Culvert - Inspection Report.docx
DOCX document 109 KB Posted
- Attached to
- RFP 252F-24 Bridge Management System
- Solicitation number
- BD-24-1206-40000-40000-111953
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Culvert Inspection Report prepared for the Massachusetts Bay Transportation Authority (MBTA) for a specific culvert structure located in Chelsea, Massachusetts, with the structure identification number C-09-021 (A5C). The inspection was conducted on August 18, 2024, as part of Task Order No. 2 under Contract No. Z94PS30, with the report prepared by a Prime Consultant based in Norwood, MA. The inspection revealed no critical findings, though the report includes recommendations for structural repairs, monitoring, and maintenance to be addressed within the next two years as part of the MBTA's Bridge Management Program.
The report includes multiple appendices covering routine culvert inspection details, potential critical findings notification, underwater inspection reports, preliminary repair cost estimates, and structure inventory and appraisal sheets. The preliminary repair cost estimate is noted as being based on 2024 costs and would require adjustments for future dates. While specific repair recommendations are partially redacted, the document emphasizes the importance of programmatic maintenance and monitoring of the culvert structure to ensure its ongoing operational integrity and safety.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
[INSPECTION TYPES] CULVERT INSPECTION
ADD ELEVATION PHOTO OF STRUCTURE
[CARRIED (LINE)] OVER [INTERSECTED]
[TOWN], MA
CULVERT NO. X-00-123
BIN NO. ABC
MILE POINT X.XX
STRUCTURE NO. X-00-123-MBT-TRO
PREPARED BY:
Prime Consultant
INSERT
PE STAMP,
SIGNATURE,
DATE
685 Canton Street, Suite 102 Norwood, MA 02062
CONTRACT NO. Z94PS30
Task Order No. 2
DATE OF INSPECTION: MONTH XX, 2024
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
[INSPECTION TYPES] CULVERT INSPECTION
ADD ELEVATION PHOTO OF STRUCTURE
[CARRIED (LINE)] OVER [INTERSECTED]
[TOWN], MA
CULVERT NO. X-00-123
BIN NO. ABC
MILE POINT X.XX
STRUCTURE NO. X-00-123-MBT-TRO
PREPARED BY:
Prime Consultant
INSERT
PE STAMP,
SIGNATURE,
DATE
685 Canton Street, Suite 102 Norwood, MA 02062
CONTRACT NO. Z94PS30
Task Order No. 2
DATE OF INSPECTION: AUGUST 18, 2024
Chelsea, MA East Route Over Mill Creek C-09-021 (A5C)
RECOMMENDATIONS
FINDINGS (MINOR/MAJOR/CRITICAL) WITH LOCATIONS
No critical findings were found during the inspection. See Item 59 - Superstructure, Item 60 - Substructure, and Item 61 - Channel and Channel Protection sections in this inspection report for non-critical findings.
RECOMMENDATIONS
A. Structural Repair:
Program repairs should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) years or prior to the next Routine Inspection:
- Item XX.X - XXXXXXX: Recommendation
- Item XX.X - XXXXXXX: Recommendation
- Item XX.X - XXXXXXX: Recommendation
B. Monitoring:
Deficiencies to the following items should be monitored during future inspections:
C. Maintenance:
Program maintenance should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) years or prior to the next Routine Inspection:
Miscellaneous Items:
Improvements should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) yeas or prior to the next Routine inspection:
None at this time.
TABLE OF CONTENTS
| SECTION |
| Page |
| LOCATION MAP |
| 1 |
| DESCRIPTION OF CULVERT |
| 2 |
APPENDIX A – 4D MBTA ROUTINE CULVERT INSPECTION REPORT
APPENDIX B – CRITICAL FINDINGS – MBTA NOTIFICATION (if any)
APPENDIX C – MBTA UNDERWATER INSPECTION REPORT
APPENDIX D – MASSDOT BRIDGE NO/BIN REQUEST (if any)
APPENDIX E – PRELIMINARY REPAIR COST ESTIMATE
APPENDIX F – NATIONAL BRIDGE ELEMENT INSPECTION (NBEI) SHEET or PONTIS BMS ELEMENT INSPECTION SHEET)
APPENDIX G – STRUCTURE INVENTORY AND APPRAISAL (SI&A) SHEETS
CITY, MA XXXXXXXX Line Over XXXXXXX X-XX-XXX (XXX)
LOCATION MAP
DESCRIPTION OF CULVERT
Structure ID Number:
Structure Number:
BIN Number:
Mile Point (if any):
Location:
Date of Construction:
Original Design Loading:
Date of Rehabilitation/Reconstruction (If any):
New Design Loading (If any):
Structure Type:
Skew:
Spans:
Width of Structure Deck:
Track Surface:
Curbs:
Sidewalk/Walkway/Median:
Structure Railing:
Protective Screen:
Approach Railing:
Superstructure:
Structure Bearing Type:
Modifications to Original Superstructure:
Utilities:
Substructure:
CITY, MA XXXXXXXX Line Over XXXXXXX X-XX-XXX (XXX) Modifications to Original Substructure:
APPENDIX A –
4D MBTA ROUTINE CULVERT INSPECTION REPORT
APPENDIX B –
CRITICAL FINDINGS – MBTA NOTIFICATION (IF ANY)
APPENDIX C –
MBTA UNDERWATER CULVERT INSPECTION REPORT
APPENDIX D –
MASSDOT BRIDGE NO/BIN REQUEST (IF ANY)
APPENDIX E –
PRELIMINARY REPAIR COST ESTIMATE
Note:
1. The estimated costs are of a rough preliminary nature only for the purpose of giving an understanding to the order of magnitude of the expenses required to correct the deficiencies existing for this structure.
2. This is not intended as a formal estimate of the actual costs to correct the deficiencies present and should not be considered in procuring costs and materials for performing bridge improvements.
3. This Preliminary Repair Cost Estimate was based on 2024 costs and would need adjustments for future dates.
RECOMMENDATIONS
Structural Repair Program repairs should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) years or prior to the next Routine Inspection:
- Item XX.X - XXXXXX: RECOMMENDATION ($X,XXX)
Monitoring Deficiencies to the following items should be monitored on future inspections:
- Item XX.X - XXXXXX: RECOMMENDATION ($X,XXX)
Maintenance Program maintenance should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) years or prior to the next Routine Inspection:
- Item XX.X - XXXXXX: RECOMMENDATION ($X,XXX)
Miscellaneous Items Improvements should be made to the following items as part of the MBTA's Bridge Management Program within the next two (2) yeas or prior to the next Routine inspection:
None at this time.
APPENDIX F –
NATIONAL BRIDGE ELEMENT INSPECTION (NBEI) SHEET
Or
PONTIS BMS ELEMENT INSPECTION SHEET
APPENDIX G –
STRUCTURE INVENTORY AND APPRAISAL (SI&A) SHEETS
image2.png image3.png image1.png
File details come from the government source that posted it. Updated .