This document is a Frequently Asked Questions (FAQs) file for the FY 2026 Natural Gas Distribution Infrastructure Safety and Modernization (NGDISM) Grant Program, issued by PHMSA under Funding Opportunity Number 693JK326NF0013, last updated May 13, 2026. Questions should be directed to PHMSAPipelineBILGrant@dot.gov, with responses posted to Grants.gov.

The grant does not require matching funds and supports repair, rehabilitation, or replacement of existing natural gas pipeline distribution infrastructure owned by municipal or community-owned utilities (excluding for-profit entities). The FY 2026 NOFO is expected to be the final opportunity, with $98 million available for award following a reduction by Public Law No. 119-75 from the originally planned $196 million. Previous funding levels were $196 million (FY 2022), $392 million (FY 2023), and $196 million (FY 2024). The application period is 60 days, with acceptance beginning March 23, 2026, and the deadline of May 22, 2026. Ineligible projects include new gas line extensions, HMI software upgrades, emergency backup generators, integrity digs (already required by regulation), and projects designed to enhance capabilities for specific customers rather than promote public safety. Eligible costs include internal labor, restoration costs for roads and sidewalks necessary due to pipeline work, equipment purchases that improve leak detection or address safety vulnerabilities (such as SCADA and GPS equipment), and consultant services for approved projects. Applicants must comply with Buy America requirements for items affixed to infrastructure, obtain competitive quotes for equipment over $15,000, and wait until a grant agreement is signed before initiating procurement. Preliminary engineering reports and indirect cost rate agreements are optional. Applicants may request reimbursement as needed without a set schedule, and projects may be phased if partial funding is received. Applications with construction and equipment-only projects should complete form SF-424C reflecting all costs.

FY 2026 NGDISM Grant Program NOFO FAQs v3

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY 2026 NGDISM Grant NOFO

Funding Opportunity Number 693JK326NF0013

Frequently Asked Questions (FAQs)

Last Updated: May 13, 2026

Questions regarding the FY 2026 NGDISM Grant NOFO should be sent via email to

PHMSAPipelineBILGrant@dot.gov. PHMSA will post responses to Grants.gov.

Number Question Answer

1 Can you give me more information on the grant, please? Is this a match type of grant?

No, this grant does not require match. For more information on the grant, please visit https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants.

2 Is it possible to review grant docs from previously successful recipients? If so pls provide details.

Here are the links to past NGDISM Grant awardees:

FY 2024 grant recipients:

https://www.phmsa.dot.gov/news/phmsa-fy2024-natural-gas-distribution-infrastructure-safety-and-modernization-grants

FY 2023 grant recipients:

https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards

FY 2022 grant recipients:

https://www.phmsa.dot.gov/about-phmsa/working-phmsa/natural-gas-distribution-infrastructure-safety-and-modernization-grants mailto:PHMSAPipelineBILGrant@dot.gov https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/news/phmsa-fy2024-natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/news/phmsa-fy2024-natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/news/phmsa-fy2024-natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/news/phmsa-fy2024-natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/phmsa-fy-2023-natural-gas-distribution-infrastructure-safety-and-modernization-grant-awards https://www.phmsa.dot.gov/about-phmsa/working-phmsa/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/natural-gas-distribution-infrastructure-safety-and-modernization-grants https://www.phmsa.dot.gov/about-phmsa/working-phmsa/natural-gas-distribution-infrastructure-safety-and-modernization-grants

3 Are the following items qualified as eligible equipment under the program?

1. HMI software (AVEVA) upgrades for the system that monitors and controls boilers, vaporizers, temperatures, and valves at LNG storage and vaporization facilities, ensuring a continuous supply to the distribution regulators.

2. Emergency backup generators sized to maintain critical operations at LNG storage and vaporization facilities during grid power loss events, which is based on LNG supply reliance, would result in loss of distribution pressure and gas supply to customers.

No, these items are not eligible for the

NGDISM grant program.

4 We are trying to do a gas line extension to help improve our gas line system I was just wondering/wanting to know if we would qualify for this grant.

Grant funds support efforts to repair, rehabilitate, or replace existing pipeline distribution infrastructure. Installing or extending new natural gas capabilities is not an eligible use of funds. For example, a project that proposes to install or extend new pipe for the purposes of providing services to new customers is not eligible.

5 We want to confirm that BABAA compliance pertains to the purchase of odorant injection systems (mobile and fixed)? There appears to be one main manufacturer of these units that is based in the US.

If the item is affixed to infrastructure, then it is subject to Buy America requirements.

6 Would gate station meters fall within the programmatic waiver for meters for the NGDISM grants?

No, the gate station meter is not included in the BABA programmatic waiver.

7 Do we need to submit a preliminary engineering report with the application? If so, is there a requirement for us to go through the procurement process first?

No, applicants are not required to submit a preliminary engineering report with the application. PHMSA advises prospective applicants to wait to initiate procurement activities until a grant agreement is signed with the agency.

8 What administration activities are eligible for reimbursement?

Allowable administrative activities are defined at 2 CFR Part 200 Subpart E.

9 Are internal labor costs allowed? Yes, internal labor costs are allowed.

10 If repairs to the road and/or sidewalk are necessary due to the pipeline replacement project, are those eligible as construction related costs?

Yes, restoration costs are allowed.

Improvement or rehabilitation for the entire right-of-way is not allowed.

11 Is there an expiration date on previous cost estimates (as in no more than 12-months, etc.)?

No, there is no expiration date on previous cost estimates. PHMSA advises prospective applicants to forecast cost increases.

12 For a replacement construction project, is an indirect cost rate agreement needed?

An indirect cost rate agreement is optional. A prospective applicant does not need an indirect cost rate agreement to be selected for award. A prospective applicant may elect the de minimis indirect cost rate. However, this is not required to be selected for award.

13 If awarded, is there a recommended schedule for reimbursement or is it as needed?

Grant recipients may request reimbursement as needed. PHMSA does not have a set schedule for reimbursement.

14 Will the option be available this year to reload a previous request that was denied because other projects were deemed to have a higher priority?

Applicants may resubmit projects that were not selected for award under previous NOFOs.

15 If my City has multiple UEIs, which

UEI should I use with my grant application?

PHMSA recommends prospective applicants with more than one UEI carefully consider the UEI used to submit the grant application. The UEI associated with the grant application should be the same UEI the applicant anticipates being reimbursed under.

16 Could you please clarify whether a formal interlocal/intergovernmental agreement between a regional planning commission and a municipality must be in place at the time of application, or if such an agreement can be executed at a later stage?

The regional planning commission intends to provide technical and administrative assistance to small and rural municipalities that may not have the internal capacity to manage the application process. In this role, the regional planning commission would be supporting applicants throughout the grant process.

PHMSA advises prospective applicants to wait to initiate procurement activities until the grant agreement is signed with the agency.

If selected for award, the applicant will need to follow the Federal procurement standards in 2 CFR 200.317-327. Note that 2 CFR 200.320(a) allows for informal procurement methods for micro-purchases

(total spent on the consultant is less than

$15,000) and small purchases (total spent on the consultant is less than $350,000).

These informal procurement methods do not require a formal bidding/proposal process. The applicant should also follow its organization's internal procurement policy.

Consultants that work on an approved

NGDISM funded project(s) are an allowable/reimbursable Federal grant cost.

Please note costs associated with the drafting of a grant application are not an allowable/reimbursable Federal grant cost.

17 Where can I find a template of a resolution to present to city council for approval for submitting an application.

Is a resolution required to receive funding?

No, a resolution is not required to receive funding.

18 Would integrity digs be eligible for a

PHMSA grant?

No. Activities that are already required by regulation are out of scope.

19 Is this grant available to public school districts?

This grant is available to municipal or community-owned utilities (not including for- profit entities). A community-owned system is owned by the customers it serves. A municipal-owned system is owned by a local government or state body. In order to be eligible for the

NGDISM grant, the utility must be community- or municipal-owned and cannot be a for-profit entity.

20 I would greatly appreciate any information, guidance, or direction you can provide regarding current or upcoming grants, as well as the application process.

The FY 2026 NOFO has been posted to

Grants.gov. You can access it here:

https://grants.gov/search-results-detail/361603. The final day to submit applications is May 22, 2026.

21 I am attempting to apply for the above grant. The instructions say to affiliate our organization with the grantor. Is this something with which you can help? Please respond all.

Options for additional questions on how to register and/or to resolve Grants.gov issues are:

1. Utilize Grants.gov Online Self-Help

(click here).

2. Utilize Grants.gov “Create a Ticket” feature (click here).

3. Contact Grants.gov Support Desk, 24 hours a day, seven days a week, excluding

Federal holidays, by phone at 800-518-

4726 or by e-mail at support@grants.gov.

https://grants.gov/search-results-detail/361603 https://grants.gov/search-results-detail/361603 https://gditshared.servicenowservices.com/hhs_grants https://gditshared.servicenowservices.com/hhs_grants mailto:support@grants.gov

22 Can you provide more guidance on applications containing multiple projects and what constitutes a single project? If two work sites are several miles from each other, is that enough for it to be considered separate projects? Is there an advantage or disadvantage to submitting multiple projects in one application versus an application for each project?

If feasible, PHMSA encourages applicants to submit one application with projects appropriately segmented. If the projects lack a reasonable tie-in, or if segmenting the projects prove to be more burdensome, applicants should consider submitting separate applications.

Applicants who submit multiple applications receive no advantage compared to applicants who propose multiple projects in a single application.

23 My question is regarding what the program is looking for in regard to job creation for a project that would just replace existing equipment.

The programmatic review criteria for construction projects considers whether the project will create jobs. However, the programmatic review criteria for equipment-only projects does not consider whether the project will create jobs.

24 An existing service line to an industrial customer is not meeting current demands. Propose replacing existing natural gas line with a larger line to meet the customer requirement. This appears to meet eligibility requirements.

The grant program is intended to support local and municipally-owned utilities to repair, replace, or rehabilitate natural gas pipelines that are leaking or prone to leaking. The grant program is intended to promote public safety, rather than enhance the capabilities of an industrial customer.

25 Our current DIMP is a 50-page Word document that defines and summarizes our system characteristics, threats, risks, etc., with an additional 86 pages of supporting data tables and calculations used to rank and prioritize mitigation measures. Do you require the supporting tables/calculations in our submission or is the Word document sufficient?

Please send the 50-page Word document;

the 86 pages of supporting data tables and calculations are not necessary.

26 On the NGDISM grant program landing page for grant recipients, there are procurement slides that say, “Contractors that develop or draft specifications, requirements, statements of work, or invitations for bids or requests for proposals must be excluded from competing for such procurements.” (slide 23)

Does this apply only to contractors drafting specs and requirements etc. for bid packages, or does it also apply to contractors who provide information and estimates for inclusion in the grant application?

Applicants may collect cost information, such as quotes and estimates, from vendors in order to develop the budget and budget narrative. Vendors who provide quotes or estimates to applicants may later compete for procurement, assuming they did not participate in that procurement's development or draft specifications, requirements, statements of work, or invitations for bids or requests for proposals.

27 Would SCADA and GPS equipment be eligible expenses under the grant?

Is the replacement of existing gas meters with the Automatic Meter

Reading (AMR) System an eligible expense?

The purchase of equipment to improve an operator’s leak detection system or address a vulnerability that could lead to the unsafe operation of a system falls within the scope of the program.

However, applicants should consider whether equipment costs are reasonable and cost effective compared to other equipment that serve the same purpose.

PHMSA will evaluate each project for its conformance to the grant program's requirements and all the criteria set forth in the NOFO.

28 We are interested in applying for the grant for both a construction project and UNRELATED leak detection equipment. Form 424A says for

“equipment only” which this is not, obviously; however, form 424C says the equipment must be “related to the

[construction] project”, which it is also not. I know it won’t be two separate applications, but do we need to fill out both forms or how do we proceed?

For an application with a construction project and an equipment-only project, please complete the SF-424C. The SF-

424C should reflect all of the costs associated with the application.

29 Are gas meters eligible expenses under the NGDSM grant program?

The purchase of equipment to improve an operator’s leak detection system or address a vulnerability that could lead to the unsafe operation of a system falls within the scope of the program.

However, applicants should consider whether equipment costs are reasonable and cost effective compared to other equipment that serve the same purpose.

PHMSA will evaluate each project for its conformance to the grant program's requirements and all the criteria set forth in the NOFO.

30 We are currently preparing an FY26 application under the NGDISM grant program and are seeking clarification regarding the identification and documentation of “Areas of Persistent

Poverty” as referenced through the

Infrastructure Investment and Jobs Act.

While the statutory definition is noted, we have not identified a clearly designated or preferred federal mapping resource for determining whether a proposed project area qualifies. Could you please advise whether PHMSA recommends or accepts a specific tool for this purpose?

Any guidance on acceptable methodologies or documentation standards would be greatly appreciated.

No, there is no such tool.

31 For the NGDISM grant, is it acceptable to only obtain one quote for budgeting purposes for the application, or is more than one quote required? If awarded, are additional quotes needed before purchasing equipment?

Applications will be evaluated on whether the project proposal includes quotes, invoices, or online estimates (current or past are acceptable) to justify costs.

If awarded, recipients must comply with the requirements of 2 CFR 200.320(a) when using informal or the micro-purchase and small purchase methods of procurement. Micro-purchases for items that cost less than $15,000 may be awarded without soliciting competitive quotes if the non-federal entity considers the price reasonable based on research, experience, purchase history, or other documented information. Small purchase procedures for items that cost greater than

$15,000 and less than $350,000 require recipients to obtain price or rate quotes from an adequate number of qualified sources.

32 Good morning, where can I direct a question regarding the grant application.

Questions regarding the FY 2026

NGDISM Grant NOFO should be sent via email to

PHMSAPipelineBILGrant@dot.gov.

PHMSA will post responses to

Grants.gov.

33 Is there any discussion about extending the application period to 60 days as in past application processes?

The application period is 60 days.

PHMSA began accepting applications on

March 23, 2026. The last day to apply is

May 22, 2026.

mailto:PHMSAPipelineBILGrant@dot.gov

34 Attachments---On page 9 of the instructions for Attachments, are these the "Agency Guidelines" referred to on the Attachments Form? Are there specifications for naming each attachment?

On Grants.gov, applicants will see a file named “Attachments [V1.2]”. The file includes the following instructions:

“Instructions: On this form, you will attach the various files that make up your grant application.

Please consult with the appropriate

Agency Guidelines for more information about each needed file. Please remember that any files you attach must be in the document format and named as specified in the Guidelines.”

The file also states:

“Important: Please attach your files in the proper sequence. See the appropriate Agency Guidelines for details.”

The form’s use of the term “Agency

Guidelines” has the same meaning as

PHMSA’s FY 2026 NGDISM Grant

Program NOFO.

There are no specifications for naming files.

35 Indirect Cost Rate Agreement (ICRA)-

--Our application is an Equipment -

Only Application. In the Budget

Narrative for that application (page 15 of the instructions), Indirect Charges are not applicable. Do we need to attach an ICRA with our application, or is it not applicable?

Indirect costs for equipment-only projects are not applicable.

36 Statements---Do the Statements required on the checklist need to be separate attachments or simply part of the Project Narrative?

Both the statement of authority and pipeline infrastructure safety and modernization capabilities and the statement certifying compliance with domestic preference/Buy America may be included in the project narrative.

37 We are unable to fill out the pdf forms

(such as SF424B-V1.1, GG_Lobbying

Form-V1.1, and SFLLL_2_0-V2.0) for the NGDISM grant unless we add text boxes for our responses. Is that acceptable?

Yes, that is acceptable.

38 Can we purchase the equipment now and get reimbursed if and when the grant is approved or do we have to wait until the official approval letter? I ask because we are looking to purchase either way and the process is under way.

No. Proposals that seek reimbursement for a project or an acquisition that has already been completed are ineligible for award.

PHMSA advises prospective applicants to wait to initiate procurement activities until a grant agreement is signed with the agency.

39 The application narrative guidance asks:

Identify whether partial funding would be accepted to complete the project and the level of minimum funding needed.

We don’t have funding to provide match to our projects; however, one of our projects is large enough to be phased if partial funding is received.

Would it be acceptable to give the cost of a single phase as the minimum funding needed and then if awarded undertake only that one phase, or is this question assuming that if partial funding is accepted the remainder of the full project would be funded internally?

It is acceptable to give the cost of a single phase as the minimum funding needed.

40 I am preparing an application for a grant under the 2026 NGDISM Grant

Program. I received an email regarding the second batch of FAQs. Would you please send to me the first batch of

FAQs for this program?

Please see the FAQ document associated with the FY 2026 NGDISM Grant

Program NOFO on Grants.gov. The first batch of FAQs includes questions 1-5.

The second batch of FAQs includes questions 6-13. The third batch of FAQs includes questions 14-30.

41 One of the cities we are working with regarding the NGDISM Grant Program wants to install additional valves as part of an emergency and economic readiness program. Below is the description of the project and the issues faced during the tornado of 2023.

Please let me know if this would fall under the program goals and objectives:

“The grant would be to install 15 valves into the system. These valves would help us to isolate parts of the gas system. When the tornado hit in 2023 we had to shut the entire system down due to a large amount of damaged risers. Half of the town was out of gas for a week while we installed valves to isolate the damaged part of town. The other half was out of gas for a month.

This proposed project would allow us to isolate portions of town in the event of another large-scale event like the tornado. Places like the hospital, the county jail, and the school were out of gas for long periods. There was a substantial impact to local businesses during that time as well.”

Thank you for your inquiry regarding the eligibility of the valve installation project under the Natural Gas Distribution

Infrastructure Safety and Modernization

(NGDISM) Grant Program.

This project is eligible for submittal and review. Based on an initial limited review, the project appears to provide a community benefit by improving system operations and maintaining natural gas service, which helps limit outages to only the immediately affected areas.

Please note that the final submission package will undergo a technical merit review and will compete with other projects nationwide. When preparing the application, please include all relevant information to support the specific need for this rehabilitation and its expected benefits.

42 What type of administration will be required during and closing the grant?

For example: quarterly reports;

closeout documents; Davis Bacon wage rates; certified payrolls; etc.

Please see H.3 Reporting Requirements.

Please be advised that the Davis Bacon

Act does not apply to the NGDISM grant program.

Additional grants administration material is available at https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/manage-your-ngdism-grant-award.

43 I am reaching out regarding the Natural

Gas Distribution Infrastructure Safety and Modernization Grant Program

(opportunity 693JK326NF0013), currently listed with a closing date of

May 22, 2026. My team has reviewed the program description and feels this is a good opportunity. However, the project is not far along enough in the process to have all the necessary details to complete the application. The details of the grant reference $200 million per year over a five-year period. Based on this I wanted to get clarification as to whether this grant opportunity is recurring on an annual basis and would be something that we could aim at applying for next year; or if being that this would be the 5th year since the

Infrastructure Investment and Jobs Act was initiated (November 2021) that this would be the last year that these funds would be available. We want to ensure that we are pursuing this opportunity at the right time and with the strongest possible application. Any guidance you can provide would be greatly appreciated.

The FY 2026 NGDISM Grant Program

NOFO is currently expected to be the final opportunity to apply for grant funds.

$196 million was made available under the FY 2022 NOFO, $392 million was made available under the FY 2023 NOFO, $196 million was made available under the FY 2024 NOFO, and $98 million was made available under the FY 2026 NOFO.

Please note Public Law No. 119-75 reduced the amount of remaining funding available for award for the FY 2026

NOFO from $196 million to $98 million.

https://www.phmsa.dot.gov/about-phmsa/working-phmsa/grants/pipeline/manage-your-ngdism-grant-award