GREAT BARRINGTON-612183-134691-A-1.pdf
PDF 634 KB Posted
- Attached to
- 612183 GREAT BARRINGTON FAP No. HIP(NGB)-003S(961)X Bridge Replacement, G-11-002, Division Street
- Solicitation number
- BD-27-1030-0H100-0H002-130317
- Issued by
- Berkshire County, Massachusetts
About this file
This is a proposal request document for the Massachusetts Department of Transportation regarding bridge replacement services in Great Barrington, Massachusetts. The project involves the replacement of the Division Street bridge over the Housatonic River (Project 612183, Federal Aid Project No. HIP(NGB)-003S(961)X). Electronic proposals must be submitted through www.bidx.com by July 7, 2026 at 2:00 p.m. Bidders are required to be pre-qualified by MassDOT in the BRIDGE-CONSTRUCTION category prior to submission and must obtain and complete a Request Proposal Form (R109) at least 14 days before the bid opening. All bidders must hold a valid MassDOT vendor code and Digital ID from bidx.com. The estimated project value is $8,626,000, and a proposal guaranty of 5% of the bid value is required.
The project is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development and the U.S. Department of Labor. Price adjustments are available for hot mix asphalt, Portland cement mixtures, diesel fuel, gasoline, and structural and reinforcing steel, with base prices and adjustment rates posted on MassDOT's website. The contract is governed by Massachusetts General Laws Chapter 30 and 39M and is subject to Title VI of the Civil Rights Act of 1964, Federal Equal Employment Opportunity specifications, and Architectural Access Board regulations. As a federally-aided project, it is subject to Federal Highway Administration non-discrimination requirements. Proposal documents are available exclusively on www.bidx.com for official bidders, while informational documents may be requested from MassDOTBidDocuments@dot.state.ma.us. COMMBUYS is not used for bidding on this project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 612183 - Notice to Contractors.pdf | ||
| A00872-612183.pdf | ||
| A00871-612183.pdf | ||
| A00832-612183.pdf | ||
| A00830-612183.pdf | ||
| A00820-612183.pdf | ||
| A00803-612183.pdf | ||
| A00811-612183.pdf | ||
| A00840-612183.pdf | ||
| 612183 - Plan Holders List 6-23-2026.pdf | ||
| A00870-612183.pdf | ||
| A00875-612183.pdf | ||
| A00802-612183.pdf | ||
| A00841-612183.pdf | ||
| A00831-612183.pdf | ||
| 612183 Bid Items List.txt | TXT text file | |
| A00801-612183.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
July 2, 2026 612183-134691
ADDENDUM NO. 1
To Prospective Bidders and Others on:
GREAT BARRINGTON
Federal Aid Project No. HIP(NGB)-003S(961)X Bridge Replacement, G-11-002, Division Street over Housatonic River
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, JULY 7, 2026, at 2:00 P.M.
Transmitting revisions to the Contract Documents as follows:
QUESTIONS AND RESPONSES: 1 page.
DOCUMENT 00104: Revised page 3.
DOCUMENT 00813: Deleted document in its entirety inserted new document (4 pages).
DOCUMENT A00801: Inserted new page 51A.
DOCUMENT B00420: Revised pages 7 through 13.
Please take note of the above, substitute the revised pages for the original, delete the document indicated and insert the new document in proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
JPB
cc: Janhavi Limaye, Project Manager
THIS PAGE INTENTIONALLY LEFT BLANK
GREAT BARRINGTON
Federal Aid Project No. HIP(NGB)-003S(961)X
Bridge Replacement, G-11-002, Division Street over Housatonic River (612183--134691)
Questions and Responses Addendum No. 1, July 2, 2026
Max Building and Bridge e-mail dated June 30, 2026.
Question 1.) MAS has the following questions: Refer to Bid Item 854.016, “Temporary Paving
Markings, 6 Inch Painted.” Given that the bridge will be closed to traffic and a full detour will be in place during construction, please clarify the intended locations where temporary pavement markings are required.
Response 1.) The temporary pavement markings are for contingent use if the project roadway segment is opened before the final pavement course is laid.
Question 2,) Refer to Drawing Sheet 9 of 53, “Drainage & Utility Plan.” REM CB – 1 EA. Bid
Qty is 1 EA. Please clarify whether DMH 1-5 is to be removed. Please clarify where the 18” and 12” RCP removal is to be paid. Consider adding standard MassDOT Bid Item 271.18 and 271.12.
Response 2.) The existing DMH 1-5 shall be removed and discarded and is incidental to the installation of DMH-1. Existing pipe located within the same trench as the proposed pipe shall be removed and discarded and is incidental, as described in Subsections 140 and 230 of the Standard Specifications. Item 272.12 12 INCH PIPE REMOVED AND DISCARDED will be added see new page A00801-51A and revised page B00420-7.
Massachusetts Department Of Transportation Highway Division Proposal No. 612183-134691
00104 - 3
NOTICE TO CONTRACTORS (Continued)
PRICE ADJUSTMENTS
This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $3.911 per gallon, and gasoline $3.136 per gallon, and Steel Base Price Index 362.0. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments
This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.
MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)
Prospective bidders and interested parties can access this information and more via the internet at
WWW.COMMBUYS.COM.
BY: Phillip Eng, Interim MassDOT Secretary Jonathan L. Gulliver, Undersecretary and Highway Administrator
SATURDAY, JUNE 6, 2026
Addendum No. 1, July 2, 2026
Addendum No. 1, July 2, 2026
00813 - 1
DOCUMENT 00813
SPECIAL PROVISIONS
PRICE ADJUSTMENTS FOR STRUCTURAL STEEL AND REINFORCING STEEL
June 17, 2026
This special provision applies to all projects containing the use of structural steel and/or reinforcing steel as specified elsewhere in the Contract work. It applies to all structural steel and all reinforcing steel, as defined below, on the project. Compliance with this provision is mandatory, i.e., there are no “opt-in” or “opt-out” clauses. Price adjustments will be handled as described below and shall only apply to unfabricated reinforcing steel bars and unfabricated structural steel material, consisting of rolled shapes, plate steel, sheet piling, pipe piles, steel castings and steel forgings.
Price adjustments will be variances between Base Prices and Period Prices. Base Prices and Period Prices are defined below.
Price adjustments will only be made if the variances between Base Prices and Period Prices are 5% or more. A variance can result in the Period Price being either higher or lower than the Base Price. Once the 5% threshold has been achieved, the adjustment will apply to the full variance between the Base Price and the Period Price.
Price adjustments will be calculated by multiplying the number of pounds of unfabricated structural steel material or unfabricated reinforcing steel bars on a project by the index factor calculated as shown below under Example of a Period Price Calculation.
Price adjustments will not include guardrail panels or the costs of shop drawing preparation, handling, fabrication, coatings, transportation, storage, installation, profit, overhead, fuel costs, fuel surcharges, or other such charges not related to the cost of the unfabricated structural steel and unfabricated reinforcing steel.
The weight of steel subject to a price adjustment shall not exceed the final shipping weight of the fabricated part by more than 10%.
Base Prices and Period Prices are defined as follows:
Base Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are fixed prices determined by the Department and found in the table below. While it is the intention of the Department to make this table comprehensive, some of a project’s unfabricated structural steel and/or unfabricated reinforcing steel may be inadvertently omitted. Should this occur, the Contractor shall bring the omission to the Department’s attention so that a contract alteration may be processed that adds the missing steel to the table and its price adjustments to the Contract.
The Base Price Date is the month and year of the most recent finalized period price index at the time that MassDOT opened bids for the project. The Base Price Index for this contract is the Steel PPI listed in the Notice to Contractors.
Period Prices of unfabricated structural steel and unfabricated reinforcing steel on a project are variable prices that have been calculated using the Period Price Date and an index of steel prices to adjust the Base Price.
The Period Price Date is the date the steel was delivered to the fabricator as evidenced by an official bill of lading submitted to the Department containing a description of the shipped materials, weights of the shipped materials and the date of shipment. This date is used to select the Period Price Index.
The index used for the calculation of Period Prices is the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index (PPI) Series ID WPU101702 (Not Seasonally Adjusted, Group: Metals and Metal Products, Item: Semi-finished Steel Mill Products.) As this index is subject to revision for a period of up to four (4) months after its original publication, no price adjustments will be made until the index for the period is finalized, i.e., the index is no longer suffixed with a “(P)”.
00813 - 2
Period Prices are determined as follows:
Period Price = Base Price X Index Factor Index Factor = Period Price Index / Base Price Index
Example of a Period Price Calculation:
Calculate the Period Price for December 2009 using a Base Price from March 2009 of $0.82/Pound for 1,000 Pounds of ASTM A709 (AASHTO M270) Grade A36 Structural Steel Plate.
The Period Price Date is December 2009. From the PPI website*, the Period Price Index = 218.0.
The Base Price Date is March 2009. From the PPI website*, the Base Price Index = 229.4.
Index Factor = Period Price Index / Base Price Index = 218.0 / 229.4 = 0.950 Period Price = Base Price X Index Factor = $0.82/Pound X 0.950 = $0.78/Pound
Since $0.82 - $0.78 = $0.04 is less than 5% of $0.82, no price adjustment is required.
If the $0.04 difference shown above was greater than 5% of the Base Price, then the price adjustment would be 1,000 Pounds X $0.04/Pound = $40.00. Since the Period Price of $0.78/Pound is less than the Base Price of $0.82/Pound, indicating a drop in the price of steel between the bid and the delivery of material, a credit of $40.00 would be owed to MassDOT. When the Period Price is higher than the Base Price, the price adjustment is owed to the Contractor.
* To access the PPI website and obtain a Base Price Index or a Period Price Index, go to http://data.bls.gov/cgi-bin/srgate
End of example.
The Contractor will be paid for unfabricated structural steel and unfabricated reinforcing steel under the respective contract pay items for all components constructed of either structural steel or reinforced Portland cement concrete under their respective Contract Pay Items.
Price adjustments, as herein provided for, will be paid separately as follows:
Structural Steel Pay Item Number 999.449 for positive (+) pay adjustments (payments to the Contractor)
Pay Item Number 999.457 for negative (-) pay adjustments (credits to MassDOT Highway Division)
Reinforcing Steel Pay Item Number 999.466 for positive (+) pay adjustments (payments to the Contractor)
Pay Item Number 999.467 for negative (-) pay adjustments (credits to MassDOT Highway Division)
No price adjustment will be made for price changes after the Contract Completion Date, unless the MassDOT Highway Division has approved an extension of Contract Time for the Contract.
Addendum No. 1, July 2, 2026
00813 - 3
TABLE
Price per Steel Type Pound
1 ASTM A615/A615M Grade 60 (AASHTO M31 Grade 60 or 420) Reinforcing Steel $0.56
2 ASTM A27 (AASHTO M103) Steel Castings, H-Pile Points & Pipe Pile Shoes (See Note below.)
$0.78
3 ASTM A668 / A668M (AASHTO M102) Steel Forgings $0.78
4 ASTM A108 (AASHTO M169) Steel Forgings for Shear Studs $0.80
5 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Plate
$0.84
6 ASTM A709/A709M Grade 36 / AASHTO M270M/M270 Grade 36 or 250 Structural Steel Shapes
$0.79
7 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Plate
$0.84
8 ASTM A709/A709M Grade 50 / AASHTO M270M/M270 Grade 50 or 345 Structural Steel Shapes
$0.79
9 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Plate
$0.87
10 ASTM A709/A709M Grade 50WT / AASHTO M270M/M270 Grade 50WT or 345WT Structural Steel Shapes
$0.80
11 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W 345W Structural Steel Plate
$0.87
12 ASTM A709/A709M Grade 50W / AASHTO M270M/M270 Grade 50W or 345W Structural Steel Shapes
$0.80
13 ASTM A709/A709M Grade HPS 50W / AASHTO M270M/M270 Grade HPS 50W or 345W Structural Steel Plate
$0.91
14 ASTM A709/A709M Grade HPS 70W / AASHTO M270M/M270 Grade HPS 70W or 485W Structural Steel Plate
$0.98
15 ASTM A514/A514M-05 Grade HPS 100W / AASHTO M270M/M270 Grade HPS 100W or 690W Structural Steel Plate
$1.50
16 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Plate
$0.87
17 ASTM A992/A992M Grade 50S / AASHTO M270M/M270 Grade 50S or 345S Structural Steel Shapes
$0.80
18 ASTM A276 Type 316 Stainless Steel $4.51 19 ASTM A240 Type 316 Stainless Steel $4.51 20 ASTM A148 Grade 80/50 Steel Castings (See Note below.) $1.55 21 ASTM A53 Grade B Structural Steel Pipe $0.98 22 ASTM A500 Grades A, B, 36 & 50 Structural Steel Pipe $0.98 23 ASTM A252, Grades 240 (36 KSI) & 414 (60 KSI) Pipe Pile $0.78 24 ASTM 252, Grade 2 Permanent Steel Casing $0.78 25 ASTM A36 (AASHTO M183) for H-piles, steel supports and sign supports $0.82 26 ASTM A328 / A328M, Grade 50 (AASHTO M202) Steel Sheetpiling $1.48 27 ASTM A572 / A572M, Grade 50 Sheetpiling $1.48 28 ASTM A36/36M, Grade 50 $0.84 29 ASTM A570, Grade 50 $0.82 30 ASTM A572 (AASHTO M223), Grade 50 H-Piles $0.84 31 ASTM A1085 Grade A (50 KSI) Steel Hollow Structural Sections (HSS), heat-treated per
ASTM A1085 Supplement S1 $0.98
32 AREA 140 LB Rail and Track Accessories $0.51 NOTE: Steel Castings are generally used only on moveable bridges. Cast iron frames, grates and pipe are not “steel” castings and will not be considered for price adjustments.
END OF DOCUMENT
00813 - 4
THIS PAGE IS INTENTIONALLY LEFT BLANK
Addendum No. 1 July 2, 2026
A00801 – 51A
ITEM 272.12 12 INCH PIPE REMOVED AND DISCARDED FOOT
Work under this Section consists of removing present drainage pipes and discarding them in accordance with the relevant provisions of Subsections 120 and 270 of the MassDOT Standard Specifications.
CONSTRUCTION METHODS
Excavation shall conform to the applicable portions of Subsection 140.60 and the following:
A trench of sufficient width and depth shall be excavated so that the present pipe can be removed and the width shall allow for thorough compaction of backfill material.
The trench left by the removal of the pipes shall be backfilled with selected material in accordance with Subsection 150 and placed in 6-in. layers and thoroughly compacted.
All excavated material not deemed suitable for backfill shall be disposed of in accordance with all applicable regulations.
METHOD OF MEASUREMENT
This item will be measured in place and will be paid per linear foot for the length of pipe removed. For measurement purposes, the quantity to be paid shall include the length of pipe located within the connecting structures. Any pipe located within the trench of other proposed work will not be included in this item.
BASIS OF PAYMENT
Payment for the above work shall be made at the contract unit price per linear foot of pipe removed and shall include full compensation for the excavation, backfill material, backfill, compaction, and disposal of material necessary to satisfactorily complete the work.
Project # 612183 Contract # 134691
Location : GREAT BARRINGTON
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
272.12 50 12 INCH PIPE REMOVED AND DISCARDED
AT _________________________
PER FOOT
402. 135 DENSE GRADED CRUSHED STONE FOR SUB-BASE
AT _________________________
PER CUBIC YARD
415.2 230 PAVEMENT FINE MILLING
AT _________________________
PER SQUARE YARD
431. 4 HIGH EARLY STRENGTH CEMENT CONCRETE BASE
COURSE
AT _________________________
PER SQUARE YARD
440. 5,400 CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL
AT _________________________
PER POUND
443. 6 WATER FOR ROADWAY DUST CONTROL
AT _________________________
PER 1000 GALLONS
450.31 140 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5)
AT _________________________
PER TON
450.42 270 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)
AT _________________________
PER TON
450.60 175 SUPERPAVE BRIDGE SURFACE COURSE - 9.5 (SSC-B - 9.5)
AT _________________________
PER TON
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 6
Proposal No. 612183-134691
B00420 - 7
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
450.70 50 SUPERPAVE BRIDGE PROTECTIVE COURSE - 9.5 (SPC-B -
9.5)
AT _________________________
PER TON
452. 315 ASPHALT EMULSION FOR TACK COAT
AT _________________________
PER GALLON
453. 950 HMA JOINT ADHESIVE
AT _________________________
PER FOOT
470.3 295 HOT MIXED ASPHALT BERM, TYPE A - MODIFIED
AT _________________________
PER FOOT
472. 70 TEMPORARY ASPHALT PATCHING
AT _________________________
PER TON
482.31 70 SAWING AND SEALING JOINTS IN ASPHALT PAVEMENT AT
BRIDGES
AT _________________________
PER FOOT
482.5 25 SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING
AT _________________________
PER FOOT
594. 60 CURB REMOVED AND DISCARDED
AT _________________________
PER FOOT
595. 1 CURB INLET REMOVED AND DISCARDED
AT _________________________
EACH
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 7
Proposal No. 612183-134691
B00420 - 8
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
620.13 175 GUARDRAIL, TL-3 (SINGLE FACED)
AT _________________________
PER FOOT
627.1 2 TRAILING ANCHORAGE
AT _________________________
EACH
627.83 2 GUARDRAIL TANGENT END TREATMENT, TL-3
AT _________________________
EACH
628.21 2 TRANSITION TO NCHRP 350 GUARDRAIL
AT _________________________
EACH
628.24 2 TRANSITION TO BRIDGE RAIL
AT _________________________
EACH
628.313 2 PERMANENT IMPACT ATTENUATOR, REDIRECTIVE, TL-3
AT _________________________
EACH
630.2 370 HIGHWAY GUARD REMOVED AND DISCARDED
AT _________________________
PER FOOT
657. 55 TEMPORARY FENCE
AT _________________________
PER FOOT
669. 230 FENCE REMOVED AND STACKED
AT _________________________
PER FOOT
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 8
Proposal No. 612183-134691
B00420 - 9
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
697.1 5 SILT SACK
AT _________________________
EACH
697.2 145 FLOATING SILT FENCE
AT _________________________
PER FOOT
698.2 50 GEOTEXTILE FABRIC FOR SUBSURFACE DRAINAGE
AT _________________________
PER SQUARE YARD
698.4 325 GEOTEXTILE FABRIC FOR PERMANENT EROSION
CONTROL
AT _________________________
PER SQUARE YARD
702. 20 HOT MIX ASPHALT SIDEWALK OR DRIVEWAY
AT _________________________
PER TON
704.2 62 GRAVEL FOR DRIVEWAYS
AT _________________________
PER SQUARE YARD
722.3 1 SCHEDULE OF OPERATIONS (TYPE C) - FIXED PRICE
$66,000
AT Sixty Six Thousand Dollars
LUMP SUM
$66,000.00 $66,000.00
740. 22 ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A)
AT _________________________
PER MONTH
748. 1 MOBILIZATION
AT _________________________
LUMP SUM
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 9
Proposal No. 612183-134691
B00420 - 10
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
751. 17 LOAM FOR ROADSIDES
AT _________________________
PER CUBIC YARD
756.1 1 CONSTRUCTION PERIOD POLLUTION PREVENTION AND
EROSION AND SEDIMENTATION CONTROL PLAN
AT _________________________
LUMP SUM
765. 150 SEEDING
AT _________________________
PER SQUARE YARD
767.121 185 SEDIMENT CONTROL BARRIER
AT _________________________
PER FOOT
769. 480 PAVEMENT MILLING MULCH UNDER GUARD RAIL
AT _________________________
PER FOOT
776.523 1 MAPLE - RED 2-2.5 INCH CALIPER
AT _________________________
EACH
816.80 1 TRAFFIC CONTROL SIGNAL REMOVED AND STACKED
AT _________________________
LUMP SUM
832. 10 WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM
PANEL (TYPE A)
AT _________________________
PER SQUARE FOOT
833.7 6 DELINEATION FOR GUARD RAIL TERMINI
AT _________________________
EACH
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 10
Proposal No. 612183-134691
B00420 - 11
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
847.1 2 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
AT _________________________
EACH
851.1 720 TRAFFIC CONES FOR TRAFFIC MANAGEMENT
AT _________________________
PER DAY
852. 270 SAFETY SIGNING FOR TRAFFIC MANAGEMENT
AT _________________________
PER SQUARE FOOT
853.1 18 PORTABLE BREAKAWAY BARRICADE TYPE III
AT _________________________
EACH
853.23 72 TEMPORARY BARRIER (TL-3)
AT _________________________
PER FOOT
854.016 2,340 TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED)
AT _________________________
PER FOOT
856.12 2,250 PORTABLE CHANGEABLE MESSAGE SIGN
AT _________________________
PER DAY
859. 3,100 REFLECTORIZED DRUM
AT _________________________
PER DAY
859.1 640 REFLECTORIZED DRUMS WITH SEQUENTIAL FLASHING
WARNING LIGHTS
AT _________________________
PER DAY
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 11
Proposal No. 612183-134691
B00420 - 12
Description : Bridge Replacement, G-11-002, Division Street over Housatonic River
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
866.106 1,140 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)
AT _________________________
PER FOOT
867.106 1,140 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)
AT _________________________
PER FOOT
874.4 8 TRAFFIC SIGN REMOVED AND STACKED
AT _________________________
EACH
877.2 7 SIGN POST REMOVED AND STACKED
AT _________________________
EACH
953.1 1 TEMPORARY SUPPORT OF EXCAVATION
AT _________________________
LUMP SUM
983.1 800 RIPRAP
AT _________________________
PER TON
983.6 1 STREAMBED RESTORATION
AT _________________________
LUMP SUM
991.1 1 CONTROL OF WATER - STRUCTURE NO. G-11-002 (04F)
AT _________________________
LUMP SUM
995. 1 BRIDGE SUPERSTRUCTURE, BRIDGE NO.G-11-002 (04F)
AT _________________________
LUMP SUM
Total Qty: 29,944
CMS104 - Report Run Date: 7/2/2026 1:40 PM Page 12
Proposal No. 612183-134691
B00420 - 13
①① Addendum No. 1, July 2, 2026
| GREAT BARRINGTON-612183-134691-A-1 |
| ADDENDUM NO. 1 |
| Questions and Responses 612183 Add #1 |
| 00104 NTC 11-14-24 Add#1pg3 |
| ITEM 272.12 12 INCH PIPE REMOVED AND DISCARDED Add#1 |
| B00420-2pgs 5-11 |
| ADPF99.tmp |
| ADDENDUM NO. 1 |
| 2026-07-02T15:00:04-0400 | |
| Eric M. Cardone |
File details come from the government source that posted it. Updated .