This document is a set of construction plans for the repair of North Park Road at milepost 15.8 in Grand Teton National Park, Wyoming, prepared by the Western Federal Lands Highway Division of the U.S. Department of Transportation. The project (WY NP GRTE 13(1), NPS PMIS No. 264351) involves asphalt surface repair, deep patching, roadway excavation, geotextile stabilization, and installation of an underdrain system along a 0.07-mile section of road. The design specifications reference Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24. The project is located in Teton County, Wyoming, at an elevation of approximately 6,810 to 6,821 feet, with an existing average daily traffic (ADT) of 756 vehicles (2024) projected to increase to 1,123 vehicles by 2044. The design accommodates a 45-mile-per-hour maximum speed and includes a two-lane configuration with 11-foot traveled lanes and 2.5-foot shoulders.
The construction scope includes clearing and grubbing (0.1 acre), removal of an existing 24-inch pipe culvert, roadway excavation (1,252 cubic yards), select borrow placement (707 cubic yards), stabilization geotextile installation (2,667 square yards), roadway aggregate base course (553 tons), asphalt concrete pavement type 1 (253 tons), installation of a new 24-inch pipe culvert (80 linear feet), and a standard underdrain system (200 linear feet). The plans specify staging and storage areas at Mudflats Pullout and Jackson Lake Overlook, with material disposal at Spread Creek Pit. Soil erosion control measures include fiber rolls totaling 809 linear feet. The bid schedule encompasses standard pay items for mobilization, construction survey and staking, contractor quality control and testing, construction schedule, equipment rental (dump trucks, backhoe loaders, rollers, hydraulic excavators), general labor, sign and delineator removal/reset, pavement markings (1,560 linear feet each for white and yellow), and temporary and permanent traffic control including traffic signal systems, cones, drums, construction signs, flaggers, and traffic control supervision.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANAGER
K. GRAY
N
R
E N
OR
A I
N
N
ST F
R
I
D
D E P A
T
NT
OFT A SP
T T
O
U
TE
ATESO
AMER
IC
A
M
NATIONAL
PARK
SERVICE
Lake
Hebgen
Lake
Shoshone Lake
Yellowstone
Y e llo w s to n e
R iv e r
R iv e r
S n a k e
Lake
Jackson
NATIONAL
PARK
YELLOWSTONE
MEMORIAL PARKWAY
JOHN D. ROCKEFELLER, Jr.
PARK
NAT'L
TETON
GRAND
KEY MAP
NATIONAL PARKS
AND GRAND TETON
YELLOWSTONE
W Y
O M
IN
G
ID
A
H O
WYOMING
MONTANA
Faithful
Old
Thumb
West
Lake
Hot Springs
Mammoth
Canyon
Jackson
4 8024
Scale in miles
Moran
Mount Moran
Mount Reid
Mountain Signal
Grand Teton x x x x
N o r t h
P a r k
R o a d
By Letter 11/21/2025
GRAND TETON NATIONAL PARK
NATIONAL PARK SERVICE
U. S. DEPARTMENT OF THE INTERIOR
AT MILEPOST 15.8
REPAIR NORTH PARK ROAD
TYPE OF CONSTRUCTION:
stabilization, underdrain system.
roadway excavation, geotextile Asphalt surface repair, deep patch, DESIGN DESIGNATION:
e (max) V
ADT (2044)
ADT (2024)
Match existing
45 MPH
1,123
SPECIFICATION:
on Federal Highway Projects, FP-24 Construction of Roads and Bridges Standard Specifications for
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VANCOUVER, WASHINGTON
WESTERN FEDERAL LANDS HIGHWAY DIVISION
LENGTH 0.07 MILES
PLANS FOR PROPOSED PROJECT
PROJECT LOCATION
NPS PMIS NO. 264351
WY NP GRTE 13(1)
WYOMING
TETON COUNTY
Grand Teton National Park Park Superintendent, DATE
APPROVED:
Western Federal Lands Highway Division Chief of Engineering, DATE
Lake Jackson
Ocean Lake Two
See Sheet A.3
GRAND
TETON
NATIONAL
PARK
Lake Leigh
Lake Jerry
Matilda Lake Emma
Enos Lake
(disposing) Spread Creek Pit
Moran
(staging/storing) Mudflats Pullout
(staging/storing) Jackson Lake Overlook
:2
P
M
A u g u s t
T it le
S h e e t c p w
-w o rk \d
\g rt e
-1 p ln -g e n
.d g n
PROJECT
NUMBER
SHEET
A.1
NPS Drwg No. 136/198057 NPS PMIS No. 264351
WY NP GRTE 13(1)
LI total central angle Lie curve central angle diameter es spiral central angle abut. abutment ADT average daily traffic AH ahead appr. approach
BK back b.f. back face BM bench mark BP balance point
br. bridge brg. bearing btwn between cc or c. to c. center to center
il. centerline cir. clear CMP corrugated metal pipe col. column cone. concrete conn. connection constr. jt. construction joint cont. continuous cs point of curve to spiral ctrs. centers CUFT cubic foot (feet) culv. culvert CUYD cubic yard(s)
D diameter DHV design hourly volume dia. diameter diaph. diaphragm dist. distance drwg(s). drawing(s)
E east e superelevation rate e.f. each face El. 94.16 elevation in feet elev. elevation emb. embankment EOP edge of pavement EQ or eq. equation EW edge of water exc. excavation exp. jt. expansion joint f.f. front face fin. finish fig. flange ftg. footing
ga. gage (gauge) galv. galvanized
ID inside diameter IE invert elevation
jt. joint
KSI thousand pounds per square inch
L length of curve lat. latitude LNFT linear foot (feet) long. longitudinal LPSM lump sum Ls length of spiral It. or LT left LW low water
NOTE:
M.L.
M.P.
mat/.
max.
MGAL
min.
mon.
N
NC
o.c.
o. to o.
OD
OG
OHWM
PC
PCC
PCS
PI
pl.
POC
POS
POT
PS
PSF
PSI
PSC
PST
PT
pvmt.
R R.
R/W rdwy.
reinf.
reqd.
rt. or RT rte.
s
SADT
SC
sect.
shldr.
SLRY
spa.
SQFT
SQYD
SRS
ST
STA, Sta.
std.
stgr.
stiff.
struc.
STS
T T.
TBM
thd.
TS
Ts typ.
V vph
VPI
w main line mile post material maximum thousand gallon minimum monument north normal crown on center out to out outside diameter original ground ordinary high water mark point of curve point of compound curve point of curve to spiral point of intersection plate point on curve point on spiral point on tangent point of tangent to spiral pounds per square foot pounds per square inch point of spiral to curve point of spiral to tangent point of tangent pavement radius range right-of-way roadway reinforcement required right route south seasonal average daily traffic point of spiral to curve section shoulder slurry unit spacing, spaces or spaced square foot square yard point of spiral to reverse spiral point of spiral to spiral (no curve) point of spiral to tangent station standard stringer stiffener structural point of spiral to tangent spiral tangent distance township temporary bench mark thread point of tangent to spiral tangent distance (spiraled curve) typical design speed (velocity) vehicles per hour vertical point of intersection west
1. Other symbols used in the plans will be shown in a legend on the appropriate plan sheet.
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
¼ Section Line
¼ Section Corner (Found, Projected) ½6 Section Line ½6 Section Corner (Found, Projected)
Property Line
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Paved, Gravel)
Railroad
Trail
Fiber Roll
Silt Fence
Sandbag
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir; Marshland
�1
-a-
½s
SEC.
--P/L
�El
½s
SEC.
P/L
//// ///NP//// //// //// /NP/ //// ////
///NWR/ //NWR// /NWR/// NWR ///
IV IV IV IV IV IV IV IV fV fV fV c--cc:cCC:CCJ:::::�
� O O o �
---------- 0 0 O _,.� ------l ) Spring or Seep
Treeline; Individual Trees (1/v- {[j
� 0 � 0 Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Above Ground Tank; Underground Tank
Boulder; Well; Antenna; Grave
Cooking Grate; Garbage Can; Picnic Table
Flagpole; Fire Hydrant
Gas & Water Meter; Gas & Water Valve
Control Point (Terrestrial and GPS)
G
CP
! n [Q] =
-a:
G WV
.'i'_ .'r.
GPS
NPS PMIS No 264351 NPS Drwa No 136/198057
North Arrow - Slope Stake Limits
Construction Limits
Bottom of Ditch
Fence
Gate with Fence
Cattleguard
Guardrail
Top of Cut Toe of Fill
ZEXISTING
- no symbol -lf-- -X- -X---J< lf-------1: =-= Jf-------l(
PROJECT
WY NP GRTE 13(1)
SHEET
NUMBER
A.2
PROPOSED
JUE IIIE IIIE MIC
Concrete Barrier and Guard Wall
Retaining Wall wall face �v�---.-.v-....,v.----.....,v-.--�v,.;,..:....= :..=..::..,--, --,--,.----�,-
Signs (single, double post; portable)
Delineators
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Pipe Culvert with Drop Inlet
Box Culvert
Underdrain
O'""'O
[>----------"v--
�---------"v--
-IUD I---
-----"v--
-►�----"v--
:1------"v--
@)1------"v--
-----..UD..._ __
Overhead/ Above Ground Utilities
- - P - - - P - -- P --- P --
Underground Utilities
- ---1 w 1- - ---1 w 1- ---1 w w 1-- FM = force main, FO = fiber optic, G = gas, IRR = irrigation, 0 = oil, P = power, SA = sanitary sewer, SD = storm drain, 55 = storm sewer, STEAM = steam, T = telephone, TV = CA TV, W = water
Poles (Power, Telephone, Joint Use, ---[:=J--- Light, Support w/Anchor) �
---0--- --ITD--
----{)---1
TP
Miscellaneous Utility Features � ■
EM = electric meter, TP = telephone pedestal, TV = CA TV pedestal, UP = transformer or junction box, WF = water fountain
Building
Right-of-Way Line
Permanent Easement
Construction Easement
Riprap
NO SCALE
L-
- - - r/w -
- - - P/E -
- no symbol -
Section A-A
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
OFFICE OF FEDERAL LANDS HIGHWAY
PLAN SYMBOLS AND
ABBREVIATIONS
-----RIW--
--PIE-----
--TCE-----
A A l J
WFLHD DETAIL
WlOl-1
SPECIFICATION
APPROVED FOR USE
6/2022
600 12000300600
Scale in feet to Moran, W Y
± 15 m iles
N
END PROJECT
"MAIN 01" 31+60.00
"MAIN 01" 35+50.00
(staging/storing)
Jackson Lake Overlook
(staging/storing)
Mudflats Pullout
M o o s e F a lls m ile s to
N o rth
P a rk
R o a d
© 2025 Microsoft Corporation Earthstar Geographics SIO
BEGIN PROJECT
GRAND
Jackson Lake
TETON
NATIONAL
PARK
:0
O c to b e r
V ic in it y M a p p w w o r k \d
\g r te p ln g e n .d g n
VICINITY MAP
PROJECT
A.3
NPS PMIS No. 264351 NPS Drwg No. 136/198057
Sheet and Description
D E F G H I
PLAN-
PROFILE
SOIL
EROSION
CONTROL
DRAINAGE DEEP
PATCH
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
BID
SCHEDULE
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 809 31 840
A0140 20101-0000 CLEARING AND GRUBBING ACRE 0.1 0.1 0.2
A0160 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0180 20401-0000 ROADWAY EXCAVATION CUYD 1252 128 1380
A0200 20410-0000 SELECT BORROW CUYD 707 93 800
A0220 20702-0000 STABILIZATION GEOTEXTILE SQYD 2667 133 2800
A0240 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 553 27 580
A0260 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 253 7 260
A0280 60201-0800 24-INCH PIPE CULVERT LNFT 80 5 85
A0300 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 200 10 210
A0320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0340 62201-0350 BACKHOE LOADER HOUR 40
A0360 62201-2050 ROLLER HOUR 40
A0380 62201-3100 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT HOUR 40
A0400 62301-0000 GENERAL LABOR HOUR 80
A0420 63316-1000 REMOVE AND RESET SIGN SYSTEM EACH 2 2
A0440 63316-2000 REMOVE AND RESET DELINEATOR EACH 2 2
A0460 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID,(WHITE) LNFT 1560 40 1600
A0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID,(YELLOW) LNFT 1560 40 1600
A0500 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM LPSM ALL
A0520 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 39 11 50
A0540 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 39 11 50
A0560 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 810 40 850
A0580 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 86 4 90
A0600 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 640 60 700
A0620 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 56 4 60
PAY ITEM
NUMBER
LINE
ITEM
NO.
c:
\p w -w or k\ d0 gr te
-1 _m w -s um m ar y-qu an tit ie s.
xl sm ]S he et
-D ec -2
:4
PM
A M E N D
SUMMARY OF QUANTITIES
QA Review
Remarks and/or Determination of Estimated
Quantity
Estimated Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B.1WY NP GRTE 13(1)
LC
8-inch compacted depth
Roadway aggregate, method 2 compacted depth, placed in two equal lifts
Asphalt concrete pavement, type 1, 4-inch
"MAIN 01"
31+60 to 35+50
2% crown 2% crown
Traveled lane
11' for Deep Patch Details
See G Sheets
C o n s tr u c ti o n l im it s
1:21:
V a r ie s
:2 t o
:4
S lo p e s ta k e l im it s
V a r ie s
:2 t o
:1
S lo p e s ta k e l im it s
C o n s tr u c ti o n l im it s
3' to 5'
Varies
Traveled lane
11'
2'-40'
Varies 2.5' 2.5'
2' to 5'
Varies
1' to 5'
Varies
Shoulder
Profile grade
Shoulder
Existing ground
Existing roadway Proposed pavement structure
Tack coat face
Vertical saw cut
CONNECTION DETAIL
:3
D e c e m b e r
P a v e m e n t R e c o n s tr u c ti o n
T y p ic a l
S e c ti o n p w w o r k \d
\g r te p ln ty p .d g n
TYPICAL SECTION
PAVEMENT RECONSTRUCTION
PROJECT
C.1
NPS PMIS No. 264351 NPS Drwg No. 136/198057
CSF=0.999640329979
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ORTHOMETRIC
ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
25201 1599830.114 2470926.713 6810.400 43° 59 18.298230 N 110° 40 03.068988 W 6782.0743 0.999640472 5/8" ir w/fhwa alum cap 1.
25202 1600242.768 2470705.051 6812.909 43° 59 22.357904 N 110° 40 06.140965 W 6784.5954 0.99964043 5/8" ir w/fhwa alum cap
25203 1600511.536 2470604.405 6819.408 43° 59 25.005077 N 110° 40 07.543730 W 6791.1017 0.999640154 5/8" ir w/fhwa alum cap
25204 1600742.544 2470364.153 6821.514 43° 59 27.269559 N 110° 40 10.852518 W 6793.2156 0.999640138 5/8" ir w/fhwa alum cap
SLIDE1 1599139.085 2471200.340 6809.111 43° 59 11.493058 N 110° 39 59.259449 W 6780.7643 0.999640439 5/8" ir w/fhwa alum cap
SLIDE2 1599364.153 2471100.211 6810.575 43° 59 13.708736 N 110° 40 00.650761 W 6782.2355 0.999640403 5/8" ir w/fhwa alum cap
COORDINATE SYSTEM : Wyoming West SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
EPOCH DATE : 2010.000
CADD SYSTEM COORDINATE SYSTEM : WY83/2011-WIF NSRS11(NAD83/2011) Wyoming, West Zone, International Foot
PROJECT : Repair North Park Road at Milepost 15.8 DATE OF FIELD WORK : August/September 2025
DATE OF FINAL ADJUSTMENT : 9/4/2025
PROJECT UNITS : International foot
-O ct -2
:5
PM
C
U se rs \a da m
.d av ie s\
D oc um en ts \P ro je ct s_
\T et on s\
N
PR
_m p1
5.
sl id e\ fie ld d at a
8-
\I nf in ity \N
PR
m p1 5.
sl id e tr av er se
\E xp or te d D at a\
[W Y
N P
G R
TE
3(
1) _m p1 5.
sl id e co nt ro l-sh ee t.
xl sx ]S he et
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
PROJECT
D.1WY NP GRTE 13(1)
SHEET
SURVEY CONTROL
:0
A
D e c e m b e r
T a b u la ti o n o f P la n Q u a n ti ti p w w o r k
\d
\g r te p ln p r o f il e .d g n
PLAN QUANTITIES
TABULATION OF
PROJECT
D.2
N23°57'47"W
.0
P
O B
.0
P
O E
C P
C P
NORTH PARK ROAD
"MAIN 01" 31+60
"MAIN 01" 35+50
E= 2470878.2728
N= 1599896.8963 E= 2470719.8751
N= 1600253.2815
See F Sheets for details Standard underdrain system
33+10 to 35+10 RT
Phone: (719) 464-4222 kkennedy@diamondcomm.com
Karl Kennedy
Optic - Communication)
Diamond Communication (Fiber
UTILITY OWNER CONTACT:
BEGIN CONSTRUCTION
END CONSTRUCTION
Construction limit
Construction limits
Slope stake limit
Slope stake limits
"MAIN 01" Line to be constructed
Edges of pavement
Profile grade
Existing ground
See F Sheets for details
24-inch pipe culvert
33+90 reset sign system
Remove and reset sign system
Remove and reset delineator
Remove and reset delineator
Remove and
Remove existing culvert fiber optic
Locate and protect
Existing 24-inch culvert
Edges of shoulder outlet
Underdrain
33+60
Underdrain outlet
34+60
N
31+0031+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50
6,792 6,792
6,796 6,796
6,800 6,800
6,804 6,804
6,808 6,808
6,812 6,812
6,816 6,816
6,820 6,820
6,824 6,824
6,828 6,828
6,832 6,832
+0.09%
+1.29%
.0
.7
HLSD = INF'
K = 167
200' VC
,8
.6
,8
.9
,8
.0
,8
.6
:0
J a n u a r y
M
A
IN
p w w o r k w f l\ d
\g r te p ln p r o f il e .d g n
31+60.00 to 35+50.00
"MAIN 01"
PROJECT
D.3
N23°57'47"W
.0
P
O B
.0
P
E
C P
C P
N
BEGIN PROJECT
31+60.00
BEGIN RECONSTRUCTION
Fiber rolls, typ.
Fiber rolls, typ.
Slope stake limits
Proposed edges of pavement
END PROJECT
35+50.00
END RECONSTRUCTION
pine in place
Protect white bark
Existing tree line
:3 a n u a r y
S o il
E ro s io n C o n tr o l P la n p w w o r k w f l\ d
\g r te p ln e c .d g n
SOIL EROSION CONTROL PLAN
PROJECT
E.1
WY NP GRTE 13(1) E.2
10.4 x 16 20301 -1900
60201 -0800
60501 -0000
Station
ES
TI
M A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
-I
N C H
P
IP
E C U
LV
ER
T
S
TA
N D
A R D
U N
D
ER
D R
IN
S
YS
TE
M
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH LNFT LNFT Lt Rt 33+90 3 11 1 80 45 x/C&P 33+10 to 35+10 200
PROJECT TOTAL 11 1 80 200
Allowable Pipe Material
NOTE: A Aluminum
1. Steel pipe culvert minimum wall thickness is the thickness 4. Plastic pipe is not allowed when final installation is exposed. Furnish metal end sections for AS Aluminized steel required by the Std. 602-1 fill height table. all plastic pipe including those specified with bevels. See Std. 602-5 for acceptable cell class. C Concrete
2. Aluminized steel pipe culvert minimum wall thickness is the 5. See Std. 602-7 for acceptable concrete cell class. GS Galvanized steel thickness required by the Std. 602-1 fill height table (steel). 6. Structural excavation quantity based on material excavated inside the vertical planes located P Plastic
3. Aluminum pipe culvert minimum wall thickness is the 18 inches outside and parallel to the limits of footings or foundations. (blank) Any appropriate material thickness required by the Std. 602-1 fill height table. x/__ Any appropriate material except __
PAY ITEM NUMBER
-D ec -2
:3
AM
c:
\p w
-w or k\ d0 gr te
-1
_D ra in ag e2 4.
xl sx
]S he et
TABULATION OF DRAINAGE QUANTITIES
PROJECT
F.1WY NP GRTE 13(1)
SHEET
NUMBERNote: The quantities shown hereon are approximate and are subject to field adjustments.
NO SCALE
Bottom of roadway excavation6" collector pipe
6" outlet pipe
Geotextile filter, class 1, non-woven
Underdrain backfill
Stabilization geotextile
Underdrain trench
2%
P r o f il e g r a d e
R o a d w a y e x c a v a ti o n l im it
C o ll e c to r p ip e
R o a d w a y e x c a v a ti o n l im it
D it c h li n e or Outlet pipe
COLLECTOR AND OUTLET PLAN
FOR DEEP PATCH AND BACKFILL
COLLECTOR AND OUTLET PIPE DETAIL
UNDERDRAIN TRENCH DETAIL
PLAN VIEW
EXCAVATION AREA
2%
12"
18"
:0
D e c e m b e r
D e e p
P a tc h D r a in a g e D e ta il p w w o r k \d
\g r te p ln d p .d g n
DEEP PATCH DRAINAGE DETAILS
PROJECT
F.2
WY NP GRTE 13(1) F.3
WY NP GRTE 13(1) F.4
FOOTNOTE:
[1]
[1]
Includes 3' overlap.
:3
O c to b e r
T a b u la ti o n o f D e e p P a tc h Q u a n ti ti p w w o r k \d
\g r te p ln d p .d g n
PATCH QUANTITIES
TABULATION OF DEEP
PROJECT
G.1
LC
NO SCALE
DEEP PATCH
"MAIN 01"
33+10 to 35+10
DEEP PATCH TRANSITION
"MAIN 01"
4-inch depth, placed in two lifts
Asphalt concrete pavement, type 1, Roadway aggregate, method 2, 8-inch depth
20'
35+10 to 35+30
32+90 to 33+10
Select borrow
Stabilization geotextile topsoil
Place conserved geotextile at face
Edge of stabilization
Existing ground and outlet pipe detail
See Sheet G.3 for collector layer a minimum of 3' at centerline.
at 12" vertical spacing. Overlap each
Place 4 layers of stabilization geotextile
See Sheet G.3 for underdrain trench detail
Select borrow pavement reconstruction
See C Sheets for
15' roll width
27' full width geotextile coverage e x c a v a ti o n r o a d w a y
1:5
:1 a n u a r y
D e e p
P a tc h D e ta p w w o r k w f l\ d
\g r te p ln d p .d g n
DEEP PATCH DETAILS
PROJECT
G.2
PLACEMENT AT PIPE
STABILIZATION GEOTEXTILE
NO SCALE
LC
4' pipe dia.
and stabilization geotextile
3" soil cover between pipe
Stabilization geotextile
Pipe, 24" the springline over the top of the culvert
Redirect geotextile layers at or above select borrow cover between stabilization geotextile
Space equal distance apart, 3"
33+90
:0
D e c e m b e r
S ta b il iz a ti o n
G e o te x ti le
P la c e m e n t a t
P ip e D e ta p w w o r k \d
\g r te p ln d p .d g n
PLACEMENT AT PIPE DETAIL
STABILIZATION GEOTEXTILE
PROJECT
G.3
:5 c to b e r
T a b u la ti o n o f T e m p o ra ry
T ra ff ic
C o n tr o l
Q u a n ti ti p w w o r k \d
\g r te p ln tt c .d g n
TRAFFIC CONTROL QUANTITIES
TABULATION OF TEMPORARY
PROJECT
H.1
WY NP GRTE 13(1) H.2
WY NP GRTE 13(1) H.3
WY NP GRTE 13(1) H.4
WY NP GRTE 13(1) H.5
WY NP GRTE 13(1) H.6
WY NP GRTE 13(1) H.7
WY NP GRTE 13(1) H.8
:4
O c to b e r
T a b u la ti o n o f P e r m a n e n t
T r a f f ic
C o n tr o l
Q u a n ti ti p w w o r k \d
\g r te p ln p tc
.d g n
TRAFFIC CONTROL QUANTITIES
TABULATION OF PERMANENT
PROJECT
I.1
WY NP GRTE 13(1) I.2
| F.1 - grte13-1_Drainage24.pdf |
| Sheet |
| QA 12.10 - grte13-1_mw-summary-quantities.pdf |
| Sheet |
| 100% grte13-1_Drainage24.pdf |
| Sheet |
| 2026-01-14T17:58:46-0800 | |
| BRENT LEE COE |
File details come from the government source that posted it. Updated .