EXHIBIT J REP and RELOC estimates.pdf
PDF 75 KB Posted
- Solicitation number
- CSOSA-L-26-0001
About this file
This document is a baseline cost estimate for relocation (RELOC) and real estate acquisition (REP) activities associated with a federal facility project. The estimate establishes a minimum total project cost of $4,384,000 and itemizes required work across seven major categories.
Security system upgrades are estimated at $700,000 and include equipment and installation for video surveillance (expanding beyond the current 51 cameras), access control systems (adding to the current 21 card readers), parking lot fencing with access-controlled gates if applicable, after-hours monitored burglar alarm services, and lobby security equipment including an x-ray machine, magnetometer, and turnstiles. IT and Telecom equipment and installation are budgeted at $200,000. Tenant Improvement (TI) and buildout design represents the largest line item at $3,000,000. Additional costs include move operations at $40,000 and furniture replacement at $444,000. Two cost items are noted as variable: NEPA Environmental Assessment (to meet GSA requirements) and test fit services if requested by the Government. These baseline costs establish the financial framework for the facility relocation project and associated infrastructure improvements.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REP and RELOC baseline ITEMS/ACTIONS EST COST
Security System EQUIPMENT AND INSTALLATION
- Video surveillance (currently we have 51 cameras)
- Access control (currently we have 21 card readers)
- If a parking lot is involved it will need fenced and be controlled with an access-controlled gate
- Security
- After hours monitored burglar alarm
- Require x-ray machine, magnetometer and turnstiles at lobby access point
700000
IT&Telecom equipment and installation 200000
TI and buildout design, buildout 3000000 Move costs 40000 Furnish furniture replace 444000 NEPA Environmental Assessment meets GSA requirements varies Test fit if requested by Gov varies
MINIMUM TOTAL 4,384,000$
Sheet1
File details come from the government source that posted it. Updated .