FTA_Terms_and_Conditions.pdf

PDF 256 KB Posted

Attached to
Title and Escrow Services
Solicitation number
230095
Issued by
Pima County, Tucson City, Arizona

About this file

This document contains the Federal Transit Administration (FTA) Terms, Conditions, and Certifications for Request for Proposal (RFP) 202523, issued by the City of Tucson. The document outlines comprehensive requirements for contractors bidding on FTA-assisted contracts, covering a wide range of federal regulatory compliance areas including civil rights, environmental protection, lobbying restrictions, debarment, disadvantaged business enterprise participation, and specific procurement guidelines. The documentation is designed to ensure that any contract awarded using federal transit funds adheres to strict federal standards and regulations across multiple operational and administrative dimensions.

The document provides detailed protocols for various contract scenarios, including requirements for contracts exceeding $100,000, non-construction activities, and research and development projects. Key compliance areas include Buy America provisions, requiring that steel, iron, and manufactured products used in FTA-funded projects are produced in the United States, mandatory certifications regarding lobbying and business practices, and specific guidelines for protest procedures. The document also establishes requirements for record retention, audit access, cargo preference, energy conservation, metric system usage, and workplace safety standards like seat belt use and restrictions on text messaging while driving. Contractors must demonstrate adherence to these comprehensive federal guidelines to be considered eligible for FTA-funded project contracts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL TRANSIT ADMINISTRATION

TERMS, CONDITIONS, AND CERTIFICATIONS

***RFP 202523 ***

FEDERAL TRANSIT ADMINISTRATION

TERMS, CONDITIONS AND CERTIFICATIONS

Requirements/Conditions For All FTA Assisted Contracts:

Federal Disclaimer to Third Parties Program Fraud and False or Fraudulent Statements and Related Acts Prohibitions Against Exclusionary or Discriminatory Specifications Debarment and Suspension Requirements Federal Changes Civil Rights Requirements Termination Provisons Requirements for Disadvantaged Business Enterprises Incorporation of FTA Terms

Requirements for Contracts Exceeding Small Purchase Threshold ($100,000):

Report, record retention, and access provisions Buy America requirements Provisions For Resolution Of Disputes, Breaches, Defaults Or Other Litigation Lobbying Requirements Bonding Requirements for Construction Activities; (may be imposed for nonconstruction activities) Clean Water Requirements Clean Air Requirements Requirements for Recycled Products (for items designated by EPA)

Cargo Preference

Acquisition of Property Shipped by Ocean Vessel Acquisition of Property Shipped by Air

Non Construction Activities Non Construction Employee Protection Requirements (Except for supplies/raw materials)

Planning, Research, Development and Demonstration Projects

Patent Rights Requirements Rights in data and copyrights requirements

Miscellaneous Special Requirements

Environmental Protection Energy Conservation Requirements Metric System Requirements

National ITS Architecture Seat Belt Use

Text Messaging While Driving

Certifications

Buy America Lobbying

Protest Procedures For Federal Transit Administration Funded Projects

City Of Tucson Protest Procedures For Federal Transit Administration (FTA) Funded Projects

Requirements/Conditions For All FTA Assisted Contracts

This Contract is Subject to Federal Financial Assistance/Application of Provisions and Clauses

This contract is funded in part by grants from the Federal Transit Administration (FTA) of the United States Department of Transportation. The award of any contract is subject to the requirements of financial assistance contracts between the City of Tucson and the U.S. Department of Transportation.

The Contractor is required to comply with all terms and conditions prescribed for third-party contracts by the U.S. Department of Transportation, Federal Transit Administration (FTA). If FTA requires any change to this Contract to comply with its requirements, both parties agree to amend the Contract as required by FTA. If such changes cause an increase or decrease in the work to be performed by the Contractor or the time for such performance, then the compensation to be paid the Contractor and time of performance shall be equitably adjusted.

The required contract clauses, which are identified below as applicable to this solicitation, will be incorporated by reference in any contract resulting from this solicitation issued by the City Of Tucson. These solicitation provisions and required contract clauses are in addition to other General Specifications, Special and Technical Specifications, Bidding or Proposal Procedures, and Bid or Proposal Forms set forth in other sections of this solicitation which may also be incorporated by reference in any resulting contract. If there is any discrepancy in the language between this document and the General Specifications, Special and Technical Specifications, Bidding or Proposal Procedures and Bid or Proposal Forms set forth in other sections of this solicitation, the stricter of two shall govern.

Some provisions and clauses require the bidder/proposer to execute and submit certain required certifications with the bid or proposal, which are included herein. Failure to execute and submit required certifications with the bid or proposal documents may render a bid or proposal non-responsive.

Federal Disclaimer to Third Parties

1. The Purchaser and Contractor acknowledge and agree that, notwithstanding any concurrence by the

Federal Government in or approval of the solicitation or award of the underlying contract, absent the express written consent by the Federal Government, the Federal Government is not a party to this contract and shall not be subject to any obligations or liabilities to the Purchaser, Contractor, or any other party (whether or not a party to that contract) pertaining to any matter resulting from the underlying contract.

2. The Contractor agrees to include the above clause in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clause shall not be modified, except to identify the subcontractor who will be subject to its provisions.

Program Fraud and False or Fraudulent Statements and Related Acts - 31 U.S.C. § 3801 et seq., 49 CFR Part 31, 18 U.S.C. § 1001, 49 U.S.C. 5307

1. The Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act of 1986, as amended, 31 U.S.C. § 3801 et seq. and U.S. DOT regulations, "Program Fraud Civil Remedies," 49 C.F.R. Part 31, apply to its actions pertaining to this Project. Upon execution of the underlying contract, the Contractor certifies or affirms the truthfulness and accuracy of any statement it has made, it makes, it may make, or causes to be made, pertaining to the underlying contract or the FTA assisted project for which this contract work is being performed. In addition to other penalties that may be applicable, the Contractor further acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification, the Federal Government reserves the right to impose the penalties of the Program Fraud Civil Remedies Act of 1986 on the Contractor to the extent the Federal Government deems appropriate.

2. The Contractor also acknowledges that if it makes, or causes to be made, a false, fictitious, or fraudulent claim, statement, submission, or certification to the Federal Government under a contract connected with a project that is financed in whole or in part with Federal assistance originally awarded by FTA under the authority of 49 U.S.C. § 5307, the Government reserves the right to impose the penalties of 18 U.S.C. § 1001 and 49 U.S.C. § 5307(n)(1) on the Contractor, to the extent the Federal Government deems appropriate.

3. The Contractor agrees to include the above two clauses in each subcontract financed in whole or in part with Federal assistance provided by FTA. It is further agreed that the clauses shall not be modified, except to identify the subcontractor who will be subject to the provisions.

Prohibitions Against Exclusionary or Discriminatory Specifications – 49 U.S.C. § 5323(h)(2)

1. Apart from inconsistent requirements imposed by Federal statute or regulations, the City of Tucson agrees that it will comply with 49 U.S.C. § 5323 (h)(2) by refraining from using any Federal assistance awarded by FTA to support procurements using exclusionary or discriminatory specifications.

Debarment and Suspension Requirements - 49 CFR Part 29, Executive Order 12549

Certification Regarding Debarment, Suspension, and Other Responsibility Matters - (Third Party Contracts over $25,000).

Instructions for Certification

1. By signing and submitting this bid or proposal, the prospective lower tier participant is providing the signed certification set out below .

2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the City of Tucson may pursue available remedies, including suspension and/or debarment.

3. The prospective lower tier participant shall provide immediate written notice to the City of Tucson if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances.

4. The terms "covered transaction," "debarred," "suspended," "ineligible," "lower tier covered transaction,"

:"participant," "persons," "lower tier covered transaction," "principal," "proposal," and "voluntarily excluded," as used in this clause, have the meanings set out in the Definitions and Coverage sections of rules implementing Executive Order 12549 [49 CFR Part 29]. You may contact the City of Tucson for assistance in obtaining a copy of those regulations.

5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized in writing by the City of Tucson.

6. The prospective lower tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction", without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions.

7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the Nonprocurement List issued by U.S. General Service Administration.

8. Nothing contained in the foregoing shall be construed to require establishment of system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings.

9. Except for transactions authorized under Paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to all remedies available to the Federal Government, the City of Tucson may pursue available remedies including suspension and/or debarment.

Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transaction

1. The prospective lower tier participant certifies, by submission of this bid or proposal, that neither it nor its "principals" [as defined at 49 C.F.R. § 29.105(p)] is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency.

2. When the prospective lower tier participant is unable to certify to the statements in this certification, such prospective participant shall attach an explanation to this proposal.

Federal Changes - 49 CFR Part 18

1. Contractor shall at all times comply with all applicable FTA regulations, policies, procedures and directives, including without limitation those listed directly or by reference in the Agreement (Form FTA MA (16) dated October, 2009 between the City of Tucson and FTA, as they may be amended or promulgated from time to time during the term of this contract. Contractor's failure to so comply shall constitute a material breach of this contract. All standards or limits set forth in this Contract to be observed in the performance of the work are minimum requirements, unless modified by the FTA.

Civil Rights Requirements - 29 U.S.C. § 623, 42 U.S.C. § 2000, 42 U.S.C. § 6102, 42 U.S.C. § 12112, 42 U.S.C. § 12132, 49 U.S.C. § 5332, 29 CFR Part 1630, 41 CFR Parts 60 et seq.

1. Nondiscrimination - In accordance with Title VI of the Civil Rights Act, as amended, 42 U.S.C. §

2000d, section 303 of the Age Discrimination Act of 1975, as amended, 42 U.S.C. § 6102, section 202 of the Americans with Disabilities Act of 1990, 42 U.S.C. § 12132, and Federal transit law at 49 U.S.C.

§ 5332, the Contractor agrees that it will not discriminate against any employee or applicant for employment because of race, color, creed, national origin, sex, age, or disability.

In addition, the Contractor agrees to comply with applicable Federal implementing regulations and other implementing requirements FTA may issue.

2. Equal Employment Opportunity - The following equal employment opportunity requirements apply to the underlying contract:

a. Race, Color, Creed, National Origin, Sex - In accordance with Title VII of the Civil Rights Act, as amended, 42 U.S.C. § 2000e, and Federal transit laws at 49 U.S.C. § 5332, the Contractor agrees to comply with all applicable equal employment opportunity requirements of U.S.

Department of Labor (U.S. DOL) regulations, "Office of Federal Contract Compliance Programs, Equal Employment Opportunity, Department of Labor," 41 C.F.R. Parts 60 et seq ., (which implement Executive Order No. 11246, "Equal Employment Opportunity," as amended by Executive Order No. 11375, "Amending Executive Order 11246 Relating to Equal Employment Opportunity," 42 U.S.C. § 2000e note), and with any applicable Federal statutes, executive orders, regulations, and Federal policies that may in the future affect construction activities undertaken in the course of the Project. The Contractor agrees to take affirmative action to ensure that applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, national origin, sex, or age. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer, recruitment or recruitment advertising, layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.

b. Age - In accordance with section 4 of the Age Discrimination in Employment Act of 1967, as amended, 29 U.S.C. § § 623 and Federal transit law at 49 U.S.C. § 5332, the Contractor agrees to refrain from discrimination against present and prospective employees for reason of age. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.

c. Disabilities - In accordance with section 102 of the Americans with Disabilities Act, as amended, 42 U.S.C. § 12112, the Contractor agrees that it will comply with the requirements of U.S. Equal Employment Opportunity Commission, "Regulations to Implement the Equal Employment Provisions of the Americans with Disabilities Act," 29 C.F.R. Part 1630, pertaining to employment of persons with disabilities. In addition, the Contractor agrees to comply with any implementing requirements FTA may issue.

3. The Contractor also agrees to include these requirements in each subcontract financed in whole or in part with Federal assistance provided by FTA, modified only if necessary to identify the affected parties.

Termination Provisions - 49 U.S.C.Part 18, FTA Circular 4220.1F

1. Termination for Convenience (General Provision): The City Of Tucson may terminate this contract, in whole or in part, at any time by written notice to the Contractor when it is in the Government's best interest. The Contractor shall be paid its costs, including contract close-out costs, and profit on work performed up to the time of termination. The Contractor shall promptly submit its termination claim to the City Of Tucson to be paid the Contractor. If the Contractor has any property in its possession belonging to the City Of Tucson, the Contractor will account for the same, and dispose of it in the manner the City Of Tucson directs.

2. Termination for Default [Breach or Cause] (General Provision): If the Contractor does not deliver supplies in accordance with the contract delivery schedule, or, if the contract is for services, the Contractor fails to perform in the manner called for in the contract, or if the Contractor fails to comply with any other provisions of the contract, the City Of Tucson may terminate this contract for default.

Termination shall be effected by serving a notice of termination on the contractor setting forth the manner in which the Contractor is in default. The contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner of performance set forth in the contract.

If it is later determined by the City Of Tucson that the Contractor had an excusable reason for not performing, such as a strike, fire, or flood, events which are not the fault of or are beyond the control of the Contractor, the City Of Tucson, after setting up a new delivery of performance schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience.

3. Opportunity to Cure (General Provision): The City Of Tucson in its sole discretion may, in the case of a termination for breach or default, allow the Contractor to cure the defect. In such case, the notice of termination will state the time period in which cure is permitted and other appropriate conditions

If Contractor fails to remedy to the City Of Tucson’s satisfaction the breach or default or any of the terms, covenants, or conditions of this Contract after receipt of written notice from the City of Tucson setting forth the nature of said breach or default, the City of Tucson shall have the right to terminate the Contract without any further obligation to Contractor. Any such termination for default shall not in any way operate to preclude the City of Tucson from also pursuing all available remedies against Contractor and its sureties for said breach or default.

4. Waiver of Remedies for any Breach: In the event that the City of Tucson elects to waive its remedies for any breach by Contractor of any covenant, term or condition of this Contract, such waiver by the City of Tucson shall not limit the City of Tucson's remedies for any succeeding breach of that or of any other term, covenant, or condition of this Contract.

5. Termination for Convenience (Professional or Transit Service Contracts): The City of Tucson, by written notice, may terminate this contract, in whole or in part, when it is in the Government's interest. If this contract is terminated, the City of Tucson shall be liable only for payment under the payment provisions of this contract for services rendered before the effective date of termination.

6. Termination for Default (Supplies and Service): If the Contractor fails to deliver supplies or to perform the services within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, the City of Tucson may terminate this contract for default. The City of Tucson shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of the default. The Contractor will only be paid the contract price for supplies delivered and accepted, or services performed in accordance with the manner or performance set forth in this contract.

If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been issued for the convenience of the City of Tucson.

7. Termination for Default (Transportation Services): If the Contractor fails to pick up the commodities or to perform the services, including delivery services, within the time specified in this contract or any extension or if the Contractor fails to comply with any other provisions of this contract, the City of Tucson may terminate this contract for default. The City of Tucson shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of default. The Contractor will only be paid the contract price for services performed in accordance with the manner of performance set forth in this contract.

If this contract is terminated while the Contractor has possession of Recipient goods, the Contractor shall, upon direction of the City of Tucson, protect and preserve the goods until surrendered to the City of Tucson or its agent. The Contractor and the City of Tucson shall agree on payment for the preservation and protection of goods. Failure to agree on an amount will be resolved under the Dispute clause.

If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been

8. Termination for Default (Construction): If the Contractor refuses or fails to prosecute the work or any separable part, with the diligence that will insure its completion within the time specified in this contract or any extension or fails to complete the work within this time, or if the Contractor fails to comply with any other provisions of this contract, the City of Tucson may terminate this contract for default. The City of Tucson shall terminate by delivering to the Contractor a Notice of Termination specifying the nature of the default. In this event, the City of Tucson may take over the work and compete it by contract or otherwise, and may take possession of and use any materials, appliances, and plant on the work site necessary for completing the work. The Contractor and its sureties shall be liable for any damage to the City of Tucson resulting from the Contractor's refusal or failure to complete the work within specified time, whether or not the Contractor's right to proceed with the work is terminated. This liability includes any increased costs incurred by the City of Tucson in completing the work.

The Contractor's right to proceed shall not be terminated nor the Contractor charged with damages under this clause if-

a. the delay in completing the work arises from unforeseeable causes beyond the control and without the fault or negligence of the Contractor. Examples of such causes include: acts of God, acts of the City of Tucson, acts of another Contractor in the performance of a contract with the City of Tucson, epidemics, quarantine restrictions, strikes, freight embargoes; and

b. the contractor, within ten [10] days from the beginning of any delay, notifies the City of Tucson in writing of the causes of delay. If in the judgment of the City of Tucson, the delay is excusable, the time for completing the work shall be extended. The judgment of the City of Tucson shall be final and conclusive on the parties, but subject to appeal under the Disputes clauses.

If, after termination of the Contractor's right to proceed, it is determined that the Contractor was not in default, or that the delay was excusable, the rights and obligations of the parties will be the same as if the termination had been issued for the convenience of the City of Tucson.

9. Termination for Convenience or Default (Architect and Engineering): The City of Tucson may terminate this contract in whole or in part, for the City of Tucson's convenience or because of the failure of the Contractor to fulfill the contract obligations. The City of Tucson shall terminate by delivering to the Contractor a Notice of Termination specifying the nature, extent, and effective date of the termination. Upon receipt of the notice, the Contractor shall (1) immediately discontinue all services affected (unless the notice directs otherwise), and (2) deliver to the Contracting Officer all data, drawings, specifications, reports, estimates, summaries, and other information and materials accumulated in performing this contract, whether completed or in process.

If the termination is for the convenience of the City of Tucson, the Contracting Officer shall make an equitable adjustment in the contract price but shall allow no anticipated profit on unperformed services.

If the termination is for failure of the Contractor to fulfill the contract obligations, the City of Tucson may complete the work by contact or otherwise and the Contractor shall be liable for any additional cost incurred by the City of Tucson.

If, after termination for failure to fulfill contract obligations, it is determined that the Contractor was not in default, the rights and obligations of the parties shall be the same as if the termination had been

10. Termination for Convenience or Default (Cost-Type Contracts): The City of Tucson may terminate this contract, or any portion of it, by serving a notice or termination on the Contractor. The notice shall state whether the termination is for convenience of the City of Tucson or for the default of the Contractor. If the termination is for default, the notice shall state the manner in which the contractor has failed to perform the requirements of the contract. The Contractor shall account for any property in its possession paid for from funds received from the City of Tucson, or property supplied to the Contractor by the City of Tucson. If the termination is for default, the City of Tucson may fix the fee, if the contract provides for a fee, to be paid the contractor in proportion to the value, if any, of work performed up to the time of termination. The Contractor shall promptly submit its termination claim to the City of Tucson and the parties shall negotiate the termination settlement to be paid the Contractor.

If the termination is for the convenience of the City of Tucson, the Contractor shall be paid its contract close-out costs, and a fee, if the contract provided for payment of a fee, in proportion to the work performed up to the time of termination.

If, after serving a notice of termination for default, the City of Tucson determines that the Contractor has an excusable reason for not performing, such as strike, fire, flood, events which are not the fault of and are beyond the control of the contractor, the City of Tucson, after setting up a new work schedule, may allow the Contractor to continue work, or treat the termination as a termination for convenience.

Requirements for Disadvantaged Business Enterprises (DBE’s) - 49 CFR Part 23 & 26

1. The Federal Fiscal Year goal has been set by the City Of Tucson in an attempt to match projected procurements with available qualified disadvantaged businesses. The City Of Tucson goals for budgeted service contracts, bus parts, and other material and supplies for Disadvantaged Business Enterprises have been established by the City Of Tucson as set forth by the Department of Transportation Regulations 49 C.F.R. Part 23& 26, March 31, 1980, and amended by Section 106(c) of the Surface Transportation Assistance Act of 1987, and is considered pertinent to any contract resulting from this request for proposal.

If a specific DBE goal is assigned to this contract, it will be clearly stated in these Legal Documents and Specifications, and if the contractor is found to have failed to exert sufficient, reasonable, and good faith efforts to involve DBE's in the work provided, the City Of Tucson may declare the Contractor noncompliant and in breach of contract. If a goal is not stated in the Special Specifications, it will be understood that no specific goal is assigned to this contract.

a. Policy - It is the policy of the Department of Transportation and the City Of Tucson that

Disadvantaged Business Enterprises, as defined in 49 CFR Parts 23 & 26, and as amended in Section 106(c) of the Surface Transportation and Uniform Relocation Assistance Act of 1987, shall have the maximum opportunity to participate in the performance of Contract financed in whole or in part with federal funds under this Agreement. Consequently, the DBE requirements of 49 CFR Part 23 & 26 and Section 106(c) of the STURAA of 1987, apply to this Contract.

The Contractor agrees to ensure that DBEs as defined in 49 CFR Part 23 & 26 and Section 106(c) of the STURAA of 1987 have the maximum opportunity to participate in the whole or in part with federal funds provided under this Agreement. In this regard, the Contractor shall take all necessary and reasonable steps in accordance with the regulations to ensure that DBEs have the maximum opportunity to compete for and perform subcontracts. The Contractor shall not discriminate on the basis of race, color, national origin, religion, sex, age or physical handicap in the award and performance of subcontracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or any such other remedy as the recipient deems appropriate.

It is further the policy of the City Of Tucson to promote the development and increase the participation of businesses owned and controlled by disadvantaged. DBE involvement in all phases of the City Of Tucson procurement activities are encouraged.

b. DBE obligation - The Contractor and its subcontractors agree to ensure that disadvantaged businesses have the maximum opportunity to participate in the performance of contracts and subcontracts financed in whole or in part with federal funds provided under the Agreement. In that regard, all Contractors and subcontractors shall take all necessary and reasonable steps in accordance with 49 CFR Part 23 & 26 as amended, to ensure that minority business enterprises have the maximum opportunity to compete for and perform contracts.

c. Where the Contractor is found to have failed to exert sufficient reasonable and good faith efforts to involve DBE's in the work provided, the City Of Tucson may declare the contractor noncomplaint and in breach of contract.

d. The Contractor will keep records and documents for a reasonable time following performance of this contract to indicate compliance with the City Of Tucson DBE program. These records and documents will be made available at reasonable times and places for inspection by any authorized representative of the City Of Tucson and will be submitted to the City Of Tucson upon request.

e. The City Of Tucson will provide affirmative assistance as may be reasonable and necessary to assist the prime contractor in implementing their programs for DBE participation. The assistance may include the following upon request:

* Identification of qualified DBE

* Available listing of Minority Assistance Agencies

* Holding bid conferences to emphasize requirements

2. DBE Program Definitions, as used in the contract:

a. Disadvantaged business "means a small business concern":

i. Which is at least 51 percent owned by one or more socially and economically disadvantaged individuals, or, in the case of any publicly owned business, at least 51 percent of the stock of which is owned by one or more socially and economically disadvantaged individuals; and

ii. Whose management and daily business operations are controlled by one or more of the socially and economically disadvantaged individuals who own it.

or

iii. Which is at least 51 percent owned by one or more women individuals, or in the case of any publicly owned business, at least 51% of the stock of which is owned by one or more women individuals; and

iv. Whose management and daily business operations are controlled by one or more women individuals who own it.

b. "Small business concern" means a small business as defined by Section 3 of the Small

Business Act and Appendix B - (Section 106(c)) Determinations of Business Size.

c. “Socially and economically disadvantaged individuals" means those individuals who are citizens of the United States (or lawfully admitted permanent residents and who are black Americans, Hispanic Americans, Native Americans, Asian-Pacific Americans, Asian-Indian Americans, or women, and any other minorities or individuals found to be disadvantaged by the Small Business Administration pursuant to section 8(a) of the Small Business Act.

i. "Black Americans", which includes persons having origins in any of the Black racial groups of Africa;

ii. "Hispanic Americans", which includes persons of Mexican, Puerto Rican, Cuba, Central or South American, or other Spanish or Portuguese culture or origin, regardless of race;

iii. "Native Americans”, which includes persons who are American Indians, Eskimos, Aleuts, or Native Hawaiians;

iv. "Asian-Pacific Americans", which includes persons whose origins are from Japan, China, Taiwan, Korea, Vietnam, Laos, Cambodia, the Philippines, Samoa, Guam, the U.S. Trust Territories of Pacific, and the Northern Marianas;

v. "Asian-Indian Americans", which includes persons whose origins are from India, Pakistan, and Bangladesh.

Incorporation Of Federal Transit Administration (FTA) Terms - FTA Circular 4220.1F

Incorporation of Federal Transit Administration (FTA) Terms - The preceding provisions include, in part, certain Standard Terms and Conditions required by DOT, whether or not expressly set forth in the preceding contract provisions. All contractual provisions required by DOT, as set forth in FTA Circular 4220.1F, are hereby incorporated by reference. Anything to the contrary herein notwithstanding, all FTA mandated terms shall be deemed to control in the event of a conflict with other provisions contained in this Agreement. The Contractor shall not perform any act, fail to perform any act, or refuse to comply with any of the City Of Tucson’s requests which would cause the City Of Tucson to be in violation of the FTA terms and conditions.

Requirements for Contracts Exceeding $100,000

Access To Records And Reports - 49 U.S.C. 5325, 18 CFR 18.36 (i), 49 CFR 633.17

Records Retention

Contractor shall retain all books, documents, papers, data and records relating to its performance under this contract until the expiration of three years after final payment of the contract and all other contractual matters are closed.

Audit and Inspection of Records

1. The Contractor shall permit the authorized representatives of the City Of Tucson, the U.S. Department of Transportation and the Comptroller General of the United States to inspect and audit any books, documents, papers, data and records relating to its performance under the contract until the expiration of three years after final payment under this contract.

2. The Contractor further agrees to include in all subcontracts hereunder a provision to the effect that the subcontractor agrees that the City Of Tucson, the U.S. Department of Transportation and the Comptroller General of the United States or any of their duly authorized representatives shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine any books, documents, papers, and records of the subcontractor directly pertinent to this contract. The term "subcontract" as used in this clause excludes

a. purchase orders not exceeding $10,000 and

b. subcontracts or purchase orders for public utility services at rates established for uniform applicability to the general public.

3. The periods of access and examination described above, for records which relate to

a. appeals under the disputes clause of this contract,

b. litigation or the settlement of claims arising out of the performance of this contract, or

c. costs and expenses of this contract to which an exception has been taken by the U.S.

Comptroller General or any of his duly authorized representatives, shall continue until such appeals, litigation, claims or exceptions have been disposed of.

Access

The following access to records requirements apply to this Contract:

1. Where the Purchaser is not a State but a local government and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C. F. R. 18.36(i), the Contractor agrees to provide the Purchaser, the FTA Administrator, the Comptroller General of the United States or any of their authorized representatives access to any books, documents, papers and records of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions. Contractor also agrees, pursuant to 49 C. F. R. 633.17 to provide the FTA Administrator or his authorized representatives including any PMO Contractor access to Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311.

2. Where the Purchaser is a State and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 633.17, Contractor agrees to provide the Purchaser, the FTA Administrator or his authorized representatives, including any PMO Contractor, access to the Contractor's records and construction sites pertaining to a major capital project, defined at 49 U.S.C. 5302(a)1, which is receiving federal financial assistance through the programs described at 49 U.S.C. 5307, 5309 or 5311. By definition, a major capital project excludes contracts of less than the simplified acquisition threshold currently set at $100,000.

3. Where the Purchaser enters into a negotiated contract for other than a small purchase or under the simplified acquisition threshold and is an institution of higher education, a hospital or other non-profit organization and is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 C.F.R. 19.48, Contractor agrees to provide the Purchaser, FTA Administrator, the Comptroller General of the United States or any of their duly authorized representatives with access to any books, documents, papers and record of the Contractor which are directly pertinent to this contract for the purposes of making audits, examinations, excerpts and transcriptions.

4. Where any Purchaser which is the FTA Recipient or a subgrantee of the FTA Recipient in accordance with 49 U.S.C. 5325(a) enters into a contract for a capital project or improvement (defined at 49 U.S.C. 5302(a)1) through other than competitive bidding, the Contractor shall make available records related to the contract to the Purchaser, the Secretary of Transportation and the Comptroller General or any authorized officer or employee of any of them for the purposes of conducting an audit and inspection.

5. The Contractor agrees to permit any of the foregoing parties to reproduce by any means whatsoever or to copy excerpts and transcriptions as reasonably needed.

6. The Contractor agrees to maintain all books, records, accounts and reports required under this contract for a period of not less than three years after the date of termination or expiration of this contract, except in the event of litigation or settlement of claims arising from the performance of this contract, in which case Contractor agrees to maintain same until the Purchaser, the FTA Administrator, the Comptroller General, or any of their duly authorized representatives, have disposed of all such litigation, appeals, claims or exceptions related thereto. Reference 49 CFR 18.39(i)(11).

7. FTA does not require the inclusion of these requirements in subcontracts.

Buy America Requirements - 49 U.S.C. 5323(j), 49 CFR Part 661

Buy America Provision: Steel and Manufactured Products Other than Buses, Rolling Stock and Associated Equipment

The contractor agrees to comply with 49 U.S.C. 5323(j) and 49 CFR Part 661, which provide that Federal funds may not be obligated unless steel, iron, and manufactured products used in FTA-funded projects are produced in the United States, unless a waiver has been granted by FTA or the product is subject to a general waiver. General waivers are listed in 49 CFR 661.7, and include final assembly in the United States for 15 passenger vans and 15 passenger wagons produced by Chrysler Corporation, microcomputer equipment, software, and small purchases (currently less than $100,000) made with capital, operating, or planning funds. Separate requirements for rolling stock are set out at 5323(j)(2)(C) and 49 CFR 661.11.

Rolling stock not subject to a general waiver must be manufactured in the United States and have a 60 percent domestic content.

A bidder or offeror must submit to the FTA recipient the appropriate Buy America certification (see Certification section) with all bids on FTA-funded contracts, of $100,000 and above, except those subject to a general waiver. Bids or offers that are not accompanied by a completed Buy America certification must be rejected as nonresponsive. This requirement does not apply to lower tier subcontractors.

Provisions For Resolution Of Disputes, Breaches, Defaults Or Other Litigation - 49 CFR Part 18, FTA Circular 4220.1F

Disputes

Disputes arising in the performance of this Contract which are not resolved by agreement of the parties shall be decided in writing by the authorized representative of the City Of Tucson. This decision shall be final and conclusive unless within ten (10) days from the date of receipt of its copy, the Contractor mails or otherwise furnishes a written appeal to the authorized representative of the City Of Tucson. In connection with any such appeal, the Contractor shall be afforded an opportunity to be heard and to offer evidence in support of its position. The decision of the authorized representative of the City Of Tucson shall be binding upon the Contractor and the Contractor shall abide be the decision.

Performance During Dispute

Unless otherwise directed by the City Of Tucson, Contractor shall continue performance under this Contract while matters in dispute are being resolved.

Claims for Damages

Should either party to the Contract suffer injury or damage to person or property because of any act or omission of the party or of any of his employees, agents or others for whose acts he is legally liable, a claim for damages therefor shall be made in writing to such other party within a reasonable time after the first observance of such injury of damage.

Remedies

Unless this contract provides otherwise, all claims, counterclaims, disputes and other matters in question between the City Of Tucson and the Contractor arising out of or relating to this agreement or its breach will be decided by arbitration if the parties mutually agree, or in a court of competent jurisdiction within the State in which the City Of Tucson is located.

Rights and Remedies

The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder shall be in addition to and not a limitation of any duties, obligations, rights and remedies otherwise imposed or available by law. No action or failure to act by the City Of Tucson, Architect or Contractor shall constitute a waiver of any right or duty afforded any of them under the Contract, nor shall any such action or failure to act constitute an approval of or acquiescence in any breach thereunder, except as may be specifically agreed in writing.

Lobbying Requirements - 31 U.S.C. 1352, 49 CFR Part 19, 49 CFR Part 20

Contractors who apply or bid for an award of $100,000 or more shall file the certification required by 49 CFR part 20, "New Restrictions on Lobbying." Each tier certifies to the tier above that it will not and has not used Federal appropriated funds to pay any person or organization for influencing or attempting to influence an officer or employee of any agency, a member of Congress, officer or employee of Congress, or an employee of a member of Congress in connection with obtaining any Federal contract, grant or any other award covered by 31 U.S.C. 1352. Each tier shall also disclose the name of any registrant under the Lobbying Disclosure Act of 1995 who has made lobbying contacts on its behalf with non-Federal funds with respect to that Federal contract, grant or award covered by 31 U.S.C. 1352. Such disclosures are forwarded from tier to tier up to the City Of Tucson.

Bonding Requirements for Construction Activities; may be imposed for non-construction activities

Refer to the Special Terms & Conditions of this Solicitation

Bid Bond Requirements (Construction )

a. Bid Security

A Bid Bond must be issued by a fully qualified surety company acceptable to the City Of Tucson and listed as a company currently authorized under 31 CFR, Part 223 as possessing a Certificate of Authority as described thereunder.

b. Rights Reserved

In submitting this Bid, it is understood and agreed by bidder that the right is reserved by the City Of Tucson to reject any and all bids, or part of any bid, and it is agreed that the Bid may not be withdrawn for the time period designated in the General Terms and Conditions subsequent to the opening of bids, without the written consent of the City Of Tucson.

It is also understood and agreed that if the undersigned bidder should withdraw any part or all of his bid after the bid opening without the written consent of the City Of Tucson, shall refuse or be unable to enter into this Contract as provided above, or refuse or be unable to furnish adequate and acceptable Performance Bonds and Labor and Material Payments Bonds, as provided above, or refuse or be unable to furnish adequate and acceptable insurance, as provided above, he shall forfeit his bid security to the extent of the City Of Tucson’s damages occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or provide adequate security therefor.

It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, Certified Check, Cashier's Check, Treasurer's Check, and/or Official Bank Check (excluding any income generated thereby which has been retained by the City Of Tucson as provided shall prove inadequate to fully recompense the City Of Tucson for the damages occasioned by default, then the undersigned bidder agrees to indemnify the City Of Tucson and pay over to the City Of Tucson the difference between the bid security and the City Of Tucson’s total damages, so as to make the City Of Tucson whole.

The undersigned understands that any material alteration of any of the above or any of the material contained on this form, other than that requested, will render the bid unresponsive.

Performance and Payment Bonding Requirements (Construction)

The Contractor shall be required to obtain performance and payment bonds as follows:

a. Performance bonds

1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the City Of Tucson determines that a lesser amount would be adequate for the protection of the City Of Tucson.

2. The City Of Tucson may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The City Of Tucson may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

b. Payment bonds

1. The penal amount of the payment bonds shall equal:

i. Fifty percent of the contract price if the contract price is not more than $1 million.

ii. Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or

iii. Two and one half million if the contract price is more than $5 million.

2. If the original contract price is $5 million or less, the City Of Tucson may require additional protection as required by subparagraph 1 if the contract price is increased.

Performance and Payment Bonding Requirements (Non-Construction)

The Contractor may be required to obtain performance and payment bonds when necessary to protect the City Of Tucson’s interest.

a. The following situations may warrant a performance bond:

1. The City Of Tucson property or funds are to be provided to the contractor for use in performing the contract or as partial compensation (as in retention of salvaged material).

2. A contractor sells assets to or merges with another concern, and the City Of Tucson, after recognizing the latter concern as the successor in interest, desires assurance that it is financially capable.

3. Substantial progress payments are made before delivery of end items starts.

4. Contracts are for dismantling, demolition, or removal of improvements.

b. When it is determined that a performance bond is required, the Contractor shall be required to obtain performance bonds as follows:

1. The penal amount of performance bonds shall be 100 percent of the original contract price, unless the City Of Tucson determines that a lesser amount would be adequate for the protection of the City Of Tucson.

2. The City Of Tucson may require additional performance bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The City Of Tucson may secure additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.

c. A payment bond is required only when a performance bond is required, and if the use of payment bond is in the City Of Tucson’s interest.

d. When it is determined that a payment bond is required, the Contractor shall be required to obtain payment bonds as follows:

1. The penal amount of payment bonds shall equal:

i. Fifty percent of the contract price if the contract price is not more than $1 million;

ii. Forty percent of the contract price if the contract price is more than $1 million but not more than $5 million; or

iii. Two and one half million if the contract price is increased.

Advance Payment Bonding Requirements

The Contractor may be required to obtain an advance payment bond if the contract contains an advance payment provision and a performance bond is not furnished. The City Of Tucson shall determine the amount of the advance payment bond necessary to protect the City Of Tucson.

Patent Infringement Bonding…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .