This document is a culvert inspection report for the Massachusetts Bay Transportation Authority (MBTA) focusing on the Framingham/Worcester Line culvert over Big Bummet Brook in Grafton, Massachusetts. The inspection was conducted on June 24, 2024, by WSP under Contract No. B92PS49, Task Order No. 2, and provides a comprehensive assessment of a three-barrel stone masonry box culvert constructed circa 1840. The report includes detailed findings on the culvert's structural condition, identifying several major deficiencies such as transverse cracks in granite masonry blocks, missing mortar in masonry joints, spalled concrete in the roof slab and headwall, and debris accumulation in Barrel 2 that is impeding brook flow.
The report recommends a series of repairs estimated at $204,000, to be programmed within the MBTA's Bridge Management Program over the next two years. Recommended repairs include repointing masonry joints, repairing cracked roof blocks, addressing concrete scaling and spalling, removing debris and vegetation, and maintaining the track retaining wall. The inspection notes no critical structural or hazard deficiencies but highlights the need for monitoring ongoing deterioration, including stone settlement, embankment erosion, and tie condition. The culvert carries two tracks with continuous welded rail and timber ties on ballast over soil fill, and the inspection was performed using visual and tactile methods, with underwater inspection support from Keolis Consultants.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Benny D’Artista, PE No. 48658
DATE
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
CULVERT INSPECTION
FRAMINGHAM/WORCESTER LINE OVER BIG BUMMET BROOK
GRAFTON, MA
BRIDGE NO. G-08-070
BIN NO. CPA
MILE POST 37.59
STRUCTURE NO. G08070-CPA-MBT-RRO
PREPARED BY:
100 Summer Street 13th Floor Boston, MA 02110
CONTRACT NO. B92PS49
Task Order No. 2
DATE OF INSPECTION:
June 24, 2024
10/23/2024
Benny D’Artista, PE No. 48658
DATE
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
CULVERT INSPECTION
FRAMINGHAM/WORCESTER LINE OVER BIG BUMMET BROOK
GRAFTON, MA
BRIDGE NO. G-08-070
BIN NO. CPA
MILE POST 37.59
STRUCTURE NO. G08070-CPA-MBT-RRO
PREPARED BY:
100 Summer Street 13th Floor
Boston, MA 02110
CONTRACT NO. B92PS49
Task Order No. 2
DATE OF INSPECTION:
June 24, 2024
Grafton, MA Framingham/Worcester Line over Big Bummet Brook G-08-070 (CPA)
RECOMMENDATIONS
Note:
This culvert was assigned a bridge number and BIN in July 2024. Refer to the approved bridge number and BIN request.
Findings (Minor/Major/Critical) With Locations:
A summary of critical findings is as follows:
No critical structural (C-S) deficiencies were observed.
No critical hazard (C-H) deficiencies were observed.
The following severe/major (S) deficiencies were observed:
o Item 62.1 – Roof: Scattered granite masonry blocks have a full width transverse crack.
The masonry joints have areas of missing mortar and/or missing chinking stones. The south fascia of the concrete roof slab is spalled.
o Item 62.3 – Walls: Scattered voids in the stone portion and areas of scaling in the concrete portion.
o Item 62.4 – Headwalls: The concrete south headwall spalled.
o Item 62.5 – Wingwalls: There is abrasion along the base of the southeast and southwest wingwalls. The southwest wingwall has an area of punky concrete at the top.
The following items have an urgency of repair designated “as soon as possible” (A):
o Item 61.3 - Debris: Barrel 2 is completely blocked by debris accumulation impeding the flow of the brook.
Recommendations:
A. Structural Repair Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
Items 62.1 – Roof and Item 62.3 – Walls: Repoint the areas of missing mortar in masonry joints and repair cracked masonry blocks in roof.
Item 62.3 - Walls: Repair voids in the stone portion and areas of scaling in the concrete portion.
Item 62.1 – Roof and Item 62.4 – Headwalls: Repair the spalled concrete in the south fascia of the roof slab and the south headwall.
Item 62.2 – Floor: Repair full depth abrasion at the south end of the floor in Barrel 3.
Item 62.5 – Wingwalls: Repair abrasion in the southwest and southeast wingwalls. Repair punky concrete in the southwest wingwall.
B. Monitoring Deficiencies to the following items should be monitored during future inspections.
Item 62.1 – Roof: Monitor areas of missing mortar in masonry joints and cracks in masonry blocks until repairs are performed.
Item 62.3 – Wall: Monitor cracks, scaling and voids until repairs are performed.
Item 61.1 – Channel Scour: Monitor pooling downstream of the culvert.
Item 61.2 – Embankment Erosion: Monitor embankment erosion.
Item General - Ties: Monitor ties for further with checks splits and end splits.
C. Maintenance Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
Item 61.3 – Debris and Item 61.4 - Vegetation: Remove debris in Barrel 2 and in channel near culvert. Remove upstream vegetation growth and debris in Big Bummet Brook.
Item 62.8 – Embankment: Cut/remove vegetation growth along both embankments above the culvert.
Approaches d – Track Retaining Walls: Repair/replace the northeast track retaining wall.
D. Miscellaneous Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
None
Table of Contents
SECTION PAGE
Location Map
Description of Bridge
APPENDICES
Appendix A - 4D MBTA Railroad/Transit Routine Culvert Inspection Report
Appendix B – Keolis Underwater Inspection Report
Appendix C – Preliminary Repair Cost Estimate
Appendix D – Pontis BMS Element Inspection Sheet
Appendix E - Structure Inventory and Appraisal (SI & A) Sheets
LOCATION MAP
DESCRIPTION OF BRIDGE
Bridge ID Number: G-08-070
Structure Number: G08070-CPA-MBT-RRO
BIN Number: CPA
Mile Post: 37.59
Location: Big Bummet Brook, Grafton, MA
Date of Construction: Circa 1840.
Original Design Loading: Unknown.
Date of Rehab./Reconstruction: Unknown: Concrete extension at south end.
New Design Loading: Unknown.
Bridge Type: Three barrel, stone masonry box culvert with concrete extension.
Skew: 0°-0’-0”
Spans: Three (3) spans at 2’-6” maximum span length (barrel width)
Width of Bridge Deck: 87’-0” (75’-0” stone masonry, 12’-0” concrete extension) (length of culvert).
Track Surface: Two (2) tracks with continuous welded rail (CWR) and timber ties on ballast over soil fill.
Sidewalk/Walkway/Median: None.
Bridge Railing: None.
Protective Screen: None.
Approach Railing: None.
Superstructure: Dry laid granite masonry block roof (original portion: 1’-1” thick) and concrete slab with embedded steel rails (widened southern portion).
Bridge Bearing Type: None.
Modifications to Original Superstructure: Widened at south end.
Utilities: Unknown (none visible).
Substructure: Four (4) stone masonry channel walls with concrete extensions at the south end and two (2) masonry block wingwalls.
Modifications to Original Substructure: Widened at south end.
APPENDIX A –
4D MBTA RAILROAD/TRANSIT ROUTINE CULVERT
INSPECTION REPORT
4D MBTA BRIDGE INSPECTION REPORT - STATEMENT OF CONCURRENCE
I hereby state that I have reviewed and in concurrence but not limited to the following:
✓ Recommendations & Inspection Findings (Minor, Major and Critical)
✓ Location Map
✓ Existing Drawings, if any
✓ Photographs
✓ Field Notes on Bridge Deficiencies
✓ Critical Findings - Notification to the MBTA, if any
✓ MassDOT Bridge No./BIN Request, if any
✓ Underwater Inspection Report, if any
✓ Additional Relevant Bridge Related Documentation, if any
✓ Preliminary Repair Cost Estimate (PRCE)
✓ National Bridge Element Inspection (NBEI) Sheet / Pontis BMS Element Inspection Sheet
✓ SI&A Sheets - Original/Previous, Marked-Up and New
✓ Bridge Video
Benny R. D’Artista, P.E. Date
No deficiencies.
No noticeable or noteworthy differences which affect the condition of the culvert. Insignificant scrape marks caused by drift.
Shrinkage cracks, light scaling, and insignificant spalling, which does not expose reinforcing steel. Insignificant damage caused by drift with not misalignment and not requiring corrective action. Some minor scouring has occurred near curtain walls, wingwalls, or pipes. Metal culverts have a smooth symmetrical curvature with superficial corrosion and no pitting.
Bridge closed. Corrective action may put back in light service.
Deterioration or initial disintegration, minor chloride contamination, cracking with some leaching, or spalls on concrete or masonry walls and slabs. Local minor scouring at curtain walls, wingwalls, or pipes. Metal culverts have a smooth curvature, non-symmetrical shape, significant corrosion or moderate pitting.
Moderate to major deterioration, or disintegration, extensive cracking and leaching, or spalls on concrete or masonry walls and slabs. Minor settlement or misalignment. Noticeable scouring or erosion at curtain walls, wingwalls, or pipes. Metal culverts have significant distortion and deflection in one section, significant corrosion or deep pitting.
Large spalls, heavy scaling, wide cracks, considerable efforescence, or opened construction joints permitting loss of backfill. Considerable settlement or misalignment. Considerable scouring or erosion at curtain walls, wingwalls, or pipes. Metal culverts have significant distortion and deflection throughout, extensive corrosion or deep pitting.
Any condition described in Code 4 but which is excessive in scope. Severe movement or differential settlement of the segments, or loss of fill. Holes may exist in walls or slabs. Integral wingwalls, nearly severed from culvert. Severe scour or erosion at curtain walls, wingwalls, or pipes. Metal culverts have extreme distortion and deflection in one section, extensive corrosion, or deep pitting with scattered perforations.
Advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the bridge until corrective action is taken.
Bridge closed. Replacement necessary.
SERIOUS
CRITICAL
"IMMINENT" FAILURE
FAILED
NOT APPLICABLE
G G
G
F
F
P
P
C
C
N
EXCELLENT
VERY GOOD
GOOD
SATISFACTORY
FAIR
POOR
Use if structure is not a culvert.
REMARKS, PHOTOS & SKETCHES
S= Severe/Major Deficiency
C-S= Critical Deficiency -
M= Minor Deficiency
CATEGORIES OF DEFICIENCIES:
URGENCY OF REPAIR:
DEFICIENCY:
I = Immediate-
A = ASAP-
P = Prioritize- [Shall be prioritized by District Maintenance Engineer or the Responsible Party (if not a State owned bridge) and repairs made when funds and/or manpower is available].
A defect in a structure that requires corrective action.
(Examples include but are not limited to: Spalled concrete, minor to moderate corrosion to steel culverts, minor settlement or misalignment, minor scouring, minor damage to guardrail, etc.)
(Examples include but are not limited to: Large spalls, wide cracks, moderate to major deterioration in concrete, considerable settlement, considerable scouring or undermining, extensive corrosion and deflection in steel culverts, etc.)
A deficiency in a structural component or element of a bridge that poses an extreme hazard or unsafe condition to the public. (Follow-up Critical Deficiency Report must be submitted separately)
[Inspector(s) stay at the bridge until the District Maintenance crew or the responsible Agency crew(if not a State bridge) show up and corrective action is taken.]
[Action will be taken by the District Maintenance Engineer or the Responsible Agency (if not a State owned bridge) upon receipt of the Inspection Report].
CUL(2)10-16
CONDITION RATING GUIDE
DEFICIENCY REPORTING GUIDE
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF
DEFECTSCODE CONDITION
2 27
GRAFTON CPA G-08-070 G08070-CPA-MBT-RRO JUN 24, 2024
BRIDGE ORIENTATION
Culvert G-08-070 (CPA) is a three (3) barrel stone masonry/reinforced concrete box culvert carrying the Framingham/Worcester Line of the MBTA Commuter Rail over Big Bummet Brook in the town of Grafton (Sketch 1 and Photos 1 to 19). This culvert is oriented from west to east and Big Bummet Brook flows north to south.
GENERAL REMARKS
Culvert Description:
This culvert was assigned a bridge number and BIN in July 2024.
The culvert has a 87’-0” length (measured in the transverse direction to the tracks) and a 1'-9" minimum barrel width. (Sketches 2 to 5). The culvert carries two (2) tracks on timber ties on stone ballast over soil fill.
The culvert consists of three (3) barrels with reinforced concrete for the first 12’-0” from the south end, and masonry construction the rest of the length. The superstructure consists of a dry laid granite block roof (original construction) and a reinforced concrete slab (widened southern end). The substructure consists of four (4) stone/masonry/reinforced concrete channel walls, two (2) granite masonry block wingwalls and two
(2) reinforced concrete wingwalls.
The tracks are numbered 1 (outbound) and 2 (inbound) from north to south. The barrels are numbered 1 to 3 and piers 1 to 2 from west to east (Sketch 3).
PAGE
REM.(2)7-96
REMARKS
CPA G08070-CPA-MBT-RRO
3 27
GRAFTON JUN 24, 2024
OF
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
G-08-070
Scope of Inspection:
This is an in-depth and hands-on inspection. The scope of this inspection was to determine the overall condition, condition ratings, and deficiency codings including urgency of repair for all applicable items shown on page 1 of this report.
Field Notes:
The description of bridge, elevations and typical cross section and available plans are included in this report (Sketches 2 to 5). All necessary bridge dimensions are shown on these sketches.
Deterioration and required inventory photos are included in this report. Inventory photos were also uploaded onto the MassDOT Bridge Inspection Management System (4D) database.
Findings (Minor/Major/Critical) With Locations:
A summary of critical findings is as follows:
· No critical structural (C-S) deficiencies were observed.
· No critical hazard (C-H) deficiencies were observed.
· The following severe/major (S) deficiencies were observed:
o Item 62.1 – Roof: Scattered granite masonry blocks have a full width transverse crack. The masonry joInts have areas of missing mortar and/or missing chinking stones. The south fascia of the concrete roof slab is spalled.
o Item 62.3 – Walls: Scattered voids in the stone portion and areas of scaling in the concrete portion.
o Item 62.4 – Headwalls: The concrete south headwall spalled.
o Item 62.5 – Wingwalls: There is abrasion along the base of the southeast and southwest wingwalls. The southwest wingwall has an area of punky concrete at the top.
· The following items have an urgency of repair designated “as soon as possible” (A):
qo Item 61.3 - Debris: Barrel 2 is completely blocked by debris accumulation impeding the flow of the brook.
Recommendations:
A. Structural Repair Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
● Items 62.1 – Roof and Item 62.3 – Walls: Repoint the areas of missing mortar in masonry joints and repair cracked blocks in roof.
● Item 62.3 - Walls: Repair voids in the stone portion and areas of scaling in the concrete portion.
● Item 62.1 – Roof and Item 62.4 – Headwalls: Repair the spalled concrete in the south fascia of the roof slab and the south headwall.
● Item 62.2 – Floor: Repair full depth abrasion at the south end of the floor in Barrel 3.
● Item 62.5 – Wingwalls: Repair abrasion in the southwest and southeast wingwalls. Repair punky concrete in the southwest wingwall.
B. Monitoring Deficiencies to the following items should be monitored during future inspections.
● Item 62.1 – Roof: Monitor areas of missing mortar in masonry joints and cracks in masonry blocks until repairs are performed.
● Item 62.3 – Wall: Monitor cracks, scaling and voids until repairs are performed.
● Item 61.1 – Channel Scour: Monitor pooling downstream of the culvert.
REMARKS
CPA G08070-CPA-MBT-RRO
4 27
GRAFTON JUN 24, 2024
OF
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
G-08-070
● Item 61.2 – Embankment Erosion: Monitor embankment erosion.
● Item General - Ties: Monitor ties for further with checks splits and end splits.
C. Maintenance Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
● Item 61.3 – Debris and Item 61.4 - Vegetation: Remove debris in Barrel 2 and in channel near culvert.
Remove upstream vegetation growth and debris in Big Bummet Brook.
● Item 62.8 – Embankment: Cut/remove vegetation growth along both embankments above the culvert.
● Approaches d – Track Retaining Walls: Repair/replace the northeast track retaining wall.
Spur/Abandoned Tracks:
There are no spur/abandoned tracks on this culvert.
Work Access Notes:
The track level was accessed during daytime hours from Westboro Road under the protection of a Keolis flagperson. The culvert underside was accessed using waders.
Clearance Notes:
The vertical clearance from the underside of the culvert roof to the waterline measured 2'-6” at the time of inspection.
Clearance Posting Notes:
There are no vertical clearance posting signs for this culvert as this portion of the Big Bummet Brook is not considered to be a navigable waterway.
Bridge Bearing Notes:
There are no bearings for this culvert.
Underwater Inspection Notes:
A Routine Underwater Bridge Inspection was performed by GEI Consultants, Inc. on April 18, 2023. The submerged portion of the culvert can be inspected using using waders based on the water depth (approximately 6" during this Routine Inspection). Thus, future Routine Underwater Inspections may not be required for this culvert.
Rating Notes:
There is no previous load rating report on-file for this culvert. The next load rating to be performed should rate this structure for AREMA Cooper E-80, F40PH (280K) Modified, HSP-47 (296K) Locomotive, 286K Rail Car, 315K CSX Rail Car and ES44AC for 315K CSX Rail Car or as directed by the MBTA.
ITEM 62 - CULVERT
Item 62.1 - Roof Stone Portion:
The granite masonry block portion of the roof is in poor condition and governs the condition of rating of Item
62.1. The dry laid joints of the granite block roof have scattered missing chinking stones and voids up to 9” deep (Photo 20). The following granite blocks in the roof are cracked:
● Barrel 1 approximately 15’-0” North of the Concrete Portion: full width transverse crack (Photo 21).
n fair c
REMARKS
CPA G08070-CPA-MBT-RRO
5 27
GRAFTON JUN 24, 2024
OF
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
G-08-070
● Barrel 2 approximately 15’-0” North of the Concrete Portion: full width transverse crack (Photo 22).
● Barrel 2 approximately 30’-0” North of the Concrete Portion: full width transverse crack (Photo 23).
● Barrel 2 approximately 34’-0” North of the Concrete Portion: full width transverse crack (Photo 24).
● Barrel 3 approximately 38’-0” North of the Concrete Portion: full width transverse crack (Photo 25).
Concrete Portion:
The reinforced concrete portion of the roof slab is in fair condition. The south fascia of the roof slab has a spall measuring full height x 6” deep x approximately 70% of the length with the embedded steel railroad rails exposed (Photo 26).
The remainder of the concrete roof slab has hairline map cracking throughout and moderate to heavy efflorescence at the interface with the walls (Photos 8, 10 and 15).
Item 62.2 - Floor In each barrel of the culvert, the floor has scattered areas of minor abrasion throughout.
At the south end of the culvert in Barrel 3, the floor along the east wall is abraded away for 12” long x 12” wide x up to full depth. Similar abrasion is present along the west wall in Barrel 1.
Item 62.3 - Walls Stone Portion:
Throughout the stone walls there are masonry joints with scattered cracked/missing mortar, most prevalent along the waterline.
Approximately 30’-0” from the north end, the west wall has a void measuring 18” long x 9” high x 16” deep at the base (Photo 27).
Approximately 15’-0” from the north end, the Pier 1 wall has a void measuring 21” long x 12” high x full depth at the base, which is visible on both faces of the pier (Photo 28).
Concrete Portion:
The reinforced concrete walls have have up to 1/2" deep scaling on approximately 50% of their surface area and abrasion along the waterline measuring up full length x to 12” high x 1/2” deep (Photos 10 and 15). On the south face of the pier walls there is scaling measuring up to 11” deep for 50% of the surface and abrasion up to 3” deep along the waterline (Photos 11, 14 and 26).
At the south end of each barrel, the reinforced concrete walls have scattered vertical and horizontal hairline cracks with heavy efflorescence throughout (Photos 11 to 14).
Item 62.4 - Headwalls The south headwall has spalling measuring full height x up to 3” deep throughout 40% of the length (Photos 2 and 26).
The north headwall has minor vegetation growth from the embankment (Photo 1).
Item 62.5 - Wingwalls The reinforced concrete wingwalls have scattered areas of minor moss growth. The southwest wingwall has abrasion along the waterline, measuring full length x 9" high x up to 3-1/2” deep with an adjacent area of hairline map cracking with minor efflorescence (Photo 17). The southwest wingwall has an full length x 6" high area of punky concrete at the top.
1 to 1
REMARKS
CPA G08070-CPA-MBT-RRO
6 27
GRAFTON JUN 24, 2024
OF
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
G-08-070
The southeast wingwall has abrasion along the waterline measuring full length x 9" high x up to 5” deep (Photo 19).
Item 62.8 - Embankment The north and south embankments of the track have moderate vegetation growth throughout (Photo 2).
ITEM 61 - CHANNEL AND CHANNEL PROTECTION
Item 61.1 - Channel Scour At the culvert outlet, the channel pools before transitioning to normal stream width approximately 15’-0” downstream of the culvert.
Item 61.2 - Embankment Erosion South of the culvert outlet, the east embankment has erosion measuring up to 3’-0” high with exposed and undermined tree roots (Photo 19).
Item 61.3 - Debris At the culvert outlet, the channel has scattered concrete debris from spalled portions of the headwall and south fascia (Photo 6).
Barrel 2 has is completely blocked by debris that is obstructing flow approximately 15’-0” from the north end (Photo 30).
Item 61.4 - Vegetation The downstream channel is well vegetated but does not impede flow.
Upstream of the of the culvert, the channel has heavy vegetation growth into the channel, obstructing flow and causing debris to build up (Photo 5).
APPROACHES
Approaches d - Track Retaining Walls Along the northeast embankment, there is a retaining wall composed of timber lagging and steel pipes. This retaining wall has outward rotation and misalignment of the lagging members allowing ballast to spill down the embankment and one lagging member to be displaced (Photo 29).
GENERAL
General 5 - Ties The timber ties have scattered minor checks and end splits throughout (Photo 7).
Sketch / Photo Log Sketch 1 : Location Map.
Sketch 2 : Description of Bridge.
Sketch 3 : Typical Elevations.
Sketch 4 : Typical Cross Section.
Sketch 5 : Available Plans.
Photo 1 : North elevation, looking southwest. Note vegetation growth along the headwall.
Photo 2 : South elevation, looking north. Note spalling of the headwall and vegetation growth from the track embankment.
Photo 3 : West approach, looking east.
REMARKS
CPA G08070-CPA-MBT-RRO
7 27
GRAFTON JUN 24, 2024
OF
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
G-08-070
Photo 4 : East approach, looking west.
Photo 5 : Upstream, looking north. Note heavy vegetation growth casuing channel debris accumulation.
Photo 6 : Downstream, looking south. Note spalled concrete from headwall in the channel.
Photo 7 : Typical top surface, looking southwest. Note ties with minor checks and end splits.
Photo 8 : Barrel 3, typical underside of concrete portion, looking south. Note roof slab with hairline map cracking and efflorescence along the interface with the walls.
Photo 9 : Barrel 1, typical underside of stone portion, looking north.
Photo 10 : West wall at the south end, looking northwest. Note abrasion, cracking and efflorescence in wall and efflorescence along the interface with the roof slab.
Photo 11 : West face of Pier 1 wall at the south end, looking northeast. Note abrasion, cracking, efflorescence and scaling.
Photo 12 : East face of Pier 1 wall at the south end, looking northwest. Note abrasion, cracking and efflorescence.
Photo 13 : West face of Pier 2 wall at the south end, looking northeast. Note abrasion, cracking and efflorescence.
Photo 14 : East face of Pier 2 wall at the south end, looking northwest. Note abrasion, cracking, efflorescence and scaling.
Photo 15 : East wall at the south end, looking northeast. Note abrasion, cracking and efflorescence in wall and efflorescence along the interface with the roof slab.
Photo 16 : Northwest wingwall, looking southwest.
Photo 17 : Southwest wingwall, looking west. Note abrasion, hairline map cracking with efflorescence and moss.
Photo 18 : Northeast wingwall, looking east.
Photo 19 : Southeast wingwall, looking east. Note abrasion and moss on wingwall and erosion of the channel bank with exposed and undermined tree roots.
Photo 20 : Barrel 1 roof near the south end has a typical masonry joint with a missing chinking stone and void, looking west.
Photo 21 : Barrel 1 roof approximately 15'-0" north of the south concrete section has a transverse crack by the full block width, looking west.
Photo 22 : Barrel 2 roof approximately 15'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
Photo 23 : Barrel 2 roof approximately 30'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
Photo 24 : Barrel 2 roof approximately 34'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
Photo 25 : Barrel 3 roof approximately 38'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
Photo 26 : South fascia with spalling along the roof slab and headwall, looking northwest. Note scaling at the south face of the Pier 1 wall.
Photo 27 : The west wall in Barrel 1, approximately 30'-0" from the north end with a void at the base, looking west.
Photo 28 : Pier 1 wall approximately 15'-0" form the north end with a full depth void at the base, looking west.
Photo 29 : Northeast track retaining wall outward rotation and misalignment of the lagging members allowing ballast to spill over, looking east.
Photo 30 : Debris clogging Barrel 2 approximately 15'-0" from the north end, looking south.
SKETCHES
Location Map.Sketch 1:
JUN 24, 2024GRAFTON CPA G08070-CPA-MBT-RRO
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF8 27
G-08-070
Description of Bridge.Sketch 2:
JUN 24, 2024GRAFTON CPA G08070-CPA-MBT-RRO
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF9 27
Typical Elevations.Sketch 3:
JUN 24, 2024GRAFTON CPA G08070-CPA-MBT-RRO
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF10 27
Typical Cross Section.Sketch 4:
JUN 24, 2024GRAFTON CPA G08070-CPA-MBT-RRO
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF11 27
Available Plans.Sketch 5:
JUN 24, 2024GRAFTON CPA G08070-CPA-MBT-RRO
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE OF12 27
North elevation, looking southwest. Note vegetation growth along the headwall.
South elevation, looking north. Note spalling of the headwall and vegetation growth from the track embankment.
JUN 24, 2024GRAFTON G-08-070
Photo 2:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 13 27OF
Photo 1:
West approach, looking east.
East approach, looking west.
JUN 24, 2024GRAFTON G-08-070
Photo 4:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 14 27OF
Photo 3:
Upstream, looking north. Note heavy vegetation growth casuing channel debris accumulation.
Downstream, looking south. Note spalled concrete from headwall in the channel.
JUN 24, 2024GRAFTON G-08-070
Photo 6:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 15 27OF
Photo 5:
Typical top surface, looking southwest. Note ties with minor checks and end splits.
Barrel 3, typical underside of concrete portion, looking south. Note roof slab with hairline map cracking and efflorescence along the interface with the walls.
JUN 24, 2024GRAFTON G-08-070
Photo 8:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 16 27OF
Photo 7:
Barrel 1, typical underside of stone portion, looking north.
West wall at the south end, looking northwest. Note abrasion, cracking and efflorescence in wall and efflorescence along the interface with the roof slab.
JUN 24, 2024GRAFTON G-08-070
Photo 10:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 17 27OF
Photo 9:
West face of Pier 1 wall at the south end, looking northeast. Note abrasion, cracking, efflorescence and scaling.
East face of Pier 1 wall at the south end, looking northwest. Note abrasion, cracking and efflorescence.
JUN 24, 2024GRAFTON G-08-070
Photo 12:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 18 27OF
Photo 11:
West face of Pier 2 wall at the south end, looking northeast. Note abrasion, cracking and efflorescence.
East face of Pier 2 wall at the south end, looking northwest. Note abrasion, cracking, efflorescence and scaling.
JUN 24, 2024GRAFTON G-08-070
Photo 14:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 19 27OF
Photo 13:
East wall at the south end, looking northeast. Note abrasion, cracking and efflorescence in wall and efflorescence along the interface with the roof slab.
Northwest wingwall, looking southwest.
JUN 24, 2024GRAFTON G-08-070
Photo 16:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 20 27OF
Photo 15:
Southwest wingwall, looking west. Note abrasion, hairline map cracking with efflorescence and moss.
Northeast wingwall, looking east.
JUN 24, 2024GRAFTON G-08-070
Photo 18:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 21 27OF
Photo 17:
Southeast wingwall, looking east. Note abrasion and moss on wingwall and erosion of the channel bank with exposed and undermined tree roots.
Barrel 1 roof near the south end has a typical masonry joint with a missing chinking stone and void, looking west.
JUN 24, 2024GRAFTON G-08-070
Photo 20:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 22 27OF
Photo 19:
Barrel 1 roof approximately 15'-0" north of the south concrete section has a transverse crack by the full block width, looking west.
Barrel 2 roof approximately 15'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
JUN 24, 2024GRAFTON G-08-070
Photo 22:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 23 27OF
Photo 21:
Barrel 2 roof approximately 30'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
Barrel 2 roof approximately 34'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
JUN 24, 2024GRAFTON G-08-070
Photo 24:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 24 27OF
Photo 23:
Barrel 3 roof approximately 38'-0" north of the south concrete section has a transverse crack by the full block width, looking north.
South fascia with spalling along the roof slab and headwall, looking northwest. Note scaling at the south face of the Pier 1 wall.
JUN 24, 2024GRAFTON G-08-070
Photo 26:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 25 27OF
Photo 25:
The west wall in Barrel 1, approximately 30'-0" from the north end with a void at the base, looking west.
Pier 1 wall approximately 15'-0" form the north end with a full depth void at the base, looking west.
JUN 24, 2024GRAFTON G-08-070
Photo 28:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 26 27OF
Photo 27:
Northeast track retaining wall outward rotation and misalignment of the lagging members allowing ballast to spill over, looking east.
Debris clogging Barrel 2 approximately 15'-0" from the north end, looking south.
JUN 24, 2024GRAFTON G-08-070
Photo 30:
CPA G08070-CPA-MBT-RRO
PHOTOS
B.I.N. BR. DEPT. NO.CITY/TOWN 8.-STRUCTURE NO. INSPECTION DATE
PAGE 27 27OF
Photo 29:
APPENDIX B –
KEOLIS UNDERWATER INSPECTION REPORT
KEOLIS COMMUTER SERVICES, LLC
UNDERWATER BRIDGE INSPECTION
OVER
, MA
BRIDGE NO:
BIN NO:
MILE POST:
STRUCTURE NO:
EQUIPMENT ID:
DATE OF CONSTRUCTION:
STRUCTURE COMP:
NUMBER OF RAILS:
STRUCTURE SIZE:
DATE OF INSPECTION:
Prepared by:
GEI CONSULTANTS, INC
FRANKLIN, MA 02038
WORCESTER LINE
BIG BUMMET BROOK
GRAFTON
37.59
CU-37.59
CONCRETE & STONE CULVERT
2 TRACKS
3 SPAN - 14.4 FEET
Apr. 18, 2023
Page___of___
CITY/TOWN BR#/M.M. B.I.N. BR. DEPT. NO. STRUCTURE NO. INSPECTION DATE
_UNDERWATER BRIDGE INSPECTION RECORD_
BRIDGE NAME:
BRIDGE NO:
TABLE OF CONTENTS
ITEM PAGE NUMBER
Table of Contents
Underwater Bridge Inspection Records
Inspection Findings/Recommendations
Divers Activity Form
Photographs
Exhibits
GRAFTON 37.59 -- -- -- APR. 18, 2023
WORCESTER LINE BIG BUMMET BROOK
6-10
11- 14
3-4 over
Page___of___
_UNDERWATER BRIDGE INSPECTION RECORD_
BOOK ___ OF ___
BRIDGE NAME:
BRIDGE NUMBER:
BIN NO:
MILE POST:
STRUCTURE NO:
STRUCTURE AGE:
STRUCTURE COMP:
NUMBER OF RAILS:
STRUCTURE SIZE:
ROUTE CARRIED:
WATERWAY CROSSED:
LOCATION:
CITY AND STATE:
COUNTY:
OTHER:_____________________________________________
DATE OF INSPECTION:______________________________________
INSPECTION PERSONNEL:
DPIC:______________________________________________
NO. 2:______________________________________________
NO. 3:______________________________________________
OTHER:____________________________________________
WEATHER: ________________________________________________
CONTRACT NO:____________________________________________
JOB NO.: GEI# 1801598
GRAFTON 37.59 -- -- -- APR. 18, 2023
WORCESTER LINE BIG BUMMET BROOK
37.59
CU-37.59
CONCRETE & STONE CULVERT
2 TRACKS
3 SPAN - 14.4 FEET
WORCESTER LINE
BIG BUMMET BROOK
GRAFTON
WORCESTER
APR. 18, 2023
Steve Dobron SD
Moritz Schelp MS
Troy Anderson TA
High 60F Low 48F over
Keolis Bridge Inspections GEI 2204816
KEOLIS ID:
GEI# 2204816
Page __ of __
INSPECTION FINDINGS / RECOMMENDATIONS
DPIC:______DIVER:______DIVER:______ENGINEER:______NOTES:______
GENERAL
GRAFTON 37.59 -- -- -- APR. 18, 2023
The inspection findings are based on an underwater inspection performed on April 18, 2023 of the culvert carrying the Worcester Line over Big Bummet Brook in North Grafton, MA. The walls of the culvert were labeled East - West and in reference to the rail orientation with Boston being East. The river flowed North to South with a low current of 1 knot. The three barrel culvert consisted of stacked granite blocks at the North end and Concrete at the south. The scope of the inspection involved visual and tactile inspection of bridge and channel components below the High Water Mark (HWM) which was 1' above the waterline. The item numbers refer to the MBTA Underwater Operation Team, Divers Activity Report on Page 5. The culvert was not entered due to its size and blocked barrels.
SD TAMS MS
ITEM NO.61 CHANNEL & CHANNEL PROTECTION
61.1 (Channel Scour): The channel scour was overall satisfactory condition. A scour pocket 1' deeper than the surrounding area was noted at the East corner of the wingwall and headwall of the downstream end of the culvert.
61.2 (Embankment Erosion): The embankment erosion was overall good condition. Minimal embankment erosion was noted at the upstream and downstream ends.
61.3 (Drift): The drift was overall poor condition. Timber buildup was found in every barrel that impeded the flow of the brook. The middle barrel was completely filled to the roof but water was still flowing through the debris. Timber drift was also noted upstream and downstream of the bridge that spanned across the waterway.
61.4 (Vegetation): The vegetation was overall good condition. It was comprised of small bushes and trees that lined the embankments.
61.7 (Aggradation): The aggradation was overall satisfactory condition. Soil aggradation was noted below the middle barrel at the downstream end of the culvert. Additionally, a pile of gravel was noted along the East embankment that spilled into the waterway. Gravel and sand aggradation was noted at the upstream end of the culvert spanning from the middle barrel to the South embankment.
ITEM NO.62 CULVERTS
62.2 (Floor): The floor was overall in satisfactory condition. A 2' long x 0.3' high x 2.6' deep spall was noted on the concrete floor of the South barrel at the downstream end.
62.3 (Walls): The walls were overall in satisfactory condition. Minor surface scaling below the waterline was noted on the concrete sections at the downstream end.
INSPECTION FINDINGS / RECOMMENDATIONS
DPIC:______DIVER:______DIVER:______ENGINEER:______NOTES:______
GRAFTON 37.59 -- -- -- APR. 18, 2023
62.4 (Headwall): The headwalls were overall in fair condition. Multiple portions of the South headwall had concrete spalling up to 0.7' deep in the areas below, above, and between the barrels. The portions above the barrels that had 0.7' deep spalling also had rebar exposed, see Photo 006. No defects were noted on the upstream granite block headwalls.
62.5 (Wingwall): The wingwalls were overall in satisfactory condition. A 0.3' deep spall was located on the West downstream wingwall at the waterline which wrapped around the West and South face, see Photo
005. A similar 0.6' deep spall was found on the East downstream wingwall that wrapped around the West and South face, see Photo 009. A 2.7' long x 0.5' high x 1' deep spall was located on the bottom step of the East downstream wingwall along with a 1' long x 1' high x 0.3' deep spall on the top step.
62.8 (Embankment): The embankments were overall in satisfactory condition. Minor amounts of erosion was noted on the slope above the downstream embankment.
62.13 (Member Alignment): The member alignment was overall in satisfactory condition. Minor stone misalignment was noted in the East barrel approximately 20' from the upstream entrance, see Photo 010.
62.14 (Deformation): The deformation was overall in good condition. No deformation was found during the inspection.
62.15 (Scour): The scour was overall in satisfactory condition. A scour pocket 1' deeper than the surrounding area was noted at the East corner of the wingwall and headwall of the downstream end of the culvert.
62.16 (Settlement): The settlement was overall in satisfactory condition. Minor amounts of stone settlement was noted in the granite block portions of the culvert.
RECOMMENDATIONS
Perform regularly scheduled underwater inspections of bridge and remove debris in the culvert barrels. No structural repairs are recommended.
SD MS TA MS
GRAFTON -- I & II APR. 18, 2023
WORCESTER LINE BANK Alan D. Pepin, PE
BIG BUMMET BROOK 1' 1' Moritz Schelp
STONE & SAND 1 KNOT SD MS TA
N 6 6
N
6 6 N 7 N 4 S-P 5 N 7 6
N N N
N N
N 6
N N
N 6
N 7
N 6
N
N N
GEI Consultants Inc.
N
5 of kburuchian Sticky Note Accepted set by kburuchian
PHOTOGRAPHS
GRAFTON 37.59 -- APR. 18, 2023-- --
Photo 001
South Elevation (Looking Upstream)
South Elevation (Looking Downstream)
Photo 002
PHOTOGRAPHS
GRAFTON 37.59 -- APR. 18, 2023-- --
Photo 003
North Elevation (Looking Downstream)
North Elevation (Looking Upstream)
Photo 004
PHOTOGRAPHS
GRAFTON 37.59 -- APR. 18, 2023-- --
Photo 005
Southwest Wingwall
West Barrel (Looking Upstream)
Photo 006
PHOTOGRAPHS
GRAFTON 37.59 -- APR. 18, 2023-- --
Photo 007
Middle Barrel (Looking Upstream)
East Barrel (Looking Upstream)
Photo 008
PHOTOGRAPHS
GRAFTON 37.59 -- APR. 18, 2023-- --
Photo 009
Deterioration at Waterline at East Wingwall
Misalignment in East Barrel (Looking Downstream)
Photo 010
GRAVEL SITS ABOVE WATERLINE
(GRADUAL BUILD UP IN CHANNEL)
3' DIA. STONES THROUGHOUT
FLOW
MATERIAL BUILD-UP
STEPPED CONC.
1' SCOUR POCKET
SOIL AGGRADATION1 2 3
1 2 3
DRY STACKED GRANITE BLOCKS
GRAVEL & SAND AGGRADATION
WATERWAY COVERED WITH
DOWNED TIMBER DEBRIS
APPROX. SHORELINE
APPROX. SHORELINE
APPROX. SHORELINE
APPROX. SHORELINE
2'L X 0.3'H X 2.6'D CONC.
SPALL ON FLOOR
\\geiconsulta B:\Working\KEOLIS\2204816 Underwater Bridge Inspections\00_CAD\Figures\Worcester Line\Bridge #37.59\Draft\Bridge #37.59.dwg - 5/9/2023
Fig. 1
MBTA Bridge Inspection Worcester Line Bridge #37.59
Grafton, MA
Keolis Commuter Services, LLC Boston, MA
STRUCTURE PLAN VIEW
April 2023Project 2204816 Consultants
CITY/TOWN
Grafton, MA
INSPECTION DATE
April 18, 2023
8.-STRUCTURE NO.B.I.N. BR. DEPT. NO.
STRUCTURE PAGE 11 OF 14
PLAN VIEW
- LOCATION & DIRECTION OF PHOTO1
SCALE, FEET
40200
7 8
TR
UE
N O
RT
H
SITE N
O
R
TH
±2 .7
±2.1'±3'
1' (T
YP
) C
O N
C
W
IN
G W
AL
L
ST
EP
S
0.
3'
D D
ET
ER
IO
R
AT
IO
N W
R
AP
PI
N
G A
R O
U N
D S
TE
PS
C O
N C
. S
PA
LL
IN
G O
N S
TE
P
FA
C
E (3
'L X
'H
X
.2 'D
±3
±3 .2
0.
5'
D C
O N
C . S
PA
LL
IN
G
0.
2'
O
VE
R H
AN
G
C O
N C
. S
PA
LL
IN
G O
N T
O P
ST
EP
F
AC
E (1
'L X
'H
X
.3 'D
±2 .5
±3
.2
±2 .5
C O
N C
. S
PA
LL
A
T C
O R
N
ER
(2 .7
'L X
.5
'H X
'D
EA
ST
S
TE
P D
IM
EN
SI
O
N S
M
IR
R O
R W
ES
T
ST
EP
S
0.
2'
D D
ET
ER
IO
R
AT
IO
N
0.
6'
D D
ET
ER
IO
R
AT
IO
N W
R
AP
PI
N
G A
R O
U N
D S
TE
PS
0.
7'
D C
O N
C . F
EL
L
O
FF
F
AC
E (R
EB
AR
E
XP
O
SE
D
U P
TO
.7 'D
C O
N C
. S
PA
LL
IN
G O
N F
AC
E
0.
7'
D C
O N
C . S
PA
LL
IN
G
±3.1'
M U
D
LI
N E
VA
R
IE
S
\\geiconsulta B:\Working\KEOLIS\2204816 Underwater Bridge Inspections\00_CAD\Figures\Worcester Line\Bridge #37.59\Draft\Bridge #37.59.dwg - 5/9/2023
Fig. 2
MBTA Bridge Inspection Worcester Line Bridge #37.59
Grafton, MA
Keolis Commuter Services, LLC Boston, MA
ELEVATION
(SOUTH LOOKING NORTH)
April 2023Project 2204816 Consultants
CITY/TOWN
GRAFTON, MA
INSPECTION DATE
April 18, 2023
8.-STRUCTURE NO.B.I.N. BR. DEPT. NO.
STRUCTURE PAGE 12 OF 14
ELEVATION
H.W.M.- HIGH WATER MARK
L.O.I.- LIMIT OF INSPECTION
WL- WATER LINE
0 4 8
SCALE, FEET
±1 7'
±6 .5
±3
±1 .2
±2
±2 .3
±2
.9
±2
±1 .8
H
.W .M
./L .O
.I.
±2
.4
±1
M
IN
O R
S
TO
N E
M
IS
AL
IG
N M
EN
T
O N
E
AS
T W
AL
L
' I
N
TO
B
AR
R
EL
M U
D
LI
N E
VA
R
IE
S
AS
SU
M
ED
EL
. 1
.0
BA
R
R
EL
C
O M
PL
ET
EL
Y
BL
O
C
KE
D
BY
D
EB
R
IS
6.
8'
IN
TO
B
AR
R
EL
\\geiconsulta B:\Working\KEOLIS\2204816 Underwater Bridge Inspections\00_CAD\Figures\Worcester Line\Bridge #37.59\Draft\Bridge #37.59.dwg - 5/9/2023
Fig. 3
MBTA Bridge Inspection Worcester Line Bridge #37.59
Grafton, MA
Keolis Commuter Services, LLC Boston, MA
ELEVATION
(NORTH LOOKING SOUTH)
April 2023Project 2204816 Consultants
CITY/TOWN
GRAFTON, MA
INSPECTION DATE
April 18, 2023
8.-STRUCTURE NO.B.I.N. BR. DEPT. NO.
STRUCTURE PAGE 13 OF 14
ELEVATION
H.W.M.- HIGH WATER MARK
L.O.I.- LIMIT OF INSPECTION
WL- WATER LINE
0 4 8
SCALE, FEET
N O
TE
S:
1.
TY
P
AL
L
BA
R R
EL
S
PA
R
TI
AL
LY
B
LO
C
KE
D
B Y
TI
M
BE
R
D
EB
R
IS
2.
TY
P
O F
IN
SI
D E
O F
BA
R
R
EL
S;
P
O
IN
TI
N
G L
O
SS
TH
R
O U
G H
O U
T
N O
P O
IN
TI
N G
L
EF
T O
N H
EA
D
W
AL
LS
5' UPSTREAM97.1
97.396.896.897.1 97.497.097.2
97.2 97.1 96.9
96.5 96.7 96.7
97.1 97.1 97.4 25' DOWNSTREAM
\\geiconsulta B:\Working\KEOLIS\2204816 Underwater Bridge Inspections\00_CAD\Figures\Worcester Line\Bridge #37.59\Draft\Bridge #37.59.dwg - 5/9/2023
Fig. 4
MBTA Bridge Inspection Worcester Line Bridge #37.59
Grafton, MA
Keolis Commuter Services, LLC Boston, MA
SOUNDINGS PLAN
April 2023Project 2204816 Consultants
CITY/TOWN
Grafton, MA
INSPECTION DATE
April 18, 2023
8.-STRUCTURE NO.B.I.N. BR. DEPT. NO.
STRUCTURE PAGE 14 OF 14
SOUNDINGS PLAN
SCALE, FEET
40200
-SOUNDING LOCATION
TR
UE
N O
RT
H
SITE N
O
R
TH
APPENDIX C –
PRELIMINARY REPAIR COST ESTIMATE
Notes:
1. The estimated costs are of a rough preliminary nature only for the purpose of giving an understanding to the order of magnitude of the expenses required to correct the deficiencies existing for the structure.
2. This is not intended as a formal estimate of the actual costs to correct the deficiencies present and should not be considered in procuring costs and materials for performing bridge improvements.
3. This Preliminary Repair Cost Estimate was based on 2024 costs and would need adjustments for future dates.
Culvert Inspection Recommendation Summary Sheet
Culvert Name: Framingham/Worcester Line over Big Bummet Brook Bridge No.: G-08-070 CPA
Service Line: Framingham/Worcester Commuter Rail Mile Post: 37.59
Consultant: WSP Date of Inspection & Report:
Contract No: B92PS49, Task Order No. 2
Item No. Description Cost ($)
Defects High Med Low
Critical
Finding
(Y/N)
Structural
62.1 & 62.3 Repoint the areas of missing mortar and repair cracked roof blocks. $125,000.00 X N
62.3 Repair voids in the stone portion and areas of scaling in the concrete portion.
$25,000.00 X N
62.1 & 62.4 Repair the spalled concrete in the south fascia of the roof slab and the south headwall.
$20,000.00 X N
62.2 Repair full depth abrasion at south end of the floor in Barrel 3. $2,000.00 X N
62.5 Repair abrasion in the southwest and southeast wingwalls. Repair punky concrete in the southwest wingwall.
$15,000.00 X N
Total $187,000.00
Safety
None.
Total $0.00
Maintenance
61.3 & 61.4 Remove debris in Barrel 2 and in channel near culvert. Remove upstream vegetation growth and debris in Big Bummet Brook.
$5,000.00 X N
62.8 Cut/remove vegetation growth along both embankments above the culvert.
$2,000.00 X N
Appr d: Repair/replace the northeast track retaining wall. $10,000.00 X N
Total $17,000.00
Others (with Cost)
None.
Total $0.00
Others (without Cost)
62.1 Monitor areas of missing mortar in masonry joints and cracks in roof blocks until repairs are performed.
X N
62.3 Monitor cracks and voids until repairs are performed. X N
61.1 Monitor pooling downstream of culvert. X N
61.2 Monitor embankment erosion. X N
General 5 Monitor ties with checks and end splits. X N
Total $0.00
Restrictions (Load, Speed, Height etc.)
None.
Total $0.00
Cost Summary
Structural $187,000.00
Safety $0.00
Maintenance $17,000.00
Others $0.00
Restrictions (Load, Speed, Height etc.) $0.00
Grand Total $204,000.00
Culvert Data
M. Greer, PE
Priority Level
Recommendations & Cost data
BIN:
6/24/2024
Inspection Team Leader:
RECOMMENDATIONS
Findings (Minor/Major/Critical) With Locations:
A summary of critical findings is as follows:
No critical structural (C-S) deficiencies were observed.
No critical hazard (C-H) deficiencies were observed.
The following severe/major (S) deficiencies were observed:
o Item 62.1 – Roof: Scattered granite blocks have a full width transverse crack. The masonry joints have areas of missing mortar and/or missing chinking stones. The south fascia of the concrete roof slab is spalled.
o Item 62.3 – Walls: Scattered voids in the stone portion and areas of scaling in the concrete portion.
o Item 62.4 – Headwalls: The concrete south headwall spalled.
o Item 62.5 – Wingwalls: There is abrasion along the base of the southeast and southwest wingwalls. The southwest wingwall has an area of punky concrete at the top.
The following items have an urgency of repair designated “as soon as possible” (A):
o Item 62.1 - Roof: Scattered granite masonry blocks have a full width transverse crack.
o Item 61.3 - Debris: Barrel 2 is completely blocked by debris accumulation impeding the flow of the brook.
Recommendations:
A. Structural Repair Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
Items 62.1 – Roof and Item 62.3 – Walls: Repoint the areas of missing mortar in masonry joints and repair cracked roof blocks. - $125,000
Item 62.3 - Walls: Repair voids in the stone portion and areas of scaling in the concrete portion. $25,000
Item 62.1 – Roof and Item 62.4 – Headwalls: Repair the spalled concrete in the south fascia of the roof slab and the south headwall. - $20,000
Item 62.2 – Floor: Repair full depth abrasion at the south end of the floor in Barrel 3. - $2,000
Item 62.5 – Wingwalls: Repair abrasion in the southwest and southeast wingwalls. Repair punky concrete in the southwest wingwall. - $15,000
B. Monitoring Deficiencies to the following items should be monitored during future inspections.
Item 62.1 – Roof: Monitor areas of missing mortar in masonry joints and cracks in masonry blocks until repairs are performed.
Item 62.3 – Wall: Monitor cracks, scaling and voids until repairs are performed.
Item 61.1 – Channel Scour: Monitor pooling downstream of the culvert.
Item 61.2 – Embankment Erosion: Monitor embankment erosion.
Item General - Ties: Monitor ties for further with checks splits and end splits.
C. Maintenance Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
Item 61.3 – Debris and Item 61.4 - Vegetation: Remove debris in Barrel 2 and in channel near culvert. Remove upstream vegetation growth and debris in Big Bummet Brook. - $5,000
Item 62.8 – Embankment: Cut/remove vegetation growth along both embankments above the culvert. $2,000
Approaches d – Track Retaining Walls: Repair/replace the northeast track retaining wall. - $10,000
D. Miscellaneous Program repairs to the following items as part of the MBTA’s Bridge Management Program as funds and/or personnel becomes available within the next two (2) years or prior to the next Routine Inspection:
None
APPENDIX D –
PONTIS BMS
ELEMENT INSPECTION SHEET
Pontis BMS Element Inspection
Span Group
El # Element Name Units Env. Total Q. % or Q State 1 State 2 State 3 State 4 State 5
Item 8
BDEPT#
B.I.N.
Town
District
District Bridge Inspection Eng'r
Inspecting Agency
Team Leader
Team Member(s)
G-08-070
CPA
G08070-CPA-MBT-RRO
Biao Huang
Grafton
WSP
Matthew W. Greer
Abigail C. Palmgren, Reda Babas
Date 06/24/2024
241 Culvert, Concrete LF along length of barrel2 39.0 0.0 20.0 19.0 0.0%
243 Culvert, Other LF along length of barrel2 228.0 0.0 114.0 110.0 4.0%
APPENDIX E –
STRUCTURE INVENTORY
AND APPRAISAL SHEETS
PREVIOUS SI&A SHEET(S)
Newly assigned Bridge No. Previous SIA not available.
MARKED-UP SI&A SHEET
Report Date: August 27, 2024
RAILROAD STRUCTURE INVENTORY AND APPRAISAL SHEET
State Information Classification Code
Condition Code
Load Rating and Posting Code
Appraisal Code
Proposed Improvements
Inspections
Rating Loads
Accessibility (Needed/Used)
Identification
Structure Type and Material
Age and Service
Geometric Data
Navigation Data
N
N
N
N
N
N
N
(B) Underwater Inspection
(C) Other Special Inspection
(*) Other Inspection ()
(*) Closed Bridge
(A) Fracture Critical Detail
(*) Damage Inspection
(92) Critical Feature Inspection:
MO
MO A)
(93) CFI DATE
(91) Frequency(90) Inspection Date
(113) Scour Critical Bridges
(36) Traffic Safety Features
(72) Approach Roadway Alignment
(71) Waterway adequacy
MO B)
MO C)
MO *)
MO *)
MO *)
E80 F40PH 286K HSP-46
NORMAL
MAXIMUM
Report Date 00/00/00
(114)Future ADT
(97) Year of Improvement Cost Estimate
(96) Total Project Cost (K)
(95) Road Improvement Cost (K)
(94) Bridge Improvement Cost (K)
(76) Length of Structure Improvement
(75) Type of Work
(115)Year of Future ADT
Code
(41) Structure -
(62) Culverts
(58) Deck
(37) Historical Significance
(22) Owner -
(21) Maintain -
(59) Superstructure
(60) Substructure
(61) Channel & Channel Protection
$0
$0
$0
00/00/00 00
00 00/00/00
00 00/00/00
00 00/00/00
00 00/00/00
00 00/00/00
00/00/00
(*) UW Special Inspection MO *)00 00/00/00
0 FT
N
BDEPT#= G08070
B.I.N= AASHTO= 030.0CPA
Town= Grafton
(35) Structure Flared
C) Type of deck protection -
( omit (a) and (b) )
(10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .