Geotechinical_Reports.pdf

PDF 80 MB Posted

Attached to
Buckler Road Water Main Replacement
Solicitation number
104580
Issued by
Prince George's County, Choptank CDP, Maryland

About this file

This is a Geotechnical Reports document prepared for the Washington Suburban Sanitary Commission (WSSC) in Maryland supporting the Buckler Road Water Main Replacement project. The project involves the installation of approximately 2.17 miles of water mains in Clinton, Prince Georges County, Maryland, consisting of 0.33 miles of 4-inch diameter pipe, 1.35 miles of 8-inch diameter pipe, and 0.49 miles of 10-inch diameter pipe, along with approximately 1.14 miles of water house connections. Sealed responses must be submitted through WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater no later than 2:00 pm on Wednesday, June 3, 2026, with late submissions not accepted.

The geotechnical reports document provides subsurface soil and geological information necessary for the design and construction of the water main infrastructure along the Buckler Road corridor. This information is critical for determining proper installation methods, pipe bedding requirements, depth of excavation, and potential soil stability considerations that contractors must address in their proposals and construction execution.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .