Global Request for Lease Proposal (RLP) Template R100 (Feb. 2026) - Copy.pdf
PDF 482 KB Posted
- Solicitation number
- CSOSA-L-26-0001
About this file
This is a GSA Request for Lease Proposals (RLP) for office space in Washington, D.C. on behalf of the Council of the District of Columbia (CSOSA). The Government seeks a minimum of 18,884 to a maximum of 20,000 ANSI/BOMA Occupant Area (ABOA) square feet of contiguous, modern quality space within a defined area bounded by North Capitol Street NW, Edgewood/Franklin Streets NW, 9th Street NE, and Florida Avenue NE/North Capitol Street NW. The lease term is 20 years with 15 years firm, and the Government retains termination rights in whole or in part after the firm term with 12 months' notice. Proposals are due by 5 PM EST on April 20, 2026, with supplemental hard copies due by 5 PM on April 23, 2026. The successful offeror will execute a lease prepared by GSA incorporating agreed terms, and award occurs upon execution by the Lease Contracting Officer (LCO), Tiffany de Lisio.
The space must meet modern building standards with a permanent facade (stone, marble, brick, or equivalent), include 36 reserved, secured, and lit surface/outside parking spaces at no additional charge, and accommodate potential roof antenna installation. The Government requires fully-serviced turnkey pricing covering building shell rental, tenant improvements (TI), Building Specific Amortized Capital (BSAC) security improvements, operating costs, and parking. The TI allowance is approximately $52 per ABOA SF for locations other than existing leased space. Offerors must provide Design Intent Drawings (DIDs) prior to award and comply with extensive eligibility requirements including Energy Star certification (with statutory exceptions), seismic safety standards (moderate or high seismicity), fire protection and life safety standards, accessibility requirements, asbestos management, environmental due diligence, and National Historic Preservation Act compliance. Award will be made to the lowest-priced, technically acceptable, responsible offeror based on present value price evaluation at a 5% discount rate, with HUBZone small business concerns eligible for a price preference waiver. The NAICS code is 531120 (Exception), and the small business size standard is determined via SBA guidelines.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GSA TEMPLATE R100 (2/26)
GSA REQUEST
FOR LEASE
PROPOSALS
NO. CSOSA-L-26-
0001*+
Offers due by 04/20/2026
In order to be considered for award, offers conforming to the requirements of the RLP must be received no later than 5PM EST on the date above. See “Receipt Of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0086.
GLOBAL RLP
TABLE OF CONTENTS
GLOBAL RLP
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
1.03 AREA OF CONSIDERATION (OCT 2021)
1.04 UNIQUE REQUIREMENTS (OCT 2021)
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026)
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
1.07 AMENDMENTS TO THE RLP (JUN 2012)
1.08 LEASE DESCRIPTION (FEB 2026)
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011) AS APPLICABLE
2.02 FLOODPLAINS (FEB 2026)
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (FEB 2026)
2.04 SEISMIC SAFETY – HIGH SEISMICITY (FEB 2026)
2.05 ASBESTOS (FEB 2026)
2.06 ACCESSIBILITY (SEP 2013)
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (FEB 2026)
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (FEB 2026)
2.12 RECEIPT OF LEASE PROPOSALS (FEB 2026)
2.13 PRICING TERMS (FEB 2026)
2.14 BUDGET SCOREKEEPING; OPERATING LEASE TREATMENT (APR 2011)
2.15 TENANT IMPROVEMENTS INCLUDED IN OFFER (FEB 2026)
2.16 TURNKEY PRICING WITH DESIGN INTENT DRAWINGS PRIOR TO AWARD (FEB 2026)
2.17 SECURITY IMPROVEMENTS INCLUDED IN OFFER (FEB 2026)
2.18 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (FEB 2026)
SECTION 3 METHOD OF AWARD
3.01 NEGOTIATIONS (FEB 2026)
3.02 HUBZONE SMALL BUSINESS CONCERN PRICE PREFERENCE WAIVER (FEB 2026)
3.03 AWARD BASIS (FEB 2026)
3.04 PRESENT VALUE PRICE EVALUATION (FEB 2026)
3.05 AWARD (FEB 2026)
SECTION 4 ADDITIONAL TERMS AND CONDITIONS
4.01 MODIFIED RLP PARAGRAPHS (OCT 2016)
RLP NO. CSOSA-L-26-0001, PAGE 1 GSA TEMPLATE R100 (2/26)
REQUEST FOR LEASE
PROPOSALS NO. CSOSA-L-26-
[18 MAR 2026]
GLOBAL RLP GSA TEMPLATE R100 (FEB 2026)
SECTION 1 STATEMENT OF REQUIREMENTS
1.01 GENERAL INFORMATION (FEB 2026)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.
The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. Included in the RLP documents is a lease template setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP and a GSA Proposal to Lease Space (GSA Form 1364) on which Offeror must submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled “Definitions and General Terms” must apply to the terms of this RLP.
C. Do not attempt to complete the lease template. Upon selection for award, the Government will transcribe the successful Offeror’s final offered rent and other price data included on the GSA Form 1364 into the lease and transmit the completed Lease, including any appropriate attachments, to the successful Offeror for execution. Neither the RLP nor any other part of an Offeror’s proposal must be part of the Lease except to the extent expressly incorporated therein. The Offeror should review the completed Lease for accuracy and consistency with his or her proposal, sign and date the first page, initial each subsequent page of the Lease, and return it to the Lease Contracting Officer (LCO).
D. The Offeror's executed Lease must constitute a firm offer. No Lease must be formed until the LCO executes the Lease and delivers a signed copy to the Offeror.
E. Offeror may not use Federal agency name(s) and/or acronym(s), e.g., General Services Administration, GSA, in the entity name that owns and/or leases the Space to GSA.
1.02 AMOUNT AND TYPE OF SPACE, LEASE TERM, AND OCCUPANCY DATE (FEB 2026)
A. The Government is seeking a minimum of 18,884 to a maximum of 20,000 of American National Standards Institute/Building Owners and
Managers Association (ANSI/BOMA) Occupant Area (ABOA) square feet (SF) of contiguous space within the Area of Consideration set forth below. See Section 2 of the Lease for applicable ANSI/BOMA standards.
B. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
C. The Government requires 36 surface/outside parking spaces, reserved for the exclusive use of the Government. These spaces must be secured and lit in accordance with the Security Requirements set forth in the Lease. Offeror must include the cost of this parking as part of the rental consideration.
D. As part of the rental consideration, the Government may require use of part of the Building roof for the installation of antenna(s). If antenna space is required, specifications regarding the type of antenna(s) and mounting requirements are included in the agency requirements information provided with this RLP.
E. The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act
(20 USC 107 et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror must provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror must advise the Government if such rights exist.
F. The lease term must be 20 Years, 15 Years Firm, with Government termination rights, in whole or in parts, effective at any time after the Firm Term of the Lease by providing not less than 12 months prior written notice.
The parties agree that Government’s obligation to pay rent is contingent upon the availability of appropriated funds for each Federal fiscal year of the term of the lease. If, for any reason, CSOSA is unable to continue the lease for its full xxx-year term, CSOSA may terminate the lease with twelve (12) month advance, written notice. If the lease is terminated prior to the full xxx-year term, CSOSA will pay rent from the date of early termination notice for a period of twelve (12) months.
e.g. If Government enters into a lease with successful offeror on 6-1-2026 that contains a 12-month cancellation clause:
• FY 2026: Government 26 - 9/30/2026, plus o 10/1/26 – 9/29/2027 (12-month cancellation period)
RLP NO. CSOSA-L-26-0001, PAGE 2 GSA TEMPLATE R100 (2/26)
• FY 2027: Government will record an FY 2027 rent obligation for:
o 9/30/2027 – 9/29/2028
• FY 2028: Government will record an FY 2028 rent obligation for:
o 9/30/2028 – 9/29/2029
This Lease may be renewed at the option of the Government for 1, 5-year term. The Government reserves the right in the Lease to not include an option, or to reduce the length of an option, if inclusion of the option would cause Lease to score as a capital lease, in accordance with the Budget Scorekeeping: Operating Lease Treatment paragraph of this RLP. Should the Government make the determination to modify the term or option(s), an amendment to the RLP will be issued.
1.03 AREA OF CONSIDERATION (OCT 2021)
The Government requests Space in an area bounded as follows:
North: North Capitol Street NW South: Edgewood Street NW to Franklin Street NW East: 9th Street NE West: Florida Avenue NE to North Capitol Street NW
Buildings with Property boundary(ies) on the boundary streets are deemed to be within the delineated Area of Consideration.
1.04 UNIQUE REQUIREMENTS (OCT 2021)
The offered Building and/or Property must have the following features as a minimum requirement:
A. Fenced Parking B. Delineated pedestrian route from parking to entrance, as applicable C. Adequate loading dock or equivalent access D. Card or key controlled elevator access when co-locating with other tenants, unless waived by LCO
1.05 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (FEB 2026)
A. Neighborhood and Parking. Outside City Center: Space must be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image.
The parking-to-square-foot ratio available on-site must at least meet current local code requirements, or, in the absence of a local code requirement, on-site parking must be available at a ratio of one (1) space for approx every 500 RSF of Space.
B. Walkability and Amenities.
1. Employee and visitor entrances of the Building must be connected to public sidewalks by continuous, accessible sidewalks.
2. A variety of employee services, such as restaurants, retail shops, cleaners, and banks, must be located within the immediate vicinity of the Building. To be considered, amenities must be accessible from the Building by continuous sidewalks, walkways, or pedestrian crosswalks. Amenities must be existing or the Offeror must demonstrate to the Government’s reasonable satisfaction that such amenities will exist by the Government’s required occupancy date.
D. Transit Accessibility. A subway, light rail, or bus rapid transit stop must be located within the immediate vicinity of the Building, but generally not exceeding a safely accessible, walkable 2,640 feet from the principal functional entrance of the building, as determined by the LCO.
1.06 LIST OF RLP DOCUMENTS (FEB 2026)
A. The following documents are attached to and included as part of this RLP package:
RLP NO. CSOSA-L-26-0001, PAGE 3 GSA TEMPLATE R100 (2/26)
DOCUMENT NAME NO. OF PAGES EXHIBIT
Lease No. CSOSA-L-26-0001 (Template L100) 52 A Agency’s Requirements 1 B Security Requirements for Level II GSA 3516, Solicitation Provisions 9 D GSA 3517B, General Clauses 32 E Proposal to Lease Space (GSA Form 1364) 4 F GSA Form 1217, Lessor's Annual Cost Statement 3 I GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)
6 G
GSAR 552.270-33 Foreign Ownership and Financing Representation for High-Security Leased Space
N/A
FAR 52.204-24, Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
Net Utilities Exhibit 2 H
1.07 AMENDMENTS TO THE RLP (JUN 2012)
This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.
1.08 LEASE DESCRIPTION (FEB 2026)
A. Offeror must examine the Lease template included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
B. The Lease contemplated by this RLP includes:
1. The term of the Lease, and renewal option, if any.
2. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.
3. Building Shell standards and requirements.
4. Information concerning the tenant agency's buildout requirements, to be supplemented after award.
5. Security Requirements.
6. A description of all services to be provided by the Lessor.
C. Should the Offeror be awarded the Lease, the terms of the Lease must be binding upon the Lessor without regard to any statements contained in this RLP.
D. The Lease contemplated by this RLP is a hybrid Lease net of utilities and janitorial services. Rent must be based upon a proposed rental rate per Rentable Square Foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. Although certain Tenant Improvement (TI) requirements information is provided with this RLP and will be incorporated into the Lease, if applicable, the TIs to be delivered by the Lessor will be based on the final design to be developed after award of the Lease, which reflects the Agency’s full requirements. Unless otherwise negotiated, the Lessor must design and build the TIs and will be compensated for TI costs, together with design and project management fees to be set under the Lease. Although the TI requirements will not be developed fully until after award, Offerors must provide the allowance stated in the Tenant Improvement Allowance paragraph of the Lease, as applicable.
Unless the Government prepares Design Intent Drawings (DIDs), after award the Lessor must prepare DIDs for the leased Space conforming to the lease requirements and other Government-supplied information related to the client agency’s interior build-out requirements. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease.
Only after the Government approves the DIDs and a final price for TIs is negotiated will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes.
The Lease contemplated by this RLP is a fully serviced, turnkey Lease with rent that covers all Lessor costs including all shell upgrades, TIs, operating costs, real estate taxes, and security upgrades. Rent will be based upon a proposed rental rate per rentable square foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor must be based upon information provided with this RLP and Lease, including Agency Specific Requirements (ASR). The Lessor must design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease.
Offerors are required to prepare Design Intent Drawings (DIDs) prior to Lease Award. See Paragraph TURNKEY PRICING WITH DESIGN INTENT DRAWINGS PRIOR TO AWARD for further details.
E. The security pricing process is described in a separate paragraph.
RLP NO. CSOSA-L-26-0001, PAGE 4 GSA TEMPLATE R100 (2/26)
F. Upon completion and acceptance of the leased Space, the lease term must commence. In instances involving an incumbent Lessor where the Government commences the lease term pending completion of TI and/or BSAC alterations, the Government must withhold TI and/or BSAC rent pursuant to Section 1 of the Lease until such time as the TI and/or BSAC is completed and accepted by the Government. During the term of the Lease, rent will be adjusted for changes to the Lessor's operating costs and real estate taxes, pursuant to paragraphs set forth in the Lease.
G. Offerors are advised that doing business with the Government carries special responsibilities with respect to fire protection and life safety, and security, as well as other requirements not typically found in private commercial leases. These are set forth both in the lease template and in the GSA 3517B, General Clauses, and will be made part of the Lease.
1.09 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
1.10 PRICING OF SECURITY REQUIREMENTS (FEB 2026)
A. The proposed Lease contains an attachment with the security requirements and obligations for the Building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a general list of countermeasures that may be installed in the leased Space as part of the Building Specific Amortized Capital (BSAC). The final list of security countermeasures will be determined during the design phase and identified in the design intent drawings and construction documents. After completing the construction documents, the Lessor must submit a list of the itemized costs. Such costs must be subject to negotiation. The Lessor must design and build the BSAC and will be compensated for BSAC costs, together with design and project management fees to be set under the Lease.
C. There must be no charge to the Government for any items that already exist in the offered Building or facility.
1.11 SECURITY LEVEL DETERMINATION FOR FACILITY HOUSING OTHER FEDERAL TENANTS (APR 2011)
If an Offeror is offering Space in a facility currently housing a Federal agency, the security requirements of the facility may be increased and the Offeror may be required to adhere to a higher security standard than other Offerors competing for the same space requirement. If two or more Federal space requirements are being competed at the same time, an Offeror submitting on both or more space requirements may be subject to a higher security standard if the Offeror is determined to be the successful Offeror on more than one space requirement. It is incumbent upon the Offeror to prepare the Offeror’s proposal accordingly.
1.12 AUTHORIZED REPRESENTATIVES (FEB 2026)
With respect to all matters relating to this RLP, only the Government's LCO designated below must have the authority to amend the RLP and award a Lease. The Government must have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Lease LCO:
Tiffany de Lisio 800 North Capitol Street NW 6th FL Washington, DC 20002 202-220-5788 TIFFANY.DELISIO@CSOSA.GOV [preferred contact method]
As to all other matters, Offerors may contact the Alternate Government Contact designated below.
Alternate Government Contact:
Elijah Anderson 800 North Capitol Street NW 6th FL Washington, DC 20002 202-220-5795
ELIJAH.ANDERSON@CSOSA.GOV
1.13 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2023)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120 (Exception).
B. The small business size standard for the applicable NAICS code is found HTTPS://WWW.SBA.GOV/SIZE-STANDARDS/.
mailto:Tiffany.deLIsio@csosa.gov mailto:Elijah.anderson@csosa.gov https://www.sba.gov/size-standards/
RLP NO. CSOSA-L-26-0001, PAGE 5 GSA TEMPLATE R100 (2/26)
RLP NO. CSOSA-L-26-0001, PAGE 6 GSA TEMPLATE R100 (2/26)
SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD
2.01 EFFICIENCY OF LAYOUT (AUG 2011) AS APPLICABLE
A. In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO.
B. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense. The Government will advise the Offeror if the test fit layout demonstrates that the Government's requirement cannot be accommodated within the Space offered.
The Offeror will have the option of increasing the ABOA square footage offered, if it does not exceed the maximum ABOA square footage in this RLP offer package. If the Offeror is already providing the maximum ABOA square footage and cannot house the Government's space requirements efficiently, then the Government will advise the Offeror that the offer is unacceptable.
2.02 FLOODPLAINS (FEB 2026)
A Lease will not be awarded for any offered Property located within a 1-percent-annual-chance floodplain (formerly referred to as 100-year floodplain) unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror must clearly demarcate the offered Property on its site plan/map submissions and must propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the Government may determine that the offered Property does not adequately avoid development in a 1-percent-annual-chance floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to a 1-percent-annual-chance floodplain, where such an adjacency would, as determined by the Government, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
2.03 SEISMIC SAFETY – MODERATE SEISMICITY (FEB 2026)
In accordance with the Earthquake Hazards Reduction Act of 1977, the following apply:
A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards will not be considered. If none of the offers is in compliance with the Seismic Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other evaluation factors specified in this RLP.
B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:
1. The offer includes a representation that the Building will have less than 10,000 ABOA SF of Space leased to the Federal Government upon commencement of the lease term (Seismic Form D),
2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).
3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic
Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.
4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic
Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.
5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic
Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit, and a schedule for the seismic retrofit. The Offeror must provide a construction schedule, concept design for the seismic upgrade, and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.
6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).
C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.
D. Definitions. For the purpose of this paragraph:
1. “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.
http://www.asce.org/publications/
RLP NO. CSOSA-L-26-0001, PAGE 7 GSA TEMPLATE R100 (2/26)
2. “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase
3. “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.
4. Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.
5. “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP
8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTPS://WWW.NIST.GOV/PUBLICATIONS/.
6. “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this RLP together with any required attachments.
7. “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic Safety
Objective in ASCE/SEI 41, unless otherwise specified.
8. “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.
9. “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.
10. “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.
2.04 SEISMIC SAFETY – HIGH SEISMICITY (FEB 2026)
In accordance with the Earthquake Hazards Reduction Act of 1977, the following apply:
A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards must not be considered. If none of the offers is in compliance with the Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other evaluation factors specified in this RLP.
B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:
1. The offer includes a representation that the Premises will be in a one-story Building of steel light frame or wood construction with less than 3,000 ABOA SF of space in the Building (Seismic Form D).
2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).
3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic
Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.
4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic
Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.
5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic
Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit and a schedule for the seismic retrofit. The Offeror must provide a construction schedule, concept design for the seismic upgrade and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.
6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).
C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.
D. Definitions. For the purpose of this paragraph:
1. “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase
2. “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase https://www.nist.gov/publications/standards-seismic-safety-existing-federally-owned-and-leased-buildings-icssc
RLP NO. CSOSA-L-26-0001, PAGE 8 GSA TEMPLATE R100 (2/26)
3. “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.
4. Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.
5. “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP
8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTPS://WWW.NIST.GOV/PUBLICATIONS/.
6. “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this RLP together with any required attachments.
7. “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic Safety
Objective in ASCE/SEI 41, unless otherwise specified.
8. “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.
9. “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.
10. “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.
2.05 ASBESTOS (FEB 2026)
A. The Government requires space with no asbestos-containing materials (ACM), or with undamaged, nonfriable ACM. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered;
and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. Notwithstanding the preceding, if no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.
B. ACM is defined as any material with a trace or more of asbestos quantity present.
C. Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in sub-paragraph A by abatement
(removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763), state, and local regulations and guidance prior to occupancy.
D. Management Plan and Reinspection Report Submittals. If space is offered which contains ACM, the Offeror must submit a current asbestos management plan or operations and maintenance plan, along with a current asbestos re-inspection report (performed within the past 5 years) that includes a list of all ACM and their condition for acceptance by the Government prior to lease award. The management plan or operations and maintenance plan, and re-inspection report must conform to generally accepted industry practice in accordance with OSHA (29 CFR § 1910.1001, 29 CFR § 1926.1101), EPA (40 CFR Part 61 - National Emission Standards for Hazardous Air Pollutants and Part 763).
E. The Government reserves the right to review Offeror’s existing records for compliance.
2.06 ACCESSIBILITY (SEP 2013)
The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered
Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.
2.07 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:
A. Verify in the Lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire
Alarm System requirements of the Lease; or
B. Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
https://www.nist.gov/publications/standards-seismic-safety-existing-federally-owned-and-leased-buildings-icssc
RLP NO. CSOSA-L-26-0001, PAGE 9 GSA TEMPLATE R100 (2/26)
2.08 ENERGY INDEPENDENCE AND SECURITY ACT (FEB 2026)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.
B. Subject to the exceptions below, unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2023, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2024. Notwithstanding the above, buildings that meet any of the following are considered as equivalent to having an Energy Star label in the most recent year, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government:
1. All new Buildings being specifically constructed for the Government, provided they achieve an ENERGY STAR® label within 18 months after occupancy by the Government, and received the “Designed to Earn the Energy Star®” certification prior to construction;
2. All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy;
3. Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; or
4. An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year.
C. Subject to subparagraph D below, EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of
Historic Places; or
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)
/Monitoring/Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-
AND-MANAGERS/EXISTING-BUILDINGS/EARN-RECOGNITION/ (use “Portfolio Manager” to apply). The ENERGY STAR® Building Upgrade Manual (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/FACILITY-OWNERS-AND-MANAGERS/EXISTING-BUILDINGS/SAVE-ENERGY/) and Building Upgrade Value Calculator (HTTP://WWW.ENERGYSTAR.GOV/BUILDINGS/TOOLS-AND-RESOURCES/BUILDING-UPGRADE- VALUE-CALCULATOR) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator
RLP NO. CSOSA-L-26-0001, PAGE 10 GSA TEMPLATE R100 (2/26)
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
2.09 ENVIRONMENTAL CONSIDERATIONS (SEP 2013)
A. The Government requests space with no known hazardous conditions or recognized environmental conditions that would pose a health and safety risk or environmental liability to the Government.
B. Upon request by the Government, Offeror must provide all known previous use of the Building.
C. Offeror must indicate in its written offer any known hazardous conditions or environmental releases with/from the offered Space, Building or
Property.
2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (OCT 2023)
A. Environmental Due Diligence.
1. At the direction of the LCO, the Offeror must provide, at the Offeror’s sole cost and expense, a current Phase I Environmental Site Assessment (ESA), using the American Society for Testing and Materials (ASTM) Standard E1527-21 and timeline, as such standard may be revised from time to time. In accordance with ASTM standards, the study must be performed by an environmental professional with qualifications that meet ASTM standards. This Phase I ESA must be prepared with a focus on the Government being the “user” of the Phase I, as the term “user” is defined in E1527-21. Failure to submit the required study may result in dismissal from consideration.
2. If the Phase I ESA identifies any recognized environmental conditions (RECs), the Offeror will be responsible for addressing such RECs, at its sole cost and expense, including performing any necessary Phase II ESA (using ASTM Standard E1903-11), performing any necessary cleanup actions in accordance with federal and state standards and requirements and submitting a proposed schedule for complying with these obligations. The Government will evaluate whether the nature of any of the RECs, the results of the Phase II, any completed cleanup, and the proposed schedule meet the Government’s needs.
B. National Environmental Policy Act.
1. While the Offeror is responsible for performing all environmental due diligence studies of the offered Property, the Government is responsible for compliance with NEPA, whether in whole or in part, on its own or with the assistance of the Offerors. NEPA requires federal agencies to consider the effects of their actions on the quality of the human environment as part of the federal decision-making process and, to that end, the Government’s obligations may, and in some cases will, be augmented by the Offerors as described in greater detail in the RLP.
2. The Government may either request information from the Offerors to help it meet its obligations under NEPA or share information provided in response to this provision with federal, state and local regulatory agencies as part of its compliance responsibilities under NEPA and other applicable federal, state and local environmental laws and regulations. Further consultation with these regulatory agencies may be necessary as part of the NEPA process.
3. The Offerors are advised that the Government may be required to release the location of each offered site and other building specific information in public hearings or in public NEPA documents. By submitting an offer in response to this RLP and without the need for any further documentation, the Offeror acknowledges and consents to such release.
4. The Government reserves the right to reject any offer where (i) the NEPA-related documentation provided by the Offeror for the offered
Property is inadequate, (ii) the offer entails unacceptably adverse impacts on the human environment, (iii) the identified adverse impacts cannot be readily mitigated, or (iv) the level of NEPA analysis is more extensive than is acceptable to the Government.
5. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of NEPA compliance. This requires research and field surveys to assess the potential impacts to the natural, social and cultural environments. Any recent studies previously conducted by the Offeror may be submitted to be included in the NEPA process.
6. The Government will not proceed with Lease award until the NEPA process is complete as evidenced by the Government’s issuance of a completed CATEX, EA or Environmental Impact Statement (EIS). Upon Lease award, any mitigation measures, whether optional or mandatory, identified and adopted by the Government will become Lease obligations. All costs and expenses for development of design alternatives, mitigation measures and review submittals for work to be performed under the Lease will be the sole responsibility of Lessor.
2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (FEB 2026)
RLP NO. CSOSA-L-26-0001, PAGE 11 GSA TEMPLATE R100 (2/26)
A. The Government is responsible for complying with section 106 of the National Historic Preservation Act (NHPA) of 1966, as amended, 54 U.S.C.
§ 306108 (Section 106). Section 106 requires federal agencies to consider the effects of their actions on historic properties prior to expending any federal funds on the undertaking. The Government is responsible for identifying whether any historic properties exist in, on, under, or near the offered Property that could be affected by the leasing action. Historic properties include both above-grade (i.e., buildings and historic districts) and below-grade (i.e., archeological sites) resources. The Government is responsible for assessing effects to identified historic properties and for consulting with the State Historic Preservation Officer (SHPO), the Tribal Historic Preservation Officer (THPO), if applicable, any local Historic Preservation or Landmarks Commission, and other interested parties, if applicable, in accordance with the implementing regulations set forth at 36 C.F.R. part 800 (Protection of Historic Properties).
B. An Offeror must allow the Government access to the offered Property to conduct studies in furtherance of the Section 106 compliance. This requires research and field surveys to assess the potential presence of historic properties that may be affected by construction activity, both above- and below-grade. Compliance also may require below-grade testing to determine the presence of archeological resources and possible artifact recovery, recordation and interpretation mitigation measures.
C. Demolition or destruction of a historic property by an Offeror in anticipation of an award of a Government lease may disqualify the Offeror from further consideration.
D. The Government reserves the right to reject any offer where documentation for the offered Property is inadequate or otherwise indicates preservation concerns or adverse effects to historic properties that cannot be minimized or reasonably mitigated, or where the level of NHPA analysis is more extensive than is acceptable to the Government.
E. If the Government determines that the leasing action could affect historic property, the Offeror of any Property…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .