEW HVAC EQUIPMENT. NEW CHW PIPING.

REQUIRES TEMP UNITS FOR AREAS TO REMAIN OCCUPIED ON 5TH AND 6TH FLOORS

RENOVATION OF 7TH FLOOR PUBLIC CORES AND CORRIDOR

CONSTRUCTION OF 8,000 SF OF SWING SPACE ON THE 2ND AND 3RD FLOORS –RECONFIGURE PARTITION LAYOUT (RENVOATED IN BDB)

CONSTRUCTION OF 1,200 SF SWING SPACE AT 6TH FLOOR

RELOCATION OF SWING TENANTS

DEMOLITION OF EXISTING, INSTALLATION OF NEW HVAC EQUIPMENT AT 7TH FLOOR MERS AND ROOF. INCLUDES AHUS, HRUS, RTU, PENTHOUSE A/C.

RENOVATION OF 7TH FLOOR WEST PUBLIC RESTROOM

INSTALLATION OF REHEAT COILS AND DUCT MODS AT 4TH, 5TH AND 6TH FLOOR LOCATIONS TO ADAPT NEW EQUIPMENT TO EXISTING DISTRIBUTION MISC. WORK INCLUDING REPLACEMENT OF FIRE PUMP AND CONTROLLER, ELECTRICAL DISTRIBUTION AND TRANS. REPLACE, COMPLETE BAS

OPTION N6b: NEW AIR RISERS 4-7 FLOORS

IN ADDITION TO ABOVE, INSTALL NEW RISERS AND COMPLETE 4W, 5 & 6 CORES

COMPLETE SCDW SYS., VENTILATION TIE-IN AT BASEMENT MERS, SOLAR HW SYS.

HVAC SYSTEM WILL BE RUN AS CAV SYSTEM AT UPPER HOUSE

OPTION N6c: COMPLETE 7TH FLOOR VAV CONVERSION AND RENOVATION

HVAC SYSTEM WILL BE RUN AS VAV SYSTEM AT 7TH FLOOR, CAV FOR REST OF UPPER HOUSE –INSTALL CAV BOXES

PROJECT OVERVIEW - PHASING - OPTIONS N6a,b,c

DEGETAU FEDERAL OFFICE BUILDING

PHASE 1 (210 DAYS FROM NTP)

“HEAD START” CONSTRUCTION IN CENTER AREA OF 7TH FLOOR – N6a & N6b MISC. DUCTWORK MODIFICATIONS FOR NEW HVAC, CHW PIPING, N6c INSTALL VAVs AND RENOVATE TENANT SPACES, 7TH AND 6TH FLOORS (525 DAYS FROM NTP) CLOSE EAST RESTROOMS, CONSTRUCT TEMP MERS AND INSTALL ADDITIONAL TEMP UNITS ON 5TH AND 6TH FLOORS – TOP OF HOUSE ON TEMP UNITS RENOVATION OF 7TH FLOOR PUBLIC CORES AND CORRIDOR, 7TH FL RISERS (OPT. N6b). COMPLETE 7TH FLOOR TENANT AREA RENOVATIONS (OPTION N6c)

CONSTRUCT SWING SPACE ON THE 2ND AND 3RD FLOORS

CONSTRUCT 6TH FLOOR SWING SPACE (FBI)

RELOCATION OF SWING TENANTS, CLOSE CAFETERIA (180 – 210 DAYS FROM NTP)

RENOVATION OF 7TH FLOOR WEST PUBLIC RESTROOM

INSTALL NEW RISERS ATH 5TH AND 6TH FLOORS, AND COMPLETE 5TH & 6TH FL CORES (OPT. N6b) COMPLETE SCDW SYS., VENTILATION TIE-IN AT BASEMENT MERS, SOLAR HW SYS. (N6b) MISC. HVAC WORK AT BASEMENT (ALL OPTs.)

PHASE 2

MOVE TENANT AND COMPLETE 6TH FL WEST TEMP MER (285 DAYS FROM NTP)

PHASE 3 (495 (N6a) OR 525 (N6b/c) DAYS FROM NTP) DEMOLITION OF EXISTING, INSTALLATION OF NEW HVAC EQUIPMENT AT 7TH FLOOR MERS AND ROOF. INCLUDES AHUS, HRUS, RTU, PENTHOUSE A/C.

4TH FLOOR WEST MISC. HVAC MODIFICATIONS, RISERS (OPT. N6b) PHASE 4 (570 (N6a) OR 715 (N6b/c DAYS FROM NTP)

RETURN TENANTS TO 7TH FLOOR, REOPEN

RETURN TEMP MER TENANTS FROM SWING SAPCE

LEED PROJECT REQUIREMENTS – GOAL OF LEED SILVER

SELECT PROJECT SYSTEMS (HVAC, CONTROLS, LIGHTING, ELECTRICAL) WILL BE COMMISSIONED UNDER 3RD PARTY COMMISSIONING AGENT (CONTRACTED BY GOVERNMENT). COMMISSIONING AGENT WILL WITNESS FUNCTIONAL TESTING PERFORMED BY CONTRACTOR. SUCCESSFUL COMMISSIONING IS A CONDITION OF ACCEPTANCE OF THE WORK. REFERENCE DIVISION 1, AND TECHNICAL COMMISSIONING SPECIFICATION SECTIONS FOR SPECIFIC REQUIREMENTS.

HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT

DEGETAU FEDERAL OFFICE BUILDING

FINAL PROJECT CLOSEOUT BY:

IF OPTIONS n6a,b,c ARE EXERCISED: 865 DAYS FROM NTP, OTHERWISE: 820 DAYS FROM NTP

SUBMITTALS FOR EQUIPMENT AND OTHER ITEMS NOT DEPENDENT ON TURN OVER OF A SPACE ARE TO BE SUBMITTED AT THE START OF THE PROJECT – NO LATER THAN 120 DAYS FROM NTP

READ THE DIVISION 1!!

PROJECT AND EXISTING CONDITIONS REQUIRE SOME SPECIFIC GENERAL REQUIREMENTS AND COORDINATION.

THESE ARE SUMMARIZED IN THE DIVISION 1 “SUMMARY” SECTION.

DETAILED ELSEWHERE IN THE DIVISION 1 AND TECHNICAL SPECIFICATION SECTIONS

SPECIAL REQUIREMENTS ARE HERE FOR A SUCCESSFUL PROJECT BASED ON LESSONS LEARNED.

THE DOCUMENTATION AND SUBMISSION PROCESS IS A CRITICAL PART OF THE EXECUTION PLAN.

GENERAL REQUIREMENTS

RELOCATION OF TENANTS AND MOVING OF FURNITURE:

CONTRACTOR IS RESPONSIBLE TO HIRE A QUALIFIED MOVER. SPECIFIC MOVING REQUIREMENTS ARE OUTLINED IN SECTION “SUMMARY”

SELECTED FURNITURE TO BE RELOCATED TO TENANT SWING SPACES.

REMAINING FURNITURE, INCLUDING ALL COURTROOM FURNITURE, TO BE TAKEN TO SECURED OFF-SITE CLIMATE CONTROLLED STORAGE. MUST SUBMIT FOR GOVERNMENT APPROVAL, AND GOVERNMENT SHALL INSPECT.

PHOTODOCUMENT ALL EXISTING CONDITIONS (FURNITURE, SPACES, ETC.)

WORK BY OTHERS/COORDINATION WITH OTHER PROJECTS AT THE SITE:

WORK OF THIS PROJECT MUST BE COORDINATED WITH OTHER IN PROCESS AND PLANNED WORK:

PROBATION/PRE-TRIAL CONSOLIDATION AT FOB 2ND FLOOR.

EXPANSION OF US MARSHALS SPACE AT FOB 2ND FLOOR WEST.

MAGISTRATE COURTS WAITING ROOM RENOVATION.

CONNECTION OF FBI CHILLED WATER SYSTEM TO MAIN BUILDING CHILLED WATER SYSTEM.

FOLLOW-ON RENOVATIONS AT THE USCH AND LINK.

OTHER PROJECTS – GSA TO ADVISE AND COORDINATE.

REFERENCE DIVISION 1 SPECIFICATIONS FOR ADDITIONAL DETAILS

EQUIPMENT REUSE – GOVERNMENT FURNISHED PROPERTY:

THIS PROJECT CONTINUES THE WORK OF AN EXISTING PROJECT. EQUIPMENT PURCHASED BY THE GOVERNMENT FROM THIS PROJECT IS AVAILABLE AS GOVERNMENT FURNISHED PROPERTY.

(2) SCHEDULES:

SCHEDULE A – GOVERNMENT FURNISHED PROPERTY THAT MUST BE REUSED. INCLUDES DOOR HARDWARE, VAV BOXES, LIGHTING CONTROL AND ELECTRICAL COMPONENTS.

SCHEDULE B – GOVERNMENT FURNISED PROPERTY THAT MAY BE REUSED AT THE GOVERNMENT’S OPTION. INCLUDES AIR-HANDLING UNITS, VFDs AND OTHER ITEMS. THE CONTRACTOR SHALL PROVIDE A DEDUCT ALTERNATE PRICE FOR INSTALLATION AND WARRANTY OF THESE GOVERNMENT PROVIDED ITEMS REVIEW. REFERENCE SECTION “ALTERNATES” AND “SUMMARY” FOR SPECIFIC REQUIREMENTS AND INVENTORY.

EXISTING PROJECT CONDITIONS:

CONTINUATION OF PREVIOUS PROJECT TO COMPLETE THE ORIGINAL BRIGING INTENT

WORK OF THIS PROJECT INTERFACES WITH THAT OF PREVIOUS, ESPECIALLY:

HVAC SYSTEMS – DOAS/HRUS FEEDING AHUS – (2) PARTIALLY COMPLETE SYSTEMS, EAST AND WEST BASEMENT, IN PLACE ARE RUNNING INTERIM, USING EXISTING BUILDING EXHAUST. DEPENDING ON OPTIONS/ALTERNATES SELECTED, VARIOUS MODIFICATIONS AND CONNECTION TO NEW EQUIPMENT WILL BE NEEDED.

NEW CENTRAL CHILLER PLANT HAS BEEN INSTALLED – CERTAIN PORTIONS OF THIS SYSTEM, SUCH AS SECONDARY CONDENSER WATER SYSTEM, WILL NEED TO BE COMPLETED AND COMMISSIONED.

CONTROLS SYSTEM – PARTIALLY INSTALLED – FINAL PROGRAMMING OF COMPLETE BUILDING SYSTEM NEEDED LIGHTING AND LIGHTING CONTROL SYSTEM – SOME LIGHTING CONTROL HUBS IN PLACE – NEW LIGHTING TO BE ADDED

ELECTRICAL DISTRIBUTION AND METERING

BAS BACKBONE

FINAL HVAC BALANCING

SOLAR PHOTOVOLTAIC SYSTEM – SUPERSTRUCTURE INSTALLED – MODULES AND BALANCE OF SYSTEM TO BE COMPLETED

SOLAR HOT WATER SYSTEM AND CISTERN PIPING

CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE A COMPLETE OPERATIONAL BUILDING AT THE CONCLUSION OF THE PROJECT (TO EXTENT OF OPTIONS EXERCISED)

EXISTING CONDITIONS – UNIT PRICES AND RELOCATIONS:

EXISTING BUILDING WITH EXTENSIVE EXISTING ABOVE CEILING INFRASTRUCTURE

SELECTED RELOCATIONS CALLED OUT ON DRAWINGS TO ALLOW NEW DUCTWORK TO BE INSTALLED ADDITIONAL ALLOCATION FOR CONCEALED, OR UNFORESEEN UTILITY RELOCATIONS TO BE ACCOUNTED IN BASE BID IN FORM OF UNIT PRICE WITH SPECIFIC QUANTITY. SEE SECTION “UNIT PRICES”. THESE ARE NON-SPECIFIC IN LOCATION, FOR USE AS ABOVE CEILING CONFLICTS ARE ENCOUNTERED. INCLUDES ELECTRICAL, FIRE PROTECTION AND PLUMBING.

EXISTING CONDITIONS – PROJECT COORDINATION:

ABOVE CEILING COORDINATION IS CRITICAL.

DETAILED MEASUREMENT AND SURVEY TO COORDINATE DESIGN WITH FIELD CONDITIONS.

COORDINATION DRAWINGS SHALL REFLECT FIELD CONDITIONS AND PROPOSE RESOLUTION/ALTERNATE ROUTING WHERE REQUIRED. COSTS SHALL BE INCLUDED IN BID.

CONTRACTOR SHALL PROVIDE ADEQUATE RESOURCES AND ALLOWANCE IN SCHEDULE TO PERFORM THIS COORDINATION

RETAIN PROFESSIONAL STAFF TO PERFORM COORDINATION

EXISTING CONDITIONS – CEILINGS AND NOISE:

U.O.N. CEILINGS TO BE INSTALLED AT SAME HEIGHT AS EXISTING. SOFFITS OR LOWERING NOT PERMITTED.

AMBIENT NOISE LEVEL BASELINE TESTING SHALL BE PERFORMED IN COURTROOMS. AMBIENT NOISE LEVEL SHALL NOT BE INCREASED IN ANY COURTROOM.

DELEGATED DESIGN – COORDINATION AND SHOP DRAWING REQUIREMENTS

COORDINATION DRAWINGS MUST BE DONE USING BUILDING INFORMATION MODELING (BIM) 3D SOFTWARE. INTERDISCIPLINARY COORDINATION DRAWINGS TO BE PREPARED UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER. DETAILED INTERDISCPLINARY COORDINATION DRAWINGS GENERATED FROM BIM COORDINATION MODEL.

SEE DIVISION 1 SECTIONS “SUMMARY” AND “PROJECT MANAGEMENT AND COORDINATION”

HVAC SHOP DRAWINGS SHALL BE PERFORMED UNDER THE SUPERVISION OF A LICENSED PE. THE SAME PE SHALL VERIFY THE INSTALLATION CONFORMS TO THE SHOP DRAWINGS.

DELEGATED DESIGN – COORDINATION AND SHOP DRAWING REQUIREMENTS

CONTRACTOR SHALL PERFORM LASER SCANNING OF SPACES ONCE CEILINGS ARE REMOVED TO DOCUMENT EXISTING CONDITIONS. THE LASER SCANNING POINT CLOUD SHALL BE USED FOR ABOVE CEILING COORDINATION.

DELEGATED DESIGN – CONTROLS SYSTEM DESIGN

PROFESSIONAL ENGINEER WITH MINIMUM OF (5) YEARS OF EXPERIENCE DESIGNING CONTROLS SYSTEMS.

PREPARE COMPLETE CONTROLS SUBMITTAL PACKAGE.

DETAILED POINTS, SEQUENCES, WIRING DIAGRAMS, PROCESS AND INSTRUMENTATION DIAGRAMS.

COMPLETE OPERATIONS DDC SYSTEM FOR WHOLE BUILDING – MUST INTERFACE WITH SYSTEM INSTALLED IN PREVIOUS PROJECT.

WORK RESTRICTIONS – WORKING HOURS

GENERAL WORKING HOURS ARE DURING UNOCCUPIED HOURS – 6 PM TO 7 AM

SELECTED NON-DISRUPTIVE WORK MAY BE PERFORMED DURING OCCUPIED HOURS WITH GOVERNMENT APPROVAL.

SEE SECTION “WORK RESTRICTIONS” FOR ADDITIONAL REQUIREMENTS.

SPECIAL INSPECTIONS & TESTING REQUIREMENTS

CONTRACTOR SHALL HIRE SPECIAL INSPECTORS FOR INSPECTIONS AS REQUIRED BY IBC

QUALITY ASSURANCE REQUIREMENTS OF DIVISION 1

ADDITIONAL INSPECTION REQUIREMENTS, SUCH AS INSPECTION OF COMPLETED DUCTWORK, ARE PART OF TECHNICAL SPECIFICATIONS.

TEMPORARY FACILITIES AND CONDITIONING REQUIREMENTS

TEMPORARY SPACE CONDITIONING TO BE PROVIDED BY CONTRACTOR DURING CONSTRUCTION

PROTECTION OF MILLWORK

TEMPERATURE AND HUMIDITY CONTROL

SIGNIFIFICANT PORTIONS OF THE PROJECT AS WELL AS BUILDING AREAS OUTSIDE THE PROJECT UNDER CERTAIN OPTIONS WILL REQUIRE TEMPORARY AIR-CONDITIONING SO THAT THEY MAY REMAIN ACTIVE DURING THE CONSTUCTION WHEN HVAC SYSTEMS SERVING THESE SPACES ARE DEMOLISHED

STAFFING REQUIREMENTS

DELEGATED DESIGN – PROFESSIONAL SUPPORT

BIM SUPPORT AND LASER SCANNING

FULL-TIME PROJECT COORDINATOR

FULL-TIME MEP COORDINATOR

FULL-TIME QAQC MANAGER

COMMISSIONING COORDINATOR

ADDITIONAL REQUIREMENTS FOR STAFF AND KEY PERSONNEL OUTLINED IN DIVISION 1 SPECIFICATIONS image1.jpg image2.jpg image3.jpeg image4.png image5.png image6.emf image7.emf image8.emf image9.jpeg image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.png image18.png

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .