NOAA GEO GS SE RFI Attachment 9 GSDD Rev P.pdf
PDF 2 MB Posted
- Solicitation number
- GEO-GS_RFI_Dec_2024
About this file
This is a Ground Segment Design Description document (GSDD_SE-07, Revision P) prepared by L3Harris Technologies for NOAA's Office of Geostationary Earth Orbit Observations and NASA/Goddard Space Flight Center. The document details the design of the GOES-R Ground Segment (GS), which operates from three main sites: NOAA Satellite Operations Facility (NSOF) in Suitland, MD; Wallops Command and Data Acquisition Station (WCDAS) in Wallops, VA; and the Consolidated Backup (CBU) facility in Fairmont, WV.
The document outlines the GS architecture and functionality, including satellite operations, product generation and distribution, and enterprise management capabilities. Key components include Mission Management (MM), Product Generation (PG), Product Distribution (PD), and Enterprise Management (EM) functions distributed across the three sites. The system processes data from multiple instruments including the Advanced Baseline Imager (ABI), processes it into various product levels (L0, L1b, L2+), and distributes it to users via GOES Rebroadcast (GRB) and other channels. The design includes significant redundancy and backup capabilities, with the CBU able to take over critical functions within 5 minutes if needed. The document also details security implementations across two domains - the SCADA Security Domain (SSD) and Non-SCADA Security Domain (NSD), with specific protocols for cross-domain operations and data handling.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUND SEGMENT DESIGN DESCRIPTION
FOR
GEOSTATIONARY GROUND SUSTAINMENT SERVICES
CONTRACT NO: 1332KP-23-D-NAAA0003
DOCUMENT CONTROL NUMBER: 7035551
GSDD_SE-07
REVISION P
27 SEPTEMBER 2024
PREPARED FOR:
NOAA OFFICE OF GEOSTATIONARY EARTH ORBIT OBSERVATIONS
GEO GROUND DIVISION CODE 416
NASA/GODDARD SPACE FLIGHT CENTER
8800 GREENBELT ROAD
GREENBELT MD 20771
PREPARED BY:
L3HARRIS TECHNOLOGIES, INC.
P.O. BOX 9800
MELBOURNE, FLORIDA 32902-9800
CAGE NUMBER: 91417
NON-EXPORT CONTROLLED
THIS DOCUMENT CONSISTS OF INFORMATION THAT IS
NOT DEFINED AS CONTROLLED TECHNICAL DATA
UNDER ITAR PART 120.33 OR TECHNOLOGY UNDER EAR
PART 772.
Ground Segment Design Description
27 September 2024 DCN 7035551, Revision P i NON-Export Controlled Information
RECORD OF CHANGE
REVISION DATE DESCRIPTION
- 08 February 2011 Initial Release
A 24 June 2011 Updated to incorporate PTR 2225, Customer Comments.
Impacted pages (in redlined version) are:
ii-ix, 1-6, 13-20, 22-26, 28-31, 33, 37-40, 43, 44, 46, 47, 50-53, 56-70, 72-74, 76-80, 83-90, 92-95, 99-106, 108, 110-113, 116, 118, 120, 122, 123, 125, 128, 130, 131, 148-
151, 153-155, 157-167, 171, 172, 178, 190, Appendix B, and Appendix C
Changed font type, to be consistent; minor formatting and updated all TOCs
A.1 12 December 2011 Updated to incorporate PTR 3390, ECP 007 Updates:
CCR 1908: 4.1.1, 4.1.1.10, 4.1.2, 4.2.2.1.2, 4.2.2.1.2.1,
4.2.2.1.13.2, 4.2.2.1.13.4, 4.2.2.1.14, 4.2.3
CCR 1910: 3.3, 4.1.1, 4.1.1.10, 4.1.2, 4.1.3.2, 4.1.3.3,
4.1.3.5, 4.1.3.5.2, 4.1.3.5.3, 4.1.3.5.4, 4.1.3.5.5, 4.1.3.5.6, 4.1.3.8, 4.1.3.8.1, 4.1.3.8.2, 4.1.3.8.3, 4.1.3.9, 4.1.4.1, 4.1.4.2, 4.1.4.3, 4.1.4.6, 4.1.4.7, 4.1.6.1, 4.1.6.2, 4.1.8.4, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.1, 4.2.2.1.2, 4.2.2.1.2.1, 4.2.2.1.2.2, 4.2.2.1.2.3, 4.2.2.1.3, 4.2.2.1.4, 4.2.2.1.5, 4.2.2.1.6, 4.2.2.1.8, 4.2.2.1.8.1, 4.2.2.1.10, 4.2.2.1.12, 4.2.2.1.13, 4.2.2.1.13.4, 4.2.2.1.13.5, 4.2.2.1.14, 4.2.3
CCR 1925: 4.1.3.4, 4.1.7.3
CCR 1926: 4.1.1.5
CCR 1949: 4.1.1, 4.1.1.10, 4.1.2, 4.2.3
CCR 1951: 3.1, 3.3, 4.1.3.4, 4.2.2.1.13.2
CCR 1955: 3.1, 3.3, 4.1.3.2, 4.1.3.3, 4.1.3.5, 4.1.3.5.2,
4.1.3.5.3, 4.1.3.5.4, 4.1.3.5.5, 4.1.3.5.6, 4.1.5, 4.1.6, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.2
CCR 1963: 4.1.1, 4.1.1.10, 4.1.2, 4.2.3
CCR 1976: 4.2.2.1.12
CCR 1995: 4.1.8.10.1, 4.1.8.10.2
CCR 2008: 3.1, 4.1.3.8, 4.1.3.8.1, 4.1.3.8.2, 4.1.3.8.3,
4.1.3.9
CCR 2018: 4.1.1, 4.2.2.1.1, 4.2.3
CCR 2055: 3.1, 4.1.1, 4.1.1.7, 4.2.2.1.5, 4.2.3
CCR 2059: 3.1, 3.3, 4.1.3.4
CCR 2061: 3.1
ii NON-Export Controlled Information
REVISION DATE DESCRIPTION
CCR 2062: 3.1, 3.3
CCR 2072: 4.1.1, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.10, 4.1.2,
4.1.6, 4.1.6.1, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.2.3, 4.2.2.1.10, 4.2.2.1.14, 4.2.3
CCR 2073: 3.1, 4.1.4.7, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.2,
4.2.2.1.2.1, 4.2.2.1.5, 4.2.2.1.6, 4.2.2.1.13, 4.2.2.1.13.5
CCR 2076: 4.1.1, 4.2.3
CCR 2079: 3.1, 3.2.4, 3.2.5, 4.1.7.3
CCR 2080: 3.1, 3.2.1, 3.2.2, 3.3, 4.1.1.7, 4.1.3.2, 4.1.3.3,
4.1.3.5, 4.1.3.5.2, 4.1.3.5.3, 4.1.3.5.4, 4.1.3.5.5, 4.1.3.5.6, 4.1.3.8, 4.1.3.8.1, 4.1.3.8.2, 4.1.3.8.3, 4.1.3.9, 4.1.4.7, 4.1.5, 4.1.6, 4.1.6.1, 4.1.8.4, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.1, 4.2.2.1.2, 4.2.2.1.2.1, 4.2.2.1.2.3, 4.2.2.1.3, 4.2.2.1.4, 4.2.2.1.5, 4.2.2.1.6, 4.2.2.1.10, 4.2.2.1.13, 4.2.2.1.13.2, 4.2.2.1.13.4, 4.2.2.1.13.5, 4.2.2.2
CCR 2089: 1.2, 4.1.1, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.10,
4.1.2, 4.1.6, 4.1.6.1, 4.1.6.2, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.2, 4.2.2.1.2.1, 4.2.2.1.2.2, 4.2.2.1.5, 4.2.2.1.6, 4.2.2.1.8, 4.2.2.1.8.1, 4.2.2.1.14, 4.2.3
CCR 2090: 2.1, 2.2
CCR 2117b: 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.10, 4.1.2, 4.1.6, 4.1.8.10, 4.2.2.1.12, 4.2.2.1.13.4, 4.2.2.1.13.5
CCR 2128: 1.2, 3.3, 4.1.1.1, 4.1.1.2, 4.1.1.3, 4.1.1.10,
4.1.2, 4.1.3.2, 4.1.3.3, 4.1.3.4, 4.1.3.5, 4.1.3.5.2, 4.1.3.5.3, 4.1.3.5.4, 4.1.3.5.5, 4.1.3.5.6, 4.1.3.8, 4.1.3.8.1, 4.1.3.8.2, 4.1.3.8.3, 4.1.3.9, 4.1.4.1, 4.1.4.2, 4.1.4.3, 4.1.4.6, 4.1.4.7, 4.1.6, 4.1.6.1, 4.1.8.4, 4.1.8.10.1, 4.1.8.10.2, 4.2.2.1.1, 4.2.2.1.2, 4.2.2.1.2.1, 4.2.2.1.2.3, 4.2.2.1.3, 4.2.2.1.4, 4.2.2.1.5, 4.2.2.1.6, 4.2.2.1.8, 4.2.2.1.8.1, 4.2.2.1.10, 4.2.2.1.12, 4.2.2.1.13, 4.2.2.1.13.2, 4.2.2.1.13.4, 4.2.2.1.13.5, 4.2.2.1.14, 4.2.2.2
Incorporated Action Items:
AI-5961 Remove McIDAS reference in Table 3.1
AI-6272 Update Zone and Domain Nomenclature
AI6271 Incorporate Peer Review Comments/Redlines
Impacted pages (in redlined version) are: ii-ix, 2-5, 7-15, 17-60, 62, 64-78, 82, 84-85, 89, 91, 95, 98-103, 106-126, 130-193, 196, 201-202, 204, 206-216, 212, 220-224, Appendix B, Appendix C , and Appendix D
Corrected minor formatting inconsistencies and updated all
TOCs iii NON-Export Controlled Information
REVISION DATE DESCRIPTION
B 30 March 2012 Updated to incorporate PTR 1781 Update for CDR and delivery date change
Update for PTR 2010, Appendix F corrections to
MOTS/OTS
Update for PTR 2752 Incorporate Service Model into
Design Description
Updated for PTR 3348 Incorporate removal of
Contingency Planning and Certification & Accreditation
Utilities from Design Description
Updated for PTR 3405 Incorporate BCR 049, Metadata
Delivery into Design Description
Updated for PTR 3713 Incorporate BCR 059, new interface at RBU into Design Description
Updated for PTR 3733 Incorporate BCN 60, use of SFTP for external interfaces into Design Description
Updated for PTR 3762 Incorporate reallocation of MM DE equipment from NSOF PPZ DE to WCDAS SOZ DE into
Design Description
Updated for PTR 4118 Incorporate clarification of manager of drop box folder into Design Description
AI-4838 Resolve Deferred Customer Comments to SE-07
Revision –
AI-6440 Update Architecture baseline for new interfaces at
RBU - BCR 059
AI-6482 Update architecture baseline for reallocation of
DE equipment - BCR 54
Update Ground Segment Design Description to include changes during detailed design leading to the CDR baseline.
C 20 July 2012 Updated to incorporate PTR 4935 Update GOES-R Ground
Segment Design Description Revision B for post CDR comments and deliver to customer as Revision C.
Updated to incorporate PTR 4553 incorporate BCN_063
ATP for CCR 2214 GS Management of PDA to remove
GAS User Account info and GAS metrics including resource, availability, and performance which are no longer provided to the GS from GAS.
D 31 October 2012 Incorporate customer comments as documented in
PTRDOC 5400.
iv NON-Export Controlled Information
REVISION DATE DESCRIPTION
D.1 29 July 2014 Rev D.1 updated Appendix E Tech Ref Model per
PTR8729.
D.2 12 August 2015 Rev D.2 Addresses PTR6267 for VAGL changes, PTR6417 for updates due to ECP007 Inst Cal changes, PTR6616 for reflecting the PDA ITE, PTR8482 for
ECP009b ESPC Services updates, AI9793 to remove the word “Service Bus” after OS Comet, AI8299 from peer review and customer comments, PTR8487 for Master
Technical Overview updates, updates to IPv4 and IPv6 capability only text, LZSS text, PTR13652 for removal of
Precise Time (PTP) from the GOES-R baseline.
D.3 10 March 2016 Rev D.3 for ECP 026 Security Boundary Extension updates; PTR 15696.
E 11 May 2016 Rev E for Architecture Updates and synchronization with
GOES-R; PTR 14713.
F 10 July 2017 PTRDOC-19337 – ECP 029, ABI Mode 6 changes.
F.1 04 December 2017 PTRDOC-19501 – GAP Filler
F.2 14 December 2018 PTRDOC-21806, updates to add MMTDS.
PTRDOC-21228, updates to add WCDAS/GL0AS and interface from GL0AS to NCEI-NC.
G 13 August 2020 PTRDOC 24568
Updated to incorporate changes due to Mod. 0159 & Mod
0160 / ECP 033 Server Replacement and Contract
Extension.
H 21 January 2021 PTRDOC 25913 – Mission Management Remote Access and Development (MM RAD)
Updated to add MM RAD and NOAA Enterprise Remote
Access VPN (ERAV).
J 23 November 2021 PTRDOC 27382
ECP 036: Updates for Compact Coronagraph (CCOR) instrument on GOES-U.
v NON-Export Controlled Information
REVISION DATE DESCRIPTION
K 15 November 2022 PTRDOC-28219
RAPR: ECP 037 SE-07: Update GS Design Description to
Add RAPR
PTRDOC-28308
ECP 038: SE-07 GS DD - Update GS Design Description to Add Interleave Capability
PTRDOC-27730
CDRL SE-07: Core Ground Segment Design Description, DCN 7035551 - Evaluate customer comments from Rev J
PTRDOC-26571
WR 7428: Obsolescence - SE-07 Design updates for replacing SRX 3600s with 4600s
PTRDOC-28146
WR 8478: SE-07 GS DD - System Overview: Add GLM
Flash Extent Density product to AWIPS
PTRDOC-28648
WR 9052: Obsolescence - Core: SE-07 updates from
Spectrum Scale upgrade
PTRDOC-28743
WR 8918: Obsolescence - Core: ICAM - SE-07_Core_GS update
L 28 April 2023 PTRDOC-29330
SE-07: Core GS Design Description, DCN 7035551 -
Evaluate customer comments from Rev K
PTRDOC-29157
SE-07: Create Appendix for SWFO SAN updates to the
GOES-R infrastructure
PTRDOC-29333
WR 9410: SE-07 GS Design Description - Update for
LZSS Decommissioning
PTRSW-26579
WR 8478: Add GLM Flash Extent Density product vi NON-Export Controlled Information
REVISION DATE DESCRIPTION
M 27 October 2023 PTRDOC-30283
GGSS: Update GS Design Description (E-Line
Decommission, Response to customer comments from
Rev L)
Incorporate changes for operational Terrestrial GRB
(TGRB)
Changed ‘RBU’ terminology to ‘CBU’.
Changed ‘LZSSc’ terminology to ‘GPAS’ (Geo Product
Access Services, in the Geo Cloud).
N 16 February 2024 PTRDOC-30653
GSDD: SE-07 Design Description - Update for SGC
Obsolescence/Replacement
P 27 September 2024 PTRDOC-31387
GSDD: SUS: Update SE-07 Design Description for Trend
Micro Deep Security 20.x vii NON-Export Controlled Information
TABLE OF CONTENTS
Paragraph Title Page
1.0 SCOPE
1.1 Identification
1.2 GOES-R Ground Segment Overview
1.3 Document Overview
2.0 REFERENCED DOCUMENTS
2.1 Applicable Documents
2.2 Reference Documents
3.0 GOES-R GS Design Description
3.1 GOES-R GS Design Decisions
3.2 GOES-R GS Architectural Design
3.2.1 GOES-R Core Ground Segment Overview
3.2.2 Antenna System Overview
3.2.3 Timing and Frequency Reference System (TFRS) Overview
3.2.4 Product Distribution and Access (PDA)/GOES-R Access Subsystem (GAS) Overview . 21
3.2.5 Space Segment Command and Telemetry Simulator Overview
3.2.6 Space Segment Satellite Simulator Overview
3.3 GOES-R GS Concept of Execution
4.0 GOES-R Core GS Design Description
4.1 GOES-R Core GS Design Decisions
4.1.1 GOES-R Core GS Vendor Allocated Ground Latency (VAGL) Approach
4.1.2 GOES-R Core GS Interface Design Decisions
GS-to-AWIPS Interface
GS-to-CLASS Interface
GS-to-PDA (GAS and ADRS) Interface
GS-to-Space Segment Interface (Simulators, FSME, Factory)
GS-to-Space Segment Satellite Interface
GS-to-Antenna System Interface
GS-to-Timing and Frequency Reference System (TFRS) Interface
GS-to-Launch Segment Ground Network Interface
GS-to-Telecom Interface
GS-to-SWPC Interface
4.1.3 GOES-R Core GS Function Deployment Decisions
4.1.4 GOES-R Core GS Behavior Decisions
GOES-R Core GS Independent Mission Management
GOES-R Core GS Element Autonomy
GOES-R Core GS Pipeline Processing Approach
GOES-R Core GS Redundancy and Backup Approach
4.1.4.4.1 GOES-R Core GS Lights Out CBU
4.1.4.4.2 GOES-R Core GS Hot CBU
4.1.4.4.3 GOES-R Core GS Symmetrical Operating Environments at WCDAS and the CBU
4.1.4.4.4 GOES-R Core GS Data Repositories at Operational Sites
4.1.4.4.5 GOES-R Core GS No Single Point of Failure
4.1.4.4.6 GOES-R Core GS Independent PG/PD Strings per Satellite
GOES-R Core GS States and Modes
GOES-R Core GS Software Failure and Error Handling
GOES-R Core GS Enterprise Management Approach viii NON-Export Controlled Information
4.1.4.7.1 GOES-R Core GS Enterprise Level Control and Monitoring
4.1.4.7.2 GOES-R Core GS Tiered Monitor and Control
4.1.4.7.3 Enterprise Management Capabilities Implementation
4.1.4.7.4 Enterprise Management Deployment
4.1.4.7.5 Enterprise Management Data Flow
GOES-R Core GS Maintenance/Upgrade Deployment
GOES-R Core GS Operational Support Locations
GOES-R Core GS Virtual Network Computing (VNC) Monitoring
GOES-R Core GS Configuration Compliance Monitoring
Data beyond section 4.1.4 redacted at this time ix NON-Export Controlled Information
LIST OF FIGURES
Figure Title Page
Figure 1.2-1 GOES-R System and GS Overview
Figure 1.2-2 GOES-R GS Primary Data Flow
Figure 3.2 GOES-R Ground Segment
Figure 3.3 GOES-R Ground Segment Data Flows
Figure 4.0 GOES-R Core GS Design Documents
Figure 4.1.1 GOES-R Core GS VAGL Approach
Figure 4.1.2 GOES-R Core GS Interfaces and Interface Requirements Specifications
Figure 4.1.4.3-1 Simplified Product Processing and Distribution Flow through GOES-R Core GS
Figure 4.1.4.3-2 First Set of Processing Steps at WCDAS/CBU (Pipelined & Occur Concurrently)
Figure 4.1.4.3-3 Second Set of Processing Steps at WCDAS/CBU (Pipelined & Occur
Concurrently)
Figure 4.1.4.3-4 Processing Steps at NSOF are Pipelined and Occur Concurrently
Figure 4.1.4.4.4 GOES-R Core GS Data Repositories in the Two Core GS Security Domains
Figure 4.1.4.5 Ground Segment State Transition Diagram
Figure 4.1.4.7.1 GOES-R Core GS Enterprise Level Control Design
Figure 4.1.4.7.2 Tiered Enterprise Monitoring and Control Approach
Figure 4.1.4.7.5-1 Health and Performance Status Data Flow
Figure 4.1.4.7.5-2 Hardware and Software Inventory Data Flow
Figure 4.1.4.7.5-3 Security Log Data Flow x NON-Export Controlled Information
LIST OF TABLES
Table Title Page
Table 1.3 Ground Segment Design Description Document Organization
Table 2.1 Applicable Documents List
Table 2.2 Reference Document List
Table 3.1 GOES-R Ground Segment Design Decisions
Table 4.1 Key and Driving GOES-R Core GS Requirements
Table 4.1.3 GOES-R Core GS Functionality for Each Location and Zone
Table 4.1.4.4 GOES-R Core GS Function States at the Sites and Zones
1 NON-Export Controlled Information
1.0 SCOPE
This document describes the design of the GOES-R Ground Segment (GS). The initial issue of this document described the Preliminary Design of the GS; subsequent revisions to this document have been generated for significant design changes driven primarily by:
• Critical Design Review (CDR)
• Server Replacement with Virtualization (ECP 033)
• Remote Access and Development (RAD)
• Compact Coronagraph (CCOR) instrument for GOES-U/GOES-19
• Space to Ground Communication (SGC) Obsolescence/Replacement
This revision of the document reflects the “end state” of the GS design for the items listed above.
1.1 Identification
The Ground System Design Document, GSDD_SE-07 (originally developed as a deliverable under
Contract DG133E-09-CN-0094), describes the design of the Geostationary Operational Environmental
Satellite “R” Series (GOES-R) Ground Segment (GS). Updates to this document are provided in accordance with Contract 1332KP-23-D-NAAA0003.
1.2 GOES-R Ground Segment Overview
The National Oceanic and Atmospheric Administration (NOAA) operates a system of Geostationary
Operational Environmental Satellites (GOES) to provide continuous weather imagery and monitoring of meteorological and space environment data to protect life and property across the United States. Two
GOES satellites remain operational (75.2 degrees west and 137.0 degrees west longitude) at all times providing coverage for the eastern United States and most of the Atlantic Ocean and the western United
States and Pacific Ocean basin. Post-Launch Test (PLT) of new satellites is performed at approximately
89.5 degrees west longitude. After PLT, an on-orbit spare satellite is maintained at 105 degrees west longitude (or the PLT location) to permit rapid recovery from a failure of either of the operational satellites.
GOES satellites provide critical atmospheric, oceanic, climatic and space weather products supporting weather forecasting and warnings, climatologic analysis and prediction, ecosystems management, and safe and efficient public and private transportation.
The next generation GOES (designated the GOES-R Series) provides continuity of the GOES mission (at
75.2 degrees west and 137.0 degrees west longitude) and improvement of its remotely-sensed environmental data. The GOES-R System consists of the Space and Ground Segments. The Space Segment comprises the spacecraft bus, and its remote-sensing instruments and communications payloads. The
Ground Segment (GS), comprising all Earth-based functions, provides satellite operations and product generation and distribution.
The primary GOES-R instrument is the Advanced Baseline Imager (ABI) that provides full disk, CONtinental United States (CONUS), and mesoscale imagery for global and CONUS forecasting and severe weather warning. Secondary instruments include the Extreme ultraviolet and X-ray Irradiance
Sensor (EXIS), Solar Ultraviolet Imager (SUVI), Space Environment In-Situ Suite (SEISS), Magnetometer
(MAG) on GOES-R (GOES-16) and GOES-S (GOES-17), Goddard Magnetometer (GMAG) on GOES-T
(GOES-18) and GOES-U (GOES-19), Geostationary Lightning Mapper (GLM), and for GOES-U (GOES-
19) the Compact Coronagraph (CCOR). Additionally, GOES-R provides a set of communications services
2 NON-Export Controlled Information
(Unique Payload Services) in support of the Data Collection System (DCS), High-Rate Information
Transmission/Emergency Managers Weather Information Network (HRIT/EMWIN), and Search-and-
Rescue Satellite Aided Tracking (SARSAT).
The GOES-R GS operates from three sites. The NOAA Satellite Operations Facility (NSOF) in Suitland, MD houses the primary Mission Management (MM), and selected Enterprise Management (EM), Product
Generation (PG), and Product Distribution (PD) functions. The Wallops Command and Data Acquisition
Station (WCDAS), located in Wallops, VA, provides the primary space communications services, EM and
MM functions, and selected PG and PD functions for the production of the sectorized Key Performance
Parameters (KPPs) for distribution to Advanced Weather Interactive Processing System (AWIPS). The third site is the Consolidated Backup (CBU) facility in Fairmont, WV, which houses the GOES-R remote backup functionality. CBU functions as a completely independent backup for the MM and selected PG and
PD functions for the production of KPPs and GOES Rebroadcast (GRB) data, and is capable of concurrent and remote operations from NSOF and WCDAS. The CBU has visibility to all operational and on-orbit spare satellites. The KPPs consist of the L2+ Cloud and Moisture Imagery (CMI) (CONUS, Full Disk, and
Mesoscale) product and its sectorized products. In addition, there are two Operational Support Locations
(OSLs) – one located at the NOAA Center for Weather and Climate Prediction (NCWP) in College Park, MD, and the other at the GOES-R factory in Melbourne, FL. The OSLs provide additional GS operator workstation positions and WAN connectivity to the GS to support GS functions such as testing and deploying updates to the field, troubleshooting and resolving issues, and system monitoring. OSLs contain no servers hosting operational functions such as satellite command and control. Figure 1.2-1 provides an overview of the GOES-R System and GS. A terrestrial network between WCDAS, CBU and NSOF has been established for GRB data, referred to as Terrestrial GRB (TGRB) data, thus removing the dependency at NSOF on GRB uplinked/downlinked data.
Figure 1.2-1 GOES-R System and GS Overview
The satellites are commanded throughout their mission lifetime from the NOAA Satellite Operational
Control Center (SOCC) located at NSOF with the ground station radio frequency (RF) interface located at
3 NON-Export Controlled Information
WCDAS, or CBU. The engineering telemetry streams are received by WCDAS, and CBU, and ground relayed to the SOCC for processing and monitoring at all locations.
The raw sensor data are received at WCDAS and processed by the PG function at WCDAS to create L1b and L2+ (CMI, GLM and GLM Flash Extent Density (FED)) products. Sectorized KPP products are created from the L2+ CMI by the PD function and directly distributed to the National Weather Service
(NWS) Advanced Weather Interactive Processing System’s (AWIPS) Network Control Facility (NCF) where key NWS Weather Forecast Offices (WFO) and other AWIPS users get their data. GLM FED products are produced from the L2+ GLM data and directly distributed to AWIPS. L0 data are generated at WCDAS and delivered to the government provided Geo Product Access Services (GPAS) in the
GeoCloud, for use in calibration and validation activities, and for secondary distribution to the NOAA
National Centers for Environmental Information – North Carolina (NCEI-NC), via the GPAS. For GOES-
U (GOES-19) the CCOR instrument L0 data are sent to the NOAA Space Weather Prediction Center
(SWPC) and the SWPC Alternate Processing Site (APS) in near real-time and are archived in the GPAS.
The L1b and L2+ (GLM) products are then rebroadcast through the spacecraft GRB transponder. The GRB data are also sent from WCDAS/CBU via terrestrial network to NSOF where the remaining L2+ products are created. Ancillary data used in generating the L2+ products at NSOF are ingested from the Ancillary
Data Relay System (ADRS) function of the Product Distribution and Access (PDA) interface. At NSOF, applicable products are distributed to the PDA GOES-R Access Subsystem (GAS) component of the
Environmental Satellite Processing and Distribution System (ESPDS) for distribution to end users such as
National Environmental Satellite, Data, and Information Service (NESDIS), NWS, and other GOES data users such as the Comprehensive Large Array-data Stewardship System (CLASS) for long term archive and access supporting retrospective users of GOES data. Figure 1.2-2 shows the primary data flow through the system.
4 NON-Export Controlled Information
Figure 1.2-2 GOES-R GS Primary Data Flow
At the CBU, the raw sensor data are received through its RF interface and processed by the PG function and distributed by the PD function.
The GS includes separate development and integration and test (I&T) environments for the purposes of ongoing development and I&T throughout the GOES-R mission. Portions of these environments are
GeoCloud Services SEIT-019A-MSCDR2-R15.vsdx 16 May 2023
WCDASNSOFCBU
GRB
TLM
CMD
AWIPS Sectorized CMI
L0, L1b, L2+
SCMI, GLM-FED
Product Users
L0 Pkt, GRB
Enterprise Management
- Monitor
- Supervise
L1b, L2+
Raw Data, GRB, TLM
Sectorized
CMI
Enterprise Management
- Monitor
- Supervise
Product Distribution
- Forma t
- Sectorize
- Distribute
A n c ill a ry
D a ta
GOES-West
GRB,
CMD
GRB
CMD
TLM
CLASS
L0, L1b, L2+
SCMI, GLM-FED
HRIT/EMWIN
GL0ASc
GRB
L1b,L2+
GOES-East
Mission Management
- TT&C
Product Generation
- L0
- L1b
- L2+ GLM GRB
- L2+ CMI
Product Distribution
- Forma t
- Secto rize
- Distribute
Product Distribution
- Format
- Distribute
L0 Pkt, GRB
GRB
Raw Data, GRB, TLM
GRB,
CMD
Enterprise Management
- Monitor
- Supervise
Product Distribution & Access (PDA)
GOES-R Antenna
HRIT/EMWIN
GOES-R Antenna
Mission Management
- TT&C
Product Generation
- L0
- L1b
- L2+ GLM GRB
- L2+ CMI
Primary Processing Backup Processing
Backup Ground Processing
External Systems
Primary Ground Processing
GOES-R Site
(NO AA5050)
External w/GS Requirements
LEGEND
L0 (CCOR-1)L0 (CCOR-1)
L0
SWFO C2
WCDAS/CBU
LO
L0
MM RAD
NCEI-NC
SWPC/SWPC APS
Mission Management
- TT&C
Product Generation
- Recover L1b
- L2+
L0
L0, L1b, L2+
SCMI, GLM-FED
GPAS USER
2eGRES 2eGRES 2eGRES
2 eGRESc eGRESc USER Administrative
L0, L2+ GLM,
L2+ CMI
L0, L2+ GLM,
L2+ CMI
eGRES
GPAS
5 NON-Export Controlled Information located at both NSOF and WCDAS to support local site development and I&T activities (Reference Master
Technical Project Overview 20230928).
Note that the “Remote Backup (RBU)” terminology has been replaced with “Consolidated Backup (CBU)” throughout the text of this document. The “RBU” terminology remains unchanged in requirements statements in Appendix C.
1.3 Document Overview
This document is written in accordance with DI-IPSC-81432A, System/Subsystem Design Description
(SSDD). It has been tailored to accommodate the Grounds System and its subsystems. This document is organized as follows:
Table 1.3 Ground Segment Design Description Document Organization
Section
Number Section Title Description
1.0 Scope Overview of the GOES-R Ground Segment
2.0 Referenced Documents Documents referenced or used in developing architecture and design
3.0 GOES-R GS Design
Description
Describes the architecture and design of the
GOES-R Ground Segment.
3.1 GOES-R GS Design Decisions Ground Segment design decisions that apply to the entire system
3.2 GOES-R GS Architectural
Design
Information about the Ground Segment architecture and design
3.3 GOES-R GS Concept of
Execution
Information about the Operational Concepts driving the design of the Ground Segment
4.0 GOES-R Core GS Design
Description
Describes the architecture and design of the
GOES-R Core Ground Segment
4.1 GOES-R Core GS Design
Decisions
Information about the GOES-R Core Ground
Segment design decisions
4.2 GOES-R Core GS
Architectural Design
Information about the GOES-R Core Ground
Segment architecture and design
4.3 GOES-R Core Ground
Segment Requirements
Traceability
Traceability of element requirement to element configuration items
5.0 Antenna System Design
Description
Describes the architecture and design of the
GOES-R Antenna System
6.0 Timing and Frequency
Reference System Design
Description
Describes the architecture and design of the
GOES-R Timing and Frequency Reference System
6 NON-Export Controlled Information
Table 1.3 Ground Segment Design Description Document Organization
Section
Number Section Title Description
7.0 Product Distribution and
Access (PDA) / GOES-R
Access Subsystem (GAS)
Design Description
Describes the architecture and design of the
GOES-R Access Subsystem
8.0 Space Segment Command and
Telemetry Simulator Design
Description
Describes the architecture and design of the
GOES-R Space Segment Command and Telemetry
Simulator
9.0 Space Segment Satellite
Simulator Design Description
Describes the architecture and design of the
GOES-R Space Segment Satellite Simulator
Appendix A Trade Studies GOES-R Core Ground Segment trade studies
Appendix B Use Case Reports GOES-R Core Ground Segment use cases and supporting Unified Modeling Language (UML) diagrams
Appendix C Requirements Traceability Traceability reports mapping GOES-R Core Ground
Segment requirements to element.
Appendix D Off The Shelf (OTS) Software
Products
List of all OTS Software (SW) products that are part of the GOES-R Core Ground Segment design
Appendix E Technical Reference Model
(TRM)
Identifies the GOES-R Core Ground Segment enterprise Information Technology (IT) standards, specifications and products
Appendix F Technical Readiness
Assessment
(TRA) Report
Identifies the GOES-R Core Ground Segment
Critical Technology Elements (CTE) and documents the evaluation of technology maturity for each CTE
Appendix G System Server Configuration Table of hardware quantities by zone.
Appendix H SWFO Antenna Network
Integration
Describes the integration of the SWFO Antenna
Network (SAN) Element with the GOES-R Ground
Segment (GS) architecture/infrastructure
Appendix B Use Case Reports reflect the CDR level use cases; hence, Appendix B is no longer maintained.
Appendix E Technical Reference Model (TRM) reflects the compliance of the GOES-R Ground Segment with the NOAA TRM at the CDR time frame; hence, Appendix E is no longer maintained.
7 NON-Export Controlled Information
2.0 REFERENCED DOCUMENTS
2.1 Applicable Documents
This section provides a list of applicable documents for the Ground Segment Design Description, with associated document number and date of issue for each.
Table 2.1 Applicable Documents List
Document Number Applicable Document Title Date/Revision
416-R-SOW-0104 GOES-R Series Ground Segment Project
Development Contract Statement of Work
Requirements Document (SOW) ECP 033 –
Contract Extension and Server Replacement
Version 5.2
15 January 2021
N/A (Stand Alone) Statement of Work (SOW)
ECP 026 – Addition of Two Operations
Support Locations V6
27 October 2015
N/A (Stand Alone) Statement of Work (SOW)
ECP 033 – Contract Extension and Server
Replacement V12
02 April 2019
N/A (Stand Alone) Statement of Work (SOW)
ECP 036 – GOES-U CCOR
24 August 2021
N/A (Stand Alone) Statement of Work (SOW)
ECP 037 – MM RAD
08 June 2021
N/A (Stand Alone) Statement of Work (SOW)
ECP 038 – GOES-T Launch Date/Split PLT
Plan
14 June 2022
CCR-03007 Extending A&A Boundaries to Operational
Support Locations (OSLs)
27 October 2015
410-R-CONOPS-0008 GOES-R Series Concept of Operations
(CONOPS)
Version 3.0
01 June 2020
410-R-LIST-0142 GOES-R Series Acronym & Glossary
Document
Version 2.0
28 January 2016
416-R-FPS-0089 GOES-R Series Ground Segment (GS) Project
Functional and Performance Specification
(F&PS)
Version 5.3
25 June 2021
416-R-GSCDRL-0146 GOES-R Series Ground Segment (GS) Project
Contract Data Requirements List
Version 4.X
22 November 2022
416-R-GSMAR-0068 GOES-R Series Ground Segment (GS) Project
Mission Assurance Requirements Document
(GSMAR)
Version 2.3
26 October 2016
8 NON-Export Controlled Information
Table 2.1 Applicable Documents List
Document Number Applicable Document Title Date/Revision
417-R-ABIPORD-0017 GOES-R Advanced Baseline Imager (ABI)
Performance and Operations Document
(PORD)
Version 2.36
22 June 2016
417-R-EXISPORD-0116 GOES-R EXIS Performance and Operations
Document (PORD)
Version 2.14
03 June 2013
417-R-GLMPORD-0057 GOES-R Geostationary Lightning Mapper
(GLM) Performance and Operations
Document (PORD)
Version 2.15
19 November 2015
417-R-SEISSPORD-0030 GOES-R Space Environment In-Situ Suite
(SEISS) Performance and Operations
Document (PORD)
Version 2.13
30 June 2016
417-R-SUVIPORD-0111 GOES-R SUVI Performance and Operations
Document (PORD)
Version 2.14
20 May 2015
417-R-GIRD-0009 GOES-R Series General Interface
Requirements Document
(GIRD)
Version 2.25
28 March 2011
417-R-IRD-0001 GOES-R System Space Segment (SS) To
Ground Located – Command, Control, And
Communications Segment (GL-C3S) Interface
Requirements Document (IRD)
Version 2.8
19 February 2015
417-R-IRD-0002 GOES-R System Space Segment (SS) To
GOES Rebroadcast (GRB) Service Interface
Requirements Document (IRD)
Version 2.7
13 June 2016
417-R-IRD-0005 GOES-R System Space Segment (SS) To Data
Collection System (DCS) Interface
Requirements Document (IRD)
Version 2.5
18 February 2014
417-R-IRD-0168 GOES-R Space Segment (SS) to High Rate
Information Transmission Service and
Emergency Managers Weather Information
Network (HRIT/EMWIN) Interface
Requirements Document (IRD)
Version 2.6
19 January 2012
416-R-IRD-0409 GOES-R Ground Segment (GS) and Space
Weather Follow On (SWFO) GS Command and Control (C2) to Space Weather Prediction
Center (SWPC) Interface Requirements
Document (IRD)
Version 2.0
29 September 2022
CCSDS 133.0-B-1 Space Packet Protocol, Blue Book, Issue 1 01 September 2003
CCSDS-650.0-B-1 Reference Model for an Open Archival
Information System (OAIS)
January 2002
9 NON-Export Controlled Information
Table 2.1 Applicable Documents List
Document Number Applicable Document Title Date/Revision
CCSDS-651.0-B-1 Producer-Archive Interface Methodology
Abstract Standard
May 2004
CCSDS 660.0-G-1 XML Telemetric and Command Exchange
(XTCE). Green Book. Issue 1
01 July 2006
CCSDS 660.0-B-1 XML Telemetric and Command Exchange
(XTCE), Blue Book, Issue 1
01 October 2007
DAO 209-3 NOAA Injury, Illness, Accident, and Fatality
Investigation and Reporting
24 August 2011
DI-IPSC-81432A System/Subsystem Design Description Data
Item Description (DID)
10 August 1999
Notice 2, 03 September 2021
IPC-A-610 D Acceptability of Electronic Assemblies 01 April 2010
ISO 19115 Geographic Information - Metadata 18 February 2009
ISO 19115 CORR 1 Geographic information — Metadata
TECHNICAL CORRIGENDUM 1 - First
Edition
01 July 2006
ISO 19115-2 Geographic information — Metadata — Part
2: Extensions for imagery and gridded data
01 June 2010
ISO TS 19138 Geographic information Data quality measures 29 September 2010
ISO TS 19139 Geographic information — Metadata — XML schema implementation
29 September 2010
MIL-HDBK-454B General Guidelines for Electronic Equipment 15 April 2007
MIL-STD-961E Department of Defense Standard Practice –
Defense and Program-Unique Specifications
Format and Content
02 April 2008 w/Change 1
NASA Form NF1627 or equivalent
Mishaps at Government Facilities 30 August 2005
NASA NPR 7150.2 NASA Software Engineering Requirements 19 November 2009
NASA NPR 8621.1B
w/Change 6
NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and
Recordkeeping
23 May 2006
NASA NPR 8705.4 Risk Classification for NASA Payload 09 July 2008
NASA NPR 8705.5A Probabilistic Risk Assessment Procedures for
NASA Programs and Projects
07 June 2010
NASA NPR 8715.3C
w/Change 1 NASA General Safety Program Requirements 12 March 2008
10 NON-Export Controlled Information
Table 2.1 Applicable Documents List
Document Number Applicable Document Title Date/Revision
NASA-STD-8719.13B
w/Change 1
Software Safety Standard 08 July 2004
NASA-STD-8739.8
w/Change 1
Standard for Software Assurance 05 May 2005
NOAA AO 209-1 National Oceanic and Atmospheric
Administration (NOAA) Safety Policy
Version 2
25 March 2009
OSGS TA 5350.01A Office of Satellite Ground Services (OSGS)
Systems Engineering Division (SED) GEARS
Technology Architecture
Version 1.0
RFC2460 RFC2460 - Internet Protocol, Version 6 (IPv6)
Specification
01 December 1998
UL-60950-1 UL Standard for Safety Information
Technology Equipment – Safety – Part 1:
General Requirements
27 March 2007
2.2 Reference Documents
This section contains a list of reference documents for the Ground Segment Design Description, with associated document number and date of issue for each. Reference documents amplify or clarify the information presented in this document.
Table 2.2 Reference Document List
Document Number Title Date/Revision
416-R-ICD-0382 GOES-R Ground Segment to Advanced Weather
Interactive Processing System (AWIPS) Interface
Control Document (ICD)
08 March 2019
Version 2.0
416-R-ICD-0383 GOES-R Ground Segment Telecommunications
Interface Control Document (ICD)
27 October 2020
Version 1.1
416-R-ICD-0384 GOES-R Ground Segment to Product Distribution and
Access (PDA) Interface Control Document (ICD)
27 October 2020
Version 1.1
417-R-ABIUIID-
GOES Advanced Baseline Imager (ABI) Unique
Instrument Interface Document (UIID)
Version 2.25
04 December 2012
417-R-ICD-0236 GOES-R Mission to/from The Near Earth Network
(NEN) Interface Control Document (ICD)
14 December 2015
Version 1.2
417-R-ICD-0302 GOES-R Space Segment to GOES Rebroadcast (GRB)
Service Interface Control Document (ICD)
22 September 2015
Version 2.0
417-R-ICD-0303 Space Segment (SS) to Ground Located - Command, Control, and Communications Segment (GL-C3S)
Interface Control Document (ICD)
1 June 2015
Revision 2.0
11 NON-Export Controlled Information
Table 2.2 Reference Document List
Document Number Title Date/Revision
7058355 GOES-R Ground Segment (GS) and Space Weather
Follow On (SWFO) GS Command and Control (C2) to
Space Weather Prediction Center (SWPC) Interface
Control Document (ICD)
31 May 2023 Revision
B
7029139 Product Distribution (PD) Element Requirements
Specification
19 December 2016
Revision F
7029144 Mission Assurance Implementation Plan
15 October 2019
7029553 Systems Engineering Management Plan (SEMP) 29 November 2021
Revision K.2
7032706 Ground Segment Operations Concept 31 October 2017
Revision F
7032713 GOES-R Series Core Ground Segment Requirements
Specification (GSRS)
17 November 2022
Revision K
7032907 Ground Segment (GS) to Comprehensive Large Array-
Data Stewardship System (CLASS) Interface
Requirements Specification (IRS)
30 January 2012
Revision D.1
7032908 Ground Segment (GS) to Advanced Weather
Interactive Processing System (AWIPS) Interface
Requirements Specification (IRS)
30 January 2012
Revision D
7032909 Ground Segment (GS) to Ancillary Data Relay System
(ADRS) Interface Requirements Specification (IRS)
13 March 2015
Revision F
7032912 Ground Segment (GS) to GOES-R Access Subsystem
(GAS) Interface Requirements Specification (IRS)
01 August 2014
Revision F.1
7032921 Ground Segment (GS) to Data Collection System
(DCS) Interface Requirements Specification (IRS)
24 June 2013
Revision D.1
7032922 Ground Segment (GS) to High Rate Information
Transmission (HRIT) / Emergency Managers Weather
Information Network (EMWIN) Interface
Requirements Specification (IRS)
27 August 2013
Revision E.1
7032923 GOES-R Ground Segment to Telecommunications
Interface Requirements Specification (IRS)
03 October 2013
Revision E
7058354 GOES-R Ground Segment (GS) and Space Weather
Follow On (SWFO) GS Command and Control (C2) to
Space Weather Prediction Center (SWPC) Interface
Requirements Specification (IRS)
01 November 2021
Revision -
7032939 Reliability, Maintainability, and Availability Project
Plan (RMAPP)
24 March 2017
Revision B.1
12 NON-Export Controlled Information
Table 2.2 Reference Document List
Document Number Title Date/Revision
7032940 System Safety Program Plan (SSPP) 17 December 2012
Revision C
7032941 Product Generation (PG) to Enterprise Management
(EM) Internal Interface Requirements Specification
(IRS)
19 December 2016
Revision F
7032942 Product Generation (PG) to Mission Management
(MM) Internal Interface Requirements Specification
(IRS)
02 March 2015
Revision E
7032943 Product Generation (PG) to Product Distribution (PD)
Internal Interface Requirements Specification (IRS)
02 March 2015
Revision E
7032947 Enterprise Management (EM) Element Requirements
Specification
19 December 2016
Revision E
7032948 Infrastructure (IS) Element Requirements Specification 19 December 2016
Revision E
7033271 Software Quality Assurance Plan (SQAP) 23 March 2017
Revision C.1
7033275 Ground Segment Facilities Requirements
Implementation Plan
25 July 2016
Revision D
7033283 Mission Management (MM) to Antenna System (ANT)
Internal Interface Requirements Specification (IRS)
19 December 2016
Revision H
7033284 Mission Management (MM) to Product Distribution
(PD) Internal Interface Requirements Specification
(IRS)
30 March 2015
Revision E
7033285 Mission Management (MM) to Element Management
(EM) Internal Interface Requirements Specification
(IRS)
19 December 2016
Revision E
7033286 Product Distribution (PD) to Enterprise Management
(EM) Internal Interface Requirements Specification
(IRS)
19 December 2016
Revision F
7033290 Infrastructure (IS) to Core Ground Segment (GS)
Internal Interface Requirements Specification (IRS)
19 December 2016
Revision E
7033292 Mission Management (MM) to Timing and Frequency
Reference System (TFRS) Internal Interface
Requirements Specification (IRS)
23 April 2012
Revision D
7033297 Core Ground Segment Element Requirement
Specification For The Product Generation (PG)
Element
19 December 2016
Revision F
7034325 GOES-R Core Ground Segment Acronym List and
Glossary
31 October 2019
13 NON-Export Controlled Information
Table 2.2 Reference Document List
Document Number Title Date/Revision
7034353 Ground Segment Element Requirement Specification
For The Mission Management (MM) Element
19 December 2016
Revision F
7034355 GOES-R Core Ground Segment Data Dictionary 11 September 2012
Revision A
7034359 Verification Tracking Log (VTL) 26 July 2016
Revision D
7034368 Reliability, Maintainability and Availability Predictions
Report
21 June 2022
Revision F
7034699 Ground Segment (GS) Assessment and Authorization
(A&A) Package:
System Security Plan
(NOAA5050)
23 March 2023
Revision AA
7034704 Ground Segment (GS) to Advanced Weather
Interactive Processing System (AWIPS) Interface
Control Document (ICD)
24 November 2014
Revision B.4
7034705 Ground Segment (GS) to Comprehensive Large Array-
Data Stewardship System (CLASS) Interface Control
Document (ICD)
15 August 2014
Revision B.3
7034709 Ground Segment (GS) to Data Collection System
(DCS) Interface Control Document (ICD)
02 August 2013
Revision C
7035268 Ground Segment (GS) to High Rate Information
Transmission (HRIT) / Emergency Managers Weather
Information Network (EMWIN) Interface Control
Document (ICD)
02 August 2013
Revision C
7035271 Infrastructure Element (IS) to Ground Segment (GS)
Internal Interface Control Document (ICD)
13 August 2020
Revision E
7035272 Mission Management (MM) to Enterprise Management
(EM) Internal Interface Control Document (ICD)
23 February 2016
Revision D
7035273 Mission Management (MM) to Antenna (ANT) System
Internal Interface Control Document (ICD)
18 March 2020
Revision E
7035274 Mission Management (MM) to Timing and Frequency
Referencing System (TFRS) Internal Interface Control
Document (ICD)
21 October 2015
Revision C
7035275 Mission Management (MM) to Product Distribution
(PD) Internal Interface Control Document (ICD)
28 September 2017
Revision D
7035276 Product Distribution (PD) to Enterprise Management
(EM) Internal Interface Control Document (ICD)
30 September 2014
Revision C
7035277 Product Generation (PG) to Mission Management
(MM) Internal Interface Control Document (ICD)
14 April 2023
Revision H
14 NON-Export Controlled Information
Table 2.2 Reference Document List
Document Number Title Date/Revision
7035278 Product Generation (PG) to Enterprise Management
(EM) Internal Interface Control Document (ICD)
10 February 2015
Revision E
7035279 Product Generation (PG) to Product Distribution (PD)
Internal Interface Control Document (ICD)
26 January 2022
Revision H
7035538 GOES-R Product Definition and User’s Guide (PUG) 31 May 2023
Revision P
7035544 Ground Segment Integration and Test Plan 05 February 2014
Revision C
7035553 Ground Segment Hardware Requirements Specification
(HWRS) Space-Ground Communications Hardware
Configuration Item (HWCI SDRL SE-22)
04 March 2015
Revision D
7035554 Ground Segment Hardware Requirements Specification
Raw Data Recorder (HWCI SDRL SE-22)
04 March 2015
Revision D
7036385 Enterprise Management (EM) Design Description (DD) 31 May 2023
Revision G
7036386 Product Distribution (PD) Design Description (DD) 14 April 2023
Revision F
7036387 Product Generation (PG) Design Description (DD) 14 April 2023
Revision H
7036388 Mission Management (MM) Design Description (DD) 31 May 2023
Revision G
7036415 Infrastructure (IS) Design Description (DD) 31 May 2023
Revision K
7066751 GOES-R Ground Segment Design Description
Addendum for SWFO Ground Segment Command and
Control (C2)
27 January 2023
Revision D
8018022 Software Management and Development Plan (SMDP) 17 November 2014
Revision G
8021130 GOES-R Core Ground Segment Metadata Model 26 January 2022
Revision J
8021135 GOES-R Core Ground Segment Software
Requirements Specification (SWRS) Product
Monitoring CSCI
12 February 2015
Revision E
8021145 GOES-R Core Ground Segment Software Database
Design Description
05 June 2023
Revision K
GOES-RQ-10-
GOES-R Space Segment to Data Collection System
(DCS) Interface Control Document (ICD)
27 March 2012
Revision A
15 NON-Export Controlled Information
Table 2.2 Reference Document List
Document Number Title Date/Revision
GOES-RQ-10-
GOES-R Space Segment to High Rate Information
Transmission (HRIT) / Emergency Managers Weather
Information Network (EMWIN) Interface Control
Document (ICD)
27 March 2012
Revision A
GOES-RQ-10-
Geostationary Operational Environmental Satellite R-
Series (GOES-R) Space to Ground Interface Control
Document
22 May 2012
Revision D
GOES-RQ-13-
GOES-R Satellite Operations Handbook (SOH), Volume 1 Launch and Orbit Raising (LOR) Operations
22 July 2016
Revision E
GOES-RQ-13-
GOES-R Satellite Operations Handbook (SOH), Volume 2 Contingency Operations
20 July 2016
Revision F
GOES-RQ-13-
GOES-R Satellite Operations Handbook (SOH), Volume 3 Spacecraft Description
19 July 2016
Revision C
GOES-RQ-13-
GOES-R Satellite Operations Handbook (SOH), Volume 4 On-Orbit Operations
20 July 2016
Revision F
GOES-RQ-13-
GOES-R Satellite Operations Handbook (SOH), Volume 5 OBC Flight User’s Operations and
Maintenance Manual
19 July 2016
Revision F
HITS-GSR-0231 Harris Information Technical Services (HITS) Ground
Segment Software Requirements Specification (SWRS)
Mission Planning and Scheduling CSCI
30 March 2015
Revision E
HITS-GSR-0235 Ground Segment Software Requirements Specification
(SWRS) Spacecraft Navigation CSCI
30 March 2015
Revision E
HITS-GSR-0237 Ground Segment Software Requirements Specification
(SWRS) TTC CSCI
30 March 2015
Revision G
16 NON-Export Controlled Information
3.0 GOES-R GS DESIGN DESCRIPTION
Section 3 of this document discusses the overall GOES-R Ground Segment Design.
3.1 GOES-R GS Design Decisions
Table 3.1 summarizes the design decisions that apply to the design of the GOES-R GS. These design decisions were made by the government and were articulated in the GOES-R Functional and Performance
Specification (F&PS) provided as System Requirements.
Table 3.1 GOES-R Ground Segment Design Decisions
Title Design Decision(s) Rationale
Spacecraft navigation
The satellite navigation system uses the
Global Positioning System (GPS).
Autonomous operations are enhanced and navigation error contribution to product mapping accuracy is minimized.
Space-ground communications links
The satellite command uplinks are at S-band. The satellite telemetry downlinks are at S-band. The satellite instrument raw data downlink is at X-band. The
GOES Rebroadcast (GRB) uplink to the satellite is at X-band. The satellite GRB downlink is at L-band.
Selected bands driven by legacy and interoperability considerations
(commanding, telemetry, GRB downlink), and bandwidth availability (instrument raw data downlink, GRB uplink).
Space- ground interface protocols
The CCSDS family of network, link, and physical layer protocols for space-ground communications are used.
Open, standards-based protocols minimize life-cycle costs.
Command and
Telemetry
Exchange
The CCSDS Recommended Standard for
XML Telemetric and Command Exchange
(XTCE) is used to exchange satellite and instrument information needed by the GS.
Standards based exchanges improve interoperability with multiple OTS products and reduce life cycle costs.
Deployment locations
The GS is deployed at the NOAA Satellite
Operations Facility (NSOF) in Suitland, Maryland, Wallops Command and Data
Acquisition Station (WCDAS) near
Chincoteague, Virginia, and the
Consolidated Backup Unit (CBU) in
Fairmont, West Virginia. The NSOF and
WCDAS are the primary sites. The CBU is the backup site.
The use of existing facilities minimizes life-cycle costs.
Continuity of operations
The CBU site promotes the continuity of operations.
GOES operational mission continuity of operations requirements.
Space-ground communications site connectivity
Telemetry and commanding links at
WCDAS and CBU. GRB uplink and downlink at WCDAS and CBU.
Instrument raw data downlink at WCDAS and CBU.
A combination of legacy, real estate availability, and life-cycle cost considerations.
17 NON-Export Controlled Information
Table 3.1 GOES-R Ground Segment Design Decisions
Title Design Decision(s) Rationale
External system connectivity
AWIPS connectivity at WCDAS and
CBU. PDA (GAS and ADRS) connectivity at NSOF.
A combination of GOES-R user requirements for products and life-cycle cost considerations.
GS partitioning The GS is partitioned into the Core
Ground Segment, the Antenna System, the
Timing and Frequency Reference System, the GOES-R Access Subsystem, the Space
Segment Command and Telemetry
Simulator and the Space Segment Satellite
Simulator.
Risk-reduction and programmatic.
Three Site
Satellite
Telemetry &
Command (T&C)
Satellite telemetry monitoring and commanding functions are available at all three sites.
Provides for continuity of operations, and operational flexibility.
Three Site
Satellite Data
Repository
Include a 5-day satellite telemetry and raw instrument data repository at NSOF
(telemetry only), WCDAS and CBU.
Provides for anomaly investigation, integration and test, and training.
Four Satellite
Extensibility
Extensibility to operate up to four satellites concurrently.
Allows satisfaction of operational mission requirements.
ISO Metadata Use applicable ISO metadata standards for
GOES-R products and produce ISO Series metadata for product types. Incorporate dynamic metadata into end product file formats.
Ensure GOES-R products are interoperable and support operational and climatology needs while reducing bandwidth use by eliminating redundant information.
Product File
Formats
Use Network Common Data Format
(netCDF-4), and Flexible Image Transport
System (FITS) file formats for products.
Utilize prevalent file formats for environmental products.
Core GS contains at least four
Elements
The Core GS to be implemented with four elements: Mission Management, Enterprise Management, Product
Generation and Product Distribution.
Customer directed in procurement.
IS as a fifth
Element
Collect network hardware, storage hardware and compute platforms into the
Infrastructure Element (IS).
Better management of selection and design of common hardware components. Consolidated storage across four elements (MM, EM, PG and PD). Optimized storage and network solutions across segment.
18 NON-Export Controlled Information
3.2 GOES-R GS Architectural Design
The GOES-R Ground System as shown in Figure 3.2 is made up of the following:
• GOES-R Core Ground Segment
• Antenna System
• Timing and Frequency Reference System
• Product Distribution and Access (PDA)/ GOES-R Access Subsystem (GAS)
• Space Segment Command and Telemetry Simulator
• Space Segment Satellite Simulator
Figure 3.2 GOES-R Ground Segment
3.2.1 GOES-R Core Ground Segment Overview
The GOES-R Core Ground Segment provides the following capabilities:
• Mission Management, which includes:
o Commanding and Encryption of the satellite commands o Telemetry monitoring, including remote access to information o Spacecraft navigation, including orbit and attitude determination, and ranging o Mission Planning and Operations, including mission planning and scheduling, and maneuver planning o Space-ground communications (SGC), including antenna system commanding, monitoring and test, raw instrument data receiving (packet extraction and distribution), GRB uplink, ranging, and GRB receiving
• Product Distribution, which includes:
o Transmission of Final Products to PDA o Non-Product distribution to external interfaces, including Mission data, CM Data, Instrument calibration data for L0 and L1b, Sample Outlier Files, and GRB
Information Packets o Transmission of Level 0 data to GPAS o Transmission of Sectorized CMI Products and GLM Flash Extent Density (FED)
Products to AWIPS
GOES-R Ground Segment
GOES-R Core Ground Segment
Antenna System
Timing and Frequency Reference
System
Product Distribution and Access / GOES-R
Access Subsystem
Space Segment Command and
Telemetry Simulator
Space Segment Satellite
Simulator
SEIT-025-GSCOMP-R1
19 NON-Export Controlled Information
• Product Generation, which includes:
o L0, L1b and L2+ product generation and distribution to external interfaces o Non-Product distribution to external interfaces, including Mission data, Ancillary
Data, Instrument calibration data for L0 and L1b, L1b and L2+ Algorithm Packages, and GRB Information Packets
• Enterprise Management; which includes o Configuration Management (CM) o Service desk o Hardware and Software health and status monitoring including computer processing, data storage and network management o Security Management o Performance monitoring
•…