As-Built_Package.pdf

PDF 54 MB Posted

Attached to
Buckler Road Water Main Replacement
Solicitation number
104580
Issued by
Prince George's County, Choptank CDP, Maryland

About this file

This is an As-Built Package submitted to the Washington Suburban Sanitary Commission (WSSC) in Maryland for the Buckler Road Water Main Replacement project. The project encompasses the installation of approximately 2.17 miles of water mains distributed across three pipe sizes: 0.33 miles of 4-inch diameter pipe, 1.35 miles of 8-inch diameter pipe, and 0.49 miles of 10-inch diameter pipe. Additionally, the project includes approximately 1.14 miles of water house connections serving the Clinton area in Prince Georges County, Maryland. Sealed responses were required to be submitted via WSSC's eProcurement Portal at https://procurement.opengov.com/portal/wsscwater no later than 2:00 pm on Wednesday, June 3, 2026, with late submissions not accepted.

The as-built documentation provides the final record of the project as constructed, reflecting any modifications or deviations from the original design specifications. This package serves as verification that the installed water main infrastructure meets WSSC's standards and project requirements. The as-built records are essential for future maintenance operations, system mapping, and regulatory compliance documentation for the water distribution system serving the Clinton community.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .