The document provided is a construction drawing and project description for a state and local contract opportunity. The Fort Valley Utility Commission (FVUC) is accepting sealed bids for labor to install 4 new underground substation feeder exits and overhead distribution poles/lines in Fort Valley, Georgia. The project involves setting 4 ductile iron poles, installing 2 wood poles, constructing 4 dual 6-inch schedule 40 duct banks totaling approximately 650 feet, installing 990 feet of 1000 MCM 3-phase primary cable, 24 1000 MCM terminators, and 6 gang-operated RLB switches. The contractor will also be responsible for removing/cutting the top out of 12 poles and removing existing overhead/underground lines. A mandatory pre-bid meeting is scheduled for August 14, 2024, and bids are due by 10:00 AM on September 3, 2024. The FVUC will furnish all materials, and the contract is for labor only.

The FVUC will be responsible for maintaining the phasing of all four feeders, and the contractor will be required to clean up all work areas. The FVUC reserves the right to reject any and all bids in total, in part, or to waive defects in bids. The project is located in Peach County, Georgia, and the contract will be awarded by the FVUC.

View the file

Other files

File Type Posted
Electric Bid Advertisement Substation Exits.pdf PDF
FVUC Substation SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X

X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X X X X X

1/0 AL N

336 AL P

25'

1/0 AL N

336 AL P

380'

1/0 AL N

336 AL P

383'

80'-2

GPC

6 A

L N

6 A L P

1'

6 A

L N

6 A L P

1'

F.V.U.C.

POLE #2

40'-3

F.V.U.C.

POLE #5

45'-3

F.V.U.C.

POLE #3

55'-3

AL N

AL P165

AL N

AL P164

1/0

AL N336

AL P111

1/0

AL N

AL P92'

1/0

AL N336

AL P92'

1/0 AL N

336 AL P

126'

F.V.U.C.

POLE #1

40'-3

RISER POLE #3

45'-10

3U213'1000 MIL

3U 177'

1000 MIL

3U214'1000 MIL

3U184'1000 MIL

XXXXXX

X X

X X

X X

X X

X X

X X

X

1/0 AL N

336 AL P

52'

1/0 AL N

336 AL P

25'

1/0 AL N

336 AL P

29'

F.V.U.C.

POLE #8

40'-3

F.V.U.C.

POLE #6

40'-3

F.V.U.C.

POLE #7

55'-3

3U 88'

1 MILLION

3U 243'

1000 kcm il

3U 51'

1 MILLION

F.V.U.C.

POLE #11

40'-3

F.V.U.C.

POLE #4

40'-3

1/0 A

L N

6 A L P

2'

1/0 A

L N

6 A L P

1/0 AL N

336 AL P

158'

F.V.U.C.

POLE #10

40'-2

X X

X X

X X

X X

X X

X X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

XXXXXXXXXXX

X X

X

X X X

3U 216'

500 CU UG P

60'-3 F.V.U.C.

PROPOSED POLE #2

55'-1

F.V.U.C.

POLE #12

40'-2

F.V.U.C.

POLE #9

45'-3

1/0

AL N

AL P84'

1/0

AL N336

AL P92'

N.O.

3X

N.O.

3X

60'-2 F.V.U.C.

85'-?

STR# 78

GPC 106'-D

STR #79

GPC

STR# 77

GPC

STR #2

MEAG

60'-?

MEAG

100'-?

STR #1

MEAG 4G

37'

50'

34'

37'

MEAG

GPC

MEAG

40' 39'

46'

GPC

N.C.

3X

RISER POLE #4

45'-10

RISER POLE #1

45'-10

N.C.

3X

RISER POLE #2

45'-10N.C.

3X

29'

29'

29'

29'

10'

10'

10'

10'

N.C.

3X

(2) 6" PVC CONDUIT

145'

(2) 6" PVC CONDUIT

138'

(2) 6" PVC CONDUIT

175'

(2) 6" PVC CONDUIT

174'

POLE #11

RM: 40'-3, (2) C7, (2) E6, (4) F1-S

RISER POLE #3

IN: 45'-10 DUCTILE, C7, M3-15, UM2-7A

PROPOSED POLE #1

IN: 55'-1, DC-C8F, M3-15V

TR: (3) 336 AL PRIMARY

(1) 1/0 AL NEUTRAL

PROPOSED POLE #2

IN: 55'-1, DC-C8F, M3-15V

TR: (3) 336 AL PRIMARY

(1) 1/0 AL NEUTRAL

RISER POLE #2

IN: 45'-10 DUCTILE, C7, M3-15, UM2-7A

RISER POLE #1

IN: 45'-10 DUCTILE, C7, M3-15, UM2-7A

RISER POLE #4

IN: 45'-10 DUCTILE, C7, M3-15, UM2-7A

Sheet No.:Drawing No.:

THIS IS A CAD DRAWING, DO NOT REVISE MANUALLY.

OF

Engineer: Drafter:

Scale:Date:

FO

RT

V

AL

LE

Y

UT

ILI

TY

C

OM

MI

SS

IO

N

PR

OP

OS

ED

F

EE

DE

R

EX

IT

S

FO

R

FO

RT

V

AL

LE

Y

#1

CO

NS

TR

UC

TI

ON

D

RA

W

IN

G

JJ BC

06/12/24 1"=20'

1 1

30'20'10' 40'

1"=20'

0'

POLE #1

RM: 45'-3, C7, UM2-7A, E1, F1-S

POLE #2

RM: 40'-3, C4, (3) E1, (3) F1-S

POLE #3

RM: 55'-3, C2V

POLE #4

RM: 40'-3, C4, E6, E1, (3) F1-S

POLE #5

RM: 45'-3, C2V

POLE #6

RM: 40'-3, C1, UM2-7A

POLE #7

RM: 55'-3, C7, E6, (2) F1-S

POLE #8

RM: 40'-3, C1

POLE #9

RM: 45'-3, C7, UM2-7A, E8, (4) F1-S

POLE #10

RM: 40'-2, C7, UM2-7A

POLE #12

RM: 40'-2, C7, E8, (4) F1-S

AutoCAD SHX Text www.Georgia811.com

Sheets and Views
Construction Drawing

File details come from the government source that posted it. Updated .