This is a Questions and Answers document for federal contract opportunity FY26MRZRMXBPA for Tactical Vehicle Maintenance, closed on February 17, 2026 at 1000 hours.
The contract covers maintenance services for a fleet of 21 vehicles: 13 MRZRs, 5 MRZR-Alphas, 2 Polaris Ranger XP Crew Cabs, and 1 Golf Cart. Service volume is determined by each vehicle's manufacturer maintenance schedule plus any unscheduled repairs arising during the performance period. The contractor is responsible for providing all services and materials on an all-inclusive basis, including labor, diagnostics, parts, and consumables such as oils, fluids, tires, brake pads, batteries, and other Polaris-approved or manufacturer-recommended components. No Government-furnished parts or consumables are anticipated. The Statement of Work explicitly requires the contractor to provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to inspect and service the vehicles. All replacement parts must be Polaris-approved or recommended to ensure vehicle integrity and performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Price List.pdf | ||
| Combo Synopsis - 6CTS Tatical Vehicle Maintanence.pdf | ||
| Attachment 1 - SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
FY26MRZRMXBPA - Tactical Vehicle Maintenance Closed 17 Feb 2026 1000hrs
1. The total number of each vehicle type currently in the fleet (MRZR, MRZR-Alpha, Ranger XP Crew, Club Car).
Response:
MRZR: 13
MRZR-Alpha: 5
Polaris Ranger XP Crew Cab: 2
Golf Cart: 1
2. Estimated annual service volume or historical usage under prior agreements, if available.
The volume of service would be determined by the manufacturer's maintenance schedule for each of these 21 vehicles, plus any unscheduled repairs that arise during the period of performance.
3. Please also confirm whether any materials or consumables would be Government-furnished, or if our company is expected to provide both services and all associated parts/materials. It appears that the contractor is responsible for providing all required parts and materials, including but not limited to oils, fluids, tires, brake pads, batteries, and other Polaris-approved or manufacturer-recommended components, and that pricing should be all-inclusive (labor, diagnostics, parts, and materials), with no Government-furnished parts or consumables anticipated.
Based on the provided Statement of Work (SOW), contractors are expected to provide both the services and all associated parts and materials. The government will not be furnishing any consumables or parts for this work.
This is confirmed in several sections of the document:
• Section 2.0 SCOPE OF WORK: This section explicitly states, "The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items as well as non-personal services necessary to inspect and service..."
• Section 5.5: This clause requires the contractor to "fix all issues with the... vehicles... using Polaris approved or recommended parts." This indicates the responsibility to source and use the correct parts.
• Section 9.1 APPLICABLE STANDARDS: It reinforces that "All replacement parts must be Polaris-approved or recommended to ensure vehicle integrity and performance."