Pre-proposal_Conference_Minutes_GS01P17BWD0003.pdf
PDF 129 KB Posted
- Solicitation number
- GS-01-P-17-BW-D-0003
About this file
Pre-Proposal minutes and Sign-In Sheet
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Meeting Minutes Pre-Proposal Conference
Soliciation GS-01-P-17-BW-D-0003 Custodial and Operations Maintenance at at 15 locations in Maine; Calais International Avenue, Ferry
Point, Vanceboro, St. Pamphile, Van Buren, Madawaska, Fort Kent, Estcourt, Milltown, Houlton, Houlton Sector HQ, Orient, Fort Fairfield, Limestone, and Presque Isle.
A Pre-Proposal Conference was held on May 18, 2017 at 11:00AM via webex.
AGENDA
• Introductions
• Ground Rules
• Project Scope Overview and Contract Requirements
• Evaluation Criteria
• Conclusion
INTRODUCTIONS
Donna Maffeo Contracting Officer Sotheavy Khon Contract Specialist Ann Goodridge Supervisory Property Manager Carl Dodge Ronald Spearin
Property manager Property Manager
John McDonald Facilities Management Specialist
The sign-in sheet will be attached to these minutes for the complete attendee list.
GROUND RULES
• No statements, remarks or explanations made by a Government representative during this pre-proposal conference nor the minutes furnished to offerors can change the written provisions of the Request for Proposal (RFP) Solicitation Documents. The solicitation documents include an SF 1449 and Line Item Spreadsheet with Solicitation Number GS-01-P-17-BW-D-0003.
Always reference the solicitation number in all correspondence.
• Terms and conditions of the solicitation remain unchanged unless an amendment is issued which incorporates any possible changes discussed or alluded to during today's pre-proposal conference. All amendments will be posted on FedBizOpps (www.fedbizopps.gov). Make sure to check FedBizOpps before submitting an offer.
• All questions, whether technical or administrative, must be submitted in writing to Sotheavy Khon (sotheavy.khon@gsa.gov ) and Donna Maffeo (donna.maffeo@gsa.gov). All questions and answers will be published in FedBizOpps.
PROPOSAL PROCESS OVERVIEW
• The due date for receipt of proposals is June 8, 2017 at 2:00 PM Eastern Time. Faxed or electronically submitted proposals are NOT acceptable. Each Offeror assumes full responsibility for ensuring that its proposal is received on or before the specified date and time.
http://www.fedbizopps.gov/ mailto:sotheavy.khon@gsa.gov mailto:donna.maffeo@gsa.gov
• Proposals must be received by the date and time state in the solicitation, or amendment, at the
Thomas P. O'Neill Federal Building, 10 Causeway Street, Room 1100 , Boston, MA 02222 (Attn:
Sotheavy Khon).
• This procurement is a 100% set aside for Small Business. The NAICS Code is 561210
(Facilities Support Services). The Small Business Standard Size is $38.5 million.
• This solicitation requires offerors to submit two separate volumes with their proposal. Submit one (1) CD or USB Flash Drive of its proposal in PDF format. No paper copies are required.
o Volume I - Price and Business Proposal.
o Volume II - Technical Proposal.
• The final date for the submission of questions is May 26, 2017.
• Period of Performance and Options: The Period of Performance for this procurement will be a base 1 year period, with four, 1-year option periods. The anticipated award date is on or about 9/9/2017, with a planned start date of 11/1/2017.
SITE VISITS: Site Visits were already held on 05/08/17 through 05/11/17. Additional site visits may not be arranged at this time.
PROJECT SCOPE OVERVIEW AND PROSPECTIVE CONTRACT REQUIREMENTS
This is a performance-based, commercial item acquisition for combined operational and mechanical maintenance services. Performance based means the offeror proposes its plan to schedule workload to meet the contract requirements. The contractor is responsible for establishing its requirements to meet all contractual obligations. (See FAR Part 37.101 for a formal definition of Performance-Based contracts.)
SECTION C - STATEMENT OF WORK
• C.2. Definitions
• C.3. References
• C.4. General Requirements
• C.5. Janitorial Services
• C.5.0.2 Cleaning Hours
The performance of the cleaning at building(s) shall take place between the hours of 7:00 a.m.
and 5:00 p.m. The hours shall not be changed unless authorized by the CO or their designee.
Actual cleaning time may vary based on situational requirements.
• Section C.5.3.1 Standard Services - Interior Services
• Section C.5.3.2 Standard Services - Exterior Services.
• Section C.5.3.3 Snow and Ice Removal. (See also exhibit 21 Pricing Exhibit Snow Services)
The Contractor shall clear snow and ice before the normal building operating hours OR within one hour at sites operating 24/7, to prevent slip hazards.
Furthermore, the Contractor shall clear snow and ice during normal building operating hours and is authorized to divert work to accomplish the task. The Contractor shall notify the CO or their designee of the diversion within 1 hour. The CO or their designee retains the right to determine what type of services and the duration of diverted services for the removal of snow and ice. When diverting labor staff, the contractor is still required to provide a minimum level of janitorial services.
Maintenance services are not to be affected by diversion of workforce.
• Section C.5.3.4 Grounds Maintenance.
• Section C.5.4 Above Standard Services. Please note that above standard services are separately priced line items.
• Section C.5.6 Solid Waste/Trash/Recycling Management
• Section C.5.7 Environmental Reporting
• Section C.5.7.3 Integrated Pest Management
• Section C.5.10 Quality Control Plan
• Section C.6 — Building Operations and Maintenance Services
• Section C.6.0.2 Initial Deficiency List. The contractor shall submit an initial deficiency list report not later than 90 days after award of the Contract to the CO or designee.
• Section C.6.1 Transition Phase Startup. The Contractor shall provide 90 days of transition startup services prior to the Contract start date to assist transitioning between Contractors
• C.6.4 General and Administrative Requirements:
• C.6.4.1 Minimum Staffing
• C.6.4.5 Use of NCMMS — This section reads in part:
All personnel requiring access to GSA’s NCMMS will be required to obtain government access account ENT credential and will need to maintain an up to date system profile. At a minimum this will entail logging into the GSA system at least every 90 days to maintain an active profile, as well as completing annual GSA IT Security Training courses through GSA’s Online University (https://gsaolu.gsa.gov).
The Contractor shall utilize NCMMS to handle mobile work management practices to the greatest extent practicable. This includes using the NCMMS mobile application for: management and input of work orders, and documentation of time to complete work orders in real-time when possible.
The Contractor shall provide within the startup period, NCMMS transition services in order to assist transitioning between incumbent and incoming contractors. The purpose of this phase is to permit a transition that is seamless to the tenants and to assess incomplete maintenance work at the time of transfer. The contractor is to review the current schedule of maintenance and shall revalidate in line with accepted pro-posed maintenance schedule. The contractor shall be responsible for creating the preventive maintenance schedule in the NCMMS and entering data of past performance of maintenance for each piece of equipment where needed.
• C.6.5 BUILDING OPERATING PLAN
• C.6.7 MONTHLY PROGRESS REPORTS — Reports shall be submitted to the COR by the 5th calendar day of the subsequent month.
• C.6.8 PERFORMANCE REVIEW MEETINGS — The contractor shall meet with the CO or their designee and other Government representatives at the discretion of the CO or designee to review contract performance. Regular monthly performance meetings will be scheduled.
• C.6.13 BUILDING MANAGEMENT SUPPORT SERVICES (MISCELLANEOUS AND
UTILITY ESCORT SERVICES) — See also Miscellaneous Work Hours (Section C.6.36.4) which requires the contractor to provide 10 hours and up to $100 of parts and supplies per calendar month per building to accomplish discretionary work in the buildings covered by this contract. This is part of the base monthly price.
• C.6.17.2 EXTENDED OPERATING HOURS — All buildings regularly operate during hours outside of normal working hours.
• C.6.19 SERVICE REQUESTS — Please review all response times.
• C.6.31.2 MAINTENANCE STANDARD — As part of the Contractor’s established system for scheduling and performing scheduled preventive maintenance (See C.6.31.1, General), the Contractor shall propose to the CO or designee, preventive or predictive maintenance standards or guides for each piece of equipment where the manufacturer/designer recommends preventive maintenance. Minimally, the preventive or predictive maintenance standards or guides proposed by the Contractor shall be based on; manufacturer’s recommended maintenance or the most current Public Buildings Service Operations and Maintenance Standards 2012 (PM Guide) or guides proposed by Contractor. The preventive or predictive maintenance standards proposed by the Contractor may be based on a combination of equipment manufacturer’s recommendations, the PBS O&M Standards, (PM Guide), sensor technology, diagnostic software, Contractor’s experience and other sources.
NOTE: The above should be specified as part of the contractor's proposed PM plan submission per Section L. A copy of the 2012 Preventative Maintenance Guide is available on the GSA website.
www.gsa.gov/portal/mediaId/203443/fileName/GSA_PM_Guide_Final_07152013.action
• C.6.36 REPAIRS - This section defines reimbursable and non-reimbursable repairs as well as establishing the shared liability methodology for reimbursable repairs. The Non-Reimbursable Repair threshold for this contract is $750.00. Please review the Shared Liability/Reimbursable Repairs Section, C.6.36.5.
• C.36.6 APPROVAL OF WORK — Please review this section.
NOTE: Additional service Task Orders will not exceed $25,000 per order.
• C.7.1 QUALITY CONTROL PLAN — NOTE: A draft Quality Control Plan (QCP) is required to be submitted as part of the contractor's proposal in Section L. The complete QCP must be submitted for review and acceptance prior to Notice to Proceed.
• C.7.2 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN (QASP) — See also the QASP table Exhibit 1.
• C. 9 SUBMITTALS (CONTRACT DELIVERABLES) See tables.
SECTION H — SPECIAL CONTRACT REQUIREMENTS
• H.1.6 — QUALIFICATIONS OF PERSONNEL
• H.1.7 MISCELLANEOUS REQUIREMENTS
• H.2 SECURITY – Language will be updated via Amendment.
• H.2.1.3 - All workers are required to be vetted by CBP prior to appearing on site for work. All workers shall have “Real ID” compliant form of Identification to present upon entering the worksites. A Passport or Passport Card issued by the United States is an example of a “Real ID” compliant document. A State of Maine License is not a “Real ID” compliant document.
• H.4 ESCORT REQUIREMENTS
• H.7 SENSITIVE BUT UNCLASSIFIED (SBU) BUILDING INFORMATION - GSA
Contractors that do not have HSPD-12 compliant clearances cannot obtain Sensitive but Unclassified (SBU) information (Privacy Act data, building information, and financial information) through GSA's IT systems
• H.8 RECORDING PRESENCE - Each Contract employee shall sign in when reporting to the facility and sign out when leaving the facility and follow card access requirements as directed by the CO or designee. Contractor shall provide time clocks and cards to facilitate this action.
• H.16 PERSONNEL QUALIFICATIONS
• H.19.2 PRICE PROPOSAL FOR ADDITIONAL SERVICES WORK
• H.19.4 PARTS AND MATERIALS - Parts and materials shall be priced at estimated actual cost marked up by the standard coefficient in the price schedule if stated. NOTE: The standard coefficient is the Administrative Fee percentage markup in the pricing schedule.
SECTION I — CONTRACT CLAUSES:
• Most contract clauses are incorporated by references and can be reviewed by the following website: https://www.acquisition.gov/
• FAR 52.222-17 Nondisplacement of Qualified Workers - The Contractor and its subcontractors shall, except as otherwise provided herein, in good faith offer those service employees employed under the predecessor contract whose employment will be terminated as a result of award of this contract or the expiration of the contract under which the service employees were hired, a right of first refusal of employment under this contract in positions for which the service employees are qualified.
• FAR 52.222-62 Paid Sick Leave Under E.O. 13706 - Provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
SECTION J. EXHIBITS
• J.1. Quality Assurance Surveillance Plan (QASP). The QASP specifies the performance standards to be measured and corrective action.
• Exhibit 24 Pricing Exhibit Snow Services - The monthly price for snow shall not contain any contingencies. The Snow Pricing Exhibit will be calculated at the end of the sow season to provide a credit to contractor or credit to GSA for actual snow fall.
• Exhibit 25 Indoor Firing Range Cleaning - Cleaning will be ordered as an additional service on an annual basis. The approach to address this exhibit will be evaluated as part of the contractor’s proposal submission under Management Plan.
• Exhibit 26 DOL Wage Determination – WD No.2015-4007, Revision 2, dated 12/30/2016
SECTION K — REPRESENTATIONS & CERTIFICATIONS
Please complete this form and ensure your SAM registration data is current.
SECTION L — INSTRUCTIONS TO OFFERORS:
• FAR Clause 52.212-1 (Incorporated by reference) Please review this clause. The Government reserves the right to award without discussions, so provide the best possible initial proposal.
• PRICE PROPOSAL: The offeror shall complete and return an original, signed Standard Form (SF) 1449 (Solicitation/ Contract/Order for Commercial Items) AND Line item Pricing Excel Spreadsheet with its offer. Offerors shall price all contract line items in each Group that an Offeror is proposing on. Failure to price all line items within a Group may be grounds for determining an offeror to be non-responsive to the solicitation. Offerors are advised that they may provide a proposal for any or all Groups. Offerors must price all items within the Group.
Each group will be evaluated separately, allowing for the possibility of multiple award(s).
Pricing Spreadsheet - The offeror shall submit their total contract pricing using the Line Item Pricing excel spreadsheet. The offeror shall submit a separate spreadsheet for any alternate proposals. The spreadsheet shall be submitted along with the signed 1449 and pertinent documents required for Volume 1, Price and Business Proposal. Proposed unit prices shall be rounded to the nearest whole dollar, no cents.
• CONTRACTOR TEAM ARRANGEMENTS - If you are planning to propose as a Contractor Teaming Agreement, either as a Joint Venture or Partnership in accordance with FAR 9.601(1) please review this section carefully.
• If the Offeror is proposing a Contractor Team Arrangement in accordance with FAR 9.601(2) as a prime contractor with one or more significant subcontractors, please comply with this section of Section L.
• Current Certified Financial Statements Offerors shall submit a copy of the last certified financial statement prepared for the offerors firm along with a copy of any interim reports since the closing date of that statement.
• CPARS forms for Past Performance. Please make sure the evaluator fully describes the work performed and includes a narrative in block 20. A fillable version of this form was posted with the solicitation. Forms must be received by the proposal due date and must be submitted directly by the evaluator. Any forms received late will be disallowed.
NOTE: CPARS Past performance evaluation forms must be sent directly by the reference if PPIRS evaluations do not exist.
• The evaluation Criteria that will be considered are: Past Performance, Experience, Management
Plan, and Price. Please be sure to address every Technical Evaluation Factor and the elements within each factor.
SECTION M - EVALUATION OF OFFERORS: Award of the contract shall be based upon the best value to the government considering all stated criteria. This will be a multiple award contract with both fixed price and IDIQ line items. The following factors shall be used to evaluate offers:
Price Past Performance Experience Management Plan
• Section M references the Line Item Pricing Excel Sheet that will be part of the Price Evaluation.
Please note that there are Above Standard services which have estimated quantities for those services. Those will be used to calculate offeror's total evaluated price. The table is provided to help calculate total evaluated price.
Note: This procurement will be evaluated using simplified procedures as authorized per FAR 13.5.
• Options: Offerors are reminded of the evaluation of Options as per the notice in the solicitation.
The total evaluated price of the offer will be the combined total of the Base Contract year, plus Option years 1, 2, 3, 4 and the 6 Month Extension Period.
INCUMBENT INFORMATION:
NVT Technologies Inc.
222 Shilling Circle, Ste 275 Hunt Valley MD 21031
Contract GS01P12BWD0050- Calais International Avenue, Ferry Point, Vanceboro, St. Pamphile, Van Buren, Madawaska, Fort Kent, Escourt
Contract GS01P14BWD0009- Houlton, Hodgdon, Limestone, Orient, Fort Fairfield, and Presque Isle
Monthly Prices are based on 12 months per year.
Answers to written Questions submitted will be posted on FBO via an Amendment.
The final submission date for questions is May 26, 2017. Questions must be submitted via email to sotheavy.khon@gsa.gov and copy donna.maffeo@gsa.gov.
Proposals are due by 3:00 P.M. EST on June 8, 2017. It is the Contractor's responsibility to ensure all Past Performance responses are received by due date.
The projected award date is September 9, 2017 and the on-site start date is November 1, 2017.
mailto:sotheavy.khon@gsa.gov mailto:donna.maffeo@gsa.gov
May 18, 2017 11:00AM EST Attendees: (Please print legibly and sign or initial to the typed name)
Name Title Organization Phone Number Email Address
Donna Maffeo Contracting Officer GSA 617-565-6012 donna.maffeo@gsa.gov
Sotheavy Khon Contract Specialist GSA 617-565-8892 sotheavy.khon@gsa.gov
Ann Goodridge Supervisory Property Manager GSA 207-6228483 ann.goodridge@gsa.gov
Carl Dodge Property Manager GSA 207-532-7852 carl.dodge@gsa.gov
Ronald Spearin Property Manager GSA 207-694-0702 Ronald.spearin@gsa.gov
Ralph Dean Contractor CCI-Alliance 207-620-7172 rdean@cci-alliance.com
Kianna Goodwin Executive Assistant Human Potential Consultants, LLC 310-756-1560 hpconsultons.onmicorosoft.com
Garnet Newcombe CEO Human Potential Consultants, LLC 310-756-1560 hpconsultons.onmicorosoft.com
Andrew Pelletier Contractor C.S. Management, Inc./Pelletier Property Services, LLC. 207-498-8332 apelletiercsm@pwless.net
Steve Mitchell Contractor BryMak & Associates, Inc. 931-572-5742 steve.mitchell@brymak.com
Diane Voudouris USP-LLC Voudouris:dmv@usp-llc.net
John Lange Madison Services j.lange@madisonservices.com
Brian Leighton International Support Group bleighton@internationalsupportgroup.com
Kent Koger
SIGN-IN SHEET
PRE-PROPOSAL CONFERENCE
MAINE 15 Custodial and OPERATIONS & MAINTENANCE
GS-01-P-17-BW-D-0003
| GS01P17BWD0003, Sign-In Sheet.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .