HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT
FEDERICO DEGETAU FEDERAL OFFICE BUILDING
CONSTRUCTION DOCUMENTS OVERVIEW
PRE-BID MEETING – JUNE 15TH, 2016
DEGETAU FEDERAL OFFICE BUILDING
| BID DOCUMENTS | BID FORM |
| BASE SCOPE | BASE |
| BID ALTERNATE 1 | OPTION N1 |
| BID OPTION A1 | OPTION N2a |
| BID OPTION A2 | OPTION N2b |
| BID OPTION 1 | OPTION N3a |
| BID OPTION 2a | OPTION N4 |
| BID OPTION 2b | OPTION N5 |
| BID OPTION 3 | OPTION N6a |
| BID OPTION 4 | OPTION N6b |
| BID OPTION 5 | OPTION N6c |
| BID OPTION 6 | |
| BID OPTION 7 | |
| ALTERNATE MAGISTRATE COURTS BID PACKAGE |
CERTAIN PORTIONS OF BID DOCUMENT BASE SCOPE, ALTERNATE 1 AND BID OPTION 1 ARE ALSO INCORPORATED INTO BID FORM BASE SCOPE
PROJECT OVERVIEW
PROJECT SCOPE CONSISTS OF:
MAGISTRATES COURTS RENOVATION (4TH FL) BID PACKAGE
RE-ROOFING OF FOB
BASE SCOPE
REPLACEMENT/REPAIR OF FOB LIGHTNING PROTECTION
SIGNAGE PACKAGE FOR FOB FLOORS 4-7
COMPLETION OF USCH AND LINK MODERNIZATION, AND FOB SIGNAGE FLOORS B-3 ARE A SEPARATE CONTRACT, HOWEVER DUE TO SHARED CHILLER PLANT, ELECTRICAL AND BUILDING ACCESS, SOME INTERFACE REQUIRED.
DEGETAU FEDERAL OFFICE BUILDING
OPTION N1
CONNECTION OF USDC THERMAFUSERS
OPTION N2a & N2b 2a – RAINHARVESTING CISTERN FOR CT MAKE-UP 2b – COMPLETE SUPPLEMENTAL MAKE-UP WELL OPTION N3a
OPTION N4
COMPLETE GRID-TIE SOLAR PV SYSTEM AT FOB ROOF
RENOVATION OF EAST RESTROOMS FLOORS 5-7
OPTION N5
6a – INSTALL NEW 7TH FLOOR MECH. EQUIP. AND ASSOC. WORK
OPTIONS N6
6b – NEW AIR RISERS FLOORS 4-7 6c – RENOVATION AND VAV CONVERSION OF 7TH FLOOR
4TH FLOOR
ROOF
1st FLOOR USDC
7thFL MERs & cores SWING 2nd and 3rd SWING 1st and 3rd
E. BASEMENT MER
4-6th floor cores
PROJECT OVERVIEW - BASE SCOPE
RENOVATION OF 4 COURTROOMS
RENOVATION OF 4 CHAMBER SUITES AND ASSOCIATED SPACES
RENOVATION OF JURY ROOMS
RENOVATION OF PUBLIC CORE AND CORRIDORS & SUPPORT SPACES
RENOVATION OF 4TH FLOOR EAST RESTROOM
NEW MER, MECHANICAL UPGRADES AT E. BASEMENT, RISERS UPGRADES TO AC-FOW-B-3
RELOCATION OF FCC (MINIMAL SPACE RENOV.)
FLOORS B -3, INCLUDING BASEMENT MERs RENOVATED IN PREVIOUS PROJECT – COURTS TO SWITCH OVER FROM OLD 7TH FLOOR CAV SYSTEMS TO NEW BASEMENT VAV SYSTEM
REMOVE CEILINGS
INSTALL NEW HVAC, FP AND INFRASTRUCTURE
INSTALL NEW CEILINGS AND LIGHTING FIXTURES
OTHER INTERIOR RENOVATIONS SUCH AS DOORS, HARDWARE, PAINT AND SOME FLOORING
COURTS RENOVATION SCOPE:
DEMOLITION/ABATEMENT
PHASED PROJECT & TURNOVER – REMAINDER OF BUILDING WILL REMAIN CONTINOUSLY OCCUPIED AND IN USE THROUGHOUT CONSTRUCTION
HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT
DEGETAU FEDERAL OFFICE BUILDING
JUDGE’S CHAMBER SWING SPACE
RE-ROOF FOB
REPLACE/REPAIR LIGHTNING PROTECTION
PROJECT OVERVIEW - PHASING
PHASED PROJECT SUGGESTED WORK SEQUENCE:
INSTALL TEMPORARY HVAC AT 4TH FLOOR RESTROOM
PHASE 1 (Completion Milestone 210 days from NTP):
RENOVATE 1ST FLOOR OFFICES AND RELOCATE FCC (NOT SHOWN HERE)
TENANT MOVES – JUDGE TO SWING CHAMBER, SHUTDOWN COURTROOM
RETURN JUDGE TO RENOVATED SPACE, REOPEN COURTROOM
CONSTRUCT MAGISTRATE SWING SPACE AT 3RD FLOOR
DEGETAU FEDERAL OFFICE BUILDING
PHASES 3A–3D (Comp. Milestone 730 days from NTP):
RENOVATE CHAMBER SUITE, COURTROOM, JURY ROOM (AS APPLICABLE) & ASSOCIATED MER UPGRADES AT PHASE 3A RENOVATE CORE & RESTROOM AND COMPLETE RISER SWITCHOVER AT LAST SUBPHASE 3D, REMOVE TEMPORARY HVAC
REPEAT (3) TIMES FOR EACH CHAMBER/CR PAIR
PHASE 2 - SKIPPED
REROOF AND REPLACE LIGHTNING PROTECTION AT ANY POINT (CONCURRENTLY, NOT SHOWN HERE)
DEFINED IN BID DOCUMENTS “ALTERNATE MAGISTRATE COURTS BID PACKAGE”
ROOF: “BID OPTION 6”
LIGHTNING PROTECTION: “BID OPTION 7”
PROJECT OVERVIEW - OPTION N1
SCOPE: CONNECT APPROXIMATELY 110 VAV DIFFUSERS INSTALLED IN PREVIOUS PROJECT TO EXISTING BUILDING DDC BAS
LOCATED IN 1ST FLOOR USDC SPACE – WILL BE OCCUPIED SO ALL WORK AT NIGHT AND CLEANED EACH DAY.
INSTALL HEATERS, CONTROLLERS @ DIFFUSERS, CONTROL WIRING, ADDITIONAL BAS CARDS/PANELS AND (2) POINTS PER DIFFUSER.
PROGRAM INTO EXISTING BAS – SEE DIV. 23 BAS SPEC FOR MORE INFORMATION
DEFINED IN BID DOCUMENTS AS “BID OPTION 5”
PROJECT OVERVIEW - OPTION N2a & N2b
DEGETAU FEDERAL OFFICE BUILDING
OPTION N2a: CONSTRUCT A CONCRETE RAINWATER HARVESTING CISTERN NEAR SOUTHEAST ENTRANCE (SITE/LAWN AREA) SITE WORK – AREA PROTECTION, CLEARING AND GRADING, EXCAVATION, SHORING/SHEET PILING.
CONCRETE CAST-IN PLACE CISTERN APPROX. 30’ X 20’ – TWO COMPARTMENTS (ONE WET ONE DRY) INSTALL PLUMBING BOOSTER PUMP, FILTRATION SYSTEM, AND COMPLETE INTERIOR NPW PIPING – TIE-IN TO COOLING TOWER MAKE-UP SYSTEM – REQUIRES OPENING OF SHAFT FROM 4-7 FL.
STORES RAINWATER FROM ROOF STORMWATER SYSTEM FOR RE-USE IN COOLING TOWER MAKE-UP
COMPLETE TEST-WELL (SCREEN CASING AND CAP) TO PROVIDE FUNCTIONING WELL TO PROVIDE SUPPLEMENTAL MAKE-UP WATER TO CISTERN SUBMERSIBLE PUMP, METER VAULT, PIPING, CONTROL PANEL, ADJUSTMENT OF TOWER TREATMENT
OPTION N2b: IN ADDITION TO OPTION N2a (CISTERN) COMPLETE A MAKE-UP WATER WELL DEFINED IN BID DOCUMENTS AS “BID OPTION 2a AND 2b”
PROJECT OVERVIEW - OPTION N3a
DEGETAU FEDERAL OFFICE BUILDING
COMPLETE SOLAR PHOTOVOLTAIC SYSTEM
ARRAY TO BE MOUNTED ON EXISTING STEEL SUPPORT STRUCTURE.
BASIS OF DESIGN SYSTEM PROVIDED – CONTRACTOR TO HIRE A SOLAR INTEGRATOR TO COMPLETE INSTALLATION ACCORDING TO PERFORMANCE SPECIFICATION PROVIDE ARRAY, WIRING, INVERTERS – GRID TIE TO EXISTING SUBSTATIONS VIA BUS DUCTS GRID-TIE 105 kW SOLAR PV SYSTEM
INCLUDE PERMITTING AND INTERCONNECTION COORDINATION WITH PREPA
STRING SIZING AND ANY STRUCTURAL CONNECTION OF ARRAY TO SUPERSTRUCTURE
DEFINED IN BID DOCUMENTS AS “BID OPTION 3”
PROJECT OVERVIEW - OPTION N4
DEGETAU FEDERAL OFFICE BUILDING
BUILDING SIGNAGE ON FOB FLOORS 4 - 7
NOTE: SIGNAGE WORK ON FLOORS B-3 ARE PART OF THE ONGOING WORK FOR THE NAZARIO CONSTRUCTION CONTRACT. THE WORK OF THIS OPTION SHALL BE COORDINATED WITH THE B-3 SIGNAGE.
PROVIDE WAY-FINDING AND BUILDING LOBBY SIGNAGE IN PUBLIC CORES AND CORRIDORS ON FOB FLOORS 4 - 7
PROJECT OVERVIEW - OPTION N5
DEGETAU FEDERAL OFFICE BUILDING
RENOVATION OF THE EAST RESTROOMS ON FLOORS 5, 6 AND 7
DEMOLISH CEILINGS FOR 5TH 6TH AND 7TH FLOOR RESTROOMS AND REPLACE WITH NEW CEILINGS AND LIGHTING. THIS WORK IS DEFINED UNDER “BID ALTERNATE 1” FOR THE 5TH AND 6TH FLOORS AND “BASE SCOPE” FOR THE 7TH FLOOR IN THE BID DOCUMENTS.
DEMOLISH AND REPLACE PLUMBING FIXTURES, TOILET PARTITIONS, TILING AND FINISHES AT THE 5TH, 6TH AND 7TH FLOOR EAST RESTROOMS. PLUMBING FIXTURE AND FINISH WORK IS DEFINED UNDER “BID OPTION 1” IN THE BID DOCUMENTS.
A DUCTWORK ALLOWANCE IS PROVIDED UNDER SECTION “UNIT PRICES” TO ACCOMMODATE ADAPTING EXISTING EXHAUST DUCTWORK TO THE NEW CEILING LAYOUT.
NOTE: RENOVATIONS FOR THE 4TH FLOOR EAST RESTROOM IS NOT PART OF OPTION N5 (TO BE DONE WITH MAGISTRATE COURTS, SEE BASE SCOPE ABOVE. RENOVATIONS FOR THE 7TH FLOOR WEST RESTROOM IS NOT PART OF OPTION N5 (OPTION N6a BELOW).
PROJECT OVERVIEW - OPTIONS N6a,b,c
DEGETAU FEDERAL OFFICE BUILDING
OPTION N6a: INSTALL OF NEW 7TH FL MECH. EQUIP. AND ASSOC.WORK DUCTWORK MODIFICATIONS IN 7TH FLOOR TENANT AREAS TO ADAPT CAV DISTRIBUTION TO NEW HVAC EQUIPMENT. NEW CHW PIPING.
REQUIRES TEMP UNITS FOR AREAS TO REMAIN OCCUPIED ON 5TH AND 6TH FLOORS
RENOVATION OF 7TH FLOOR PUBLIC CORES AND CORRIDOR
CONSTRUCTION OF 8,000 SF OF SWING SPACE ON THE 2ND AND 3RD FLOORS –RECONFIGURE PARTITION LAYOUT (RENVOATED IN BDB)
CONSTRUCTION OF 1,200 SF SWING SPACE AT 6TH FLOOR
RELOCATION OF SWING TENANTS
DEMOLITION OF EXISTING, INSTALLATION OF NEW HVAC EQUIPMENT AT 7TH FLOOR MERS AND ROOF. INCLUDES AHUS, HRUS, RTU, PENTHOUSE A/C.
RENOVATION OF 7TH FLOOR WEST PUBLIC RESTROOM
INSTALLATION OF REHEAT COILS AND DUCT MODS AT 4TH, 5TH AND 6TH FLOOR LOCATIONS TO ADAPT NEW EQUIPMENT TO EXISTING DISTRIBUTION MISC. WORK INCLUDING REPLACEMENT OF FIRE PUMP AND CONTROLLER, ELECTRICAL DISTRIBUTION AND TRANS. REPLACE, COMPLETE BAS
OPTION N6b: NEW AIR RISERS 4-7 FLOORS
IN ADDITION TO ABOVE, INSTALL NEW RISERS AND COMPLETE 4W, 5 & 6 CORES
COMPLETE SCDW SYS., VENTILATION TIE-IN AT BASEMENT MERS, SOLAR HW SYS.
HVAC SYSTEM WILL BE RUN AS CAV SYSTEM AT UPPER HOUSE
OPTION N6c: COMPLETE 7TH FLOOR VAV CONVERSION AND RENOVATION
HVAC SYSTEM WILL BE RUN AS VAV SYSTEM AT 7TH FLOOR, CAV FOR REST OF UPPER HOUSE –INSTALL CAV BOXES
PROJECT OVERVIEW - PHASING - OPTIONS N6a,b,c
DEGETAU FEDERAL OFFICE BUILDING
PHASE 1 (210 DAYS FROM NTP)
“HEAD START” CONSTRUCTION IN CENTER AREA OF 7TH FLOOR – N6a & N6b MISC. DUCTWORK MODIFICATIONS FOR NEW HVAC, CHW PIPING, N6c INSTALL VAVs AND RENOVATE TENANT SPACES, 7TH AND 6TH FLOORS (525 DAYS FROM NTP) CLOSE EAST RESTROOMS, CONSTRUCT TEMP MERS AND INSTALL ADDITIONAL TEMP UNITS ON 5TH AND 6TH FLOORS – TOP OF HOUSE ON TEMP UNITS RENOVATION OF 7TH FLOOR PUBLIC CORES AND CORRIDOR, 7TH FL RISERS (OPT. N6b). COMPLETE 7TH FLOOR TENANT AREA RENOVATIONS (OPTION N6c)
CONSTRUCT SWING SPACE ON THE 2ND AND 3RD FLOORS
CONSTRUCT 6TH FLOOR SWING SPACE (FBI)
RELOCATION OF SWING TENANTS, CLOSE CAFETERIA (180 – 210 DAYS FROM NTP)
RENOVATION OF 7TH FLOOR WEST PUBLIC RESTROOM
INSTALL NEW RISERS ATH 5TH AND 6TH FLOORS, AND COMPLETE 5TH & 6TH FL CORES (OPT. N6b) COMPLETE SCDW SYS., VENTILATION TIE-IN AT BASEMENT MERS, SOLAR HW SYS. (N6b) MISC. HVAC WORK AT BASEMENT (ALL OPTs.)
PHASE 2
MOVE TENANT AND COMPLETE 6TH FL WEST TEMP MER (285 DAYS FROM NTP)
PHASE 3 (495 (N6a) OR 525 (N6b/c) DAYS FROM NTP) DEMOLITION OF EXISTING, INSTALLATION OF NEW HVAC EQUIPMENT AT 7TH FLOOR MERS AND ROOF. INCLUDES AHUS, HRUS, RTU, PENTHOUSE A/C.
4TH FLOOR WEST MISC. HVAC MODIFICATIONS, RISERS (OPT. N6b) PHASE 4 (570 (N6a) OR 715 (N6b/c DAYS FROM NTP)
RETURN TENANTS TO 7TH FLOOR, REOPEN
RETURN TEMP MER TENANTS FROM SWING SAPCE
LEED PROJECT REQUIREMENTS – GOAL OF LEED SILVER
SELECT PROJECT SYSTEMS (HVAC, CONTROLS, LIGHTING, ELECTRICAL) WILL BE COMMISSIONED UNDER 3RD PARTY COMMISSIONING AGENT (CONTRACTED BY GOVERNMENT). COMMISSIONING AGENT WILL WITNESS FUNCTIONAL TESTING PERFORMED BY CONTRACTOR. SUCCESSFUL COMMISSIONING IS A CONDITION OF ACCEPTANCE OF THE WORK. REFERENCE DIVISION 1, AND TECHNICAL COMMISSIONING SPECIFICATION SECTIONS FOR SPECIFIC REQUIREMENTS.
HIGH PERFORMANCE GREEN BUILDING MODERNIZATION FOLLOW-ON PROJECT
DEGETAU FEDERAL OFFICE BUILDING
FINAL PROJECT CLOSEOUT BY:
IF OPTIONS n6a,b,c ARE EXERCISED: 865 DAYS FROM NTP, OTHERWISE: 820 DAYS FROM NTP
SUBMITTALS FOR EQUIPMENT AND OTHER ITEMS NOT DEPENDENT ON TURN OVER OF A SPACE ARE TO BE SUBMITTED AT THE START OF THE PROJECT – NO LATER THAN 120 DAYS FROM NTP
READ THE DIVISION 1!!
PROJECT AND EXISTING CONDITIONS REQUIRE SOME SPECIFIC GENERAL REQUIREMENTS AND COORDINATION.
THESE ARE SUMMARIZED IN THE DIVISION 1 “SUMMARY” SECTION.
DETAILED ELSEWHERE IN THE DIVISION 1 AND TECHNICAL SPECIFICATION SECTIONS
SPECIAL REQUIREMENTS ARE HERE FOR A SUCCESSFUL PROJECT BASED ON LESSONS LEARNED.
THE DOCUMENTATION AND SUBMISSION PROCESS IS A CRITICAL PART OF THE EXECUTION PLAN.
GENERAL REQUIREMENTS
RELOCATION OF TENANTS AND MOVING OF FURNITURE:
CONTRACTOR IS RESPONSIBLE TO HIRE A QUALIFIED MOVER. SPECIFIC MOVING REQUIREMENTS ARE OUTLINED IN SECTION “SUMMARY”
SELECTED FURNITURE TO BE RELOCATED TO TENANT SWING SPACES.
REMAINING FURNITURE, INCLUDING ALL COURTROOM FURNITURE, TO BE TAKEN TO SECURED OFF-SITE CLIMATE CONTROLLED STORAGE. MUST SUBMIT FOR GOVERNMENT APPROVAL, AND GOVERNMENT SHALL INSPECT.
PHOTODOCUMENT ALL EXISTING CONDITIONS (FURNITURE, SPACES, ETC.)
WORK BY OTHERS/COORDINATION WITH OTHER PROJECTS AT THE SITE:
WORK OF THIS PROJECT MUST BE COORDINATED WITH OTHER IN PROCESS AND PLANNED WORK:
PROBATION/PRE-TRIAL CONSOLIDATION AT FOB 2ND FLOOR.
EXPANSION OF US MARSHALS SPACE AT FOB 2ND FLOOR WEST.
MAGISTRATE COURTS WAITING ROOM RENOVATION.
CONNECTION OF FBI CHILLED WATER SYSTEM TO MAIN BUILDING CHILLED WATER SYSTEM.
FOLLOW-ON RENOVATIONS AT THE USCH AND LINK.
OTHER PROJECTS – GSA TO ADVISE AND COORDINATE.
REFERENCE DIVISION 1 SPECIFICATIONS FOR ADDITIONAL DETAILS
EQUIPMENT REUSE – GOVERNMENT FURNISHED PROPERTY:
THIS PROJECT CONTINUES THE WORK OF AN EXISTING PROJECT. EQUIPMENT PURCHASED BY THE GOVERNMENT FROM THIS PROJECT IS AVAILABLE AS GOVERNMENT FURNISHED PROPERTY.
(2) SCHEDULES:
SCHEDULE A – GOVERNMENT FURNISHED PROPERTY THAT MUST BE REUSED. INCLUDES DOOR HARDWARE, VAV BOXES, LIGHTING CONTROL AND ELECTRICAL COMPONENTS.
SCHEDULE B – GOVERNMENT FURNISED PROPERTY THAT MAY BE REUSED AT THE GOVERNMENT’S OPTION. INCLUDES AIR-HANDLING UNITS, VFDs AND OTHER ITEMS. THE CONTRACTOR SHALL PROVIDE A DEDUCT ALTERNATE PRICE FOR INSTALLATION AND WARRANTY OF THESE GOVERNMENT PROVIDED ITEMS REVIEW. REFERENCE SECTION “ALTERNATES” AND “SUMMARY” FOR SPECIFIC REQUIREMENTS AND INVENTORY.
EXISTING PROJECT CONDITIONS:
CONTINUATION OF PREVIOUS PROJECT TO COMPLETE THE ORIGINAL BRIGING INTENT
WORK OF THIS PROJECT INTERFACES WITH THAT OF PREVIOUS, ESPECIALLY:
HVAC SYSTEMS – DOAS/HRUS FEEDING AHUS – (2) PARTIALLY COMPLETE SYSTEMS, EAST AND WEST BASEMENT, IN PLACE ARE RUNNING INTERIM, USING EXISTING BUILDING EXHAUST. DEPENDING ON OPTIONS/ALTERNATES SELECTED, VARIOUS MODIFICATIONS AND CONNECTION TO NEW EQUIPMENT WILL BE NEEDED.
NEW CENTRAL CHILLER PLANT HAS BEEN INSTALLED – CERTAIN PORTIONS OF THIS SYSTEM, SUCH AS SECONDARY CONDENSER WATER SYSTEM, WILL NEED TO BE COMPLETED AND COMMISSIONED.
CONTROLS SYSTEM – PARTIALLY INSTALLED – FINAL PROGRAMMING OF COMPLETE BUILDING SYSTEM NEEDED LIGHTING AND LIGHTING CONTROL SYSTEM – SOME LIGHTING CONTROL HUBS IN PLACE – NEW LIGHTING TO BE ADDED
ELECTRICAL DISTRIBUTION AND METERING
BAS BACKBONE
FINAL HVAC BALANCING
SOLAR PHOTOVOLTAIC SYSTEM – SUPERSTRUCTURE INSTALLED – MODULES AND BALANCE OF SYSTEM TO BE COMPLETED
SOLAR HOT WATER SYSTEM AND CISTERN PIPING
CONTRACTOR WILL BE RESPONSIBLE TO PROVIDE A COMPLETE OPERATIONAL BUILDING AT THE CONCLUSION OF THE PROJECT (TO EXTENT OF OPTIONS EXERCISED)
EXISTING CONDITIONS – UNIT PRICES AND RELOCATIONS:
EXISTING BUILDING WITH EXTENSIVE EXISTING ABOVE CEILING INFRASTRUCTURE
SELECTED RELOCATIONS CALLED OUT ON DRAWINGS TO ALLOW NEW DUCTWORK TO BE INSTALLED ADDITIONAL ALLOCATION FOR CONCEALED, OR UNFORESEEN UTILITY RELOCATIONS TO BE ACCOUNTED IN BASE BID IN FORM OF UNIT PRICE WITH SPECIFIC QUANTITY. SEE SECTION “UNIT PRICES”. THESE ARE NON-SPECIFIC IN LOCATION, FOR USE AS ABOVE CEILING CONFLICTS ARE ENCOUNTERED. INCLUDES ELECTRICAL, FIRE PROTECTION AND PLUMBING.
EXISTING CONDITIONS – PROJECT COORDINATION:
ABOVE CEILING COORDINATION IS CRITICAL.
DETAILED MEASUREMENT AND SURVEY TO COORDINATE DESIGN WITH FIELD CONDITIONS.
COORDINATION DRAWINGS SHALL REFLECT FIELD CONDITIONS AND PROPOSE RESOLUTION/ALTERNATE ROUTING WHERE REQUIRED. COSTS SHALL BE INCLUDED IN BID.
CONTRACTOR SHALL PROVIDE ADEQUATE RESOURCES AND ALLOWANCE IN SCHEDULE TO PERFORM THIS COORDINATION
RETAIN PROFESSIONAL STAFF TO PERFORM COORDINATION
EXISTING CONDITIONS – CEILINGS AND NOISE:
U.O.N. CEILINGS TO BE INSTALLED AT SAME HEIGHT AS EXISTING. SOFFITS OR LOWERING NOT PERMITTED.
AMBIENT NOISE LEVEL BASELINE TESTING SHALL BE PERFORMED IN COURTROOMS. AMBIENT NOISE LEVEL SHALL NOT BE INCREASED IN ANY COURTROOM.
DELEGATED DESIGN – COORDINATION AND SHOP DRAWING REQUIREMENTS
COORDINATION DRAWINGS MUST BE DONE USING BUILDING INFORMATION MODELING (BIM) 3D SOFTWARE. INTERDISCIPLINARY COORDINATION DRAWINGS TO BE PREPARED UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER. DETAILED INTERDISCPLINARY COORDINATION DRAWINGS GENERATED FROM BIM COORDINATION MODEL.
SEE DIVISION 1 SECTIONS “SUMMARY” AND “PROJECT MANAGEMENT AND COORDINATION”
HVAC SHOP DRAWINGS SHALL BE PERFORMED UNDER THE SUPERVISION OF A LICENSED PE. THE SAME PE SHALL VERIFY THE INSTALLATION CONFORMS TO THE SHOP DRAWINGS.
DELEGATED DESIGN – COORDINATION AND SHOP DRAWING REQUIREMENTS
CONTRACTOR SHALL PERFORM LASER SCANNING OF SPACES ONCE CEILINGS ARE REMOVED TO DOCUMENT EXISTING CONDITIONS. THE LASER SCANNING POINT CLOUD SHALL BE USED FOR ABOVE CEILING COORDINATION.
DELEGATED DESIGN – CONTROLS SYSTEM DESIGN
PROFESSIONAL ENGINEER WITH MINIMUM OF (5) YEARS OF EXPERIENCE DESIGNING CONTROLS SYSTEMS.
PREPARE COMPLETE CONTROLS SUBMITTAL PACKAGE.
DETAILED POINTS, SEQUENCES, WIRING DIAGRAMS, PROCESS AND INSTRUMENTATION DIAGRAMS.
COMPLETE OPERATIONS DDC SYSTEM FOR WHOLE BUILDING – MUST INTERFACE WITH SYSTEM INSTALLED IN PREVIOUS PROJECT.
WORK RESTRICTIONS – WORKING HOURS
GENERAL WORKING HOURS ARE DURING UNOCCUPIED HOURS – 6 PM TO 7 AM
SELECTED NON-DISRUPTIVE WORK MAY BE PERFORMED DURING OCCUPIED HOURS WITH GOVERNMENT APPROVAL.
SEE SECTION “WORK RESTRICTIONS” FOR ADDITIONAL REQUIREMENTS.
SPECIAL INSPECTIONS & TESTING REQUIREMENTS
CONTRACTOR SHALL HIRE SPECIAL INSPECTORS FOR INSPECTIONS AS REQUIRED BY IBC
QUALITY ASSURANCE REQUIREMENTS OF DIVISION 1
ADDITIONAL INSPECTION REQUIREMENTS, SUCH AS INSPECTION OF COMPLETED DUCTWORK, ARE PART OF TECHNICAL SPECIFICATIONS.
TEMPORARY FACILITIES AND CONDITIONING REQUIREMENTS
TEMPORARY SPACE CONDITIONING TO BE PROVIDED BY CONTRACTOR DURING CONSTRUCTION
PROTECTION OF MILLWORK
TEMPERATURE AND HUMIDITY CONTROL
SIGNIFIFICANT PORTIONS OF THE PROJECT AS WELL AS BUILDING AREAS OUTSIDE THE PROJECT UNDER CERTAIN OPTIONS WILL REQUIRE TEMPORARY AIR-CONDITIONING SO THAT THEY MAY REMAIN ACTIVE DURING THE CONSTUCTION WHEN HVAC SYSTEMS SERVING THESE SPACES ARE DEMOLISHED
STAFFING REQUIREMENTS
DELEGATED DESIGN – PROFESSIONAL SUPPORT
BIM SUPPORT AND LASER SCANNING
FULL-TIME PROJECT COORDINATOR
FULL-TIME MEP COORDINATOR
FULL-TIME QAQC MANAGER
COMMISSIONING COORDINATOR
ADDITIONAL REQUIREMENTS FOR STAFF AND KEY PERSONNEL OUTLINED IN DIVISION 1 SPECIFICATIONS image1.jpg image2.jpg image3.jpeg image4.png image5.png image6.emf image7.emf image8.emf image9.jpeg image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.png image18.png
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .