The provided document is a General Provisions document for goods and services contracts issued by Pierce County, Washington, establishing standard bidding, contracting, and procurement requirements. Pierce County Planning and Public Works is seeking a marine waste oil and bilge water pumping and disposal services contractor for two ferry vessels: the M/V Christine Anderson and M/V Steilacoom II, both moored at the Steilacoom Ferry Landing. The contract will cover services including marine and industrial cleaning, hazardous waste transportation, waste handling, and proper disposal. While specific contract duration is not explicitly stated, the General Provisions document indicates potential contract renewal periods up to 5 years, with automatic yearly renewals unless either party provides 30-day cancellation notice.
The pricing terms allow for potential price adjustments after the first 90 days, with any increases requiring written documentation and being proportional to verifiable cost changes at the manufacturer or supplier level. The County reserves the right to accept or reject pricing adjustments. The contract includes comprehensive insurance requirements, with the contractor needing to maintain commercial general liability insurance with coverage limits of $1,000,000 per occurrence and $2,000,000 aggregate. The procurement process emphasizes competitive bidding, with evaluation criteria including the bidder's experience, delivery capabilities, financial resources, compliance with affirmative action requirements, and overall responsibility. The County maintains flexibility in contract award, with the ability to award to one or more bidders and reject any or all bids as needed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL PROVISIONS
| 1. | BIDDING REQUIREMENTS |
| 1.1 | USE AND COMPLETION OF COUNTY PROPOSAL SHEETS |
| A. | Bidder's Proposal |
Each Bidder must bid exactly as specified on the Invitation to Bid (hereinafter referred to as bid) sheets. All bids must remain open for acceptance by the County for a period of at least 60 calendar days from the date of opening of the bids.
B. Alterations of Proposals Not Allowed Proposals that are incomplete or conditioned in any way, contain alternatives or items not called for in the General Provisions and Specifications, or not in conformity with law may be rejected as being nonresponsive. The County cannot legally accept any proposal containing a substantial deviation from these Specifications.
C. Filling Out County Bid Forms All proposals must be made upon blanks furnished by the Procurement & Contract Services Department of Pierce County and the prices must be stated in figures either written in ink or typewritten. No proposal having erasures or interlineations will be accepted unless initialed by the Bidder in ink.
1.2 CLARIFICATION OF PROPOSAL FOR BIDDER
If a prospective Bidder has any questions concerning any part of the Bid/Proposal, he/she may submit a written request to the Pierce County Procurement & Contract Services Office for answer of his/her questions. Any interpretation of the Bid will be made by an Addendum duly issued and mailed or delivered to each prospective Bidder. Such addendum must be acknowledged (a) by signing and returning the addendum or (b) by letter. Such acknowledgement must be received by the County prior to the bid opening. Pierce County will not be responsible for any other explanation or interpretation of the bid documents.
| 1.3 | BLANK |
| 1.4 | BID SECURITY - NOT USED |
| 1.5 | DELIVERY OF PROPOSALS TO PIERCE COUNTY |
All bid proposals and documents must be delivered via the County's eProcurement Portal, prior to the scheduled time and date stated in the Invitation to Bid. Pierce County shall assume no responsibility for delay of bids. No other submittal process will be accepted.
Bids received after the time stated in the bid will not be accepted and will be returned, unopened, to the Bidder. There will be no exceptions or waivers of this requirement.
1.6 CONTRACTOR'S STATE REGISTRATION NO. (NOT APPLICABLE TO SUPPLY ONLY CONTRACTS) Contractors are required to be registered by the State per Chapter 18.27 of the Revised Code of Washington and their registration number must be listed on the bid.
1.7 BID IS NONCOLLUSIVE
The Bidder represents by the submission of the Proposal that the prices in this Bid are neither directly nor indirectly the result of any formal or informal agreement with another bidder.
| 1.8 | EVALUATION OF BID |
| A. | Experience, Delivery Time and Responsibility |
In the evaluation of otherwise responsive bids, the Bidder's experience, delivery time and responsibility in performing other contracts will be considered. In addition to price, the following may be considered:
| I. | The ability, capacity and skill of the bidder to perform the contract or provide the services required. |
| II. | Whether the bidder can perform the contract or provide the service promptly, or within the time specified, without delay or interference. |
| III. | The character, integrity, reputation, judgment, experience and efficiency of the bidder. |
| IV. | The quality of performance of previous contracts or service. |
| V. | The previous and existing compliance by the bidder with laws and ordinances relating to contracts or services. |
| VI. | The sufficiency of the financial resources and ability of the bidder to perform the contact or provide the service. |
| VII. | The quality, availability and adaptability of the supplies or contractual services to the particular use required. |
| VIII. | The ability of the bidder to provide future maintenance and service for the use of the subject of the contract. |
| IX. | Compliance with all affirmative action requirements, minority business enterprise and women's business enterprise subcontracting and contracting requirements. |
| B. | Insertions of Material Conflicting with Specifications |
Only material inserted by the Bidder to meet requirements of the Specifications will be considered. Any other material inserted by the Bidder will be disregarded as being nonresponsive and may be grounds for rejection of the Bidder's Bid/Proposal.
C. Correction of Ambiguities and Obvious Errors The County reserves the right to correct obvious ambiguities and errors in the Bidder's proposal and to waive non-material irregularities and/or omissions. In this regard, if the unit price does not compute to the extended total price, the unit price shall govern. Written prices will govern over numeric prices.
| 1.9 | WITHDRAWAL OF BID |
| A. | Prior to Bid Opening |
Any Bidder may withdraw his/her Bid prior to the scheduled bid opening time by delivering a written notice to the Chief Clerk, Pierce County Council Office. The notice may be submitted in person or by mail; however, it must be received by the County Council Office prior to the time for bid opening.
B. After Bid Opening No bidder will be permitted to withdraw his/her Bid/Proposal after the time of bid opening, as set forth in the Invitation To Bid, and before the actual award of the Contract, unless the award of Contract is delayed more than sixty (60) calendar days after the date set for bid opening. If a delay of more than 60 calendar days does occur, then the Bidder must submit written notice withdrawing his/her Bid to the Pierce County Purchasing Agent.
1.10 OPENING OF BIDS
At the time and place set for the opening of bids, all Proposals, unless previously withdrawn, will be publicly opened and read aloud, irrespective of any irregularities or informalities in such Proposal.
1.11 TAXES
The County will pay sales and use taxes imposed on goods or services acquired hereunder as required by law. The Vendor must pay all other taxes including, but not limited to: Business and Occupation Tax, taxes based on the Vendor's gross or net income, or personal property to which the County does not hold title. The County is exempt from Federal Excise Tax. Where applicable the County shall furnish a Federal Excise Tax Exemption certificate.
1.12 APPROVED EQUAL
The brand names listed indicate the standard of quality required. Brands of equal quality, performance and use will be considered provided the offeror specifies the brand, model and other data for comparison with their bid. Pierce County will be the sole judge for approving other brands offered as equals to the brand specified. Bidders shall indicate if they are offering alternate brands in the space below each item and must provide descriptive specifications explaining the merits of the substitute item.
1.13 FAILURE TO SUBMIT BIDS
If the recipient of this Bid does not submit an offer for the goods or services requested, they shall return it and/or a written notice stating whether they wish to continue to receive future solicitations for the type of supplies or services specified. Failure to do so may result in removal of the recipient's name from the bidders' mailing list.
1.14 APPROXIMATE QUANTITY REQUIREMENTS
The quantities listed are the County's current approximate requirements. Pierce County will neither be obligated by nor restricted to these quantities and may increase or decrease any item(s) ordered under this contract and pay according to the unit prices quoted in the Bid.
1.15 COOPERATIVE PURCHASING
The Washington State Interlocal Cooperative Act RCW 39.34 provides that other governmental agencies may purchase goods and services on this solicitation or contract in accordance with the terms and prices indicated therein if all parties are willing. The Contract maximum for this contract per annual term, or for any renewal period, is for Pierce County’s use only. Other agencies may use this contract up to their contract limits, if any, exclusive of and in addition to the County’s contract maximum.
1.16 DELIVERY
Quotation shall cover delivery F.O.B. Pierce County, Tacoma, Washington, (unless otherwise stated in this Invitation to Bid at the designated address set forth in the proposal given to each bidder).
1.17 AWARD
The County reserves the right to award a contract for any or all items to one or more Bidders, to reject any and all Bids or any item(s) within the Bids, to waive any informality in the Bids, and to call for new Bids as best meets the needs of the County.
| 2. | CONTRACT REQUIREMENTS |
| 2.1 | AWARD OF CONTRACT |
Written notification will be mailed or otherwise furnished to the successful offeror (lowest responsive bidder). Within 20 calendar days after the notice of proposed award, the apparent successful bidder shall return the signed contract or other specified award documents prepared by the County, insurance certification as required and any other pre-award information the County requires.
Until the County executes said contract or award/acceptance documents, no proposal shall bind the County to execute a contract, nor obligate it to bear any expense pursuant to the Invitation for Bids. Neither shall any work begin within the project limits or within the County furnished sites. The Contractor shall bear all risks for any work begun outside such areas and for any materials ordered before the contract is executed by the Contracting Agency, and the Contractor is given written Notice To Proceed.
Pierce County is prohibited by RCW 39.06.010 from executing a contract with a Contractor who is not registered or licensed as required by the laws of the state. In addition, Pierce County may require persons doing business with the County to possess a business license prior to award.
When the Proposal Form provides spaces for a business license number, a Washington State Contractor's registration number, or both, the bidder shall insert such information in the spaces provided. The County may at its option, require legible copies of the Contractor's Registration and/or business license be submitted to the Architect/Engineer as part of the County's pre-award information and evaluation activities.
2.2 CONTRACT RENEWAL PERIODS (When specifically allowed by the Invitation to Bid) This proposed agreement shall remain in effect for a period of one year from and after its effective date and shall automatically be renewed on a year-to-year basis thereafter unless either party hereto serves notice upon the other party of its intention to cancel at least 30 days in advance of the termination of the first year, or during any yearly renewal thereof. Notice during each renewal term may occur at any time during the course of such term. Prices will be considered firm for at least the first 90 days of the contract. After the first 90 days of the contract, reasonable changes to prices will be allowed pursuant to the following conditions:
A. All requests for a pricing increase or decrease (“pricing adjustment(s)”) must be in writing, accompanied by satisfactory written documentation supporting the pricing adjustment. Satisfactory written documentation supporting the pricing adjustment, may include, but is not limited to, relevant U.S. Bureau of Labor Statistics Producer Price Index (PPI) or Consumer Price Index (CPI) information or a published manufacturer or supplier price change.
B. All requests for pricing adjustments must be delivered by the party requesting the pricing adjustment to the other party, in accordance with the Notice requirements herein, at least 30 days prior to the proposed effective date of the pricing adjustment.
C. Pricing adjustments will be in proportion to verifiable changes in costs to the Vendor resulting directly from cost increases or decreases at the manufacturer or supplier level.
D. Pricing adjustments, once approved, shall remain firm and fixed for at least 90 days after the effective date of the price adjustment.
E. Pricing adjustments shall not result in or produce a higher profit margin than that of the original contract.
F. The County shall, at all times, have the option to accept a pricing adjustment or cancel the balance of the contract.
G. All pricing decreases must be offered to the County by the Vendor.
H. Only the Purchasing Department may accept a pricing adjustment on behalf of the County.
Total contract period not to exceed 5 years.
2.3 CONFLICTS IN SPECIFICATIONS
Anything mentioned in the Specifications and not shown on the Drawings and anything on the Drawings and not mentioned in the Specifications shall be of like effect and shall be understood to be shown and/or mentioned in both. In case of differences between Drawings and Specifications, the Specifications shall govern. In addition, in the event of any conflict between these General Provisions, the Technical Provisions and/or the Proposal pages, the following order of precedence shall control:
| a) | Preprinted portions of the Proposal pages prevail if they conflict with the General or Technical Provisions. |
| b) | Technical Provisions prevail if they are in conflict with the General Provisions. |
| c) | Unit prices will prevail when an error in extending total amounts occurs. |
In case of discrepancy of figures between Drawings, Specifications or both, the matter shall immediately be submitted to the Pierce County Purchasing Agent for determination. Failure to submit the discrepancy issue to the Purchasing Agent shall result in the Vendor's actions being at his/her own risk and expense.
| 2.4 | INSPECTION |
| A. | Of the Work |
All materials furnished and work done shall be subject to inspection.
The Inspector administering the Contract shall at all times have access to the work wherever it is in progress or being performed, and the Vendor shall provide proper facilities for such access and inspection. Such inspection shall not relieve the Vendor of the responsibility of performing the work correctly, utilizing the best labor and materials in strict accordance with the Specifications of the Contract. All material or work approved and later found to be defective shall be replaced without cost to Pierce County.
B. Inspector's Authority The Inspector shall have power to reject materials or workmanship which do not fulfill the requirements of these Specifications, but in case of dispute the Vendor may appeal to the Pierce County Purchasing Agent, whose decision shall be final.
The Contract shall be carried out under the general control of the representative of the particular Department administering the Contract, who may exercise such control over the conduct of the work as may be necessary, in his or her opinion, to safeguard the interest of Pierce County. The Vendor shall comply with any and all orders and instructions given by the representative of the particular Department administering the Contract in accordance with the terms of the Contract.
Nothing herein contained, however, shall be taken to relieve the Vendor of his/her obligations or responsibilities under the Contract.
2.5 FEDERAL, STATE AND MUNICIPAL REGULATIONS
This Agreement shall be subject to all laws, rules, and regulations of the United States of America, the State of Washington, and political subdivisions of the State of Washington.
2.6 GUARANTEE
The supplier and/or manufacturer of the supplies, material and/or equipment furnished pursuant to this Contract agrees to correct any defect or failure of the supplies, materials and/or equipment which occurs within one year from the date of: (1) test energization if electrical or mechanical equipment; (2) commencement of use if supplies or materials, provided, however, said guarantee period shall not extend beyond eighteen months after date of receipt by the County. All of the costs (including shipping, dismantling and reinstallation) of repairs and/or corrections of defective or failed equipment, supplies and/or material is the responsibility of the supplier and/or manufacturer.
When the supplier is not the manufacturer of the item or equipment, supplier agrees to be responsible for this guarantee and supplier is not relieved by a manufacturer's guarantee. The supplier hereby assigns to the County the contractor’s right to enforce all manufacturer’s warranties for materials or systems incorporated into the work, to the extent defects which are not corrected by the supplier under their guarantee. The supplier shall provide evidence of all manufacturers’ warranties prior to acceptance.
The Contract guarantee period shall be suspended from the time a significant defect is first documented by the County until the work or equipment is repaired or replaced by Vendor and accepted by the County. In addition, in the event less than ninety (90) days remain on the guarantee period (after deducting the period of suspension), the guarantee period shall be extended to allow for at least ninety (90) days from the date the work or equipment is repaired or replaced and accepted by the County.
| 2.7 | PIERCE COUNTY'S RIGHT TO TERMINATE CONTRACT |
| A. | Termination for Default |
If the Vendor defaults by failing to perform any of the obligations of the contract or becomes insolvent or is declared bankrupt or commits any act of bankruptcy or insolvency or makes an assignment for the benefit of creditors, the County may, by depositing written notice to the Vendor in the U.S. mail, postage prepaid, terminate the contract, and at the County's option, obtain performance of the work elsewhere. If the contract is terminated for default, the Vendor shall not be entitled to receive any further payments under the contract until all work called for has been fully performed. Any extra cost or damage to the County resulting from such default(s) shall be deducted from any money due or coming due to the Vendor. The Vendor shall bear any extra expenses incurred by the County in completing the work, including all increased costs for completing the work, and all damage sustained, or which may be sustained by the County by reason of such default.
If a notice of termination for default has been issued and it is later determined for any reason that the Vendor was not in default, the rights and obligations of the parties shall be the same as if the notice of termination had been issued pursuant to the Termination for Public Convenience paragraph hereof.
B. Termination for Public Convenience The County may terminate the contract in whole or in part whenever the County determines, in its sole discretion, that such termination is in the best interests of the County. Whenever the contract is terminated in accordance with this paragraph, the Vendor shall be entitled to payment for actual work performed at unit contract prices for completed items of work. An equitable adjustment in the contract price for partially completed items of work will be made, but such adjustment shall not include provision for loss of anticipated profit on deleted or uncompleted work. Termination of this contract by the County at any time during the term, whether for default or convenience, shall not constitute a breach of contract by the County.
2.8 VENUE AND CHOICE OF LAW
In the event that any litigation should arise concerning the construction or interpretation of any of the terms of this Agreement, the venue of such action of litigation shall be in the Superior Court of the State of Washington in and for the County of Pierce. This Agreement shall be governed by the law of the State of Washington.
2.9 PAYMENT
Payment discount periods of twenty (20) calendar days or more offered by the Contractor will be considered in determining the apparent lowest responsible bid. Invoices will not be processed for payment, nor will the period of cash discount commence, until receipt of a properly completed invoice, all invoice items are received, and satisfactory performance of Contractor has been attained. If an adjustment in payment is necessary due to damage or dispute, the cash discount period shall commence on the date final approval for payment is authorized. Payment will not be considered late if the payment is mailed within the time specified. If no terms are specified, net 30 days will automatically apply. Payment(s) made in accordance with contract terms shall fully compensate the Contractor for all risk, loss, damages, or expense of whatever nature and acceptance of payment shall constitute a waiver of all claims submitted by Contractor.
2.10 WITHHOLDING PAYMENT
In the event the Contracting Officer determines that the Contractor has failed to perform any obligation under this Agreement within the times set forth in this Agreement, then the County may withhold from amounts otherwise due and payable to Contractor the amount determined by the County as necessary to cure the default, until the Contracting Officer determines that such failure to perform has been cured.
Withholding under this clause shall not be deemed a breach entitling Contractor to termination or damages, provided that the County promptly gives notice in writing to the Contractor of the nature of the default or failure to perform, and in no case more than 8 days after it determines to withhold amounts otherwise due. A determination of the Contracting Officer set forth in a notice to the Contractor of the action required and/or the amount required to cure any alleged failure to perform shall be deemed conclusive, except to the extent that the Contractor acts within the times and in strict accord with the provisions of the Disputes clause of this Agreement. The County may act in accordance with any determination of the Contracting Officer which has become conclusive under this clause, without prejudice to any other remedy under the Agreement, to take all or any of the following actions: (1) cure any failure or default, (2) to pay any amount so required to be paid and to charge the same to the account of the Contractor, (3) to set off any amount so paid or incurred from amounts due to become due the Contractor. In the event the Contractor obtains relief upon a claim under the Disputes clause, no penalty or damages shall accrue to Contractor by reason of good faith withholding by the County under this clause.
2.11 DEFENSE AND INDEMNITY AGREEMENT
The Contractor agrees to defend, indemnify and save harmless the County, its appointed and elected officers and employees, from and against all loss or expense, including but not limited to judgments, settlements, attorney's fees and costs by reason of any and all claims and demands upon the County, its elected or appointed officials or employees for damages because of personal or bodily injury, including death at any time resulting therefrom, sustained by any person or persons and for damage to property including loss of use thereof, whether such injury to persons or damage to property is due to the negligence of the Contractor, his/her Subcontractors, its successor or assigns, or its or their agent, servants, or employees, the County, its appointed or elected officers, employees or their agents, except only such injury or damage as shall have been occasioned by the sole negligence of the County, its appointed or elected officials or employees.
The preceding paragraph is valid and enforceable only to the extent of the Contractor’s negligence, for damages arising out of services or work in connection with or collateral to, a contract or agreement relative to construction, alteration, repair, addition to, subtraction from, improvement to, or maintenance of, any building, highway, road, railroad, excavation, or other structure, project, development, or improvement attached to real estate, including moving and demolition in connection therewith, a contract or agreement for architectural, landscape architectural, engineering, or land surveying services, or a motor carrier transportation contract, for damages caused by or resulting from the concurrent negligence of (i) the County or its agents or employees, and (ii) the Contractor or the Contractor’s agents or employees.”
2.12 INDUSTRIAL INSURANCE WAIVER
With respect to the performance of this agreement and as to claims against the County, its officers, agents and employees, the Contractor expressly waives its immunity under Title 51 of the Revised Code of Washington, the Industrial Insurance Act, for injuries to its employees and agrees that the obligations to indemnify, defend and hold harmless provided in this agreement extend to any claim brought by or on behalf of any employee of the Contractor. This waiver is mutually negotiated by the parties to this agreement.
2.13 INSURANCE REQUIREMENTS
The contractor shall not commence work under this contract until he/she has obtained all insurance required under these General Provisions, and evidence of such insurance has been approved by Pierce County.
| A. | Insurance Required |
| 1) | Compensation Insurance. The contractor shall comply with the Workmen's Compensation Act of the State of Washington and the United States Longshoremen's and Harborworkers' Compensation Act during the life of this contract, and in case any work is sublet, the contractor shall require any and all subcontractors to comply with said acts. |
| 2) | Liability Insurance. The contractor shall procure and maintain during the life of this contract Commercial General Liability insurance, with an insurance carrier licensed or eligible under RCW Chapter 48.15 to do business in the State of Washington, which includes but is not limited to operations of contractor, with limits of not less than: |
| Coverage |
Limits of Liability
Commercial General Liability Insurance
Bodily injury Liability and Property Damage Liability
$1,000,000 each occurrence $2,000,000 aggregate
Commercial Automobile Liability Insurance
Bodily Injury Liability and Property Damage Liability
$1,000,000 each occurrence Or combined single limit coverage of $2,000,000
The following coverages shall be included in both Primary and Excess Liability contracts:
| 1. | Broad Form Property Damage Coverage | yes X no_____ | ||
| 2. | Blanket Broad Form Contractual | yes X no_____ | ||
| 3. | Stop-Gap Employer's Contingent Liability | yes X no_____ | ||
| 4. | Independent Contractors Liability | yes X no_____ | ||
| 5. | Personal Injury Liability | yes X no_____ |
(Libel, Slander, Defamation)
| 6. | Products and Completed Operations | yes X no_____ |
| 7. | Non-owned and Hired Car Coverage | yes X no_____ |
The contractor's insurance policies shall also contain a "cross liability" endorsement substantially as follows:
The inclusion of more than one Insured under this policy shall not affect the rights of any Insured as respects any claim, suit or judgment made or brought by or for any other Insured or by or for any employee of any other Insured. This policy shall protect each Insured in the same manner as though a separate policy had been issued to each, except that nothing herein shall operate to increase the company's liability beyond the amount or amounts for which the company would have been liable had only one Insured been named.
Pierce County shall be named as an additional insured as respects this contract, and such insurance as is carried by the contractor shall be primary (over any insurance carried by Pierce County). The contractor shall provide a certificate of insurance to be approved by the County Risk Manager prior to contract execution.
3. Property Insurance. The contractor shall effect and maintain insurance as stated below naming Pierce County as an additional assured upon the entire work done at any time under this contract to 100% of insurable value thereof, including items of labor and materials connected therewith, whether in or adjacent to the structure insured, materials in place or to be used as a part of the permanent structure. Any loss shall be payable to the contractor and Pierce County as their interests may appear at the time of such loss.
Type of Insurance
| 1. | Builders/Installation Floater/All Risk | yes_____ no X | |
| 2. | Earthquake and Flood | yes_____ no X |
Pierce County shall not be obligated to notify the insurance company(ies) if all or part of the building or structure is occupied by Pierce County.
| B. | General Requirements |
| 1. | Contractor agrees to assume the risk of loss or damage regardless of cause, whether or not insured, until the job is accepted by the County Executive or his designee. |
| 2. | Pierce County shall have no obligation to report occurrences unless a claim is filed with the Pierce County Auditor; nor shall Pierce County have an obligation to pay premiums. |
| 3. | In the event of nonrenewal or cancellation of or material change in the coverage required, thirty (30) days written notice will be furnished Pierce County prior to the date of cancellation, change or nonrenewal, such notice to be sent to the Pierce County Risk Manager, 955 Tacoma Ave S, Ste 303, Tacoma, WA 98402. |
It is further provided that no liability shall attach to the County by reason of entering into this contract, except as expressly provided herein.
2.14 BIDDER'S DUTY TO EXAMINE
The Bidder agrees to be responsible for examining the drawings, specifications, delivery schedules, delivery locations and all instructions. Failure to do so will be at the Bidder's risk.
2.15 PERMITS
The Vendor shall procure and pay for all permits and licenses necessary for the completion of this Contract including those permits required by Pierce County. In the event a necessary permit is not obtained the Vendor will not be permitted to work on items subject to said permit and any delays caused thereby will not be subject to extra compensation or extension.
2.16 FUTURE NON-ALLOCATION OF FUNDS
If sufficient funds are not appropriated or allocated for payment under this contract for any future fiscal period, the County will not be obligated to make payments for services or amounts incurred after the end of the current fiscal period. No penalty or expense shall accrue to the County in the event this provision applies.
| 2.17 | DISPUTES |
| A. | General |
Differences between the Vendor and the County, arising under and by virtue of the Contract Documents shall be brought to the attention of the County at the earliest possible time in order that such matters may be settled or other appropriate action promptly taken. Except for such objections as are made of record in the manner hereinafter specified and within the time limits stated, the records, orders, rulings, instructions, and decisions of the Pierce County Purchasing Agent, shall be final and conclusive.
B. Notice of Potential Claims The Vendor shall not be entitled to additional compensation which otherwise may be payable, or to extension of time for (1) any act or failure to act by the Purchasing Agent or the County, or (2) the happening of any event or occurrence, unless the Vendor has given the County a written Notice of Potential Claim within 10 days of the commencement of the act, failure, or event giving rise to the claim, and before final payment by the County. The written Notice of Potential Claim shall set forth the reasons for which the Vendor believes additional compensation or extension of time is due, the nature of the cost involved, and insofar as possible, the amount of the potential claim. Vendor shall keep full and complete daily records of the Work performed, labor and material used, and all costs and additional time claimed to be additional.
C. Detailed Claim The Vendor shall not be entitled to claim any such additional compensation, or extension of time, unless within 30 days of the accomplishment of the portion of the work from which the claim arose, and before final payment by the County, the Vendor has given the County a detailed written statement of each element of cost or other compensation requested and of all elements of additional time required, and copies of any supporting documents evidencing the amount or the extension of time claimed to be due.
2.18 FORCE MAJEURE
Definition: Except for payment of sums due, neither party shall be liable to the other or deemed in default under this contract if and to the extent that such party’s performance of this contract is prevented by reason of force majeure. The term “force majeure” means an occurrence that is beyond the control of the party affected and could not have been avoided by exercising reasonable diligence. Force majeure shall include acts of God, war, riots, strikes, fire, floods, epidemics, or other similar occurrences.
Notification: If either party is delayed by force majeure, said party shall provide written notification within forty-eight (48) hours. The notification shall provide evidence of the force majeure to the satisfaction of the other party. Such delay shall cease as soon as practicable and written notification of same shall be provided. The time of completion shall be extended by contract modification for a period of time equal to the time that the results or effects of such delay prevented the delayed party from performing in accordance with this contract.
Rights Reserved: The County reserves the right to cancel the contract and/or purchase materials, equipment or services from the best available source during the time of force majeure, and Contractor shall have no recourse against the County.
2.19 NOTICE
Except as set forth elsewhere in the Agreement, for all purposes under this Agreement, except service of process, notice shall be given by the Vendor to the department head of the department for whom services are rendered, and to the County Purchasing Agent, 950 Fawcett Avenue, Suite 100, Tacoma, WA 98402.
Notice to the Vendor for all purposes under this Agreement shall be given to the address reflected on the Invitation to Bid. Notice may be given by delivery or by depositing in the US Mail, first class, postage prepaid.
2.20 SEVERABILITY
If any term or condition of this contract or the application thereof to any person(s) or circumstances is held invalid, such invalidity shall not affect other terms, conditions or applications which can be given effect without the invalid term, condition or application. To this end, the terms and conditions of this contract are declared severable.
2.21 WAIVER
Waiver of any breach or condition of this contract shall not be deemed a waiver of any prior or subsequent breach. No term or condition of this contract shall be held to be waived, modified or deleted except by an instrument, in writing, signed by the parties hereto.
2.22 SURVIVAL
The provisions of the following paragraphs, the provisions of the non-collusion affidavit, and the liability of the Vendor for default during the term of the Agreement shall survive, notwithstanding the termination or invalidity of this Agreement for any reason:
· Taxes
· Guarantee
· Pierce County's Right to Terminate Contract
· Venue and Choice of Law
· Hold Harmless & Indemnity Agreement
· Waiver
· Future Non-Allocation of Funds
2.23 ENTIRE AGREEMENT
This written contract represents the entire Agreement between the parties and supersedes any prior oral statements, discussions or understandings between the parties.
GENERAL PROVISIONS – SUPPLY W/INS. Page 9 of 9