GATE_308880_CONTRACT_PRICE_SCHEDULE.pdf
PDF 88 KB Posted
- Attached to
- GATE-REHAB MASONRY FACILITIES-JB
- Solicitation number
- 140P4525R0041
About this file
This document is a Contract Price Schedule for the National Park Service (NPS) for a project at Gateway National Recreation Area. The solicitation (Number 308880) is for rehabilitating masonry facilities at Floyd Bennett Field and Fort Tilden, with a developed area identified as JABA. The contract includes four base line items for building rehabilitations (Buildings 117, 57, 201) and chimney removal, with a base price currently listed at $0.00. Additionally, there are four optional line items including Building 88A rehabilitation, generator removal, masonry repointing for Building 125, and lintel replacement at the Ryan Visitor Center, also currently priced at $0.00. The document requires offerors to submit pricing for both base and option line items, with instructions to provide total prices for lump-sum items and unit prices for unit-priced items, warning that failure to provide complete pricing may render the proposal unacceptable.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS)
Solicitation Number:
PARK - PMIS: GATEWAY NATIONAL RECREATION AREA
(Project Management Information System) 308880 Developed Area: JABA
Project Title: Rehabilitate Masonry Facilities at Floyd Bennett Field and Fort Tilden Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts ` govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Price
1 Building 117 Rehabilitation 1 LS $0.00
2 Building 57 Rehabilitation 1 LS $0.00
3 Remove Chimney Next to Building 149 1 LS $0.00
4 Building 201 Rehabilitation 1 LS $0.00
TOTAL BASE PRICE (Contract Modification Line Item Number 1 through 4) --------------------------------------------------------------------------------- $0.00
OPTION 1 BUILDING 88A REHABILITATION
5 Building 88A Rehabilitation 1 LS $0.00
OPTION 2 REMOVE GENERATOR BEHIND BUILDING 88A
6 Remove Generator Behind Building 88A 1 LS $0.00
OPTION 3 REPOINT BUILDING 125 MASONRY
7 Repoint Building 125 Masonry 1 LS $0.00
OPTION 4 REPLACE LINTELS ON RYAN VISITOR CENTER
8 Replace Lintels on Ryan Visitor Center 1 LS $0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Items Number 5 through 8) ----------------------------------------------------------- $0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS ---------------------------------------------------------------------------------------- $0.00
Price Schedule Template