General Conditions Breakout 6-17-2014.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Z2DZ--621-23-100 - Renovate Bldg. 200 Atrium Federal contract opportunity
- Solicitation number
- 36C24924B0005
About this file
This document provides a breakdown of general condition costs for a federal construction project. It lists categories of general condition expenses such as superintendent, project manager, field office engineer, builders risk and other project-specific insurance, site maintenance and protection, progress photos, dumpsters, office and storage trailers, phones, signage, travel, lodging, record and as-built document preparation, weather and infection control, and information technology. For each category it includes a value field to enter the cost. The total of all the general condition cost categories is calculated at the bottom.
The related federal contract opportunity is solicitation number 36C24924B0005 to renovate building 200 atrium for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9. The document appears to provide a template for contractors to break out general condition costs when submitting a schedule of values for the identified construction project opportunity.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GC Breakout
| GENERAL CONDITIONS BREAKOUT | |
| When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage. |
| General Condition Description | Value |
| Superintendent | $ - 0 |
| Project Manager | $ - 0 |
| Field Office Engineer | $ - 0 |
| Builder's Risk Insurance | $ - 0 |
| Other Project Specific Liability Insurance | $ - 0 |
| Site Maintenance and Protection | $ - 0 |
| Progress Photos (per contract specifications) | $ - 0 |
| Dumpsters | $ - 0 |
| Office Trailer | $ - 0 |
| Storage Trailer/POD/CONEX | $ - 0 |
| Telephone (Cell and/or Landline) | $ - 0 |
| Signage (per contract specifications and/or drawings) | $ - 0 |
| Travel (must comply with Federal Travel Regulations) | $ - 0 |
| Lodging (must comply with Federal Travel Regulations) | $ - 0 |
| Record Document Preparation | $ - 0 |
| As-builts (per contract specifications) | $ - 0 |
| Weather Protection (per contract specifications) | $ - 0 |
| Infection Control (per contract specifications) | $ - 0 |
| Information Technology (Internet, etc.) | $ - 0 |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| $ - 0 | |
| General Conditions Total | $ - 0 |