Amendment- 0004.pdf
PDF 787 KB Posted
- Solicitation number
- GS-01P-12-BZ-C-0005
About this file
Revised Bid due and date and Clarification of question
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract - GS-01P-12-BZ-C-0005.pdf | ||
| Amendment 0006.pdf | ||
| Amendment-0005.pdf | ||
| Amendment- 0003.pdf | ||
| SF30 amend ll.pdf | ||
| Second Site vist With sign in sheet 01052012.docx | DOCX document | |
| Amendment 0001.pdf | ||
| Sign sheet 12212011.docx | DOCX document | |
| Second Pre-Bid site visit Notice 01032012.doc | DOC document | |
| Contract Agreement.pdf | ||
| Solicitation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070 STANDARD FORM 30. (Rev. 10-83) Previous Edition unusable Prescribed by GSA FAR (48 CFR) 53.243
Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code
2. AMENDMENT MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than item 6) CODE
(x) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
8. NAME AND ADDRESS OF CONTRACTOR (NO., Street, Country, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning ______ copies of amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OR OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Check One
A. THIS ORDER ID ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 16B. UNITED STATES OF AMERICA
(Signature of person authorized to sign)
15C. DATE SIGNED
(Signature of Contracting Officer)
16C. DATE SIGNED
Supplementary Page
PAGE 2 OF 2 GS-01P-12-BZ-C-0005/0004
Description of Modification/Amendment:
see attachment:
Amendment 0004 to Solicitation No. GS-01P-12-BZ-C-0005
Amendment 0004: The Solicitation, Montpelier Cooling Towers Replacement
Solicitation GS-01P-12-BZ-C-0005 is hereby amended as follows:
l.G Receipts of Bids: Bid due date is extended as follows:
Change From: 18 January 2012, Time 2:00 pm Local Time
Change To: 19 January 2012, Time: 2:00 pm Local Time
NOTE: Modifications to original bids and acknowledgement of Amendment 0004 will be authorized via email to carolyn.weekes@gsa.gov and must be received by the revised bid due date and time specified above. Bidders are cautioned to allow sufficient time for transmission of email.
The below question and answer provided for Clarification:
Question: 1
It appears you have 3 contradictions in the alternate 2in the bid schedule sheet on page 5. Which one do you want?
The schedule states-in the Solicitation 1442 section page 5. -0003 Alternate 2: Provide materials and labor to install the stainless steel duct work for the cooling tower system. Reference section 012300 in specification document:
NOTE: Provide only the additional cost for Alternate 2.in the specs it states the following on page 224
6. Corrosion Resistant Construction: Unless otherwise noted in this specification, all steel panels and structural members shall be constructed of heavy-gauge G-235 (Z700 metric) hot-dip galvanized steel with all edges given a protective coating of zinc-rich compound.
Alternate #2: Corrosion Resistant Construction (Unless otherwise noted in this specification), all steel panels and structural members shall be constructed of type 304 stainless steel and assembled with type 304 stainless steel nut and bolt fasteners.
In the specs it states the following on page 225 e. Cold Water Basin: The cold water basin shall be provided with large area lift out strainers with perforated openings sized smaller than the water distribution system nozzles and an anti-vortex device to prevent air entrainment. The strainer and anti-vortex device shall be constructed of the same material as the basin to prevent dissimilar metal corrosion Standard basin accessories shall include a brass make-up valve with large diameter polystyrene filled plastic float for easy adjustment of the operating water level.
1) (Alternate #2) Cold Water Basin: The cold water basin shall be constructed of heavy-gauge type 304 stainless steel panels and structural members up to the heat transfer section/basin joint. The basin shall be provided with large area lift out strainers with perforated openings sized smaller than the water distribution system nozzles and an anti-vortex device to prevent air entrainment. The strainer and anti-vortex device shall be constructed of the same material as the basin to prevent dissimilar metal corrosion. Standard basin accessories shall include a brass make-up valve with large diameter polystyrene filled plastic float for easy adjustment of the operating water
Answer 1. See specification section 012300 Para 3.1.B refers you to Division Section 230000 Para 2.09 which is applicable in its entirety. Therefore Alternate 2 applies to all items specified in this section
Acknowledgement of Amendments:
Bidders must acknowledge receipt of all amendments by one of the following methods in block 11 of SF
30 and per above.
| topmostSubform[0]: |
| Page1[0]: |
| AMENDMENT_OF_SOLICITATIONMODIFICATION_OF_CONTRACT[0]: |
| IDCode[0]: |
| pdfpage1[0]: 1 |
| Pages[0]: 2 |
| DocNo[0]: 0004 |
| EffDate[0]: JAN 17, 2012 |
| ReqNo[0]: 1PCS-12-0005 |
| ProjNo[0]: |
| IssuedByCode[0]: 1PSA |
| IssuedBy[0]: ACQUISITION BRANCH, SVC CENTERS DIV |
GSA/PBS
10 CAUSEWAY ST., RM 1100
BOSTON MA 02222-1077
| AdminByCode[0]: |
| AdminBy[0]: |
| ContractorCode[0]: |
| FacCode[0]: |
| SolChg[0]: Yes |
| AwdChg[0]: Off |
| SolNo[0]: GS-01P-12-BZ-C-0005 |
| SolDate[0]: DEC 15, 2011 |
| AwdNo[0]: |
| AwdDate[0]: |
| NoCopies[0]: 1 |
| Amended[0]: Yes |
| OffrExt[0]: Yes |
| OffrNoEx[0]: Off |
| ApprData[0]: See Schedule |
| ChgeOrd[0]: Off |
| ChgeOrder[0]: |
| Modify[0]: Off |
| B_THE_ABOVE_NUMBERED_CONTRACTORDER_IS_MODIFIED_TO_REFLECT_THE_ADMINISTRATIVE_CHANGES_such_as_changes_in_paying_office__appropriation_date__etc_SET_FORTH_IN_ITEM_14__PURSUANT_TO_THE_AUTHORITY_OF_FAR_43103b[0]: |
| SuppAgre[0]: Off |
| SuppAuth[0]: |
| ModOthr[0]: Off |
| OthrSpec[0]: |
| NoReq[0]: Off |
| Require[0]: Off |
| Copies[0]: |
| Descript[0]: See Supplementary Page. |
| SignName[0]: |
| SignTitl[0]: |
| ContDate[0]: |
| ContrOfficerInfo[0]: |
| CODate[0]: |
| ContratorInfo[0]: |
| ContractorPOC[0]: |
| Contractor[0]: |
| ModAmount[0]: |
| Header[0]: |
| _15B_CONTRACTOROFFEROR[0]: |
| Footer1[0]: |
| signature[0]: |
File details come from the government source that posted it. Updated .