Greenburgh PD HVAC - Bid Addendum 1.pdf

PDF 247 KB Posted

Attached to
Greenburgh Police Department HVAC Improvements - Single Prime Bid - 2026
Solicitation number
2138066
Issued by
Westchester County, New York

About this file

This is Addendum No. 1 to the bid documents for the Town of Greenburgh Police Department HVAC Improvements project, issued by BBS Architects on September 2, 2026. The addendum modifies the original contract requirements and provides clarifications on the scope of work, which is limited to rooftop HVAC unit replacement at the Greenburgh Police Department located at 188 Tarrytown Road, White Plains, New York. Key modifications include deletion of the standby generator from the scope of work, clarification that the project involves replacement of RTU-6 with a new packaged gas-fired heating and direct expansion cooling unit, and specification of a Kee Guard non-penetrating safety railing system measuring 42 inches high with toe boards in standard galvanized finish, totaling 18 feet in length, supplied by Simplified Safety. The addendum confirms that bidders have 70 days to complete the project from contract award and that crane operations may be performed during normal working hours. The existing electrical panel serving the RTU operates at 120/208V with 400A capacity.

The addendum addresses twelve bidder requests for information regarding existing building systems and equipment specifications. Critical clarifications include confirmation that no existing Building Management System (BMS) is present, with the mechanical contractor responsible for all commissioning activities using the approved equipment manufacturer's checklist rather than employing an independent commissioning agent. The Town is unable to locate certain documentation, including roofing system manufacturer information and warranty details, and is still researching fire alarm vendor contact information. The addendum establishes that factory controls and a thermo-humidistat will be provided by the approved rooftop unit manufacturer, with the mechanical contractor responsible for installation, wiring, startup, and commissioning of the new equipment.

View the file

Other files

File Type Posted
GPD HVAC - Project Manual.pdf PDF
GPD HVAC - Bid Plans.pdf PDF
GPD-HVAC Notice to Bidders.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FREDERICK W. SEEBA, PE, MANAGING PARTNER

LAWRENCE SALVESEN, AIA, PARTNER

KEVIN J. WALSH, AIA, PARTNER

KENNETH G. SCHUPNER, AIA, PARTNER

JOSEPH B. RETTIG, AIA, PARTNER

GARY W. SCHIEDE, AIA, PARTNER

ROGER P. SMITH, AIA, FOUNDING PRINCIPAL

ARCHITECTS

LANDSCAPE ARCHITECTS

ENGINEERS

BBS

244 EAST MAIN STREET | PATCHOGUE | NEW YORK 11772 | T. 631.475.0349 | F. 631.475.0361 187 WOLF ROAD, SUITE 205 | ALBANY | NEW YORK 12205 | T. 518.621.7650 | F. 518.621.7655 www.BBSARCHITECTURE.COM

September 2, 2026

ADDENDUM NO. 1

Re: Town of Greenburgh Greenburgh Police Department HVAC Improvements Single Prime Bid BBS File No. 26-129

This addendum contains changes to the requirements of the contract drawings and/or project manual. Such changes shall be incorporated into the contract documents and shall apply to the work with the same meaning and force as if they had been included in the original documents.

Wherever this addendum modifies a portion of a paragraph of project manual or any portion of the drawing, the remainder of the paragraph or drawing affected shall remain in force.

The conditions of the basic project manual shall govern all work described in this addendum.

Wherever the conditions of work and the quality or quantity of materials or workmanship are not fully described in this addendum, the conditions of work, etc. included in the basic project manual for similar items of work shall apply to the work described in this addendum.

The "Conditions of the Contract" apply to all work described in this addendum.

The following changes shall be and are hereby made:

SPECIFICATION MODIFICATIONS

1. Section H – Special Conditions, Page H-1, Paragraph 201 – Scope of Work, Delete reference to the standby generator. The scope of work is the roof top

HVAC Unit replacement.

B B S | A R C H I T E C T S | L A N D S C A P E A R C H I T E C T S | E N G I N E E R S

Addendum No. 1

BIDDER REQUST FOR INFORMATION (RFI)

1. Please identify the existing roof-system manufacturer, membrane type and assembly, warranty holder, warranty number and remaining warranty term. Please also provide Division 07 specifications.

Answer – The Town is searching their records for this information. The information may not be available.

2. Specification Section 230513 requires integration of the new equipment with the existing temperature control system. Please identify the existing BMS/temperature controls manufacturer and current servicing vendor. If BMS integration is not required, confirm that the RTU may operate soley through it’s factory controller and programmable thermostat.

Answer – There is no existing BMS system. Controls are factory controls and a thermo-humidistat that is called out on the plans to be provided by the approved roof top unit manufacturer. MC to install and wire it and MC to do start up and Commissioning on the new unit with approved manufacturer.

3. Specification Section 230800 requires an Independent Commissioning Agent who is not affiliated with the contractor. It also requires mechanical, controls and TAB contractors to include commissioning related costs and participate in testing. Th e Contract Documents do not clearly identify which party retains and pays the Independent Commissioning Agent. Please clarify.

Answer – For this contract there is no Independent Commissioning Agent. The MC shall be responsible for performing all commissioning of all new equipment that the MC furnishes and installs with the approved equipment manufacturer and in the closeout documentation, shall provide a complete commissioning checklist of the new equipment. The checklist must be provided by the approved equipment manufacturer.

4. Please provide the required Kee-Rail system model, dimensioned guardrail layout and total length, height, rail configuration, base and counterweight arrangement, finish, roof-protection requirements, applicable design loads/code criteria, and required engineered calculations or shop drawings. Confirm whether toe boards or access gates are required and whether installation must be coordinated with the existing roofing manufacturer to preserve warranty.

Answer – Provide and install Kee Guard non-penetrating safety railing system, 42” high with toe boards, standard galvanized finish as supplied by Simplified Safety, (866) 335-3178, www.simplifiedsafety.com. A total length of 18 feet is required. Manufacturer shall provide drawing and counterbalance arrangements.

5. Please confirm we have 70-days to complete the project form contract award.

Answer – Confirmed.

6. Please confirm crane operation can be performed during normal working hours.

Answer – Confirmed.

7. Is there an existing BMS in the Building. Please provide contact info.

Answer – There is no existing BMS system. Controls are factory controls and a thermo-humidistat that is called out on the plans to be provided by the approved roof top unit manufacturer. MC to install and wire it and MC to do start up and Commissioning on the new unit with approved manufacturer.

8. Please provide contact info for the Fire Alarm Vendor.

Answer – The Town is looking into this.

9. Please provide contact info for the Roofer that holds the warranty on the Roof.

Answer – The Town is searching their records for this information. The information may not be available.

10. During the initial walkthrough we were not able to locate where the existing panel was serving the RTU being replaced. Can a clear photo of the existing panel/breaker be provided and the location of this panel marked on the overall key plan.

Answer – Refer to below photographs and plan. Panel is 120/208V, 400A.

11. Drawing M2.01 Key Plan Note #6, sates MC to have GC furnish and install new Kee-Rail Ballasted Roof Edge Guard Rail System. Please provide a specification on required Guardrail System and provide a detail on how to attach Guardrail System to existing Roof Structure

Answer – Provide and install Kee Guard non-penetrating safety railing system, 42” high with toe boards, standard galvanized finish as supplied by Simplified Safety, (866) 335-3178, www.simplifiedsafety.com. A total length of 18 feet is required. Manufacturer shall provide drawing and counterbalance arrangements.

12. I was reading through the scope of work and would like some clarification on the attached page. On Page 177 of the bid document it mentioned a 500KW generator and we would like to know if this would be in addition to the HVAC units?

Answer - Delete reference to the standby generator. The scope of work is the roof top HVAC Unit replacement.

END OF ADDENDUM No. 1