FWC 25.26-32C Addendum Questions and Answers.pdf

PDF 214 KB Posted

Attached to
YELLOW RIVER LITTLE GIN HOLE LANDING RESTORATION
Solicitation number
ITB-14458
Issued by
Leon County, Florida

About this file

This is an Addendum document issued by the Florida Fish and Wildlife Conservation Commission (FWC) for Solicitation No. FWC 25/26-32C, the Little Gin Hole Restoration Project. The addendum addresses five questions and answers clarifying project specifications and requirements submitted during the competitive bidding process. Key clarifications include confirmation that contractors must possess similar experience in scope and scale of work to be considered responsible bidders, that coir/burlap matting will cover the 10:1 floodplain and 4:1 back slope up to grade with an additional 1-foot berm for runoff control, and that project technical specifications will be provided as project documentation. The addendum also resolves conflicting engineering design specifications regarding burlap fabric elevation coverage by referring bidders to the updated project plans sheet 3. All bid responses are due no later than 4:00 PM ET on Tuesday, January 13, 2026, with the public bid opening scheduled for the same date.

Post-restoration plant maintenance requirements specify that contractors shall maintain and care for seeded areas for eight weeks or until a satisfactory 95 percent vegetation cover has been established, with additional details provided in the technical specifications. The addendum confirms that only the bid amount will be considered when comparing responsive and responsible bidders, meaning lower bids from contractors with less experience may be evaluated equally against more experienced bidders if both meet the responsiveness and responsibility criteria. Protests must be filed with the FWC Purchasing Office within the time prescribed in Florida Statutes Section 120.57(3) and Chapter 28-110 of the Florida Administrative Code.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Fish and Wildlife Conservation Commission

Commissioners Rodney Barreto Chairman Coral Gables

Steven Hudson Vice Chairman Fort Lauderdale

Preston Farrior Tampa

Joshua Kellam Palm Beach Gardens

Gary Lester Oxford

Albert Maury Coral Gables

Sonya Rood St. Augustine

Office of the Executive Director Roger A. Young Executive Director

Charles “Rett” Boyd Assistant Executive Director

George Warthen Chief Conservation Officer

Jessica Crawford Chief of Staff

850-487-3796

850-921-5786 FAX

Managing fish and wildlife resources for their long-term well-being and the benefit of people.

620 South Meridian Street Tallahassee, Florida 32399-1600 Voice: 850-488-4676

Hearing/speech-impaired:

800-955-8771 (T) 800-955-8770 (V)

MyFWC.com

DATE: JANUARY 8, 2026

ADDENDUM NO.: 3

BID NO.: FWC 25/26-32C

BID TITLE: LITTLE GIN HOLE RESTORATION PROJECT

UPDATE: QUESTIONS AND ANSWERS

The enclosed addendum has been issued for consideration in the preparation of your response to the Florida Fish and Wildlife Conservation Commission’s (FWC) Solicitation No. FWC 25/26-32C, “Little Gin Hole Restoration ProjectClick or tap here to enter text.”.

All responses to the subject solicitation must be received no later than 4:00 PM (ET) on Tuesday, January 13, 2026.

A response received after the exact time specified will not be considered.

Failure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes (F.S.), or failure to post the bond or other security required by law within the time allowed for filing a bond shall constitute a waiver of proceedings under Chapter 120, Florida Statutes. Written notices, formal requests and proceedings must conform with the requirements set forth in Chapter 28-110, Florida Administrative Code (F.A.C.). Protests must be filed with the Purchasing Office, Fish and Wildlife Conservation Commission, 1875 Orange Avenue East, Tallahassee, Florida 32311-6160 within the time prescribed in Section 120.57(3), F.S. and Chapter 28-110, F.A.C.

Sincerely, Elbert Orellana FWC Procurement Manager

FWC SOLICITATION ADDENDUM 2

BEGIN ADDENDUM

QUESTION #1

To be considered for award, are contractors required to have experience that is identical or very similar to the proposed project? If so, how will FWC weigh that requirement against a lower bid submitted by a contractor with less experience or qualifications?

ANSWER #1

Contractors considered responsible will need to have similar experience in scope and scale of work.

Contractors considered responsive will need to provide all the items required by the bid. Only the bid amount will be considered when comparing responsive and responsible bidders.

QUESTION #2

Please clarify whether coir matting is intended to cover the 10:1 floodplain (in addition to what is covered from the second bank soil lift) and the 4:1 back slope up to the top of the terrace. The engineering plans do not clearly indicate whether the floodplain is included.

ANSWER #2

Based on field observations and discussion during the pre-bid meeting, the intent is now to bring the coir/burlap all the way up the bench and slope (10:1 and 4:1 sections) to grade (where we also intend to add a 1’ berm to control overland runoff). The project plans sheet 3 has been updated to reflect/clarify this.

QUESTION #3

Will project specifications be provided as part of the project documentation?

ANSWER #3

Project technical specifications will be provided as part of the project documentation (attachment 1).

QUESTION #4

What is the required elevation coverage for the burlap fabric on each soil lift? The engineering design shows halfway up (0.5') on one page and full coverage on another. Could you clarify which specification applies?

ANSWER #4

See response to Question #2.

QUESTION #5

Post restoration, how many days of watering are required for the installed plants?

Irving, Jordan THIS IS FOR Q&A ONLY. IF YOU ARE NOT USING THE ADDENDUM FOR Q&A, DELETE THIS SECTION AND USE THE SECOND OPTION BELOW.

Morgan, Alisha Use Heading 1 in Styles (on the Home tab) to automatically insert “Question” and the sequential number.

Morgan, Alisha Use Heading 2 to automatically insert “Answer” and the sequential number (aligns to the Question #)

FWC SOLICITATION ADDENDUM 3

ANSWER #5

The contractor shall maintain and care for seeded areas for 8 weeks or until satisfactory (95% cover) stand of vegetation has been established. Additional details will be provided in the technical specifications (attachment 1).

END ADDENDUM

Irving, Jordan IF YOU HAVE MULTIPLE TOPICS ON YOUR ADDENDUM, FOR EXAMPLE Q&A AND A PRICE SHEET CHANGE/SCOPE OF WORK CHANGE, ENSURE THAT THE END ADDENDUM IS MOVED TO THE BOTTOM.

Question #1
Answer #1
Question #2
Please clarify whether coir matting is intended to cover the 10:1 floodplain (in addition to what is covered from the second bank soil lift) and the 4:1 back slope up to the top of the terrace. The engineering plans do not clearly indicate whether the...
Answer #2
Question #3
Answer #3
Project technical specifications will be provided as part of the project documentation (attachment 1).
Question #4
Answer #4
See response to Question #2.
Question #5
Answer #5