This document is a Scope of Work (SOW) for a state and local contract opportunity issued by the Fort Valley Utility Commission (FVUC) in Peach County, Georgia. The project involves replacing 4 underground aging feeders out of FVUC's #1 12 KV Substation located at 580 Hampton St, Fort Valley, GA 31030. The scope includes setting 4 ductile iron poles, installing 2 wood poles, 4 dual 6-inch schedule 40 duct banks, 990 feet of 1000MCM 3-phase primary cable, 24 1000MCM terminators, and 6 gang-operated RLB switches. The contractor will also be responsible for removing/cutting the top out of 12 poles and removing the existing overhead/underground lines. A mandatory pre-bid meeting is scheduled for August 14th, 2024, at 9 AM, and bids are due by September 3rd, 2024, at 10 AM. The contract will be awarded on September 3rd, 2024, at 1 PM.
This is a labor-only contract, as FVUC will furnish all materials. The contractor must be licensed and responsible for obtaining utility dig request notifications, verifying underground facilities, and maintaining the phasing of all four feeders. The contractor will also be responsible for site cleanup, restoration, and safety practices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Feeder Exits Final Drawings.pdf | ||
| Electric Bid Advertisement Substation Exits.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Valley Utility Commission
Substation Feeder Exits 4601-2324-02
1.Project Overview and Purpose:
o This project involves replacing 4 Underground ageing feeders out of Fort Valley’s #1 12 KV Substation.
o Project is located at 580 Hampton St. Fort Valley Georgia 31030.
2. Project Scope:
o Consists of setting four Ductile Iron poles: 45/H9 approx. 3973lbs each.
o Install two, 55/1 wood poles.
o Install four Duel 6” schedule 40 duct banks with a combined length of approx. 650ft.
o Install approx. 990ft. combined length of 1000mcm 3 phase primary cable.
o Install 24 1000mcm terminators.
o Install 6 Gang operated RLB switches.
o Remove/Cut top out of 12 Poles.
o Remove existing overhead/Underground lines.
o Conduits will be Stubbed outside the substation fence by MEAG Power.
o The contractor will be responsible for maintaining the phasing of all four feeders.
3. Labor and Materials:
o This will be quoted for labor only as FVUC will furnish all material.
o The Contractor shall be responsible for obtaining all Utility Dig Request Notifications prior to any work being performed on any section of the project. All underground facilities, such as electric, water, natural gas, sewage, telephone, cable TV, etc., both publicly and privately owned, shall be verified before any digging is performed. All liability for damage to facilities in or near the work area will be the sole responsibility of the Contractor.
o All retired materials taken down shall be returned to the Fort Valley Utility Commission’s Electrical Department warehouse facilities.
o The Contractor shall clean up all work areas where work has been performed on the project at the end of each workday. All scrap, trash and other related items shall be removed from the site and hauled off at the end of each workday. All holes and trenches shall be filled in and compacted to ensure that there are no hazards for others working within the project or to the public.
o Project Completion: The project site shall be protected and/or restored to a condition equal to that existing prior to the commencement of work. Upon completion of contract, deliver work complete and undamaged. Existing work (lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
o The Contractor shall exercise all safety practices associated within the Electric Utility industry to insure protection for himself, the public and the Owner’s facilities. The Contractor shall furnish all necessary safety and health equipment to his employees.
o All substation switching will be the contractor’s responsibility and shall be performed by a ITS certified operator. All switching orders shall be reviewed by FVUC Electric Superintendent 48 hours prior to switching.
o All work on MEAG property shall meet the most current training standards.