A00840-612183.pdf

PDF 7 MB Posted

Attached to
612183 GREAT BARRINGTON FAP No. HIP(NGB)-003S(961)X Bridge Replacement, G-11-002, Division Street
Solicitation number
BD-27-1030-0H100-0H002-130317
Issued by
Berkshire County, Massachusetts

About this file

This document is a memorandum and administrative completeness review correspondence between the Massachusetts Department of Environmental Protection (MassDEP), the Massachusetts Department of Transportation Highway Division (MassDOT), and Green International Affiliates, Inc. regarding a 401 Water Quality Certification application for the Bridge No. G-11-002 replacement project on Division Street over the Housatonic River in Great Barrington, Massachusetts. The project involves replacement of an existing bridge superstructure with a 136-foot-6-inch structure, placement of riprap scour countermeasures within the Housatonic River, roadway improvements, and installation of additional catch basins and leaching basins. MassDEP issued an Administrative Completeness and Technical Deficiency Review letter dated October 22, 2025, requiring supplemental information and clarifications. The applicant submitted comprehensive responses on December 11, 2025, addressing seven specific technical deficiencies, including correction of structural length discrepancies, clarification of Time of Year restrictions, field verification of bankfull width measurements, inclusion of Licensed Site Professional specifications, cofferdam system design details, and complete removal of temporary sheet piles. Public notice was published in the Berkshire Eagle newspaper on October 3, 2025, initiating a 21-day public comment period. MassDEP coordination with the Massachusetts Natural Heritage and Endangered Species Program (NHESP) required completion prior to certification issuance.

The response documentation demonstrates project modifications resulting from agency coordination, including alterations to the riprap scour countermeasure design to allow complete removal of support of excavation sheet piles, with corresponding decreases in riprap quantities and increases in natural streambed material installation. The project is subject to a Time of Year restriction stipulated in the Massachusetts Endangered Species Act (MESA) Determination Letter dated October 10, 2025, prohibiting water work between April 1 and July 15 to protect state-listed species, particularly mussels. The bankfull width of the Housatonic River was established at approximately 134 feet through field observations and aerial photograph review, with the conservative StreamStats estimate of 152 feet used for stream crossing narrative discussions. Special provisions addressing mussel and fisheries protection requirements are included in the project contract to avoid taking state-listed species. The estimated project value is $8,626,000 with proposals due July 7, 2026, through www.bidx.com, requiring pre-qualification by MassDOT in the BRIDGE-CONSTRUCTION category and a 5% proposal guaranty. The project is subject to prevailing wage requirements and price adjustments for materials including hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural steel.

View the file

Other files

File Type Posted
612183 - Notice to Contractors.pdf PDF
A00872-612183.pdf PDF
A00871-612183.pdf PDF
A00832-612183.pdf PDF
A00830-612183.pdf PDF
A00820-612183.pdf PDF
A00803-612183.pdf PDF
A00811-612183.pdf PDF
612183 - Plan Holders List 6-23-2026.pdf PDF
A00870-612183.pdf PDF
A00875-612183.pdf PDF
A00802-612183.pdf PDF
A00841-612183.pdf PDF
A00831-612183.pdf PDF
612183 Bid Items List.txt TXT text file
A00801-612183.pdf PDF
GREAT BARRINGTON-612183-134691-A-1.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 612183-134691

A00840 - 1

DOCUMENT A00840

MASSACHUSETTS

Department of Environmental Protection

ADMINISTRATIVE COMPLETENESS REVIEW OF THE

401 WATER QUALITY CERTIFICATE APPLICATION

LETTER AND RESPONSES

A00840 - 2

THIS PAGE IS INTENTIONALLY LEFT BLANK

MEMORANDUM

December 11, 2025

This memorandum provides the responses to DEP Administrative Completeness and Technical Deficiency Letter for 401 WQC Transmittal No: 25-WW26-0024-APP.

Proof of public notice published in the Berkshire Eagle newspaper on October 3, 2025 is attached to these Responses.

Responses to each technical review comment are noted below in Bold.

GENERAL

1. Section 4.0 (Proposed Conditions) states a 136.5-foot superstructure will be installed while section

1.0 (Introduction) states it will be a 138-foot structure. Please clarify which length is correct.

The correct length is 136’-6”, as shown on the plans and noted in section 4.0. The inclusion of the 138’ length was a clerical error.

2. Section 11 states that “proposed activities are likely to be subject to Time of Year restriction by NHESP” while an attached letter from Adam Kautza indicates that DFW will not request a TOY restriction. Please clarify.

To: Heidi M. Davis, MassDEP (heidi.davis@mass.gov )

Cc: Dan Vasconcelos, USACE (daniel.b.vasconcelos@usace.army.mil) Kevin Newton, USACE (Kevin.M.Newton@usace.army.mil) Ryan Hale, MassDEP (ryan.hale@mass.gov) Tyler Lewis, MassDEP (tyler.lewis@mass.gov) Melissa Lenker, MassDEP (Mellissa.Lenker@dot.state.ma.us) Janhavi Limaye, PM, MassDOT (janhavi.b.limaye@dot.state.ma.us) Lily Collins, MassDOT ( lily.r.collins@dot.state.ma.us) Courtney Walker, MassDOT (courtney.l.walker@dot.state.ma.us) Michael Joa, MassDOT (michael.a.joa@dot.state.ma.us) Great Barrington Conservation Commission (conservation@townofgb.org) Matthew LaPlante, Green International Affiliates, Inc. (mlaplante@greenintl.com)

From: Oxana Fartushnaya, Green International Affiliates, Inc.

Date: December 11, 2025

Project Name: Bridge No. G-11-002 (04F) Replacement, Division Street over Housatonic River, Great Barrington, MA

Project Number: Green No. 21058.01XX

Subject: Response to MassDEP Administrative Completeness and Technical Deficiency Review letter for 401 WQC Transmittal No: 25-WW26-0024-APP

A00840 -3

Response to MassDEP Administrative Completeness and Technical Deficiency Review letter for 401 WQC Transmittal No: 25-WW26-0024-APP

The DFW coordination materials received at the time of our initial Water Quality Certification submission included Adam Kautza stating that a TOYR was unlikely to be necessary. However, since the submission of our applicant materials, the MESA Determination Letter received from the Division of Fisheries and Wildlife, dated October 10, 2025, includes a TOYR stipulating that “no work shall occur within water from April 1 – July 15”. A MESA Determination letter, dated 10/10/2025, was submitted to DEP via email as well as uploaded on ePLACE, on 10/14/2025.

3. Section 5.0, Stream Crossing Narrative, notes that the bankfull width of the Housatonic Rivers is 152 feet according to StreamStats. Was the bankfull width field verified? And if so, where was the measurement taken?

Section 3.2 of the WQC narrative notes that the existing bankfull width (BFW) of the Housatonic River, as measured in the field, is approximately 134 feet, while Section 12 (SCGS #3) references the USGS StreamStats value of approximately 152 feet. During the August 15, 2025 pre-filing site visit with MassDEP and USACE, it was agreed that the BFW could be reliably estimated using StreamStats data and verified through aerial imagery. The BFW was observed to be well-defined and consistent along the river reach between the Risingdale Dam (NATID: MA00250), about 0.9 miles upstream, and the Williams River confluence about 0.5 miles downstream. Based on field observations and aerial photograph review, the average BFW was approximately 134 feet (ranging from ~115 feet upstream to ~150 feet downstream). For the stream crossing narrative discussion section (SCGS #3), the more conservative StreamStats value of 152 feet was used (Please see the attached MassMapper Markup).

4. A DOT Specification for a Licensed Site Professional (LSP) should be included.

MassDOT Item 180.03 is included in the Contract (Please find attached).

5. The proposed cofferdam system for dewatering and installation of riprap does not appear to provide adequate room for the contractor to work. Please provide details of the anticipated cofferdam system and how it will allow for the proper installation of the riprap.

The proposed sheet pile layout reflects the standard approach used on projects of a similar nature. Sheet piles would not typically be moved farther out, as the contractor can excavate directly up to them without issue. The specific cofferdam details are also normally determined by the contractor. Per discussions on 11/6/2025, MassDEP agreed that the proposed layout of the cofferdam system for dewatering and installation of riprap will suffice for this project.

6. A note on Plan Sheet 23 of 52 states that temporary support of excavation will be cut off 1 foot below riverbed. All steel sheet piles installed for dewatering and support of excavation should be removed completely.

Following discussions with MassDEP on 11/6/2025, the riprap scour countermeasure design was altered to allow for the support of excavation sheet piles to be completely removed from the riverbed once the installation of the riprap and natural streambed material is complete. The new design will not shift the proposed scour countermeasure impact footprint or alter dredge/fill volumes; however, the proposed quantity of riprap to be installed has decreased while the

A00840 -4

Response to MassDEP Administrative Completeness and Technical Deficiency Review letter for 401 WQC Transmittal No: 25-WW26-0024-APP quantity of proposed natural streambed material to be installed has increased. The bridge plan sheets have been modified to reflect these changes and are attached to this document.

7. MassDEP understands coordination with the Massachusetts Natural Heritage and Endangered Species Program (NHESP) is ongoing regarding Priority and Estimated Habitats of Rare Species at the project site. Please note that NHESP coordination must be complete prior to issuance of the WQC.

MESA Determination letter, dated 10/10/2025, was emailed to MassDEP and was uploaded on ePLACE on 10/14/2025. The project contract includes special provisions to address the special conditions for mussel and fisheries protection to avoid a Take of state-listed species. No work will occur in water from April 1 to July 15.

Enclosed with this letter response are the following documents:

Proof of published public notice MESA Determination MassMapper BFW Measurements MassDOT Item 180.03 Bridge Plan (Sheets 6 & 8)

Y:\Shared\Engineering\Projects\2021\21058\21058.01XX Great Barrington Division St\612183\DOCS\PERMITS\WQC\Admin And Techdef Review\Responses To Admin And Tech Def - 612183.Docx

A00840 -5

ATTACHMENTS

• Administrative Completeness and Technical Deficiency Review letter, dated 10/22/25

• Proof of published public notice

• MassMapper BFW Measurements

• MESA Determination, NHESP File No.: 24-18735, dated 10/10/2025

• MassDOT Item 180.03

• Bridge Plan (Sheets 6 & 8)

A00840 -6

Maura T. Healey Governor

Kimberley Driscoll Lieutenant Governor

Rebecca L. Tepper Secretary

Bonnie Heiple Commissioner

This information is available in alternate format. Please contact MassDEP at 617-292-5500.

TTY# MassRelay Service 1-800-439-2370 MassDEP Website: www.mass.gov/dep

Printed on Recycled Paper

October 22, 2025

Massachusetts Department of Transportation Highway Division Ten Park Plaza, Suite 4160 Boston, MA 02116 ATTN: Michael Joa

RE: 401 WATER QUALITY CERTIFICATION

Administrative Completeness and Technical Deficiency Review

401 WQC Transmittal No: 25-WW26-0024-APP

AT: Division Street Housatonic River Great Barrington, MA

Dear Mr. Joa:

The Massachusetts Department of Environmental Protection (MassDEP) Wetlands Program Highway Unit has completed its Administrative Completeness Review of the application for the above-referenced Water Quality Certification (WQC) application. The application requires proof of public notice in the Environmental Monitor per Section 24 of Chapter 79 of the Acts of 2014 to be administratively complete. In addition, please provide proof of which newspaper the legal ad was published and date of publication per 314 CMR 9.05(3).

MassDEP has also completed its Technical Review of the above-referenced application and requests that you submit the following additional information:

1. Section 4.0 (Proposed Conditions) states a 136.5-foot superstructure will be installed while section 1.0 (Introduction) states it will be a 138-foot structure.

Please clarify which length is correct.

A00840 -7

2. Section 11 states that “proposed activities are likely to be subject to Time of Year restriction by NHESP” while an attached letter from Adam Kautza indicates that DFW will not request a TOY restriction. Please clarify.

3. Section 12.0, Stream Crossing Narrative, notes that the bankfull width of the

Housatonic Rivers is 152 feet according to StreamStats. Was the bankfull width field verified? And if so, where was the measurement taken?

4. A DOT Specification for a Licensed Site Professional (LSP) should be included.

5. The proposed cofferdam system for dewatering and installation of riprap does not appear to provide adequate room for the contractor to work. Please provide details of the anticipated cofferdam system and how it will allow for the proper installation of the riprap.

6. A note on Plan Sheet 23 of 52 states that temporary support of excavation will be cut off 1 foot below riverbed. All steel sheet piles installed for dewatering and support of excavation should be removed completely.

7. MassDEP understands coordination with the Massachusetts Natural Heritage and Endangered Species Program (NHESP) is ongoing regarding Priority and Estimated Habitats of Rare Species at the project site. Please note that NHESP coordination must be complete prior to issuance of the WQC.

Upon receipt of all requested supplemental information, MassDEP has 30 calendar days in which to issue or deny a certification.

Should you have any questions relative to this letter, please contact me at heidi.davis@mass.gov and Tyler Lewis at tyler.lewis@mass.gov.

Sincerely, Heidi M. Davis Highway Unit Supervisor

Ecc: DEP WERO – Michael McHugh USACE – Dan Vasconcelos MassDOT – Melissa Lenker MassDOT – Courtney Walker

Proposal No. 612183-134691

A00840 -8 mailto:heidi.davis@mass.gov mailto:tyler.lewis@mass.gov

MassDOT – Lily Collins Green International - Oxana Fartushnaya - ofartushnaya@greenintl.com

Great Barrington ConCom – Kate Van Olst - conservation@townofgb.org

A00840 -9

B6 | CLASSIFIEDS | The Berkshire Eagle | BerkshireEagle.com Friday, October 3, 2025

WANT TO BE SEEN BY OVER

40,000 READERS?

FRONT PAGE

BOX ADS ONLY

$35PER

DAY

Reserve yours today and get your message seen!

1-800-245-0254, EXT. 4

classifieds@newenglandnewspapers.com

HELP YOUR BUSINESS EXPLODE!

Advertise in the Professional Service Directory. Call today: 413-496-6340.

CHESHIRE, 21 MEADOWVIEW DR.

Sat., 10/4, 9-4pm. Bench drill press, miter & table saw, hand, power & garden tools, hardware, workbench, wheelbarrow, PVC piping, paint brushes, weights, Diamond Back bike, household, china, Angels, clothing, pickleball, golf, & free stuff.

Tag Sales

Town of New Ashford Special Town Meeting The New Ashford Select Board has called a Special Town Meeting for Monday, October 20, 2025 at 6PM at the New Ashford Town Hall, 188 Mallery Road. The warrant articles are available at the Town Hall, at newashford-ma.us, or by e-mail treasurer@townofnewashford.com.

Ad# 97727 10/03/2025

COMPANIONS NEEDED ~ job is for 5 Days a Week — 5 Hours pe Day — Salary is $30 per Hour. Clean record, good recommendations, mobile, with many skills. For more details about the position. email me (manuelandrea062@gmail.com).

Help Wanted

WANTED TO RENT in Pittsfield area on bus route. 2 to 3 bedroom in a duplex with yard, nice neighbor-hood, gas heat. up to $1700 per month. Call 413-441-7745 or 413-841-9431.

I AM SEEKING a studio or a one bedroom apartment in North Berk-shire County. I am able to afford $1200 a month. Please call 413-553-7618.

Wanted to Rent

PITTSFIELD, Large 4 bedroom, 1 bath duplex. Off st parking, wash-er/dryer hookup. $2250+ utilities.

1st & last. Avail 11/1. 518-441-5143.

ALL RENTALS

on-line at:

www.rhabc.com by the Rental Housing Association of Berk-shire County

Apartment Rentals

PUBLIC NOTICE

Massachusetts Department of Environmental Protection

Division of Wetlands and Waterways 100 Cambridge Street, Suite 900

Boston, MA 02114

Pursuant to 33 U.S.C. 1341 and M.G.L. c. 21 §43 and 33 U.S.C.

1341 M.G.L. c. 21 §§ 26 - 53, notice is given of a 401 Water Quality Certification application for the Bridge No. G-11-002 Superstructure Replacement Project in the Town Great Barrington, MA by the Massachusetts Department of Transportation Highway Division, 10 Park Plaza, Room 7360, Boston, MA 02116. The project will include the replacement of the existing bridge superstructure, the placement of riprap scour countermeasures within the Housatonic River along the existing abutments, and roadway improvements. Additional catch basins and leaching basins are also proposed within a portion of the project corridor. Additional information may be obtained from the Massachusetts Department of Transportation — Highway Division at the above address, Attention Courtney Walker or by emailing Courtney.l.walker@dot.state.ma.us.

Written comments should be sent to Heidi Davis, MassDEP Wetlands Program, 100 Cambridge Street, Suite 900, Boston, MA 02114 or heidi.davis@mass.gov within 21 days of this notice.

Any group of ten persons, any aggrieved person, or any governmental body or private organization with a mandate to protect the environment who submits written comments within 21 days of this notice may appeal the Department's Certification. Failure to submit written comments before the end of the public comment period may result in the waiver of any right to an adjudicatory hearing.

Ad#97720 10/03/2025

Primetime A Pittsfield B North County C West Stockbridge, Lanesborough, Hinsdale < Movies Oct. 3, 2025

A B C 7 PM 7:30 8 PM 8:30 9 PM 9:30 10 PM 10:30 11 PM 11:30

(4) (3) (6)

WBZ

WSHM

WRGB

(3) Inside Ed. (N)

(4) Patriots

(6) CBS 6

News at 7 (N)

(3) Ent.

Tonight (N)

(6) Family Feud (N)

'TVPG'

Fire Country "Fire and Ice"

'TV14'

Fire Country "Eyes and Ears Everywhere" 'TV14'

Blue Bloods "Life Sentence" 'TV14'

(3) News (N)

(4) News (N)

(6) CBS 6

News at 11pm (N)

(:35) The Late Show With Stephen Colbert

'TVPG'

(5) (10)

WCVB

WTEN

(5) News (N)

(10) Wheel

(N) 'TVG'

(5) Chronicle (10) Jeopardy!

Celebrity Wheel of Fortune "Joey McIntyre, Retta, Oliver Hudson" (N)

'TVPG'

20/20 (N) (5) News (N)

(10) News10 at 11 (N)

(:35) J.

Kimmel Tom Hanks, Spike Lee 'TV14'

(13) (22)

WNYT

WWLP

(13) ET (N)

(22) Wheel

(N) 'TVG'

(13) Inside Ed.

(22) Jeopardy!

On Brand With "Billboard in the Sky" Southwest Airlines enlists the On Brand Agency. (N) 'TVPG'

Dateline NBC (N) (13) NewsCha

(22) News

(:35) Tonight Show (N)

'TV14'

(57) WGBY 12 12 - (6:30) PBS

News (N)

Rick Steves' Europe

Washington Wk (N)

Firing- Hoover (N)

Perform. "The Magic of Grace Bumbry" (N) 'TVPG'

American Masters "Julia Alvarez: A Life Reimagined"

'TV14'

(45) WCWN 15 15 4 Flip Side (N) Flip Side (N) Law "The Key to the Castle" 'TV14'

Law & Order Toronto "Good Neighbours" 'TV14'

CBS 6 News

(L) (N)

CBS 6

Power

The National News Desk

(L) (N)

(17) WMHT 11 11 5 (6:30) PBS

News (N)

New York Now

Washington Wk (N)

Firing- Hoover (N)

Live at Caffe' Lena:

Vanessa Collier

Lena: A Life In Folk TVFilm Amanpour (N)

(11) WPIX - - 11 One on One: Race for N.J.

Governor (L) (N)

Law "The Key to the Castle" 'TV14'

Law & Order Toronto "Good Neighbours" 'TV14'

PIX11 News at Ten (N) Seinfeld Seinfeld

(51) WNYA 4 4 16 Seinfeld Seinfeld Chicago Fire "Trapped"

'TV14'

NewsChann el (N)

Hollywood (N)

Chicago Fire "The Little Things" 'TV14'

Friends Friends

(23) WXXA 7 8 8 Judy "Brews and Bruise"

Athletes Who Inspire

Women's College Volleyball Nebraska at Penn State From Rec Hall in University Park, Pa. (L) (N)

News10 at 10:00 (N)

News10 at 10:30 (N)

Big Bang Theory, The

Young Sheldon

A&E 38 38 33 The First 48 "Broken Youth" 'TV14'

The First 48 "The Wrong Girl" 'TV14'

The First 48 "Death Comes Knocking" 'TV14'

The First 48 "Life Interrupted; Lucifer" 'TV14'

(:05) First 48 "Dangerous Company" 'TV14'

AMC 29 29 36

(5:45) <++ Carrie (‘13) Chloë Grace Moretz. 'TVPG'

<+++ It (‘17) Jeremy Ray Taylor, Sophia Lillis, Jaeden Martell. (P) 'TVPG' <++ Pet Sematary (‘89) Dale Midkiff. 'TVPG'

BET 79 <++ Men in Black II (‘02) Will Smith, Tommy Lee Jones. 'TVG' (:25) <++ Men in Black 3 (‘12) Tommy Lee Jones, Will Smith. 'TVG'

BRAVO 59 59 37

(5:30) <++ The Twilight Saga: New Moon (‘09) Kristen Stewart. 'TVG'

<++ The Twilight Saga: Eclipse (‘10) Robert Pattinson, Taylor Lautner, Kristen Stewart. 'TVG'

< The Twilight Saga:

Breaking Dawn Part 1

CNBC 48 48 58

Shark Tank 'TVPG' Shark Tank 'TVPG' Shark Tank 'TVPG' Shark Tank 'TVPG' Shark Tank 'TVPG'

CNN 46 46 57 E. B. OutFront (L) (N) Cooper 360 (L) (N) The Source With (L) (N) CNN NewsNight (L) (N) Laura Coates Live (L) (N) COMC 36 36 44 The Office The Office The Office The Office The Office The Office <+++ Dodgeball: A True Underdog Story (‘04) 'TVG'

CSNNE 26 26 30

(6:30) Early

(L) (N)

Early Edition Pats Podcast

Quick Slants

Pats Podcast

BST Fridays (L) (N) BST Fridays

DISC 37 37 39 Deadliest "Dire Straits" Deadliest "Rage Bait" (N) Bering Sea "Gold Can Mend a Broken Heart" (N) 'TV14' Built in the Bronx DISN 43 43 52 Place Place Vampirina Vampirina: Teenage "First Nightmare" Place Place Vampirina Vampirina

ESPN 24 24 25

WNBA Countdown (L) (N) 2025 WNBA Finals Game 1: Teams TBA (L) (N) Football (L)

(N) College Football West Virginia at BYU (L) (N)

ESPN2 25 25 26

College Football Charlotte at South Florida (L) (N) SportsCenter (L) (N) NFL Live

FNC 53 53 60 Ingraham (L) (N) Jesse Watters (L) (N) Hannity (L) (N) Gutfeld! (N) Fox News at Night (L) (N) FREE 122 122 54 (6:30) <+++ Monsters, Inc. (‘01) 'TVG' (:35) <+++ Monsters University (‘13) Billy Crystal. 'TVG' The 700 Club

FX 31 31 <++ Fast & Furious Presents: Hobbs & Shaw (‘19) Dwayne Johnson. 'TVG' <++ Fast & Furious Presents: Hobbs & Shaw 'TVG'

HBO 518 518 500

5:50 < Mortal Kombat

(:45) <+++ The Iron Claw (‘23) Jeremy Allen White, Harris Dickinson, Zac Efron. The Von Erich brothers fight to be world champions. 'TV14'

Real Time With Bill Maher (N) 'TVMA'

Task "All Roads" 'TVMA'

HIST 39 39 34 The UnXplained The UnXplained The UnXplained (N) (:05) Proof-There (N) (:05) The UnXplained

LIFE 30 30 22

NCIS "Hereafter" 'TVPG' NCIS "Detour" 'TV14' NCIS "Prime Suspect"

'TVPG'

(:05) NCIS "Seek" 'TV14' (:05) NCIS "Squall" 'TV14'

MAX 539 531 550

(6:10) <+ Mortdecai (‘15) Johnny Depp. 'TVG'

<++ Bullet Train (‘22) Joey King, Aaron Taylor-Johnson, Brad Pitt. (P) 'TVPG'

(:05) < Your Monster (‘24) Tommy Dewey, Melissa Barrera. 'TV14'

:50 < Amityville: ...

MSNBC 49 49 59 The Weeknight (L) (N) All In With (L) (N) The Briefing (L) (N) Last Word (L) (N) 11th-Stephanie (L) (N)

NESN 54 54 29

NHL Hockey Boston Bruins at Washington Capitals From Capital One Arena in Washington, D.C.

College Hockey Connecticut at Colorado College (L) (N) Bensinger (N)

NICK 33 33 50 Friends Friends Friends Friends Friends Friends Friends Friends Big Bang Big Bang POP Law "Veteran's Day" NCIS: New Orleans NCIS: New Orleans NCIS: New Orleans NCIS: New Orleans

PRMT 55 55 35 Two Men Two Men <++ Fifty Shades of Grey (‘15) Jamie Dornan, Dakota Johnson. 'TV14' <++ Fifty Shades Darker (‘17) 'TV14'

SHOW 551 551 600

(6:15) <+++ Mean Girls (‘04) Lindsay Lohan. 'TVG'

Reunion <+ Grown Ups (‘10) Kevin James, Chris Rock, Adam Sandler. 'TVG'

(:45) <+ Grown Ups 2 (‘13) Kevin James, Chris Rock, Adam Sandler. (P) 'TVG'

SYFY 61 61 48 <++ The Texas Chainsaw Massacre Part 2 (‘86) (P) 'TV14' <++ Scarecrows (‘88) Ted Vernon. (P) 'TV14' Movie

TCM 58 58 303

(5:45) <+++ Cat on a Hot Tin Roof (‘58) 'TVG'

<+++ Rain (‘32) Walter Huston, William Gargan, Joan Crawford. 'TVG'

<++ Another Man's Poison (‘51) Gary Merrill, Emlyn Williams, Bette Davis. 'TVG'

:45 < Audrey Rose

TBS 8 52 24 Big Bang Big Bang <+++ Avengers: Age of Ultron (‘15) Robert Downey Jr.. (P) 'TVG' (:50) < Avengers: Age of Ultron 'TVG' TLC 40 40 41 90 Day Diaries 90 Day Diaries (N) 90 Day Diaries (N) 90 Day (N) Seeking Sister Wife 90 Day

TMC 571 571 610

(5:20) <+++ Zodiac (‘07) Jake Gyllenhaal. 'TVPG'

<+++ Green Room (‘15) Imogen Poots, Alia Shawkat, Anton Yelchin. (P) 'TVPG'

(:35) < Area 51 (‘15) Ben Rovner, Jelena Nik, Reid Warner. 'TVPG'

(:10) <+++ The Grifters (‘90) John Cusack. 'TVPG'

TNT 27 27 23 Movie <+++ Dumb & Dumber (‘94) Jim Carrey. 'TVG' (:45) <+ Joe Dirt (‘01) David Spade. (P) 'TVG' Movie USA 28 28 47 Law-SVU "Totem" WWE Friday Night SmackDown (L) (N) 'TVPG' Rainmaker "Episode 8" (N) Rainmaker (N) / (:05) 9-1-1

(SEAL)

THE COMMONWEALTH OF

MASSACHUSETTS

LAND COURT

DEPARTMENT OF THE TRIAL

COURT

Docket Number: 25 SM 002870

ORDER OF NOTICE

To:

Ardelyne I. Rosario: Justin Shane Moakler and to all persons entitled to the benefit of the Servicemembers Civil Relief Act, 50 U.S.C. c. 50 §3901 (et seq):

PennyMac Loan Services, LLC

THE BERKSHIRE BEWITCHES

ARE SEEKING DONATIONS

FOR AN

UPCOMING FUNDRAISER

to benefit The Dalton American Legion

& Berkshire Bewitches community efforts

The Berkshire Bewitches are reaching out for support from the community & businesses for an upcoming fundraiser later this month at The Dalton American Legion.

•Desserts •Snack size bags of chips •Gift Certificates

•Raffle Items

Your contributions will not only enhance the evening but also demonstrate your commitment to our community. Together, we can create an unforgetta-ble experience while giving back to vital local organiza-tions. Every little bit helps, and your support would mean the world to us and the Legion.

Thank you for considering this opportunity to make a positive impact!

To make a donation

Call/Text 413-464-1651 or email msinopoli@ berkshireeagle.com

AnnouncementsProudly serving the Berkshires DonnaThomasRealty 413-664-9271 www.donnathomasrealty.com

New in North Adams This house has been converted to a 6 Bd, 3 bth single living home. The seller has done extensive interior work. Including a new High

Efficiency Dual-Fired Gas Boiler providing both heat and domestic Hot Water. This residence also comes with an additional lot!

Priced to sell at $199,900 Call Donna Thomas Realty today at 413-664-9271

LEE WATER CUSTOMERS

HYDRANT FLUSHING SCHEDULE

FALL 2025

The fire hydrants in the Town of Lee are scheduled to be flushed on approximately Sunday, October 19, 2025 through November 10, 2025, between the hours of 6:00PM and 2:00AM.

The following is the expected street order for flushing:

Golden Hill, Laurel St., Summer St., Prospect St., W. Park St., Spring St.

and Mandalay Rd.

Fairview St., Stockbridge Rd., George St., Devon Rd., Spring St., Parkview and Mtn. View Ter., Navin Heights, Theresa Ter. and Debra Ave.

Bradley Park, East St., Abbey Court, Hartwood Dr., Bradley St., Mill St., Woodland Rd., Washington Mtn.

Rd.

East Center, Greylock St., Orchard St., Center St., Columbia St., West Center, Canal, Main St., Railroad St.

(Center of Town), Housatonic St.

Marble St., Cone St., Park St, East Lee, Old Pleasant St., Rt. 102 to South Lee.

Any street not listed would be included with nearest listed street.

Customers experiencing dirty water after the flushing should run their cold water tap for 10-15 minutes or until clear. For further information please call the Water Plant on 413-243-5526.

Ad# 97714 10/03/2025,10/11/2025

NORTHERN BERKSHIRE

HOMEFINDERS

TOWN OF GREAT BARRINGTON

PUBLIC HEARING

TOWN OF GREAT BARRINGTON

NOTICE OF PUBLIC HEARING

The Selectboard will hold a Public Hearing on Monday, October 20, 2025 at 6:00 PM at 334 Main St, Great Barrington, MA 01230, to act on the application from Latin Grocery Inc. for transfer of license and change of manager of the All Alcoholic Beverages on-premises liquor license at 284 Main Street, #11, Great Barrington, MA 01230.

Proposed manager: Ne lson Losada-Menaca Stephen Bannon Chair

AD# 97621

10/03/2025

Town of Tyringham

Conservation Commission

Notice is hereby given that the T y r i n g h a m C o n s e r v a t i o n Commission will hold a public hearing on October 9, 2025, 7:00 PM, via Zoom only to act on a Request for Determination of App l icat ion f i led by The Morgan-Alsop Nominee Trust for the parcel known as Map 403, Lot 5, on 28 Main Road. The link will be available on the town website at least 48 hours in advance. The applicant wishes to upgrade a septic system and the described work is within the buffer zone.

Copies are on file at the Town Hall and can be viewed Monday through Thursday 9 AM to 2 PM. All interested persons should attend the public hearing or submit comments in writing to the Conservation Commission. Failure to make recommendations on the matter for review shall be deemed lack of opposition thereto.

Matthew Punt in , Cha i rman T y r i n g h a m C o n s e r v a t i o n Commission

AD# 97749

10/03/2025 claiming to have an interest in a Mortgage covering real property in North Adams, numbered 139 Reed Street, given by Ardelyne I. Rosario, Justin Shane Moakler to Mortgage Electronic Registration Systems, Inc., as nominee for Evolve Bank & Trust, dated February 28, 2020, and recorded in the Berkshire County (Northern District) Registry of Deeds in Book 1706, Page 858 and now held by the Plaintiff by assignment, has/have filed with this court a complaint for determination of Defe n d a n t ' s / D e f e n d a n t s ' Servicemembers status.

If you now are, or recently have been, in the active military service of the United States of America, then you may be entitled to the benefits of the Servicemembers Civil Relief Act. If you object to a foreclosure of the above-mentioned property on that basis, then you or your attorney must file a written appearance and answer in this court at Three Pemberton Square, Boston, MA 02108 on or before November 10, 2025, 2025, or you may lose the opportunity to challenge the foreclosure on the ground of noncompliance with the Act.

Witness, Gordon H. Piper, Chief Justice of this Court on September 29, 2025.

Attest:

Deborah J. Patterson Recorder 28294

Ad# 97693 10/03/2025

Commonwealth of Massachusetts The Trial Court

Probate and Family Court Berkshire Division

44 Bank Row Pittsfield, MA 01201

(413) 442-6941

INFORMAL PROBATE

PUBLICATION NOTICE

Docket No. BE25P0674EA

Estate of: Frederic Carl Chapman Also known as: Frederic C.

Chapman a/k/a Frederic Chapman Date of Death: 05/26/2025

To all persons interested in the above captioned estate, by Petition of Petitioner Ronald L. Russell of Randolph, ME.

a Will has been admitted to informal probate.

Ronald L. Russell of Randolph, ME has been informally appointed as the Personal Representative of the estate to serve without surety on the bond.

The estate is being administered under informal procedure by the Personal Representative under the Massachusetts Uniform Probate Code without supervision by the Court. Inventory and accounts are not required to be filed with the Court, but interested parties are entitled to notice regarding the administration from the Personal Representative and can petition the Court in any matter relating to the estate, including distribution of assets and expenses o f administration. Interested parties are entitled to petition the Court to institute formal proceedings and to obtain orders terminating or restricting the powers of Personal Representatives appointed under informal procedure. A copy of the Petition and Will, if any, can be obtained from the Petitioner.

James R. Loughman, Esq.

Donovan O'Connor & Dodig, LLP 1330 Mass MoCA Way North Adams, MA 01247

Ad# 97764 10/03/2025

Join Our Team!

The Shopper’s Guide, owned by The Berkshire Eagle, is looking for an enthusiastic Advertising Sales Specialist to join our team.

This full time in-house position works along-side the sales team across Berkshire County, MA, portions of Litchfield County, CT and Columbia County, NY. The primary focus is to meet with advertisers and businesses throughout our region to educate and present our advanced portfolio of print and digital products.

If you’re motivated and ready to hustle, you’ll thrive as an Advertising Sales Specialist. Sales experience is great, but if you’re new, we’ll train you! Strong communication, presentation skills, and attention to detail are key. Bring the right attitude, and we’ll help you succeed! We offer a competitive salary and bonus plans as well as a full array of benefits.Advertising & Events print • online • mobile www.shoppersguideinc.com

Grow your skills… Advance your career… Connect with community…

Start an Exciting New Job in Media!

$38K - $45K plus commission.

ADVERTISING

SALES SPECIALIST

Full Time

For consideration complete the online application and submit your resume at berkshireeagle.com/apply

Public NoticesPublic Notices Public Notices

A00840 -10

P rin te d

O c t 2

, 2

C o n to u rs ft (L a b e ls in F e e t)

D a m s (b y H a z a rd C o d e

D a m s (b y H a z a rd C o d e ) L a b e ls

M a s s G

IS

-M a s s D

O T

R o a d s S tre e t N a m e s

A e ria l Im a g e ry

P ro p e rty T a x P a rc e ls

R isin g d a le im p o u n d m e n t d a m

(N A

T

ID

: M A

C o n flu e n ce o f

W illia m s a n d

H o u sa to n ic R iv e r

B rid g e

N o

. G -1

-0 p p ro x im a te ly

F e e t

A p p ro x im a te ly

F e e t

A00840 -11

October 10, 2025

Julia Hoogeboom

Massachusetts Department of Transportation - Highway Division, Environmental Services

10 park plaza

Boston, MASSACHUSETTS 02116

RE: Applicant: Julia Hoogeboom, Massachusetts Department of Transportation - Highway Division, Environmental Services

Project Location: Division Street over the Housatonic River

Project Description: 612183 - GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-002, DIVISION STREET

OVER HOUSATONIC RIVERGREAT

NHESP File No.: 24-18735

Dear Applicant:

The Natural Heritage & Endangered Species Program of the Massachusetts Division of Fisheries & Wildlife (the

“Division”) received the MESA Project Review Checklist and supporting documentation for review pursuant to the

Massachusetts Endangered Species Act (MGL. c. 131A) and its implementing regulations (321 CMR 10.00) (MESA).

PROJECT DESCRIPTION (the “Project”)

The project, as currently proposed, includes the replacement of the Division Street Bridge over the Housatonic

River in Great Barrington as shown on the Project Plan.

STATE-LISTED SPECIES

The Project as currently proposed will occur within Priority Habitat of the following state-listed species:

Scientific Name Common Name Taxonomic Group State Status

Special ConcernMusselCreeperStrophitus undulatus

Special ConcernDragonfly/DamselflyBrook SnaketailOphiogomphus aspersus

Special ConcernFishLongnose SuckerCatostomus catostomus

State-listed species and their habitats are protected in accordance with the MESA.

MASSACHUSETTS ENDANGERED SPECIES ACT (MESA)

A00840 -12

24-18735NHESP No. Page 2 of 3 Issued October 10, 2025

The MESA is administered by the Division and prohibits the Take of state-listed species, which includes actions that

“in reference to animals, means to harass, harm, pursue, hunt, shoot, hound, kill, trap, capture, collect, process, disrupt the nesting, breeding, feeding or migratory activity or attempt to engage in any such conduct, or to assist such conduct, and in reference to plants, means to collect, pick, kill, transplant, cut or process or attempt to engage or to assist in any such conduct. Disruption of nesting, breeding, feeding or migratory activity may result from, but is not limited to, the modification, degradation or destruction of habitat of state-listed wildlife species”

(321 CMR 10.02). The purpose of the Division’s review under the MESA regulations is to determine whether a Take of state-listed species will result from the proposed project.

Based on the information provided and the information contained in our database, the Division finds that the

Project must be conditioned to avoid a prohibited Take of state-listed species (321 CMR 10.18(2)(a)). To avoid a prohibited Take of state-listed species, the conditions attached to this letter must be met.

Provided the attached conditions are fully implemented and there are no changes to the project plans, this project will not result in a Take of state-listed species. We note that all work is subject to the anti-segmentation provisions

(321 CMR 10.16) of the MESA. This determination is a final decision of the Division of Fisheries and Wildlife pursuant to 321 CMR 10.18. Any changes to the proposed project or any additional work beyond that shown on the site plans may require an additional filing with the Division pursuant to the MESA. This project may be subject to further review if no physical work is commenced within five years from the date of issuance of this determination, or if there is a change to the project.

If you have any questions regarding this letter please contact Tim McGuire, Endangered Species Review Biologist, at timothy.mcguire2@mass.gov, (508) 389-6366.

Sincerely, Jesse Leddick

Assistant Director cc: david paulson, Massachusetts Department of Transportation

Julia Hoogeboom, Massachusetts Department of Transportation

Attachment: List of Conditions

A00840 -13

24-18735NHESP No. Page 3 of 3 Issued October 10, 2025

List of Conditions

Applicant: Julia Hoogeboom, Massachusetts Department of Transportation - Highway Division, Environmental Services

Project Location: Division Street over the Housatonic River

Project Description: 612183 - GREAT BARRINGTON- BRIDGE REPLACEMENT, G-11-002, DIVISION STREET OVER

HOUSATONIC RIVERGREAT

NHESP File No.: 24-18735

Heritage Hub Form ID: RC-96012

Approved Plan: Proposed Superstructure Replacement Great Barrington Division Street Over Housatonic

River

Plan date: 9/4/25 Revised Date: N/A

To avoid a prohibited Take of state-listed species, the following condition(s) must be met:

1. Mussel Protection: Prior to the start of work within Land Under Water and Waterbodies or Bank, a one-time mussel sweep shall be conducted immediately prior to the work. The purpose of the sweep is for a qualified biologist to search the area area of work in-water and vicinity for mussels and translocate them outside of area subject to alteration.

a. State Listed Mussel Sweep: Mussels shall be located, identified, and moved to suitable habitat away from impacts associated with the project immediately prior to work within habitat.

b. Pre-Approval: The Division must pre-approve the candidate biologist(s) prior to any Work subject to this condition. The ability to locate and identify state-listed mussels requires significant experience with the target mussel species. The resume/curriculum vitae of the candidate biologist, demonstrating extensive experience locating state-listed mussels, shall be sent to the Division for written pre-approval.

c. Collection Permit: The biologist must obtain a Commercial Scientific Collection Permit for this project site prior to conducting mussel sweeps. Commercial Scientific Collection Permit Application & filing fee information can be found at: https://www.mass.gov/doc/commercial-scientific-collection-permit-application/download.

d. Survey Timing: Survey and relocation of mussels shall only occur between June 1 and October 1.

e. Reporting: The survey report, reporting positive or negative finding (aka ‘fail to find’) shall be submitted to the Division as outlined in the survey guidelines reporting all state-listed and watch-listed species. Please note that survey data must be submitted via the Heritage Hub (www.mass.gov/heritagehub) within 10 days of the completion of the survey.

2. Fisheries Protection: To avoid impacts to state listed fish, no work shall occur within water from April 1 - July

15.

A00840 -14

Project No. 612183

ITEM 180.03 LICENSED SITE PROFESSIONAL SERVICES HOUR

Within limited areas of the project site, soils, sediments and/or groundwater may be contaminated.

A Licensed Site Professional (LSP) shall be required to provide the services necessary to comply with the requirements of the MCP. These services may include sampling, analysis and characterization of potentially contaminated media, preparation of Immediate Response Action (IRA) Plans, Utility-Related Abatement Measure (URAM) and Release Abatement Measure (RAM) Plans, Imminent Hazard Evaluations, status reports, transmittal forms, release notification forms, risk assessments, completion statements, and related documents required pursuant to the Massachusetts Contingency Plan (MCP). LSP hours related to the characterization and disposal of contaminated soil and/or sediment are incidental to the disposal items. An estimate of LSP services to be provided shall be submitted to the Engineer for approval before any LSP activity begins.

The name and qualifications of the LSP and all environmental technicians to be assigned to the project shall be submitted to the Engineer for approval at least four weeks prior to initial site activities. The LSP shall have a current, valid license issued by the Massachusetts Board of Registration of Hazardous Waste Site Cleanup Professionals. The LSP shall have significant experience in the oversight of MCP activities at active construction sites. Qualification packages for the LSP and each technician shall include a resume, all recent work assignments with responsibilities identified (previous 5 years), and applicable training and certifications. A list of all Notices of Noncompliance, Notice of Audit Findings and Enforcement Orders issued by the DEP shall be submitted for all work assignments listed for the LSP and environmental technicians.

The LSP shall evaluate soil and/or sediment with discoloration, odor, and presence of petroleum liquid or sheening on the groundwater surface, or any abnormal gas or materials in the ground which are known or suspected to be oil or hazardous materials. Excavated soil and sediment which is suspected of petroleum contamination shall be field screened using the jar headspace procedures according to established DEP Guidance. All field screening equipment must be pre-approved by the Engineer. The LSP shall ensure proper on site calibration of all field screening instrumentation.

The Engineer shall be contacted immediately when observations or any field screening results verify contamination requiring further analysis, and/or enhanced management of suspect soil and/or sediment. Any enhanced management of contaminated soil to ensure proper stockpiling and storage is incidental to the LSP Services item. The LSP shall adequately characterize subsurface conditions prior to backfill in areas where contaminated material has been excavated.

The Engineer shall approve the locations of the testing sites prior to the sampling.

A00840 -15

ITEM 180.03 (continued)

Contaminated soil, sediment and/or groundwater shall be handled in accordance with all applicable state and federal statutes, regulations and policies. The LSP shall adequately characterize contaminated media for comparison to the requirements of the MCP. The Contractor and the LSP shall be aware of the reporting requirements for releases of oil and/or other hazardous material (OHM) as set forth in federal and state laws and regulations, and shall both be held responsible for performing the work in accordance with all applicable Federal and State laws and regulations. The LSP shall maintain written records in a clear and concise format which tracks the excavation, stockpiling, analysis and reuse/disposal of all suspect contaminated soils, sediments and groundwater. These records shall be up-to-date and available to the Engineer on a bi-weekly basis.

The LSP shall review and summarize the laboratory data from any analyses performed on contaminated media. A report shall be delivered to the Engineer outlining the material sampling methods, laboratory analysis results and proposed course of action. The laboratory report together with Chain of Custody forms for all analytical results shall be submitted to the Engineer within 14 days after completion of such analyses.

The LSP and Contractor shall be held responsible for the submission of all MCP-related documents to the Engineer at least 14 days in advance of any timeframe specified in the MCP and for the timely submission of data and tracking information as noted within this Item. All documents prepared under this Item must be reviewed and signed by the approved LSP. The Contractor and LSP shall be responsible for all fines, penalties and enforcement requirements imposed by applicable regulatory agencies for failure to meet regulatory and contract timeframes. No compensation will be provided for such fines, penalties and enforcement actions.

The Contractor and the LSP shall be aware of the reporting requirements for releases of oil and/or other hazardous material (OHM) as set forth in federal and state laws and regulations, and shall both be held responsible for performing the work in accordance with all applicable Federal and State laws and regulations.

If the Contractor causes a release of OHM, the Contractor shall be responsible for assessing and remediating the release in accordance with all pertinent State and Federal regulations, including securing the services of a LSP, at his own expense.

The LSP shall coordinate all activities involving both MassDOT and the DEP through the Engineer. Any notification of release shall be approved by the Department before submittal to the DEP, except if an imminent hazard condition exists as defined in 309 CMR 4.03(4)(b).

A00840 -16

ITEM 180.03 (continued)

Laboratory Testing in Support of LSP Services

Laboratory testing provides for analytical testing in support of LSP services related to maintaining MCP compliance, such as delineating the extent and type of contamination present. Sampling and testing for disposal purposes are not included.

In order to maintain compliance with the MCP or other regulatory requirements, the LSP shall request approval from the Engineer to obtain samples from various locations and depths within the project area and to perform laboratory analyses on those samples. The samples shall be delivered to a DEP-certified laboratory using proper chain-of-custody documentation for analyses which, depending upon site conditions and suspected and/or identified contaminants of concern, may include, but are not limited to, metals, polychlorinated biphenyls (PCBs), volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), pesticides, polycyclic aromatic hydrocarbons (PAHs), extractable petroleum hydrocarbons (EPHs) and volatile petroleum hydrocarbons (VPHs).

Subsequent testing, depending upon initial results, may be required for Toxicity Characteristic Leaching Procedure (TCLP) analyses (EPA Method 1311) for metals.

Method of Measurement and Basis of Payment

LSP Services for work under this item will be measured per person, per hour of service provided by LSP, Environmental Technicians and other approved personnel. Travel time shall not be included in the billable hours. LSP hours related to soil/sediment disposal (disposal characterization, landfill acceptance, disposal package preparation, etc.) shall be incidental to disposal items.

The quantity and type of laboratory tests must be approved by the Engineer beforehand. The contractor will be reimbursed upon satisfactory written evidence of payment. The contractor may be required to obtain cost estimates from three DEP certified laboratories for the Engineer to choose the service provider. Laboratory testing related to soil/sediment disposal (disposal characterization, landfill acceptance, disposal package preparation, etc.) shall be incidental to disposal items.

LSP Services will be paid at the Contractor bid price for each hour, or fraction thereof, spent to perform the work as described above. The bid price shall be a blended rate that includes the cost of the LSP, environmental technicians and other personnel, the performance of all work tasks and field screening, including required equipment, materials and instrumentation, and production of all documentation described above. All requests for payment must be accompanied by the following information: the names of the personnel associated with the work charged under LSP Services, dates and hours worked, work conducted, including, where appropriate, locations as identified on the construction plans, and a copy of the field diary for the dates submitted.

Laboratory Testing will be reimbursed upon receipt of paid invoices for testing approved by the Engineer.

A00840 -17

G R

E A

T B

A R

R

IN

G T

O N

LA

D

IV

IS

IO

N

S T

R E

E T

O V

E R

H O

U S

A T

O N

IC

R

IV

E

R

S T

A

F

D . A

ID

P

R O

J . N

O i+-p Op:-(;,]"

M

O

JE

C T

FILE

N

O

S H

E

T

L

S

H E

E

61218

W

INGW

ALL

G E

N E

R A

L P

L A

N A

N D

E L

E V

A T

IO

S3-

TL4 RAILING POST SPACING (TYP.)

rn rn

Cll

I

5' -

0" SHOULDER

PROP .• PRECAST HIGHW

AY

SIL

G

U A

D

(HW

Y. ITEM

, TYP.

I

STATION

ll+, l-�

'\-r-

-.._1.

--1

-IEQUATION -

-s -1-=

::t-t--r- ""'l r,., 11, GUARDRAIL TRANSITION (TYP.)

I I I-

EXIST. ABUTM

ENT

FOOTING

AND PILES TO REM

AIN

(TYP.) -

------i

I 29+

I

PROP. PRECAST

ABUTM

ENT CAP (TYP.)

31+

N71"20'27"E W

.P. #2

PROP. PRECAST

I W

.P.

APPROACH SLAB (TYP.) _____J

STA. 29+

27 • i

STA. 30H

j4.04

11 '-

0" TRAVEL LANE

<t BRG. EAST ABUTM

ENT

I <t BRG. W

EST �BUTMENT

0 .-__ =_�)JJ=J:j�Z:::S�;+ =��;;=+:==

HIGHW

AY GUARDRAIL

DRf lNAGE

(H W

Y

ITE

M

TY

P

' ""T--r-

--r--

I 5' -

0" SHOULDER

" SAFTEY CURB W

ITH S3-

M

TL4 RAILING (TYP.)

RIP RAP M

2.02.0 (TYP .)

4 SPACES

25' - 0" =

100' - 0"

PARAFFIN JOINT SPACING (TYP.)

136'-

6" P

A

W

IR

PROP. PRECAST CUSTO

HIGHW

AY GUARDRAIL

TRANSITION (TYP.)

C. TO C. BEARINGS\

LOCATION LINE 1950 COUNTY LAYOUT ALTERATION

1= x

�_j

N

E R

SCALE:

f = 2 '-

0"

<t BEARING W

EST ABUTM

ENT

STATION E QUATION: DIVISION STREET CONSTRUCTION �

STA. 29+

95.81

= HOUSATONIC RIVER

� STA. 101+

00.00

STA. 29+

27.54

136' - 6"

EL. 700.63 -

--i-.

-C -_

-T _O _C _. _B _E _A

-RI _N _G

_S -i--

<t BEARING EAST ABUTM

ENT

PRECAST CUSTOM

HIGHW

AY

STA. 3o+ 54.o4

EL. 701.01

GUARDRAIL TRANSITION

8" NON-

P.T. TRANSVERSE

PRECAST HIGHW

AY

IM

PACT ATTENUATOR

PARAFFIN JOINT (TYP.)

W

ELDED PLATE GIRDER

S3-

M

TL4 RAILING

DECK PANELS

GUARDRAIL TRANSITION

(HIGHW

AY IT EM

, TYP.)

HIGHW

AY GUARDRAIL

PROP. C.I.P. EXIST. W

EST ABUTM

ENT

AND W

INGW

A LLS

PROP. LOW

CHORD

EL. 694.43

PROP. PRECAST

ORDINARY HIGH W

ATER LEVEL

PROP. PRECAST

CUT TO EL. 691.90 -

i,vw

.-.i.-..

......-.j

..... '--k

I

/ 11

W

EST ABUTM

ENT CAP�

TEM

PO RARY SUPPO RT OF

EXCAVATION CUT -

OFF EL. 690.5

EL. 687.97 \y

BASE 100-

YR FLOOD

EAST ABUTM

ENT CAP

c---

EXIST. EAST ABUTM

ENT

EL. 693.93

AND W

INGW

ALLS

DESIGN

10-

YR FLOOD

J..

11 \

CUT TO EL. 691.90

EXIST. ABUTM

ENT /W

INGW

ALL PORTION �

I I

I

::-c

TO REM

AIN (TY P.)

f

_ L I

L

:;: ::.o-;, ,:C:-

EXIST. BOT. oF wEsT ABUT. :��\ it

L 1 n i t I TT rr rr 1 1 1 �

- < :: : �j :{ � t� L l �:;,1 :

Y

LJ LJ LJ LJ LJ LJ

DURING CONSTRUCTION (TYP.)

HOUSATONIC RIVER

t

EL. 691.41

OBSERVED W

ATER LEVE L -

-2'

11 \

APPROX. RIVER BED

EL

685 79

_-••. '. ·'&j

_ J

U

(1/2 .0/2023)

J, 1 Tl

Tl

TT

1 + In

I _J �c� si .7 ti

T. OF EAST ABUT. PILE CAP

CHANNEL SHALL NOT BE REDUCED LESS THAN 91 '-

9" u u u u u u u u

EXIST. TIM

BER PILES

TO REM

AIN

(TYP.)

SCOUR COUNTERM

EASURE

(TYP.)

SEE SHEET 8 FOR DETAILS

TEMPORARY SUPPORT OF EXCAVATION

TO BE REM

OVED AFTER SCOUR

COUNTERM

EASURE INSTALLA

TION (TYP.)

E L

EV

A

TIO

= 2 '-

0" M

N

TH

D

YYYY

ISSUED FOR CONSTRUCTION

DATE

THIS SHEET IS APPROVED FOR

CONSTRUCTION BY M

ASSDOT

DESCRIPTION

AUTHORIZED SIG NA TORY:

sT =A =T =E

-B =R�I D�G =E�EN-G�I N-E =E =R-

USE ONLY PRINTS OF LA

TEST DATE

S

H E

E T

E

TS

B

ID

G

O

(O

F

W Q C/

ACO

E

PLAN

S

SH

EET

O

F 21, REVISED

11/

19/

S C

A L E

IN

F

E E

T

A00840 -18

Cil

Cil rill

Ci, W

S T

A B

U

TM

E N

T P

2 '- 0"

EXIST. ABUTM

ENT

I

PORTION TO REM

AIN

M

ATCH EXIST.

RIVER BED

BOTTOM

OF EXIST. PILE CAP

EL. 679±

EXISTING TIM

BER PILES

TO REM

AIN (TYP.) -

.liQIES;_

1.

12" THICK LAYER OF CRUSHED STONE OVER GEOTEXTILE FABRIC.

3' - 0" M

IN.

RIPRAP LAYER ON TOP OF CRUSHED STONE AND BELOW

THALW

EG CONSISTING OF

18" DIAM

ETER FOR D50 AND 36" DIAM

ETER FOR D100. VARIOUS THICKNESS LAYER

OF NATURAL STREAM

BED M

ATERIAL TO M

ATCH EXISTING STREAM

BED ELEVATIONS.

2.

USGS M

ONITORING EQUIPM

ENT LOCATED AT THE EAST ABUTM

ENT M

UST BE

PROTECTED DURING INSTALLATION OF SUPPORT OF EXCAVATION AND SCOUR

COUNTERM

EASURE.

PROP. NATURAL STREAM

BED

M

ATERIAL OVER M

2.02.0 SEE

NOTE 1

TY

P

IC

A

L A

B U

TM

E

N T

S E

C

TIO

2'-

8'- 0"

APPROXIM

ATE SUPPORT

OF EXCAVATION TIP

EL. 668.75

I I I

I I

6'-90 i

G R

E A

T B

A R

R

IN

G T

D

IV

IS

IO

N S

T R

E E

T O

V E

R H

O U

S A

T O

N

IC

R

IV

A

D . A

ID

P

R O

J . N

O

S H

E

T

S

H E

E

I \ I

I

1-

----t-1

SEDIM

ENT CONTROL

I I

I I I I

� 35·op·oo"\

I I

I I

I

\ I

I

TEM

PORARY SUPPORT OF EXCAVATION

EL. 690.5 (TYP.)

TEM

PORARY SUPPORT OF

EXCAVATION TO BE REM

OVED

AFTER SCOUR COUNTERM

EASURE

INSTALLATION (TYP.)

APPROX. RIVERBED THALW

EG

EL.

678.5

BOT. OF SCOUR COUNTERM

EASURE

EL. 674.5 (TYP.)

FOLD GEOTEXTILE FABRIC FOR

PERM

ANENT EROSION CONTROL

BACK 3' -

0" AT TOE

E A

S T

A B

U

TM

E N

T P

2 '-

BARRIER (TYP.)

RIPRAP M

2.02.0

(TYP.) -

P R

O J

E C

T F

IL

E

N O

C

O U

R C

O U

N T

E R

M E

A S

U R

E D

E T

A

IL

N T H

D

YYYY

ISSUED FOR CONSTRUCTION

DATE

THIS SHEET IS APPROVED FOR

CONSTRUCTION BY M

ASSDOT

DESCRIPTION

AUTHORIZED SIGNATORY:

�sT=A=TE�B

R=l

=DG�E�EN_G

_I N�E

=ER�

USE ONLY PRINTS OF LA

TEST DATE

S H

E E

E

TS

B

ID

G

O

(O

F

W Q C/

ACO

E

PLAN

S SH

EET 19 O

F 21, REVISED

11/ 19/

S C

A L E

IN

F

E E

T

2'-10"

S C

A L E

IN

F

E E

T

5'-4" 2'-10"

A00840 -19

THIS PAGE IS INTENTIONALLY LEFT BLANK

A00840 -20

A00840-1 DEP Admin Comp 401 WQC Ltr and Responses
A00840-2 DEP Admin Comp 401 WQC Ltr and Responses

File details come from the government source that posted it. Updated .