S02-Solicitation Attachment-Price Schedule.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z2DZ--621-23-100 - Renovate Bldg. 200 Atrium Federal contract opportunity
Solicitation number
36C24924B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document contains a price schedule template and instructions for a renovation project opportunity with the Department of Veterans Affairs. The template includes line items for various construction divisions with columns for labor, material, and equipment costs. Offerors are instructed to provide fixed prices for each line item in the greatest level of detail possible, with the goal of capturing all associated work. The opportunity solicitation number is listed as 36C24924B0005 and aims to renovate the atrium in Building 200. The document also contains a deduct alternative for unspecified changes with its own line item template. Offerors are directed to clearly identify any proposed additional work.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DZ--621-23-100 - Renovate Bldg. 200 Atrium, newest first.
File Type Posted
36C24924B0005 0013.docx DOCX document
36C24924B0005 0012.docx DOCX document
36C24924B0005 0011.docx DOCX document
36C24924B0005 0010.docx DOCX document
36C24924B0005 0009.docx DOCX document
36C24924B0005 0008.docx DOCX document
36C24924B0005 0007.docx DOCX document
RFI Form Quillen Atrium - RFI No. MC3-1_VA Resp_Redacted.pdf PDF
RFI.pdf PDF
36C24924B0005 0006.docx DOCX document
36C24924B0005 0005.docx DOCX document
correction sheet AD104 notes as revision 7 01-22-2024.pdf PDF
621-23-100_Addendum 1_Bldg. 200 Atrium Arial Work and Barrier Locations 01-18-2024.pdf PDF
621-23-103_Addendum1_Drawing Revisions 01102024.pdf PDF
621-23-100_Addendum 1_VA MTN HOME Life Safety Drawings.pdf PDF
621-23-103_Addendum 1_21 13 13.pdf PDF
621-23-100_Addendum 1_01 00 00 Rev 1_01-19-2024.pdf PDF
36C24924B0005 0004.docx DOCX document
36C24924B0005 0003.docx DOCX document
processed-EA71A9BE-1986-4312-9984-078B1781616A.jpeg JPEG file
36C24924B0005 0002.docx DOCX document
36C24924B0005 0001.docx DOCX document
36C24924B0005_1.pdf PDF
621-24-1-5619-0001_621-23-100_100 FOR BID_Specs_11212023.pdf PDF
General Conditions Breakout 6-17-2014.xlsx XLSX spreadsheet
62123100_IFB_Drawings_11212023 VA Revision 1.pdf PDF
WD TN20230191 10132023.pdf PDF
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer-Breakdown

JOB NAME: Location:Solicitation NumberProject Number -Proposal Date -
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
01 00 00GENERAL REQUIREMENTS$0.00$0.00$0.00$0.00
01 33 23Shop Drawings, Product Data, and Samples$0.00$0.00$0.00$0.00
01 35 26Safety Requirements$0.00$0.00$0.00$0.00
01 42 19Reference Standards$0.00$0.00$0.00$0.00
01 45 29Testing Laboratory Services$0.00$0.00$0.00$0.00
01 58 16Temporary Interior Signage$0.00$0.00$0.00$0.00
01 74 19Construction Waste Mangement$0.00$0.00$0.00$0.00
01 81 13Sustainable Construction Requirements$0.00$0.00$0.00$0.00
DIVISION 2EXISTING CONDITIONS$0.00
02 41 00Demolition$0.00
DIVISION 5METALS$0.00
05 40 00Cold-Fomred Metal Framing$0.00$0.00$ - 0$0.00
DIVISION 6WOOD, PLASTICS, AND COMPOSITES$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 8OPENINGS$0.00
08 11 13Hollow Metal Doors and Frames$0.00$0.00$0.00$0.00
08 14 00Interior Wood Doors$0.00$0.00$0.00$0.00
08 41 13Aluminum-Framed Entrances and Storefronts$0.00$0.00$0.00$0.00
08 71 00Door hardware$0.00$0.00$0.00$0.00
08 71 13Automatic Door Operators$0.00$0.00$0.00$0.00
08 80 00Glazing$0.00$0.00$0.00
0$0.00$0.00$0.00$0.00
DIVISION 9FINISHES$0.00
09 05 16Subsurface Preparation for Floor Finishes$0.00$0.000.00$0.00
09 22 16Non-Structural Metal Framing$0.00$0.000.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 30 13Ceramic/Porcelain Tiling$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 54 23Linear Metal Ceilings$0.00$0.00$0.00$0.00
09 65 13Resilient Base and Accessories$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00$0.00
09 66 16Terrazzo Floor Tile$0.00$0.00$0.00$0.00
09 72 16Vinyl Coated Fabric Wall Covering$0.00$0.00$0.00$0.00
09 72 31Polyporpylene Fabric Wall Covering$0.00$0.00$0.00$0.00
09 84 33Sound-Absorbing Wall Units$0.00$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
DIVISION 10SPECIALTIES$0.00
10 14 00Signage$0.00$0.00$0.00$0.00
10 26 00Wall and Door Protection$0.00$0.00$0.00$0.00
10 28 00Toilet, Bath and Laundry Accessories$0.00$0.00$0.00$0.00
DIVISION 12FURNISHINGS$0.00
12 32 00Manufactured Wood Casework$0.00$0.00$0.00$0.00
12 36 00Countertops$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00
DIVISION 22PLUMBING$0.00
22 05 11Common Work Results for Plumbing
22 40 00Plumbing Fixtures
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)ERROR:#REF!
23 37 00Air Outlets and Inlets
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 19Low-Voltage Electrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway and Boxes for Electrical Systems
26 27 26Wiring Devices
26 51 00interior Lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 33Raceways and Boxes for Communications Systems
27 15 00Communications Structured Cabling
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electroinc Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 28.33Conduits and Backboxes for Electronic Safety and Security
28 31 00Fire Detection and Alarms
$0.00

$0.00

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Base Offer Item 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

Deduct Alternate 1

JOB NAME: TBD LOCATION: TBDSolicitation NumberProject TitleSolicitation NumberProject NumberProposal Date
SPEC/COST CODEDESCRIPTIONLABORMATERIALEQUIPMENTLINE TOTALSDIVISION TOTALS
DIVISION 1GENERAL REQUIREMENTS$0.00
Infection Control Walls$0.00$0.00$0.00$0.00
Submittal Process$0.00$0.00$0.00$0.00
Supervision$0.00$0.00$0.00$0.00
Demolition$0.00$0.00$0.00$0.00
Dumpsters$0.00$0.00$0.00$0.00
Job-site Office Equipment$0.00$0.00$0.00$0.00
Safety & First Aid-ICRA$0.00$0.00$0.00$0.00
Final Cleaning$0.00$0.00$0.00$0.00
Punchlist/Closeout$0.00$0.00$0.00$0.00
DIVISION 2SITE WORK$0.00
02 41 00Demolition$0.00
DIVISION 6WOOD, PLASTICS AND COMPOSITES$0.00
06 06 00Translucent Resin Panel System$0.00$0.00$ - 0$0.00
06 20 00Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 72 00Roof Accessories
07 84 00Firestopping
07 92 00Joint Sealants
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
09 51 00Acoustical Ceilings$0.00$0.00$0.00$0.00
09 65 16Resilient Sheet Flooring$0.00$0.00$0.00$0.00
09 65 19Resilient Tile Flooring$0.00$0.00$0.00
09 91 00Painting$0.00$0.00$0.00$0.00
DIVISION 10ACCESSORIES$0.00
10 14 00Signage$0.00$0.000.00$0.00
10 26 00Wall and Door Protection$0.00$0.000.00$0.00
DIVISION 14CONVEYING EQUIPMENT$0.00
14 21 00Electric Traction Passenger Elevators P1-P4$0.00$0.00$0.00$0.00
14 21 20Electric Traction Passenger Elevators P7-P9$0.00$0.00$0.00$0.00
14 21 30Electric Traction Service Elevators S5-S6$0.00$0.00$0.00$0.00
14 21 90Passenger Elevators Data Connection P10-P12$0.00$0.00$0.00$0.00
Division 21FIRE SUPPRESSION$0.00
21 13 13Wet-Pipe Sprinkler Systems$0.00$0.00$0.00$0.00
09 22 16Non Struct Metal Framing$0.00$0.00$0.00$0.00
09 29 00Gypsum Board$0.00$0.00$0.00$0.00
DIVISION 23HEATING, VENTILATING AND AIR CONDITIONING (HVAC)$0.00
23 05 11Common Work Results for HVAC$0.00$0.00$0.00$0.00
23 05 12General Motor Requirements for HVAC and Steam Generation Equipment$0.00$0.00$0.00$0.00
23 07 11HVAC and Boiler Plant Insulation$0.00$0.00$0.00$0.00
23 23 00Refrigerant Piping$0.00$0.00$0.00$0.00
23 81 00Decentralized VRF Equipment$0.00$0.00$0.00$0.00
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations$0.00$0.00$0.00$0.00
26 05 19Low-Voltage Electrical Power Conductors and Cables$0.00$0.00$0.00$0.00
26 05 26Grounding and Bonding for Electrical Systems$0.00$0.00$0.00$0.00
26 05 33Raceways and Boxes for Electrical Systems$0.00$0.00$0.00$0.00
26 24 16Panelboards$0.00$0.00$0.00$0.00
26 27 26Wiring Devices$0.00$0.00$0.00$0.00
26 29 21Enclosed Switches and Circuit Breakers$0.00$0.00$0.00$0.00
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations$0.00$0.00$0.00$0.00
27 05 26Grounding and Bonding for Communications Systems$0.00$0.00$0.00$0.00
27 05 33Raceways and Boxes for Communications Systems$0.00$0.00$0.00$0.00
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 31 00Fire Detection and Alarm$0.00$0.00$0.00$0.00

TOTALS

TOTAL LABOR $0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT$0.00
$0.00
TOTAL SUB

DIVISION GRAND TOTALS

DIVISION GRAND TOTALS$0
TAX FOR MATERIALS$0

SUBTOTAL $0

OVERHEAD0%$0
PROFIT0%$0

SUBTOTAL $0

BOND/FEE0%$0
PERMITS/LICENSES$0

GRAND TOTAL $0

Deduct Alternate 1INSTRUCTIONS
1. It is the intent of this pricing schedule to provide all the divisions of work associated with this project per the original design. Alteration or changes made to this schedule must clearly highlight and identify the proposed additional work as perceived by the Offeror.

2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division when each division has been broken down in price to a greater degree;

3. Divisions must still be listed even if not applicable to the construction requirement;

4. The information above does not propose to include all possible division or subdivisions needed for the requirement referenced above. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept the price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown.

&"-,Bold" &"-,Bold"

FFP Per Item

Base Bid Item 1DescriptionFirm Fixed Price
$0.00

Alt Ded 1 $0.00