This Scope of Work document outlines post-disaster catering and support services for Glades Electric Cooperative (GEC) in Florida, detailing the requirements for major storm restoration activities across two staging locations in Glades County. The contractor must provide meal services for 150-300 electric utility workers from two facilities located approximately 40 miles apart in Lake Placid (north) and Moore Haven (south), with meal offerings including breakfast and dinner in buffet style, box lunches for takeaway, and optional in-field deliveries. Required catering capabilities include a full kitchen with mandatory backup power generation, hot meal preparation, box lunch assembly, food refrigeration, and dining facilities with or without air conditioning. The contractor must mobilize within 24-48 hours of authorization and maintain 24/7 operations, seven days a week, including holidays as requested. The scope is non-exhaustive, meaning GEC may request additional services beyond those listed or fewer services than specified. The contract will be activated through a Master Service Agreement using a Notice to Proceed, Task Order, or Task Release, with specific work details and locations provided at authorization.
All pricing is structured on a time-and-materials basis with hourly rates submitted according to GEC's rate-sheet template. Quoted hourly rates must include labor costs, fringe benefits, hand tools, supervision, transportation, and all other applicable expenses not separately itemized. The contractor is prohibited from subcontracting work except for renting tables, chairs, and tents as needed. Mandatory requirements include providing beverages, flatware, paper goods, and all necessary supplies; tracking meals served by quantity and recipient for regulatory compliance; and participating in stakeholder meetings. The contractor must submit daily reports by 5:00 p.m. the following day containing contractor name, contract number, cumulative and daily hours by personnel position, and other operational and complaint tracking information as requested. Failure to provide audit-quality documentation by the deadline may result in financial penalties. All work must comply with local, state, and federal laws, including requirements imposed by FEMA, FDEM, FAA, and other applicable state and federal agencies.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 2026-06 – Catering Services in Post-Disaster Environment
Scope of Work
I. General
The scope of services under this RFP includes post-disaster catering and support services for major storm restoration activities (the Services).
GEC will activate the MSA through a Notice to Proceed, Task Order, or Task Release (Authorization) with the specific details of the work, including exact locations within its territory requiring assessments. The Services described below are non-exhaustive examples of services that may be requested; however, GEC may request less than all the services described, or additional services not specifically listed below but within the general scope of the RFP.
II. Services
• Depending on the severity and the most impacted areas, GEC will have two (2) staging locations approximately 40 miles apart. North location: Lake Placid, FL South Location: Moore Haven, FL
• Post-storm catering services to supply breakfast (buffet style), lunch (to go) and dinner (buffet style) for 150-300 electric utility workers in post-disaster environment;
• Catering Requirements:
o Kitchen and Catering (must have backup source of power in the event there is no electricity) o Hot Meals o Box Lunches o Refrigeration for food o Dining Facilities (with or without A/C)
• Catering Optional Services o Infield deliveries
• Must include, but not limited to, drinks, flatware, paper goods and other necessary supplies;
• Please list all other services that will be included, or available, with your services (i.e. tent, lights, etc.);
• The provider will need to track meals served for quantity and who the meal was served to so compliance with various regulatory requirements can be maintained;
• Work may not be subcontracted with the exception of renting tables, chairs, tents, as needed;
• Participation in meetings with key stakeholders;
• Contractor shall have the ability to mobilize within 24-48 hours of Authorization and provide all services 24-hours a day, seven (7) days a week, including holidays (if requested) for the term of the Contract.
• Contractor shall perform all requested activities in accordance with local, State, and Federal law, including those imposed by FEMA, FDEM, the Federal Aviation Administration, and any other State or Federal agencies.
Contract Terms
In addition to compliance with applicable Federal, State, and local rules and regulations, Contractor must also comply with the MSA and the terms and conditions in the Authorization, which will dictate the anticipated effort needed to complete the Services and include applicable terms and conditions for the Services.
Fee Structure
Given the uncertain nature of the quantity of work required and the percentage of service territory that will be impacted by the disaster, Contractor will have a time and materials fee structure at the rates proposed in response to this RFP. All hourly rates are to include labor costs, fringe benefits, hand tools, supervision, transportation, and all other applicable costs not separately provided for in the Price Proposal form.
Documentation Management & Support
Contractor shall provide data management and support as a part of the Services, including use of a compatible system for clearly tracking and documenting all elements identified above. Contractor must also substantiate its costs. Contractor must maintain all records pertaining to work performed consistent with the requirements set forth in the MSA and Authorization. Contractor shall submit a report by close of business each day with, at a minimum, the following information:
• Contractor’s Name;
• Contract Number;
• Daily and cumulative hours for personnel, by position, if appropriate;
• Other operational and complaint tracking information, as requested.
Failure to provide audit quality information by 5:00 p.m. of the following day of operation may result in financial penalty to the Contractor.