GEMS 15 kVA UPS Technical Specifications - BY_Knotts.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- EMA - GEMS Facility UPS Units - ARG
- Solicitation number
- 25-588IEMA-MGMTA-B-45482
- Issued by
- St. Clair County, Illinois
About this file
This document contains the technical specifications for a 15 kVA Uninterruptible Power Supply (UPS) system required for the GEMS project at the Byron Nuclear Generating Station and the GEMS Test Bay in Springfield, Illinois. The UPS system is an Eaton 9355 model with a 3-high cabinet style and 64 batteries, providing 15 kVA / 13.5 kW of power at 0.9 power factor. The UPS system requires 208/120V AC, 3-phase, 4-wire (plus ground) Wye input power at 60 Hz, and provides 208/120V AC, 3-phase, 4-wire (plus ground) Wye output power at 60 Hz. The UPS system must meet various technical requirements, including a minimum of 91% efficiency, 1% voltage regulation, and 70 minutes of battery runtime at full load.
The document also specifies the required communications and diagnostic capabilities, as well as the warranty and service requirements, including 24/7 on-site emergency response within 8 hours of notification and the need for a certified vendor to perform the initial startup of the unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers~11.docx | DOCX document | |
| standard terms and conditions~7.pdf | ||
| standard-illinois-certifications-v.23.1~62.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 GEMS UPS Technical Specifications
| Tech Specs | |
| Model | Eaton 9355 |
| Cabinet Style | 3 High w/ 64 Battery |
| Power | |
| Ratings | 15 KVA / 13.5KW @ 0.9 P.F. |
| Topology | Double Conversion |
| Input | |
| Input Voltage | 208/120V AC, 3Ø, 4 Wire (+ Gnd), Wye |
| Input Frequency | 60 Hz ± 5 Hz |
| Voltage Correction Range | 176-228.8V AC |
| Power Factor (Full Load) | 0.99 typical |
| Output | |
| Waveform (On-Line) | Sinewave |
| Waveform (On-Battery) | Sinewave |
| Output Voltage (RMS) | 208/120V AC, 3Ø, 4 Wire (+ Gnd), Wye |
| Output Frequency | 60 Hz |
| Efficiency (Full Load / On-Line) | 91% typical |
| Voltage Regulation | ± 1% |
| Input Current Distortion | <= 5% THD |
| Overload Capabilities | 125% (1 min.) / 150% (5 sec.) / 110% (10 mins.) |
| Battery | |
| Battery Type | VRLA, 9AH, maintenance free (Field replacable) |
| Typical Backup Time (Full Load) | > 70 min @ full load (> 8 hours @ 15% full load) |
| External Battery Cabinet (EBM) Configuration | EBM 96 (Qty 2 for BY unit only) (Knotts St. unit = Qty 0) |
| Operation / General | |
| Diagnostics | Full system self-test @ startup |
| UPS Bypass | Automatic on overload or UPS failure |
| On-Line Transfer Time | 1 ms typical |
| Audible Noise (Full Load @ 1m) | < 58 dBA |
| Communications | |
| Minimum Requirements | Graphical LCD w/ backlight display, RS-232, X-slot Industrial Relay Card, network communications card (INDGW-X2 Industrial Gateway Card) |
| Network type | Factory Installed MS Network Card (SNMP) |
| Certifications | |
| Quality | ISO 9001 |
| Warranty | |
| Standard | 1 Year Full Parts & Labor, including 24/7 on-site emergency response within 8 hours of notification. |
| Customer Service | |
| Initial Start Up | Vendor must be certified to perform initial startup of the unit per manufacturer requirements. Location: On-site @ Byron Nuclear Generating Station and Knotts St. GEMS Test Bay in Springfield, IL. |
| Tech Support Availability | 24/7 (Unlimited) |
File details come from the government source that posted it. Updated .