A00831-612183.pdf
PDF 11 MB Posted
- Attached to
- 612183 GREAT BARRINGTON FAP No. HIP(NGB)-003S(961)X Bridge Replacement, G-11-002, Division Street
- Solicitation number
- BD-27-1030-0H100-0H002-130317
- Issued by
- Berkshire County, Massachusetts
About this file
This document is a Request for Proposals issued by the Massachusetts Department of Transportation for the replacement of the Division Street bridge over the Housatonic River in Great Barrington, Massachusetts (Project 612183, Federal Aid Project No. HIP(NGB)-003S(961)X). The project involves the complete replacement of the existing bridge structure, with proposals due on July 7, 2026, at 2:00 p.m. through www.bidx.com. Bidders must be pre-qualified by MassDOT in the BRIDGE-CONSTRUCTION category and must obtain and complete a Request Proposal Form (R109) at least 14 days prior to bid opening. All bidders are required to hold a valid MassDOT vendor code and Digital ID from bidx.com. The estimated project value is $8,626,000, and electronic proposals must be submitted exclusively through bidx.com rather than through COMMBUYS.
A proposal guaranty equal to 5% of the bid value is required at submission. The project is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development and the U.S. Department of Labor. Price adjustments are available for hot mix asphalt, Portland cement mixtures, diesel fuel, gasoline, and structural and reinforcing steel, with base prices and adjustment mechanisms posted on MassDOT's website. The contract is federally-aided and governed by Massachusetts General Laws Chapter 30 and 39M, with compliance required under Title VI of the Civil Rights Act of 1964, Federal Equal Employment Opportunity specifications, Architectural Access Board regulations, and Federal Highway Administration non-discrimination requirements. Proposal documents are available on www.bidx.com for official bidders, while informational documents may be requested from MassDOTBidDocuments@dot.state.ma.us.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 612183 - Notice to Contractors.pdf | ||
| A00872-612183.pdf | ||
| A00871-612183.pdf | ||
| A00832-612183.pdf | ||
| A00830-612183.pdf | ||
| A00820-612183.pdf | ||
| A00803-612183.pdf | ||
| A00811-612183.pdf | ||
| A00840-612183.pdf | ||
| 612183 - Plan Holders List 6-23-2026.pdf | ||
| A00870-612183.pdf | ||
| A00875-612183.pdf | ||
| A00802-612183.pdf | ||
| A00841-612183.pdf | ||
| 612183 Bid Items List.txt | TXT text file | |
| A00801-612183.pdf | ||
| GREAT BARRINGTON-612183-134691-A-1.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 612183-134691
A00831 - 1
DOCUMENT A00831
ARMY CORPS OF ENGINEERS
GENERAL PERMIT
Massachusetts Department Of Transportation Highway Division
A00831 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
Regulatory Division Transportation & Utility Section File No. NAE-2025-02189
Courtney Walker Massachusetts Department of Transportation - Highway Division 10 Park Plaza, Room 7360 Boston, Massachusetts 02116 Via Email: courtney.l.walker@dot.state.ma.us
Dear Ms. Walker:
This letter is in response to the application you submitted to the U.S. Army Corps of Engineers (USACE), New England District on October 2, 2025, for a Department of the Army general permit verification. We have assigned this project file number NAE-2025- 02189, which you should reference in all correspondence with this office. This letter follows a provisional notification letter from this office, dated October 24, 2025.
A review of the information provided indicates the proposed work includes the permanent discharge of fill material within 2,368 square feet below the Ordinary High Water (OHW) mark of the Housatonic River associated with the replacement of the bridge conveying Division Street over the Housatonic River, at Latitude 42.231730º and Longitude -73.354840º, in Great Barrington, Berkshire County, Massachusetts. The existing abutments will be cut down and retained. Rip-rap scour protection overtopped with natural streambed material will be installed in front of the abutments. The work is shown on the enclosed plans titled “MASSACHUSETTS DEPARTMENT OF
TRANSPORTATION HIGHWAY DIVISION PLAN AND PROFILE OF DIVISION
STREET (BRIDGE NO. G-11-002 (04F)) IN THE TOWN OF GREAT BARRINGTON,”
on 21 sheets dated 9/4/2025 (sheets 18 and 19 dated Revised 11/19/2025).
Based on the information you have provided, we verify that the activity is authorized under General Permit 23 of the June 2, 2023, federal permit known as the Massachusetts General Permits (GPs). If the extent of the project area and/or nature of the authorized impacts to waters are modified, a revised application must be submitted to this office for written approval before work is initiated. You can find a copy of these permits at: https://www.nae.usace.army.mil/Missions/Regulatory/State-General- Permits/.
Any deviation from the terms and conditions of the permit, or your submitted plans, may subject the permittee to the enforcement provisions of our regulations. Therefore, in the event changes to this project are contemplated, it is recommended you coordinate with this office prior to proceeding with the work. This office must approve
Proposal No. 612183-134691
A00831 - 3 https://www.nae.usace.army.mil/Missions/Regulatory/State-General-Permits/ https://www.nae.usace.army.mil/Missions/Regulatory/State-General-Permits/ any changes before you undertake them. You must perform this work in compliance with the terms and conditions of the GPs listed above, and also in compliance with the following special conditions:
Project Specific Special Conditions:
1. The permittee shall complete and return the enclosed Work-Start Notification Form to this office at least two weeks prior to the anticipated construction start date.
2. The permittee shall complete and return the enclosed Completion Certification
Form to this office at least one month following the completion of the authorized work.
3. All construction shall be completed in accordance with the limits of construction and construction sequences detailed on the enclosed plan drawings, titled
“MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY
DIVISION PLAN AND PROFILE OF DIVISION STREET (BRIDGE NO. G-11-002
(04F)) IN THE TOWN OF GREAT BARRINGTON,” on 21 sheets, and dated 9/4/2025 (sheets 18 and 19 dated Revised 11/19/2025). If you change the plans or construction methods for work within or adjacent to the Housatonic River, please contact us immediately to discuss modification of this authorization.
USACE must approve any changes before you undertake them.
4. A conditioned Water Quality Certification (WQC) has been issued by the Massachusetts Department of Environmental Protection for your project and is attached. You must comply with the conditions specified in the WQC.
This verification is valid until June 1, 2028. You must commence or be under contract to commence the work authorized herein by June 1, 2028, and complete the work by June 1, 2029. If not, you must contact this office to determine the need for further authorization before beginning or continuing the activity. It is recommended that you contact this office before this authorization expires to discuss if permit reissuance is a possibility.
This GP verification and any associated authorizations does not preclude the necessity to obtain any other federal, state, or local permits, licenses, and/or certifications, which may be required.
If you have any questions related to this verification or have issues accessing documents referenced in this letter, please contact Daniel Vasconcelos, Project Manager at 978-318-8653, or by email at daniel.b.vasconcelos@usace.army.mil.
A00831 - 4
This agency continually strives to improve our customer service. To better serve you, please complete the Customer Service Survey located at:
https://regulatory.ops.usace.army.mil/customer-service-survey/.
Sincerely, Ryan Malterud Deputy Chief, Regulatory Division Regulatory Division
Enclosures cc (w/enclosures):
Heidi Davis, MassDEP (via heidi.davis@mass.gov) Michael Joa, MassDOT (via michael.a.joa@dot.state.ma.us)
A00831 - 5
Work-Start Notification Form
File Number: NAE-2025-02189 State: Massachusetts County: Berkshire
Permittee: Massachusetts Department of Transportation - Highway Division, Courtney Walker Date Verification Issued: 2/12/2026 Project Manager: Daniel Vasconcelos
At least two weeks prior to commencing the activity authorized by this permit, sign this certification and return it to the following address:
US ARMY CORPS OF ENGINEERS
New England District
Attn: Daniel Vasconcelos 696 Virginia Road
Concord, MA 01742 or daniel.b.vasconcelos@usace.army.mil 978-318-8653
Please note that your permitted activity is subject to a compliance inspection by a U. S.
Army Corps of Engineers (USACE) representative. Failure to comply with any terms or conditions of this authorization may result in the USACE suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action.
The people (e.g. contractor) listed below will do the work, and they understand the permit’s conditions and limitations.
Contractor Name/Contractor Firm: _______________________________________ Business Address: ____________________________________________________ Contractor Phone and Email: ___________________________________________
Proposed Construction Dates: Start: _____________ Finish: ___________
Signature of Permittee Date
A00831 - 6
U.S. Army Corps of Engineers (USACE)
CERTIFICATION OF COMPLIANCE WITH DEPARTMENT OF THE ARMY PERMIT
For use of this form, see Section 404 of the Clean Water Act, Section 10 of the Rivers and Harbors Act of 1899, and Section 103 of the Marine Protection, Research, and Sanctuaries Act; the proponent agency is CECW-COR.
Form Approved -
OMB No. 0710-0003
Expires 2027-10-31
The Agency Disclosure Notice (ADN)
The Public reporting burden for this collection of information, 0710-0003, is estimated to average 10 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.
Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PURPOSE: This form is used by recipients of U.S. Army Corps of Engineer Regulatory permits to certify compliance with the permit terms and conditions.
Your permitted activity is subject to a compliance inspection by a U.S. Army Corps of Engineers representative. If you fail to comply with this permit, you are subject to permit suspension, modification, or revocation.
Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the U.S. Army Corps of Engineers, New England District, Regulatory Office.
The certification can be submitted by email at daniel.b.vasconcelos @usace.army.mil or by mail at the below address:
U.S. Army Corps of Engineers
New England District Office
Street Address: 696 Virginia Road
City: Concord State: Massachusetts Zip Code: 01742-2751
COMPLETED BY THE CORPS
Corps Action Number: NAE-2025-02189
Permit Type: General Permit
General Permit Number and Name (if applicable): 23 (Linear Transportation Projects and Stream Crossings)
Name of Permittee: Courtney Walker
Project Name: MassDOT-Highway Division Great Barrington, MA
Project Location (physical address): Division Street Great Barrington, Massachusetts
PERMITTEE'S CERTIFICATION
Date Work Started:
Date Work Completed:
Enclose photographs showing the completed project (if available).
I hereby certify that the work authorized by the above referenced permit has been completed in accordance with all of the permit terms and conditions, and that any required compensatory mitigation has been completed in accordance with the permit conditions.
Name Date Signature
Proposal No. 612183-134691
A00831 - 7 mailto:whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil mailto:EnterEmailName@usace.army.mil
M A S S A C
H U
S E T T S D
E P A R
T M
E N
T O
F T
R A N
S P O
R T A T
IO
N
H
IG
H W
A Y D
IV
IS
STATE I
A I
G R
E A
T B
A R
R
IN
G T
O
D
IV
IS
IO
N
S T
R E
E T
FED. AI
D PR
O J. N
O.
I 5
T
I s�
OE��
s
I
I
PR
O
JEC
T FILE N
O
612183
T
IT
L E
S H
E E
T
IN
D
X
W Q
C /A
C O
E P
L A
S
U
B M
IT
T
A L
D A
T E
: 1
/1 /2
E E
T N
O
4-5
-13
IN
D
S C
R
IP
T
TITLE SH
EET & IN
D
EX
LEG
EN
D
& ABBR
EVIATIO
N
S
G
EN
ER
AL N
O
TES
TYPIC
AL SEC
TIO
N
S
C O
N
STR
U C
TIO
N
PLAN
& WQ
C
/AC
O
E IM
PAC
TS PLAN
C
N
STR
U C
TIO
N
PR
O
FILE
C U
R
B TIE & G
R
AD
IN
G
PLAN
R
AIN
AG
E & U
TILITY PLAN
P iM iPI
+ l!OR l�IPli.
o li.
PI
IPli.
bOPI
SIG
SU
M
M
ARY
ROFfll; W
Pl •i.
il4iPl+ P
6" Pl
8 1
D
ETO
U R
SH
EET
D
ETO
U R
SIG
N
SU
M
M
ARY
C O
N
STR
U C
TIO
N
DETAILS
D
Rl>'e'
OIO
Y D iP
ILS
18-44
BR
ID
G
E PLAN
S
(SELEC
TED
SH
EETS)
45-53 C
RO
SS SEC
TIO
N
S
PLAN
AN
D
PR
O
FILE O
F
D
IV
IS
IO
N S
T R
E
(B
ID
G
E N
O . G
-11-002 (04F
IN
TH
E TO
W
N O
F
G R
E A
T B
A R
R
IN
G T
FED
ER
AL AID
PR
O
JEC
T N O
S U
B M
IT
T
L er
I.LJ
...J
...J z
CJ)
::i a
<rri e=
-=i o
O J
E C
T B
E
IN
A
.0
.4
.5
S C
A
LE
1" = 4
00'
T H
E S
E P
LA
N
S A
R E
S U
P P
LE
M
E N
T E
D B
Y T
H E
O C
T O
B
2025 C
N S
T R
U C
T
IO
N S
T A
N D
A R
D D
E T
A
ILS
T
H E
15 O
V E
R H
E A
D S
IG
N
A L S
T R
U C
T U
R E
A N
D F
O U
N D
A T
IO
N
S T
A N
D A
R D
D R
A
VI/
IN
G
S , M
A S
S D
A
F F
IC
M
A N
A G
E M
E N
T P
LA
N
S A
N D
D E
T A
IL D
R
A
VII
IN
G
S , T
1990 S
A
N D
A R
D D
R A
VIII
N
G S
F O
R S
IG
D S
U P
P O
R T
S , T
1968 S
A
N D
A R
D D
R A
VII
IN
G S
F O
R T
R A
F F
IC
S
IG
N
A
LS
A N
D H
IG
H
W A
Y
LIG
H T
IN
G
A
N D
T H
E
LA
T E
S T
E D
IT
IO
N O
F T
H E
A M
E R
IC
A
N S
T A
N D
A R
D F
O R
N U
R S
E R
Y S
T O
C K
D E
S
IG
N D
E S
IG
N
A T
IO
N
(D
IV
IS
IO
N S
T R
E E
T
D E
S
IG
N S
P E
0M
AD
T (2024)
AD
T (2044)
K
11.0%
EB 50.4%
T (PEAK
O U
R
2.3%
T (AVER
AG
E D
AY)
3.7%
V
D D
H V
FU
N
C
TIO
N
AL C
LASSIFIC
ATIO
BAN
C
O
LLEC
TO
9/4/2025 100%
SU
BM
ISSIO
6/12/2025 75%
SU
BM
8/5/2024 25%
SU
BM
ATE
D
ESC
R
IPTIO
REV#
N G
T H
O F
P R
O J
E C
T
.0
F
E E
T
.1
M
IL
7l m i!g
.Q
I ig hway Divis ion
C /A
C O
E P
LA
N
S S
H E
E T o f 2
E P
A R
E D
B Y
G ree n ln te m a tio:
n .a'
I A
· lf rlia te s . l111 c::
A loc ho e:r o am pa
"'I' it:
.IJTies ?ood'
Cn.'S, SUil:e
:;,:I).
T""
"icsbuly . W.
·e;,;
P R
O V
IE
F E
N G
IN
E
TE
I::, <I)
A00831 - 8
A00831 - 9
A00831 - 10
A00831 - 11
A00831 - 12
H
WA
Y G U
A R
D D
E
TA
ILS
PR
P PER
M
AN
EN
T IM
PAC
T ATTEN
U
ATO
R
, R
ED
IR
EC
TIVE W
ITH
EXTEN
D
ED
EN
D
SH
O
E TR
AN
SITIO
N
), TL-3 -STA 28+95 LT
-STA 29+18 LT
PR
O
P PER
M
AN
EN
T IM
PAC
T ATTEN
U
ATO
R , R
ED
IR
EC
TIVE W
ITH
EXTEN
D
ED
EN
D
SH
O
E TR
AN
SITIO
N
), TL-3 -STA 28+95 R
T
-STA 29+18 R
T
PR
O
P TR
AN
SITIO
N
TO
BR
ID
G
E R
AIL -STA 30+72 LT
-STA
31+06 LT
PR
O
P TR
AN
SITIO
N
TO
BR
ID
G
E R
AIL
-STA 30+72 R
T -STA
31+06 R T
PR
O
P G U
AR
D
R
AIL, TL-3 (SING
LE FAC
ED)(DEEP PO
ST) -STA 31+06 LT -STA 31+20 LT
PRO
P G U
AR
D
R
AIL, TL-3 (SIN
G
LE FAC
ED
)(D
EEP PO
ST) -STA 31+06 R
T -STA 31+81 RT
PRO
P G U
AR
D
R
AIL TAN
G
EN
T END TR
EATM
EN
T, TL3 -STA 31+20 LT -STA 31 +51 LT
PRO
P G
U
AR
D R
AIL TR
AILIN
G
AN
C H
O R
AG
E, TL-3-
STA
31+81 RT-
STA 31+90 R
T
PR
O
P G U
AR
DR
AIL TR
AILIN
G
ANC
H O
R
AG
E, TL-3
-STA
31+88 LT
-31+89 LT
PR
O
P G U
AR
D
R
AIL, TL-3 (SING
LE FAC
ED
) -STA 31 +89 LT -STA 31 +97 LT
PR
O
P TR
AN
SITIO
N
TO
N C
H
RP 350 G
U
AR
D R
AIL -STA 31 +97 LT -STA
32+31 LT
r
BEG
PRO
JEC
T
BE
G
IN
FIN
E
M
ILLIN
G A
N D
R
ES
U R
FA
C
27 +00.00
N 2914840.4984
E 153609.5685
T R
O P H
M
JY
BER
PE A
-M
• D
IFIED
ET
T
EE
l
EM
TR
GRA
VEL
�EM
EXI
PA\l
PO
ST
PR
O P LEAe
H
(TYr
(SEE SH
E
PR
G
P SLO
PE LI
P LO
A:
PR
O
P C
LEAR
IN
s
PR
O
P PER
M
EASEM
EN
T
PR
O
P TEM
P EASEM
EN
T
'-c
EN
D
FIN
E M
ILLIN
G
AN
D
RESU
RF
BE
G
IN
FU
LL D
E P
TH
R
E C
O N
S
TR
U C
TIO
27+50.00
R
EM
SH
R
U
BS
APPROXIMATE
SEPTIC SYSTEM
_Jc, 7_J-
7Jo
L
_J
L
I I
I I
PR
O
P LO
AM
:& SEED
(TYP)
QJ.!!:ill'._.
EP @)
BEG. 1950 COUNlY
<l
LA
YOUT ALTERATION
<'ci
BK/PG 295/63
'6�
P H
M 'j
D R
IV
EWA
Y
P G
R
AVEL
'o
0"R V
EWA
Y q, '1' c> e PER
M
AN
EN
T IM
PAC
T
ATTE"j(IIJ� O
R , R
ED
IR
EC
TIV
E, TL-3
R &D
E-X[ST G
U
AR
D
R
AIL (TYP)
p M
O o if\E'D R
O C
KFILL (TYP)
J.- R
&D E �
TIN
G
R
IPR
AP (TYP)
JANICE SHIELDS
R
9T WI
N G
W
ALLS (TYP)
BK/PG 2401/319
5'.l DIVISION ST
MAP /LOT 1130280000000270
SUBJECT TO ELECTRIC
EA
SEMENT
BOOK 2415 PAGE 322
(NOT PLOTT
ABLE)
PERMANENT LUW/WOTUS IMPACT AREA =
2,368 SF ±
TOTAL DREDGE/FILL WITHIN LUW/WOTUS VOLUME = 674 CY
TOTAL PERMANENT IMPACT AREA = 2,368 SF ±
TR
A
FFIC
S
IG
N
A L C
O N
D U
IT
N O
N tv
P TEM
P EASEM
EN
T
R O
P H M
A D R
IV
EW
AY
N/F
OWNER UNKNOWN
O
P PER
M
EASEM
EN
T
PR
O
P SED
IM
EN
T C
O N
TR
O
L BAR
R
IER
(TYP)
PR
O
P PER
M
AN
EN
T IM
PAC
T ATTEN
U
ATO
R
R
ED
IR
EC
TIV
E, TL-3
H O
U S
A
TO
N
IC
R
IVE
oH W -
LU
W /W
O
TU
S (P
E R
M
2,368 S F ---sc
-w ofll<"
ED
G
E/FILL VO
LU
M
E
674 C Y
O
P N
ATU
R
AL STR
EAM
BED
M
ATER
IAL
O
VER
M
2.02.2 (TYP)
(SEE BR
ID
G
E PLAN
SH
EET 12)
BRIDGE NO. G-
11-
N/F
OWNER UNKNOWN
SC
ALE: 1" = 40'
BANK/OHW (PERENNIAL STREAM)
FEMA 100-
YEAR FLOOD ELEVATION
W
Q C
/AC
O
E PLAN
S SH
EET 6 of 21
G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E
WA
R S
U
PPLY A
LTE
R
A
TIO
N E
D R
A
IN
A G
E D
E
ILS
FED. AID
PR
O
J. N O
I s�
T
I s�
OE��
s
SEE SH
EET 9
MA I
I
X
I
PROJECT FILE NO.
IM
A C
T P
L
EN
PRO
JEC
T I
E N
D
FIN
E M
ILLIN
G
A N
D R
ES
U
R
FA
C
32+50.00
N 2915016.0041
E 154130.8108 f
Y'
EN
D
FU
LL D
EPTH REC
O
N
STRU
C
D
IN
A R
Y H
IG
H W
TER
L. 687.97' (N A
VD
88)
BEG
IN
FIN
E
M
ILLIN
G A
N D
R
ES
U R
FA
C
32+25.00
N/F
RISING PAPER
LA
ND LLC
BK/PG 2306/28
PLA
N BK/PG Q/36
PLA
N BK/PG Q/68
(AUL)
PARK ST
NORTH
MAP/LOT
1130070000000300
AC
ESS TO
PAR
E M
AIN
TAIN
ED
A
R
IP
D
BR
;as.,.
FEN
C
'-'lllO-'
-O
HW
(P U
B L
IC
V A
R
IA
B L
E W
ID
T
H
PR
O
P G U
AR
D
R
AIL (TYP)
PR
O
P M O
D
IFIED
R O
C
KFILL (TYP)
R
ET W
IN
G
WA
LLS (TYP)
PR
O
P SED
IM
EN
T C
O N
TR
O
L BAR
R
IER
(TYP)
-==-y-y
EXIST
G
U
AR
D R
AIL
PR
O
P PAV
EM
EN
T
M
ILLIN
G M
U
LC
DECIDUOUS -
HEAVY
COVER
MIXED DIAMET
ER
PR
O
P G R
AD
E BR
EAK
FO
R
P R
O
FILE
S
EE S
H E
E T N
O . 7
A00831 - 13
A00831 - 14
A00831 - 15
A00831 - 16
OVER
LEG
END
-UTILITIES
EXISTING
OVERHEAD
W
IRE
EXISTING
D
RAINAG
E
PROPOSED
D
RAINAG
E
EXISTING
SEW
ER
B
G
IN
P
R O
J E
G
IN
F
IN
E
M
ILLIN
G A
N D
R E
S U
R F
A C
A
40.498
E
.5
G
IN
F U
LL D
E
P T
H R
E C
O N
S T
R U
C T
A l,.
P. C B (1-1) h ,.J--
V
O
P. 3 LF -12" D
R
AIN
PIPE
-O
PTIO
N
1.3%
(R
EM
i"
P. 19 LF -15" D
R
AIN
PIPE -O
PTIO
N
0.6%
J
(R
EM
'1)
15�
-r d r y r y r
PR
O
P. 6 LF -15" R
C P @
0.7%
J:
L1 8 -1'() l
J. . ""
PR
O
P. LB (1-8)
PR
O
P. 5 LF -12" D
R
AIN
PIPE
-O
PTIO
N
2.8%
J\-_J
PR
O
P. C B (1-6) t
P.16 LF
-12" D R
AIN
PIPE
-O
PTIO
N
1.0%
'.L j � b
PR
O
P. D M
H (1-3)
7"
P. LB (1-9{
O
P. 6 LF
-12" D
R
AIN
PIPE
-O
PTIO
N
1.0% fR p
P. D M
H (1-4 f
-f
P. C
B (1-7) N/F r
JANICE SHIELDS
I N C
BK/PG 2401/31
V
P. 5 LF -12" D
R
AIN
PIPE -O
PTIO
N
0.9
LF -12" D
R
AIN
PIPE -O
P
EM
V �
Cn O
53 DIVISION ST
MAP /LOT 11302800000 0270
RA
IN
A
G E
S
TR
U C
TU
R
E
TA
LE
STATIO
ELEV.
V. ELEV. IN
V. ELEV. O
U T
N O
TES
28+09.3
1=694.94' (PR
O P. C
B (1-7))
PR
O P. D
M H
(1-4)
-5.5' LT
699.38
1=695.05' (PR
O P. C
B (1-2))
1=693.15' (PR
O P. D
M H
(1-5))
FLAT TO
P
1=693.22' (PR
O P. D
M H
(1-3))
PR
O
P. D M
H (1-5)
28+49.2 699.60
1=692.85' (PR
O
P. D M
H (1-4))
1=692.80' 0
-5.9' LT
PR
O
P. LB (1-8)
27+77.9
698.67
1=694.22' (PR
O P. C
B (1-6)) 20.4' R
T
PR
O
P. LB (1-9)
28+01.7
698.19
1=694.35' (PR
O P. C
B (1-7)) 21.5' R
T W
Q C
/A C
O E
P
LA
N S
S H
E
T 10 of 21 BEG. 1950 COUN1Y
YOUT ALTERATION
BK/PG 295/63
tv
R
EM
U
PL AN
D
TR
AFFIC
SIG
N
ALS
N/F
OWNER UNKNOWN
OHW 30
BRIDGE NO. G-
11 -002
N/F
OWNER UNKNOWN
SC
ALE: 1" = 40'
F110 r-i
--; -c y- Yy y
D
IN
AR
Y H
IG
H
W
ATER
EL.
687.97' (N
AVD
88)
R
ET U
PL
AN
D G
U Y
N G J
MA I
G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E
FED
. AID
PRO
J. NO
l 5�
I s�
OE��
s
PROJECT FILE NO.
812183
D R
A
IN
A G
E
U T
IL
IT
Y P
L
DECIDUOUS -
HEA
VY
COVER
Ml> E
N D
F
IN
E M
IL
L
IN
G
A N
D R
E S
U R
F A
C
A 32+
50.00 .,_.
'r
'r
'"I-i--..J
.,A
JJ
D F
U L
L D
E P
T H
R E
C O
N S
T R
U C
T
G
IN
F
IN
E M
ILLIN
G
A N
D R
E S
U R
F A
C
A 32+
25.00 r _:[_
!'EMA
roo-
YFM
FL
O E1£V
ATION
(695.
4' ""
END PR
O
JEC
T
S T
A
.3
.9
_ -.. -! -?,�� �� � °!, !:� :� :� Y:� ?-!'� -_ -_ -_ =_ --=_ =_cc: _-. _ =11 --:if� =-/::-=-=- -�- v!n_.
, f"" ,_ ;:= -� �:=--'�:::..
t' l f -
___\l p�u
RIPRAP
IP
L N
G .15
•r:1 F
SW
LOCATION
. . R fa
EP
FEJIA
l'£AR
Fl.
_PC
+11.El2
-f'/--
P BLIC
VA IABLE WIDTH
y -y r
Y yY
Yr
-�L
R
EM
U
PL� G
U
Y AN
"Jr-
24""1lli
691.92' 9•
IN
24"R ,"
PL AN
D
PO
W
ER
ETERc
6 92.13"
ET U
PL
1 C
TR
AFFIC
SIG
N ,fu-
S f'ld,.I
& ABAN
D O
N C
O N
D U
IT
N O
TES:
,w F# ra
1.
AR
EAS BETW
EEN
TH
E LEAC
H
IN
G
BASIN
S AN
D C
ATC
H
BASIN
S TH
AT C
AN
N O
T BE C
O
M
PAC
TED
95%
• 'I'
EJ.£V
SH
ALL BE BAC
KFILLED
VIII
TH
C
R U
SH
ED
STO
N
E.
Y
2.
SC
O
U R
C O
U N
TER
M
EASU
R
ES, SU
PPO
R T O
F EXC
AVATIO
N , C
O
FFER
D
AM
S, O R
AN
Y O
TH
ER
R
EQ
U
IR
ED
SU
PPO
R
TS M
U
ST BE IN
STALLED
VIII
TH
TH
E O
VER
H
EAD
VI/I
R
ES R
EM
AIN
IN
G
IN
TH
EIR
C U
R R
EN
T LO
C
TH
E N
O R
TH
SID
E O
F TH
E BR
ID
G
E. TH
E C O
N
TR
AC
TO
R
SH
O U
LD
EXPEC
T TH
E IN
STALLATIO
N
O
F TH
E
SH
EETIN
G
O N
TH
E N
O R
TH
SID
E O
F TH
E BR
ID
G
E TO
BE A C
H
ALLEN
G
E R
EQ
U
IR
IN
G
SPEC
IAL TEC
H N
IQ
U
ES
SU
C H
AS PR
E-EXC
AVA
TIO
N
, SID
E VIBR
ATIO
N O
F TH
E SH
EETIN
G
O R
AD
D
IN
G
SH
EETIN
G
SPLIC
ES. ALL
O
SH
A R
EQ
U
IR
EM
EN
TS M
U
ST BE AD
H
ER
ED
TO
W H
EN
IN
STALLIN
G
N
EAR
TH
E O
VER
H
EAD
W
IR
ES.
D
RA
IN
A
G E
S
TR
U C
T U
R E
TA
STATIO
ELEV.
V. ELEV. IN
V. ELEV. O
U T
N O
TES
PR
O
P. C B (1-1)
27+83.4 699.20
1=694.68' (PR
O
P. D M
H (1-3))
FLAT
TO
P
-12.2'LT
PR
O
P. C B (1-2)
28+09.1 699.19
1=695.10' (PR
O
P. D M
H (1-4))
FLAT TO
P
-14.9' LT
PR
O
P. C B (1-6)
27+83.4 699.17
1=695.10' (PR
O
P. D M
H (1-3))
13.8' R T
1=694.35' (PR
O
P. LB (1-8))
PR
O
P. C B (1-7)
28+09.6 699.19
1=695.10' (PR
O
P. D M
H (1-4))
15.0' R T
1=694.41' (PR
O
P. LB (1-9))
27+86.1
1=694.94' (PR
O P. C
B (1-6))
PR
O P. D
M H
(1-3) 699.33
1=694.64' (PR
O
P. C B (1-1))
1=693.34' (PR
O
P. D M
H (1-4))
FLAT
TO
P
-5.6' LT
1=693.44' (E X
. D M
H
A00831 - 17
E
E C
T
IO
N O
F
TR
A F
F
IC
R U
C K
D E
T O
U R
R O l22-:2j
R K
Z O
R T
A B
LE
C
H A
N G
E A
B
LE
M E
S S
A G
E S
TY
E Ill B
A R
R
IC
A
M S
B O
A R
S C
A
LE
1"= 1100'
N O
TE
G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E
A T
E T
F E
D . A
ID
P
R O
J . N
O
I s��� T
I s rHoE�;� M
A I
I
I P
R O
JE
C
T FILE
N
O
61218
D E
T O
U R
S H
E
(P
M S
D
IS
P
LA
Y A
D
VA
N C
E N
O
TIF
IC
A
TIO
N
M
E S
S A
G E
M
E S
S A
G E
D
IV
IS
ID
N S
T
M M
M /D
M /D
(P
M S
D
IS
P
LA
Y D
U R
IN
G
C O
N S
TR
U
C
TIO
N
M E
S S
A G
E
D
IV
IS
LO
S
S S
A G
E
F O
LLO
TO
E
TH
E
C O
N
TR
A C
TO
R
S H
A
LL IN
S
TA
LL P
C
M S
B O
A R
D S
1000 F E
E T
P R
IO
R
TO
TH
E F
IR
S
T A D
V A
N C
E W
A R
N
IN
G S
IG
N
A
LO
N G
D
IV
IS
E E
T, V A
N D
E U
S E
N V
ILLE
R
O A
D , A
N D
TH
E
F R
O N
T S
TR
E
T &
R K
S
TR
E E
T IN
TE
R S
E C
TIO
N
P C
M S
B O
A R
D M
E S
S A
G E
S
FO
R D
E
TO
T
TO
S
C al
C /A
C O
E P
LA
N
S S
H E
E T 11 of 21
A00831 - 18
A00831 - 19
A00831 - 20
A00831 - 21 f-w w
LI...
f-<(
_J
L.
(1 h e
B o n d
Engineersl Er>vironm en11lS pecialiu
P roject:
D ivisionS treetB ridgeR eplacem ent Loe11
�on:
D ivision S treet, G reat B arrington, M
A Client:
Tow n cf G reat B arTington
D rilling Co. N ew England B ori"'ii Contractors
Fore an:
R .P osa_
Type
FJ
S plitS poon T
&B R ep.:, I.D
O.D
1-3
B"/2" D
M .,S tart:
End:
01/ 06/
Ham m erW t.
00i
Locabcn
P lan
Ham m
•rF al
0"
0"
GS
. Elev.
Rig M �ke/
Model B ·53 w auto harr m er
D <lpth Ca�il>Q 1 z s m p e am ple B low
P
IO
B low
D th p., ,6
• R eading
(I t.)
P er 0 t.
e c.( in)
( ppm
M edium dense, brow n, firie to m edium S
AND
f-s,,m e S ilt, tr,ice G r,ivol, dry (Cobble in spoon tip)
5-17 f-
Loose, gray, fine to m edium S
AND
and S
ILT
II
l. G roundw ater estim ate:l ,it 11 ' t>ased on sam ple w etness.
TR
A
C
E (TR
.) 0 _ <IO%
2 .. s tich fram 3-1/
4"/ 6-5
B" hollcw
-s t"m auo "'" to 4"/
4-1/ 2" flus h-
L IT
TLE (Ll.l :o _ <20¾
01nt ._,, ,ing at 12'
E (S
O
S
C
ALE
rt, B O
R
T E
S
B oring N o.
age l or
J F ilt1N o.�
SOOO-O_
B _
Chocked b y:� epth
C.sinc R efer toN otel trati;iraphy
LO
C
R
IN
O
LAN
S
B
B
O R
IN
TAK
FO
R P
O
S
AN
N
D
ITIO
AT
O
R
TS
LY,
B U
T
T N
E C
E S
S
AR
ILY
S
H
ATU
IALS
E
N C
O U
N
TE
R
R
N S
TR
U
C
TIO
N
W
VE
LS
O
R
S
E R
TIM
TAK
R
IN
T
N E
C E
S S
AR
ILY
S H
O U
L.
FIG
U
R
LU
M
M B
B
LO
Q U
IR
IVE
" I.D
S P
LIT
S
P O
P
" U S
U
IG
H
T
FALLIN
B
O R
P
R
S
TO
R
AG
FAC
ILITY
LO
C
(2
TH
R
AVE
LAW
E N
C E
M
A.
N
TR
AC
AY
E X
AM
IL
P
C O
N
TAC
TIN
AS
S D
O T
G E
O
TE
C H
N
IC
AL
S
E C
LAZ
A, B O
S
TO
N
M A
ALL
B O
R
IN
C E
M B
JAN
AR
Y
B O
R
IN
ER
E
M
AD
E B
Y N
EN
LAN
R
N
TR
AC
TO
R S
D W
AY
S
TR
E
E T, D E
R R
Y, N
H
R
TIC
AL
D
ATU
(N
AVD
O
F
IS
O
U G
H O
U T.
AR
TE
IAN
O
U
N D
ITIO
C
O U
N
TE
R
R
D E
AP
P R
O X
IM
ATE
LY
FE
T.
TH
E
R E
FO
R
E
N
S
TR
U C
ALL
ALLO
YO
VATIO
D E
FIN
VATIO
N
TE
N
TIO
M E
R
FAC
S E
R
U
AL
E
AP
R
O X
IM
ATE
LY
T
AB
AD
W
AY,
C O
R R
E S
P O
N D
R
O X
VATIO
T.
AR
TE
N D
ITIO
C O
U N
TE
R
B
A, FLO
S P
ILLE
AVE
M E
N T
E S
S E
N
TIALLY
ITIN
R E
H
ID
T
IM
P E
VAN
C
R
IN
G
W Q
C /A
C O
E P
LA
N
S S
H E
E T o
.-H cn
_j
<C e
B o
EngineerslEtwironm entalS peciali,t, P roject
D i•isionS t:reetB ridgeR epi acem ert D i•iSionS t,.,,,, t,G re11tB arrin9ton,M A
Tow n of G reat B arrington
S am ple D escription v ery soft , .. ray, Silt'/ CLAY, trace fine S and
---i Fixed
--P ist:>n S am ple
U-- 2/ f-
Fixed --P ist:>n S am ple
S --8
--3
W H/18
S
"V ery sofl, gray/ brow n,CLAY& S
ILT,trace f-
• ove, loose, gray/ Drow
n. f,neS
AND
f-
- S ·_'f
_ S+-
V ery st; ff, gray, a..
AY &
S
ILT and line I� coarseS
AN
D
,som eG rasel
N otes:
. D ifficulty rem oving tub., lrom sam pler.S am ple likely highly disturted.
4.A ppro,.
1.S'boulder at oring No.
'No.� lo;
--o-'., -ci,,,cked by:�
<:neral
S trati-.raphy
. U nable to advance c�sing/ roller bit past 65
' du e to dam aged casing. B orehole gr�uted via trem ie m ethods and ol'l' set boring appro�. 3 feet east
(B --l
OIA)
B
S
C
ALE
rt;
T ig h e
B o
Engin..., rsl
Environm entalS pecialists P roject;
D ivision S tru t B rid9e R eplacem ent
Location:
D
M sionS tn, et,G reatB arrinqton,M
A Client:
Tow n o/G reatB ar.-ingt on
D rillir,g Co. New
En11land B oring Conlracle>rs
Fore an:
R.P osa_
Type
FJ
S pltS poon
T &B
R ep.:••
.D
O.D
1-3
B"/
2" D ateS tart:
End:
01/
07/ 20.
Ham m erW t.
00;<
40# loa!tion P lan Ham m •rF all
0"
0"
GS
. Elev.
Rig M ake/ Model B
-53 w
/ auto ham m er
D epth Casing m o/ sam ple B low
,; IP
��,rl�"" ( ft.)
:. /4' c.( in)
-:i h
P er6 " I '(��",;;
Offsetb orin9
11pprox.3 feet&
1st ofB
--1 01.
f-
Casing advanced to 40'; driller atte m pt.ed to f-m i';!t� i�
�l� �" o��� i�
�t
,ippm
,. SO'. B
oneholegrouted si,, trem i., m ethods and otfset aeprox. 6' north [B
--1 01B
B
A
S C
ALE
rt, G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E E
T O
V E
R H
O U
S A
T O
N
IC
R
IV
AT
E I
F
ED. A
ID PR
OJ. N
O.
I s�
T I s TH OE T
{r�
I I
I
O
JE
C T
F
ILE
N O
B O
R
IN
G L
O G
S
O
EloringN o.
Pege l of I
F ile �o.�
5000-0_ B _
Cn<!
ed by: � eptt, Cosine N otR ecorded
S tr11ti(Jr11phy
M O
N T
H
D D
YYYY
U
N S
TR
U
C
E E
R
O
N
S
TR
U C
M
AS
S
D O
T
AU
TH
O
R
IZ
N
ATO
R
Y:
U
LY
P R
S C
R
IP
TATE
ID
G
IN
E
LATE
S T
E E
E
ID
G
(0
F
5'-4"
S C
A L E
IN
F
E E
T
10'-8" 5'-4"
A00831 - 22
L,._
LI...
-L,._
Q_
R
T E
S
T ig h e
B o
Eng ;ne
�,,1 En,;,..,,..,,,, ,. .. 15 pociJll;$1, Project·
Division Street Bridge R cpl�ccm cnt Division Str,,"1:
Great Barringt on MA
Tow n ot Great B<irrlnqte>n a�_ - "•: . · a Bor<n<J
C ontrM: to,-,, Ty pe �
T8,, R
I.D./ 0, D, /4 .5"
DateS tart
1/ 10/ lD Ham m erW t Plan
Ham m er Fall R ig MakeJModel
B-w aut.o ham m er
D epth c a s in g lz s� m le pl •
Blow s
De pth
(It
ForF t ec.(in)
(I t,) Sam p leO .,scliption
Ver· 1den.., ,brnw n/ 9ray,fine toc oacse S
ND
--f
--t-
-j-
--jand GR A
VE
L, som e Silt
C -2/
-8
Very dense,gray/ brow n,nneS
A
ND
andS
IL
T f--
---1
(P<Js,ible W e,th ere<I R ock in ,poo n tip
S-3
90- 90
.1 100/
1"
' 1_"-+-
"-·'_ 00
M o derat.e ly hard, m o de,rate l;· t.o sliohtJy eathered, m od erately fractur ed to sou nd, f-li11ht gray -w hite, fin e
!O m e dium g rained
DOL
OS
TON
E,cle>se te> m
<>de,ately closo, f-
---i sholle>w to m od erate ly
-dip p ing fractures
R
EC
SB
60"•
96.7%
--t
--t-
-:-c, -t-
R
Q D
; 4 9'/
60" = Bl .7%
'_l
-t
°'i--:-, ,--t
-j
:1., 7v :
e :�
:;e ad� �x
•�;!� to f-
--t-
-j-f:
:b
:ha�I ::
t;o :
ii:;
C:4 S"/
7S.0% r-
---t-
--t
R Q
D
22.5"/
7.5% r- ---j-
-cs
_ss..., ,_os_ ->
_rn, �, :i:
�Q�� l ;� hs�� nd, r-
�, �: I
:e n;o t�
: di:c:ly g���;:
EC
96.7% f-- ---j-
--t
---j R
Q D
49"/
60" •
0.7%
-6/
!:8 110-115
M
<><ler ately har d, m
<>d erately to sligh�y eathered,ex trem e ly fracturedto soond, light f-gr�y
-w hitc, fin e to m ediu m g r�incd o;:
,7 :
allow fractur"" f-
---i
R
Q D: 3
.5"/
60" = 5 2.5%
ErJdol' borin<, atllS
O
B
S C
ALE
,1i
2 '-
1.
S
E
E T
R
TE
S
W Q
C /A
C O
E P
LA
N
S S
H E
E T o f
Bor ingN o.
o _�
;o�:-o-
C keck• d by
General Strati\lraphy
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E E
T O
V E
R H
O U
S A
T O
N
IC
R
IV
A T
E I
M A
I I
1s
I so
P R
O
JE
C T
F
IL
E N
O
B O
R
IN
G L
O G
S
O
N T
H
D D
S
U
N
S
TR
U C
E S
C R
IP
E
E
R O
N S
TR
U
C
M
AS
S O
O T
AU
TH
O R
IZ
N
ATO
R Y:
U
LY
P
R
E
E E
ID
ID
G
IN
E
LATE
S T
O
(O
F
5'-4"
S C
A L E
IN
F
E E
T
10'-8" 5'-4"
A00831 - 23
LL
21.Q
EL.
.0 (1/
24/ 20) x
:,e l/l cS g
!;i:
.o...
O> u t--
O'.
<D o_ n_
D..
h e
B o
Engin,e.er< I En..-iron ento1Speciali!t•
S am ple D escription l-
-s -,_ I
Loo,e, b,ow n, fine S
AN
D ,m d S
ILT, trace G r.>sel,traoeW ood,m oisl
S -S
/1
20-22 1-v ery 100,e, gray, nrie S
AN
D
, little S ilt
S -6
/1
25-2
1-
Loo,e, 9ray/brow n, fine S
AN
D , ,cm e s;1t
. S w tich fm m 3-l/4"/6
-5/8 " hollow
-sta m aug.,r• to 4"/4-1(2 " Mush -
LITTLE
LI.I JO
20 % oint casin1, at!
S'
S O
E(
:2
0-<
35-< 50 %
B <lringN o.�
Pa11e ol
FileN o.�
5000-0 _B _
Checked by:� epth
Casino R erert.oN otel
- o�•r�undw ater e,tim ated ot 13' t>& sed on sam ple w etne5s .
T
RA C
j � o:� �
S
C
ALE
fs
B O
R
T E S
S
E E
R
TE
S
AR
TE
N D
ITIO
C
O U
N
TE
R
D
E
FR
AD
AY
R
W Q
C /A
C O
E P
LA
N
S S
H E
E T o f-LL
:::e
:::e i= v;
x
MQ
en
.i:S ec>
<O
8:: 9::
h e
B o
Engineer, I �n•ironm ental Spoci�lim
Project:
Divi,ionS treetB ridge Repl;,cem ent
L ocation•
DM
sionS tre.,t,G reatB arrin<;ton, '1A Client·
Tow n ofG rM tB arrin9ton
B low s P,r
6"
(ppm f-
S
_f
;o f -i� n, fine S
AN
D and S
ILT, 2-
3" S ilt&
---i V ery loos,,, gray, fine S
AN
D . som e S ilt
S -9
/1
0-4 f-
---i
Loose, gray, fine S
AN
D , little S ilt
S -1
0/2
45-4
W H
/12 f-v ery soft, grey, Verved S
ILT&.
C
LAY
U -1
/ 2�
7-4
PUS
H f-
---t
Fix� -Pistan S p�
---t
--t H< ed-Pistan S am ple
S -1
3/6
0-62
Loose, light brow n,fin<!lo m edium S
AN
D f-
---i som e S ilt, little G rnvel (Cobble
Fr.>gm ent in sp o on tip)
---i M edium d ense,ligti:
brow n,fin e to edium
--t sAN
D , littjc S ik, trac" G rav"I
00 6"
V eryd ense,� roy/brow n,fine to coar� S
AN
D f-
---t
-r
-t-
--t andG
RAV
EL,trace S ilt s_• _• 1
_ u+-
- 4
-1
_ •1
_ u n _ 4
-i
(C
N T 'D
S
C
ALE
fs
B<> rN1gN o.� eN o.4- �o�
-o-&----- Checked by:� eral S trabgraphy
_QQQ
2ZQ
" 0 h e
B o
[1>9 ine<ers lE nvironm entalS peci•lin
Project, Divi,ionS treetB
-idge R eplacem ent
Locaticn, Division 5
1...,el, G re�t B arr;noton, M A
Client, Tow ne
JG
..,,lltB arrinpton
RM
din
( ppm
S am pl<> D ascriplion f-s _-, _, l
_ "t-
_SO
e � •nse, brow n, SILT a, ,d fine S
AN
D
, trar s_ -, _• l t-
---i
•nse, brow n, SJLT a'ld fine S
AN
D
, tra e s_ -,_a
"t-
---i
�::., � •nse, brow n, SILT a-.d fine S
AN
D , trac"
---t
V ery dense, brcw n, SILT and fine S
-27
30-1
0-� ery dens e,gray/brow n,fioo to coarseS
AN
D
--l and GRAV EL, little sm
(Possible W eathered
R ock)
---i
-28 y dense,black/brow n, fine to coarse S
AN
D
---t
"~ S
~' r
--t and G
RAV
EL, som e S it (Possible W eath ered R ock)
---t
-30/ t:t�
00/6" f-
"-t-
---i N o R ec-every End ofboringat1
SO
S
C
ALE
fs
G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E E
T O
V E
R H
O U
S A
T O
N
IC
R
IV
A T
E I
O
JEC
T FILE NO
612183
B O
R
IN
G L
O G
S
O oring N o.
a.�
�o�� -o-
Chec,ed by:� en erlll S trll�graphy
G
CK
M0NTH/0D/Yl'YY
IS
S
U
N
S
TR
U C
E S
C R
IP
E
E
R O
N S
TR
U
C
S
D O
T
AU
TH
O
R
IZ
N
ATO
R
Y
ID
G
IN
E
LY
LATE
S
T
E E
E
E
ID
G
(0
F
5'-4"
S C
A L E
IN
F
E E
T
10'-8" 5'-4"
A00831 - 24
R
E A
T B
A R
R
IN
G T
D
IV
IS
IO
N
S T
R E
E T
O V
E R
H O
U S
A T
O N
IC
R
IV
A
D . A
ID
P
R O
J . N
O i+-p Op:-(;,]"
O
JE
C T
FILE
N
O
S H
E
T
S
H E
E
61218
W
INGW
ALL
G E
N E
R A
L P
L A
N A
N D
E L
E V
A T
S3-
TL4 RAILING POST SPACING (TYP.)
rn rn
Cll
5' -
0" SHOULDER
PROP .• PRECAST HIGHW
AY
SIL
G
U A
(HW
Y. ITEM
, TYP.
I
STATION
ll+, l-�
'\-r-
-.._1.
--1
-IEQUATION -
-s -1-=
::t-t--r- ""'l r,., 11, GUARDRAIL TRANSITION (TYP.)
I I I-
EXIST. ABUTM
ENT
FOOTING
AND PILES TO REM
AIN
(TYP.) -
------i
I 29+
I
PROP. PRECAST
ABUTM
ENT CAP (TYP.)
31+
N71"20'27"E W
.P. #2
PROP. PRECAST
I W
.P.
APPROACH SLAB (TYP.) _____J
STA. 29+
27 • i
STA. 30H
j4.04
11 '-
0" TRAVEL LANE
<t BRG. EAST ABUTM
ENT
I <t BRG. W
EST �BUTMENT
0 .-__ =_�)JJ=J:j�Z:::S�;+ =��;;=+:==
HIGHW
AY GUARDRAIL
DRf lNAGE
(H W
Y
ITE
M
TY
P
' ""T--r-
--r--
I 5' -
0" SHOULDER
" SAFTEY CURB W
ITH S3-
M
TL4 RAILING (TYP.)
RIP RAP M
2.02.0 (TYP .)
4 SPACES
25' - 0" =
100' - 0"
PARAFFIN JOINT SPACING (TYP.)
136'-
6" P
A
PROP. PRECAST CUSTO
HIGHW
AY GUARDRAIL
TRANSITION (TYP.)
C. TO C. BEARINGS\
LOCATION LINE 1950 COUNTY LAYOUT ALTERATION
1= x
�_j
N
E R
SCALE:
= 2 '-
0"
<t BEARING W
EST ABUTM
ENT
STATION E QUATION: DIVISION STREET CONSTRUCTION �
STA. 29+
95.81
= HOUSATONIC RIVER
� STA. 101+
00.00
STA. 29+
27.54
136' - 6"
EL. 700.63 -
--i-.
-C -_
-T _O _C _. _B _E _A
-RI _N _G
_S -i--
<t BEARING EAST ABUTM
ENT
PRECAST CUSTOM
HIGHW
AY
STA. 3o+ 54.o4
EL. 701.01
GUARDRAIL TRANSITION
8" NON-
P.T. TRANSVERSE
PRECAST HIGHW
AY
IM
PACT ATTENUATOR
PARAFFIN JOINT (TYP.)
W
ELDED PLATE GIRDER
S3-
M
TL4 RAILING
DECK PANELS
GUARDRAIL TRANSITION
(HIGHW
AY IT EM
, TYP.)
HIGHW
AY GUARDRAIL
PROP. C.I.P. EXIST. W
EST ABUTM
ENT
AND W
INGW
A LLS
PROP. LOW
CHORD
EL. 694.43
PROP. PRECAST
ORDINARY HIGH W
ATER LEVEL
PROP. PRECAST
CUT TO EL. 691.90 -
i,vw
.-.i.-..
......-.j
..... '--k
I
/ 11
W
EST ABUTM
ENT CAP�
TEM
PO RARY SUPPO RT OF
EXCAVATION CUT -
OFF EL. 690.5
EL. 687.97 \y
BASE 100-
YR FLOOD
EAST ABUTM
ENT CAP
c---
EXIST. EAST ABUTM
ENT
EL. 693.93
AND W
INGW
ALLS
DESIGN
10-
YR FLOOD
J..
11 \
CUT TO EL. 691.90
EXIST. ABUTM
ENT /W
INGW
ALL PORTION �
I I
I
::-c
TO REM
AIN (TY P.)
f
_ L I
L
:;: ::.o-;, ,:C:-
EXIST. BOT. oF wEsT ABUT. :��\ it
L 1 n i t I TT rr rr 1 1 1 �
- < :: : �j :{ � t� L l �:;,1 :
Y
LJ LJ LJ LJ LJ LJ
DURING CONSTRUCTION (TYP.)
HOUSATONIC RIVER
t
EL. 691.41
OBSERVED W
ATER LEVE L -
-2'
11 \
APPROX. RIVER BED
EL
685 79
_-••. '. ·'&j
_ J
(1/2 .0/2023)
J, 1 Tl
Tl
TT
1 + In
I _J �c� si .7 ti
T. OF EAST ABUT. PILE CAP
CHANNEL SHALL NOT BE REDUCED LESS THAN 91 '-
9" u u u u u u
EXIST. TIM
BER PILES
TO REM
AIN
(TYP.)
SCOUR COUNTERM
EASURE
(TYP.)
SEE SHEET 8 FOR DETAILS
TEMPORARY SUPPORT OF EXCAVATION
TO BE REM
OVED AFTER SCOUR
COUNTERM
EASURE INSTALLA
TION (TYP.)
E L
EV
A
= 2 '-
0" M
N
TH
D
ISSUED FOR CONSTRUCTION
DATE
THIS SHEET IS APPROVED FOR
CONSTRUCTION BY M
ASSDOT
DESCRIPTION
AUTHORIZED SIG NA TORY:
sT =A =T =E
-B =R�I D�G =E�EN-G�I N-E =E =R-
USE ONLY PRINTS OF LA
TEST DATE
S
H E
E T
E
ID
G
O
F
W Q C/
ACO
E
PLAN
S
SH
EET
O
F 21, REVISED
11/
19/
S C
A L E
IN
F
E E
T
A00831 - 25
Cil
Cil rill
Ci, S T
A B
U
TM
E N
T P
0"
EXIST. ABUTM
ENT
I
PORTION TO REM
AIN
M
ATCH EXIST.
RIVER BED
BOTTOM
OF EXIST. PILE CAP
EL. 679±
EXISTING TIM
BER PILES
TO REM
AIN (TYP.) -
.liQIES;_
1.
12" THICK LAYER OF CRUSHED STONE OVER GEOTEXTILE FABRIC.
3' - 0" M
IN.
RIPRAP LAYER ON TOP OF CRUSHED STONE AND BELOW
THALW
EG CONSISTING OF
18" DIAM
ETER FOR D50 AND 36" DIAM
ETER FOR D100. VARIOUS THICKNESS LAYER
OF NATURAL STREAM
BED M
ATERIAL TO M
ATCH EXISTING STREAM
BED ELEVATIONS.
2.
USGS M
ONITORING EQUIPM
ENT LOCATED AT THE EAST ABUTM
ENT M
UST BE
PROTECTED DURING INSTALLATION OF SUPPORT OF EXCAVATION AND SCOUR
COUNTERM
EASURE.
PROP. NATURAL STREAM
BED
M
ATERIAL OVER M
2.02.0 SEE
NOTE 1
TY
P
IC
A
L A
B U
TM
E
N T
S E
C
2'-
8'- 0"
APPROXIM
ATE SUPPORT
OF EXCAVATION TIP
EL. 668.75
I I I
I I
6'-90 i
G R
E A
T B
A R
R
IN
G T
IS
IO
N S
T R
E E
T O
V E
R H
O U
S A
T O
N
IC
R
IV
A
D . A
ID
P
R O
J . N
O
S H
E
T
S
H E
E
I \ I
I
1-
----t-1
SEDIM
ENT CONTROL
I I
I I I I
� 35·op·oo"\
I I
I I
I
\ I
I
TEM
PORARY SUPPORT OF EXCAVATION
EL. 690.5 (TYP.)
TEM
PORARY SUPPORT OF
EXCAVATION TO BE REM
OVED
AFTER SCOUR COUNTERM
EASURE
INSTALLATION (TYP.)
APPROX. RIVERBED THALW
EG
EL.
678.5
BOT. OF SCOUR COUNTERM
EASURE
EL. 674.5 (TYP.)
FOLD GEOTEXTILE FABRIC FOR
PERM
ANENT EROSION CONTROL
BACK 3' -
0" AT TOE
E A
S T
A B
U
TM
E N
T P
BARRIER (TYP.)
RIPRAP M
2.02.0
(TYP.) -
P R
O J
E C
T F
IL
E
N O
O U
R C
O U
N T
E R
M E
A S
U R
E D
E T
A
IL
N T H
D
ISSUED FOR CONSTRUCTION
DATE
THIS SHEET IS APPROVED FOR
CONSTRUCTION BY M
ASSDOT
DESCRIPTION
AUTHORIZED SIGNATORY:
�sT=A=TE�B
R=l
=DG�E�EN_G
_I N�E
=ER�
USE ONLY PRINTS OF LA
TEST DATE
S H
E E
E
ID
G
O
F
W Q C/
ACO
E
PLAN
S SH
EET 19 O
F 21, REVISED
11/ 19/
S C
A L E
IN
F
E E
T
2'-10"
S C
A L E
IN
F
E E
T
5'-4" 2'-10"
A00831 - 26
A00831 - 27
, 19f
(TYP.)
2'- 11f
5'-
S
HO
UL
DE
S3-
TL4
R
A
IL
ING (TYP.)
C.I.P. S
AFETY
C U
RB (TYP.)
11'- 0"
T R
AVEL LA
NE
35'- 3"
D
IV
IS
IO
N
S T
REE
CO
NS
T
R
UC
T
IO
N
I 11'-
0" T
R
AVEL LA
NE
1f
S
UPE
RPAVE B
R
IDGE S
U
RFA
CE COU
RSE
OVE
R 1f
S
UPE
RP
AVE B
R
IDGE P
RO
TEC
T
IVE
CO
U
RSE OVE
R
M
EM
B R
ANE W
ATE
RP
R? OF
ING
C.I.P. CLOS
U
RE PO
ROF
ILE G
R
A
DE L
INE\
8"
TH
ICK
2%
2% P
REC
AST DECK P
A
NEL
ROP. 57t
PLATE G
DE
R
(TYP.)
DECK P
A
NEL
l12"
5 SP. @
5'-
1oi " = 29'-
3¾"
2'-8"
2'-8" 5'- 4" iiiiiiiiiiiiiii
ID
O
C
SCALE IN FEET
ALE: �" = 2'-
0"
17'- 1t
DECK P
NEL
3" (TYP.)
5'-
HO
UL
8"
REVEAL
(TYP.)
G1 2·- 11�"
# 4 @ 6" (T&
B)
" CL.
P
REC
AST
DECK P
A
NEL
G
ALV
A N
IZE
D
SC
REE
N
OVE
IPES -
23 G
AGE,
i\" M
ESH \
SE
AL E
DGE OF P
U
NC
TU
RE IN
M
EM
B
R A
NE WAT
E
RP
ROOF
ING
W
IT
H
TA
R
M
AST
IC (TYP.)
SOCKET TYPE
CO
UPL
ING
45·
ELBOW (TYP.)
r 0 SCHE
DULE 40
P.V.C D
R A
IN
P
IPE
(TYP.)
16 1" 3"
S3- M
TL4
R
A
IL
ING--.
I
# 4
ADD'L.
# 4
2'- 9"
S E
C
O U
FElY
ALE:
1" = 2' -
0"
SCALE IN FEET
t x r°U
G
ROOVE F
ILLE
ITH JO
IN
T
SE
ALE
2' f'
RECESS
HM
A W
E A
R
ING
t-- ----+a t--
RF
ACE
3" i------1
FA
CE OF
AB
U
TM
E
N
--a
C
ALE:
1f' = 2'-
0"
D E
IP
ALE: 1f = 2'-
0" 8"
!'- 4" iiiiiiiiiiiiiii
SCALE IN FEET
WQ
C
/A C
O E
P
LA
N S
S H
E E
T
1 o f 2
SEE
DET
A
!' -4 " iiiiiiiiiiiiiii
S E
C
TIO
N
SC
ALE:
SCALE IN FEET
1r
= 2'- 0"
D E
A
AIL
1'- 4"
!'- 4" 2'-8" iiiiiiiiiiiiiii
ALE:
f
2' - 0"
SCALE IN FEET
BOTTOM
PLA
TE
f
' 0 SC
HE
DULE 40
P.V.C.
D
R A
IN
P
IPE
NO
N-
W
EL
D U
IT CLAM
P
D
ET
EB
SCALE :
1f
8"
SCALE IN FEET
P A
R A
F
JO
T D
E
TAIL
!'- 4"
!' -4"
SC
ALE:
ii" 2' -
0"
!'- 4"
SCALE IN FEET
2'-8"
-..r
ROOVE
#5
6"
3" CL.
t C
H
AM
NS
T. JO
AKE F
IN
ISH)
# 5
6"
2" CH
AM
(TY
P.)
EAT BAR
R
ING
TO
N
DM
SIO
N STR
EET O
VER
HO
USATO
N
IC
IVER
T
E.
I
F E
D
. AI
D P
R O
J . N
O
I s�� T
I s � E r�
I
I
I
P R
O
JE
C T
F
IL
E N
O
TR
ANSVER
SE B
R
ID
G
E SEC
TIO
N
AN
D C
UR
B DETAILS
1" __/
NS
T. JO
(R
AKE F
IN
ISH)
W.P.
A
N D
E
OF M
B R
A
NE
W
ATE
RP
ROOF
ING
2%
I
� 1il �
F A
F lY
TA
4"
ALE: 3" = 2'-
0"
4"
SCALE IN FEET
I �
-I
MONTH/DD/YYYY
ISS
UE
D
FO
R
CO
NST
R
UC
T
---1 l--
D:a:. A.:.:. T .::. E _
D :::.a E::.:: S"' C c..: R
.::.. IP
..:. Tl:.:: O .:.o N
---1
T H
IS S
HEET
IS
APP
ROVE
D
CONS
R
UC
TI ON BY M
ASS
DO
ml
1--
A "'"' U
'"'" T '"'" H
O "'"' R"" l"" Z E'=' D-
S
'"" IG
"°' N '-" A
T '--; O,,, R
..:. Y
""'s=--'
T�A ""T: E=- -, B:R "'l"= D� G "'E=, -:E'-- N� G"=._ I N� E� E
""R_----1
USE O
LY P
R
IN
TS OF LA
TES
S
H E
E T
O F
E
ID
G
O
F)
A00831 - 28
Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs
Department of Environmental Protection Address: 100 Cambridge Street, Suite 900, Boston MA 02114 | Phone: 617-292-5500
Maura T. Healey Governor
Kim Driscoll Lieutenant Governor
Rebecca Tepper Secretary
Bonnie Heiple Commissioner
1/12/2026
Massachusetts Department of Transportation Highway Division 10 Park Plaza, Suite 6340 Boston, MA 02116 ATTN: Courtney Walker
RE: 401 WATER QUALITY CERTIFICATION
BRP WW 11, Minor Fill Project
BRP WW 08, Minor Dredge Division Street Bridge G-11-002 (04F) replacement over the Housatonic River Great Barrington, MA
401 WQC Filing Number: 25-WW26-0024-APP
USACE Application No. NAE-2025-02189 MassDOT File Number: 612183
Dear Ms. Walker:
The Massachusetts Department of Environmental Protection (MassDEP) has reviewed your application for a Water Quality Certification (WQC), as referenced above. The WQC application was deemed complete on December 12, 2025. In accordance with the provisions of MGL Ch. 21, §§26-53 and Section 401 of the Federal Clean Water Act as amended (33 U.S.C. §1251 et seq.), it has been determined there is reasonable assurance the proposed project will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00) and other applicable requirements of state law.
The project proposes the replacement of the existing, temporary bridge (G-11-002 (04F)) superstructure over the Housatonic River, as well as improvements to the existing roadway approaches and minor stormwater improvements in Great Barrington (the Project).
Proposed work includes riprap scour protection which will be installed around the existing abutments.
A00831 - 29
The Commonwealth of Massachusetts Department of Environmental Protection
Address: 100 Cambridge Street, Suite 900, Boston, MA 02114 Phone: 617-292-5500
The original bridge, constructed in 1950, consisted of a single-span structure with an overall bridge span of 136.5 feet and width of 25 feet. This bridge carried two 10-foot travel lanes with no shoulders. The original bridge was closed to vehicular traffic in 2019 due to structural deficiencies and the current temporary structure was installed in November of 2022. The temporary bridge is a single-span structure with a length of 140 feet and a width of 26 feet-10 inches. The temporary bridge carries one lane of alternating traffic and a 5-foot sidewalk. Division Street is a two-lane, uncurbed road with two 11-foot travel lanes and no shoulders or sidewalks.
The Project will occur within Priority Habitat of several state-listed species. Accordingly, the Natural Heritage & Endangered Species Program of the MA Division of Fisheries and Wildlife (NH&ESP) has determined that, in order to avoid a prohibited take of state-listed species, the conditions outlined in the NH&ESP letter of October 10, 2025 shall be met. This includes a prohibition of in-water work between April 1st and July 15th. While the Housatonic River as a whole is considered a cold water fishery, the MA Division of Fisheries and Wildlife has stated that this particular location is not known for supporting cold water fish.
The Project will occur within a Federal Emergency Management Agency (FEMA) 1% annual chance of flooding zone (Zone AE) associated with the Housatonic River but will not impact the Base Flood Elevation or regulatory floodway. Though TMDLs have not been established for this segment of the Housatonic River, it is listed as a Category 5 waterway in the Integrated List of Waters as a result of impairment due to the presence of the invasive zebra mussel (Dreissena polymorpha) and elevated concentrations of PCBs (polychlorinated biphenyls) in fish tissue.
The Project will replace the existing temporary bridge with a new 136.5-foot single-span structure consisting of steel plate girders with a composite concrete deck. The new bridge width will be 32 feet consisting of two 11-foot travel lanes, one in each direction, and 5-foot shoulders on both sides. The existing abutments will be cut down, recapped, and reutilized with the construction of the new superstructure. These abutments will have riprap scour protection installed around them. 330 feet of full depth reconstruction of the approaches will occur, with approximately 160 feet on the east side of the bridge and 170 feet on the west side. During the course of project review, the proposed quantity of riprap to be installed was decreased while the quantity of proposed natural streambed material to be installed was increased.
A00831 - 30
In total, 2,368 square feet (sf) of permanent impact to Land Under Water (LUW) is required to complete the project. Permanent impacts are due to the placement of riprap scour countermeasures surrounding the existing bridge abutments.
Installation of riprap scour protection will require dredging of approximately 674 cubic yards (cy) of material. The Project area is known to have high levels of PCBs which was corroborated by soil samples taken in April of 2025. These samples also revealed low levels of heavy metals just below the RCS-1 limit. Proper handling, containment, dewatering and transportation of this material will be conducted throughout the duration of the project.
An alternatives analysis was completed in accordance with 314 CMR 9.00. Three alternatives were considered, and the chosen alternative was picked to minimize impacts to the Housatonic River. The no-build alternative is not practicable to meet the project goal of removing the temporary bridge superstructure.
The Project meets the Stormwater Management Standards to the maximum extent practicable (MEP) per 314 CMR 9.06(6). The installation of the pathways and hardscapes at the approaches will increase impervious surface within the Project limits by 3,205 sf.
The proposed stormwater improvements include four additional deep sump catch basins placed along the northern and southern edges of the western approach. The proposed catch basins will connect into the existing closed drainage system, discharging to the Housatonic River. Additionally, the two catch basins installed along the southern edge of the roadway will discharge stormwater to two proposed leaching basins, which will be installed along the southern edge of the western approach. Additional stormwater control measures (SCMs) were not proposed due to steep slopes and the presence of Article 97 property in close proximity to the project limits.
The Project will comply with the Stream Crossing Standards to the maximum extent practicable. All standards will be met except for Standard 3. Bankfull width of the Housatonic River is 152 feet, requiring a span of 182 feet to satisfy 1.2 times bankfull width. The current span of 134 feet will not change because the existing abutments will be utilized for the proposed bridge.
Based on a review of information provided by the applicant, MassDEP finds that this project complies with the standards described under 314 CMR 9.06. Public notice was
A00831 - 31 provided in the Berkshire Eagle on October 3, 2025. No comment letters were received during the public comment period.
Therefore, based on information currently in the record, MassDEP grants a WQC for this project subject to the following conditions to maintain water quality, to minimize impact on waters and wetlands, and to ensure compliance with appropriate state law. MassDEP further certifies in accordance with 314 CMR 9.00 that there is reasonable assurance the project or activity will be conducted in a manner which will not violate applicable water quality standards (314 CMR 4.00) and other applicable requirements of state law. Finally, the Department has determined that upon satisfying the conditions and mitigation requirements of this approval, the project provides a level of water quality necessary to protect existing uses and accordingly finds that the project to be implemented satisfies the Surface Water Quality Standards at 314 CMR 4.00. This WQC is for all federal permits and licenses, including the U.S. Coast Guard Bridge Permit, pursuant to 40 CFR Part 121.
Pursuant to 314 CMR 9.09(1)(d); 314 CMR 9.06(6)(a); 310 CMR 9.06(2); 314 CMR 9.07; 314 CMR 9.07(1); 314 CMR 9.09(7)(5)(c); 314 CMR 9.11; and 314 CMR 9.09(1)(e), the following Special Conditions are necessary to ensure that construction practices and stormwater controls are implemented in such a manner as to prevent degradation to wetlands and waters; ensure that practicable steps have been taken which will avoid and minimize impacts to wetlands and waters; minimize turbidity and sediment caused by construction activities; ensure that water quality is not degraded, and that biology of the waters are not negatively impacted by potential discharges; and/or maintain a record of the dredged material for reference and to ensure accountability in its transportation.
Those Special Conditions that require direct submittals to MassDEP for either review, or review and approval, are denoted by the following notation (Submittal) at the end of the condition and are summarized in Attachment A. In addition, those conditions with the (Submittal) designation shall be included in the Special Provisions and, as applicable, reviewed at the Pre-Construction Meeting.
1. All work shall be performed in accordance with the following documents and plans:
a. Application for Water Quality Certification. “Bridge No. G-11-002 (04F) Replacement Division Street over Housatonic River” in Great Barrington, MA.
Prepared by Green International Affiliates on behalf of MassDOT, dated
A00831 - 32
September 30, 2025, with cover letter and attachments. 401 WQC Filing Number: 25-WW26-0024-APP.
b. MassDEP Technical Review, 401 Water Quality Certification, Minor Fill and Dredge Project Certification. Bridge No. G-11-002 (04F) Replacement Division Street over Housatonic River in Great Barrington, MA. Dated October 22, 2025.
c. Responses to MassDEP Technical Review, 401 Water Quality Certification, Minor Fill and Dredge Project Certification. Bridge No. G-11-002 (04F) Replacement Division Street over Housatonic River in Great Barrington, MA.
Prepared by Green International Affiliates on behalf of MassDOT, Dated December 11, 2025.
d. MESA Determination from Massachusetts Division of Fisheries and Wildlife, Natural Heritage & Endangered Species Program, dated October 15, 2025.
Pre-Construction
2. A qualified Fluvial Geomorphologist (FGM) with a minimum of five years of relevant professional experience in stream replication and restoration projects shall be employed to oversee all LUW replication and restoration activities as proposed in the WQC application and approved herein. The name, contact information, and qualifications of the FGM shall be provided to MassDEP for review and approval with a copy to the Great Barrington Conservation Commission prior to the Pre- Construction Meeting required in Condition 5. The FGM shall either attend the Pre- Construction Meeting or a separate virtual or onsite meeting with MassDEP, MassDOT, and the Contractor prior to any LUW replacement or restoration work.
(Submittal)
3. One individual with at least three years of experience with construction period erosion and sedimentation controls shall be employed to be responsible for CP/PP inspections (CP/PP Inspector). The name, contact information, and qualifications of the CP/PP Inspector shall be provided to MassDEP for review and approval with a copy to the Great Barrington Conservation Commission prior to the Pre- Construction Meeting required in Condition 5. (Submittal)
A00831 - 33
4. Prior to the Pre-Construction Meeting required in Condition 5, the applicant shall provide MassDEP with the name and contact information of the Resident Engineer (RE) responsible for ensuring that all work complies with the conditions of this WQC. (Submittal)
5. A minimum of 21 days prior to the start of ground disturbance or vegetation clearing, MassDOT shall contact MassDEP to schedule an onsite Pre-Construction Meeting to review the approved plans and terms and conditions of this WQC. The RE, the construction contractor (Contractor), a representative from the MassDOT Environmental Section and/or the District Environmental Engineer shall attend the Pre-Construction Meeting. No work shall commence prior to the Pre- Construction Meeting.
6. MassDEP shall be copied on applicable submittals to the U.S. Army Corps of Engineers (USACE). These include but are not limited to: Self-Verification Notification Form (SVNF); Pre-Construction Notification (PCN); Work-Start Notification Form; Mitigation Work-Start Notification Form; and Compliance Certification Form. The Work-Start Notification Form shall be submitted at least 14 days before the anticipated start of work and the Compliance Certification Form shall be submitted within 30 days following the completion of the authorized work.
(Submittal)
7. A CP/PP shall be developed and implemented as required by 314 CMR 9.06(6)(a)8.
A minimum of 14 days prior to the start of work, MassDOT shall submit the CP/PP for review and approval. If the U.S. Environmental Protection Agency (EPA) Construction General Permit (CGP) applies, the Stormwater Pollution Prevention Plan (SWPPP) may serve as the CP/PP, providing it includes the measures required to be in the CP/PP per these Special Conditions, in addition to the measures specifically required by the CGP. Any subsequent changes to the approved CP/PP (defined herein as including the construction period SWPPP if applicable) must be approved by MassDEP. (Submittal)
8. Training regarding erosion and sedimentation controls is required. The CP/PP Inspector and any other relevant personnel responsible for erosion and sedimentation controls shall complete the EPA CGP Inspector Training, or other training that meets the CGP requirements, as well as complete a comprehensive
A00831 - 34 review of the approved CP/PP. Proof of completion of the training shall be submitted to MassDEP prior to the start of work. (Submittal)
9. The CP/PP shall identify, but shall not be limited to, staging and laydown areas in relation to LUW, proposed dewatering methods and locations, proposed stockpile locations and their proximity to catch basins or other drainage conveyances that discharge to wetland resource areas, and the location of construction-period erosion and sedimentation controls. Stockpiles shall be located no less than 50 feet from LUW, catch basins, or other drainage conveyances that discharge to LUW.
10. A minimum of 14 days prior to the start of work, MassDOT shall submit a Control of
Water Plan for review and approval. The Plan shall include a description of proposed methods to isolate and dewater work areas within streams while maintaining stream flow, including but not limited to the method of isolation (e.g., steel sheeting or sandbag cofferdam), dewatering methods and locations and specifications for stream bypass systems as applicable. The Control of Water Plan shall include a plan depicting LUW boundaries, and the location of all relevant methods and materials which shall be located within the LUW impact areas approved herein. The plan shall meet the requirements of the CP/PP and be specific to the Project. Dewatering and stream bypasses shall be conducted under the supervision of the RE or other project staff with knowledge of these practices and comply with the applicable conditions identified herein. (Submittal)
11. Prior to the start of work, approved erosion and sedimentation control measures shall be installed per the approved CP/PP and as applicable, the manufacturer specifications. Erosion and sedimentation control measures may consist of, but are not limited to, silt fence, staked straw bales, silt/turbidity curtains, compost filter tubes, etc.
12. Prior to the Pre-Construction Meeting, the boundaries of LUW shall be re-flagged where they are within 50 feet of the limits of work. All boundary markers, once in place, shall remain in place throughout construction until all disturbed surfaces have been permanently stabilized. Boundary markers shall be fully evaluated annually and refreshed where needed. Implementation of and compliance with this requirement shall be documented by the RE. All construction personnel shall be made aware of these markers.
A00831 - 35
13. Prior to any work within the 1% annual chance of flooding zone within Project limits, including mobilization or storage of equipment and materials, a Flood Contingency Plan shall be submitted to MassDEP for review and approval that includes at a minimum the following information and provisions: (Submittal)
a. The RE and/or Contractor shall monitor the National Weather Service forecast daily, and upon issuance of a flood watch or flood warning for the Project area, the Flood Contingency Plan shall be implemented.
b. Upon implementation of the Flood Contingency Plan, all construction equipment and materials located below the Base Flood Elevation (BFE) shall be removed and placed in an upland location above the BFE and outside of
LUW.
c. Anchored stationary equipment may remain below the BFE if demonstrated to be required and upon written approval from MassDEP.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .