About this file
This document is an amendment to the FY22 Crane Operator Training Evaluation & Certification request for proposals issued by the Illinois Department of Transportation (IDOT). The RFP requests training and certification services for IDOT's Day Labor staff on various types of cranes, including articulating boom cranes, mechanic's service trucks, overhead cranes, and JLGs. The RFP originally specified that the testing be conducted through NCCCO, but this amendment states that NCCER will also be an acceptable certifying body.
The RFP requires bidders to provide pricing both on a per-class basis and a total estimated price. IDOT will evaluate and award the contract based on the total estimated price. The document does not provide any additional details on pricing terms, set-asides, funding sources, or other salient information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY22 Crane Operator Training Evaluation & Certification
B-29651 / 22-DL-R-130223
Amendment #1 IDOT Responses to Vendor’s Questions
| 1. | In the bid documents it states "1. The result should be an adequate number of | certified crane operators for mobile cranes in accordance with the Occupational | Safety and Health Standards [29 CFR 1926, Subpart CC]. The daily operations | of the Day Labor staff include operation of various types of cranes, including, but | not limited to: |
| · Articulating Boom Crane/knuckleboom |
· Mechanic’s Service Trucks
· Overhead (Bridge) Crane
· JLG with side-shifting boom" Yet, the RFP demands that the testing be conducted through NCCCO.
We are with the only other company that does national licensing called NCCER.
We would like to bid on this RFP using NCCER.
Response: NCCER will be acceptable.
| 2. | What is the Difference between the price per class and total price? | |
| Response: | The per class price and the total rows would be the same and then would | be added together to come up with the estimated grand total. |