falcon_flowmeters_questions_technical 07_31.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Flow Meters
Solicitation number
FY255701046
Issued by

About this file

The document is a detailed Questions and Answers (Q&A) spreadsheet for a federal solicitation to purchase and install new water flow meters and sensors for the International Boundary and Water Commission (IBWC) Falcon Field Office in Texas. The Q&A file addresses technical specifications for a project involving five new water flow meters and thirteen sets of ultrasonic water flow sensors to be installed on penstock generators and hollow jet valves. Key technical clarifications include acceptable sensor configurations, training requirements, electrical and wiring specifications, display requirements (a 15-16 inch electronic display in the control room), and installation details.

The related federal contract opportunity is a 100% small business set-aside Request for Quote (RFQ) with solicitation number FY255701046, targeting instrument manufacturing businesses. The procurement seeks to purchase and install new flow meters and sensors at the Falcon Field Office in Falcon Heights, TX. Critical procurement details include: site visits are recommended (closed July 8, 2025), quotes are due August 5, 2025, at 3:00 pm MST, and the award will be made to the lowest-priced technically acceptable offeror. Vendors must be SAM.gov registered small businesses, and the evaluation will consider technical acceptability, technical approach, and past performance. The contract will require performance and payment bonds equal to 100% of the contract price.

View the file

Other files

File Type Posted
falcon_flowmeters_questions_technical 07_31.xlsx XLSX spreadsheet
falcon_flowmeters_questions_commercia 08_01.xlsx XLSX spreadsheet
2- CLIN Structure - 08012025.docx DOCX document
falcon_flowmeters_questions_commercia 07_31l.xlsx XLSX spreadsheet
1- PWS.pdf PDF
2- CLIN Structure.docx DOCX document
3- WD 15-5309.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical

IDDATEDOCUMENTPAGESECTIONSUBJECTQUESTIONANSWER
53/4/241- PWS.pdf32.1 DThe Contractor shall supply/install/calibrate five (5) New Water Flow Meters with Thirteen (13) Set

of Ultrasonic Water Flow Sensors Mounted Type or Dilled Type, Three for each Penstock Generator

and Two for each Hollow Jet ValveThe specification states that there will be 13 sets of transducers. This would mean 3 sets of transducers on the 3 Penstock pipes and 2 sets on the 2 Holow Jet pipes. With our preferred solution we will achieve less than 1% inaccuracy with 2 sets of transducers on each line for a total of 10 sets instead of 13, and it will be lower cost. Is this acceptable?Please provide in your submittal wherever you think would provide the accuracy required on this project 1% sounds great. If you think 10 set of transducers provide this tyope of accuracy would be reviewed.
83/4/241- PWS.pdf11.4 A.4The Contractor Shall Install/Update/Compile Data of New Water Flow Sensors with New
Water Flow MetersWhat does 'Compile Data" mean? Is this calibration data? What data is being requestedCalibration and Comminication from New Transducers (Sensors) and Flow Meters
93/4/241- PWS.pdf63.2 AThe Government will not be furnishing any utilities for this project including, but not limited to
electricity, telephone, sewer, and natural gas.If we will not have electrical power, will we need to bring generators?IBWC provides electricity to complete the project, the only utility that we don't providebathrooms if you bring crew more than 4 peoples and stay more than a week need to provide portable restroom. Power Plant have some issues with sewer lines.
103/4/241- PWS.pdf52.3 B.aThe Contractor shall furnish factory-trained representatives as required to conduct

training sessions on the operation and maintenance of constructed works. The trainers shall be qualified in providing all required training and have expert knowledge of all

aspects of the operation and maintenance of their systems and associated components.Is there an expectation of how many training sessions?There is only one training operation session to memployees, prior to this training Contractor shall provide final report and recommendations to provide maintenace on this equipment.
146/20/251- PWS.pdf42.1 G"The Contractor shall provide/install at least 16 inches (Or Bigger) Electronic Display to monitor the

new meters data, and this display would be installed at Power Controllers Main Control Room., This purchased by the Contractor. The main function of this Display is to provide information/data about monitor display quality and specifications will be evaluated by IBWC Team prior to be approved and

water flow rate on every Penstock or Hollow Jet Valves"Will a monitor this large fit in the space available in the control panel, or is this a desktop display in the control room?There is enough space to install the 16" digital display mounted on the control panel.
157/8/251- PWS.pdf42.1 G"The Contractor shall provide/install at least 16 inches (Or Bigger) Electronic Display to monitor the

new meters data, and this display would be installed at Power Controllers Main Control Room., This purchased by the Contractor. The main function of this Display is to provide information/data about monitor display quality and specifications will be evaluated by IBWC Team prior to be approved and

water flow rate on every Penstock or Hollow Jet Valves"Is this 16 inch diagonal or 16 inch width?16 inch width rectangular.
157/16/251- PWS.pdf42.1 G"The Contractor shall provide/install at least 16 inches (Or Bigger) Electronic Display to monitor the

new meters data, and this display would be installed at Power Controllers Main Control Room., This purchased by the Contractor. The main function of this Display is to provide information/data about monitor display quality and specifications will be evaluated by IBWC Team prior to be approved and

water flow rate on every Penstock or Hollow Jet Valves"In the site walkthrough the site personnel indicated that 16 inch sized monitor is not required. For them it is acceptable to have amonitor that fits in the panel and shows the 5 flows with accumulator reset capability. They said it could be smaller than 16 inches. Is the 16 inch size required?The size can be close to 16 inches not smaller than 15 inches because is too small to display the information/data.
167/9/251- PWS.pdf42.1 NThe Contractor shall Provide/Install New Sensors Signal Wiring running from Penstock’s Pipes and

Hollow Jet Valves to New Flow Meters Locations, and new communication wire from new Flow Meters all the way to the Operators Control Room for the New Display to monitor the flow rate

meters.We will use a PLC to connect the transmitter to the display unit in the control room. Should we wall mount the PLC?There is enough space to install the PLC on the back of the Control Panels after the Old Equipment been removed.
177/9/251- PWS.pdf42.1 NThe Contractor shall Provide/Install New Sensors Signal Wiring running from Penstock’s Pipes and

Hollow Jet Valves to New Flow Meters Locations, and new communication wire from new Flow Meters all the way to the Operators Control Room for the New Display to monitor the flow rate

meters.Should the PLC be encliosed in a cabinet with a specific NEMA rating?If the PLC is mounted in the Control Room on the back of the Control Panel enclosure is not required.
187/9/251- PWS.pdf11.4 A 5The Contractor Shall Install/Update/Compile Signal Data from New Water Flow Ultrasonic

Sensors with New Water Flow Meters and Display the information in a Touch Screen that will

be installed in the Operators Control RoomFor the flow functionality, does it only require display or current and accumulated flow with a reset on the accumulator? Are there other functions required?No Other information is required
197/16/251- PWS.pdf32.1 DThe Contractor shall supply/install/calibrate five (5) New Water Flow Meters with Thirteen (13) Set

of Ultrasonic Water Flow Sensors Mounted Type or Dilled Type, Three for each Penstock Generator

and Two for each Hollow Jet ValveDuring the site walkthrough it was mentioned that any treatment of the pipe surface (such as paint) should be done prior to mounting the flow sensors. Will the pipes be treated/painted prior to installation of the flow sensors?Depends when the New sensors would be schedule to be installed. (Not guarantee the pipes will be treated or cleaned prior of the installation)
207/21/251- PWS.pdf84.1 BSource Control

1. 2. The Contractor shall use only materials that meet the Contract requirements.

Unless otherwise specified or compliance confirmed, the Contractor shall use new materials for the work. Material can be reused onsite upon written approval of COR.

3. 4. All materials installed shall be free of defects.

The Contractor shall secure the Government’s compliance confirmation of the proposed source

of materials to be used before their deliveryTo protect cable, it should be in conduit. We measure 300 ft of conduit is required from the electrical panel. Will this conduit be required for qualified bids?The conduit required to run electrical wire would be NEC Standards and signal wire the same way.
217/21/251- PWS.pdf84.1 BSource Control

1. 2. The Contractor shall use only materials that meet the Contract requirements.

Unless otherwise specified or compliance confirmed, the Contractor shall use new materials for the work. Material can be reused onsite upon written approval of COR.

3. 4. All materials installed shall be free of defects.

The Contractor shall secure the Government’s compliance confirmation of the proposed source

of materials to be used before their deliveryIn our walkthrough, the only asbestos was in the cable tray. The scope will not require any cutting or modification of the cable tray. Is there any other asbestos that would be impacted by the scope of this project?The best of my knowledge only the asbestos shown during the site visit
227/21/251- PWS.pdf84.1 BSource Control

1. 2. The Contractor shall use only materials that meet the Contract requirements.

Unless otherwise specified or compliance confirmed, the Contractor shall use new materials for the work. Material can be reused onsite upon written approval of COR.

3. 4. All materials installed shall be free of defects.

The Contractor shall secure the Government’s compliance confirmation of the proposed source

of materials to be used before their deliveryWill backup power need to be run to transmitters or the PLC (PLC is used for communication from transmitters to control room)Not required if the PLC is installed inside the control room.
237/21/251- PWS.pdf42.1 PThe Contractor shall make any adjustment, changes necessary on the Generators Control Panels to
Install/Set up the new Water Flow Rate Digital Display.Per our discussion with site personell we will be insalling dedicated circuit from electrical panel. We estimimated 300ft run for circuits to power PLC, and transmitters. Will this be required for qualified bids?Contractor can hire a Subcontractor to run this dedicated feeder
247/21/251- PWS.pdf94.1 E 2The Contractor shall remove and dispose of materials in accordance with Paragraph 2.2 If

requested or otherwise noted in these specifications, the Contractor shall provide an appropriate level of documentation to verify proper disposal. After commissioning the old equipment will be removed (demolition). It it expected that personnel will remain onsite until demolition is complete? The disposal of the old equipment would be Contractor Responsibility