Summary: Electrical Plans - Level 1 and Level 2, Phase 1

These documents are electrical construction drawings for a multi-level facility project, presented as detailed plans for Level 1 and Level 2, Phase 1. The drawings provide comprehensive electrical system design specifications, including power distribution, lighting, receptacles, telecommunications, and specialized systems across multiple functional areas within the building. The project appears to be a military or government training facility, as indicated by room designations such as TACSAT classrooms, Navy classrooms, Common Core Labs, Learning Environments, and administrative spaces.

The electrical plans are organized by area (Areas B through E) at each level and include detailed keynotes for power distribution, conduit routing, equipment specifications (including various VVER panels, QPH/QPL/QDH circuits, and FCU units), and installation requirements. Key electrical components documented include panel designations (NPL, NDL, NPH designations for various circuits), voltage specifications (ranging from 4 to 12 volts for various applications), equipment locations marked with elevation heights (+18", +66", +78"), and specialized installations for telecommunications, emergency power systems, and data distribution. The drawings reference coordination with other trades and specify that feeder conduits are installed above ceilings with coordination requirements noted for proper installation procedures, indicating a complex, coordinated construction effort requiring coordination among multiple mechanical, electrical, and structural trades.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POWER GENERAL NOTES

POWER KEYNOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

CENTRAL

STORAGE

10231023

CORRIDOR

10201020

A6 E-501-P1

A1 E-501-P1

E9 E-501-P1

A9 E-501-P1

A4 E-501-P1

G9 E-501-P1

NSG1M1

1. SEE ENLARGED PLAN SHEET E-401-P1 A1 FOR INFORMATION.

PROVIDE 42x32x14 PULL BOX FOR FEEDERS REFER TO ONE

LINE DIAGRAM. REFER E-601-P1 FOR CONDUIT AND

CONDUCTOR SIZES.

2. 42x38x27 PULL BOX FOR FEEDERS.

3. FEEDER CONDUITS FROM MAIN SWITCHGEAR NSG1M1 UP TO

2ND FLOOR. REFER TO ONE LINE DIAGRAM E-601-P1 FOR

CONDUIT AND CONDUCTOR SIZES. REFER E9/E-501-P1 FOR

MOUNTING SUPPORT DETAIL.

4. FEEDER CONDUITS UP TO SECOND FLOOR MECHANICAL ROOM.

REFER TO SHEET EP-102-P1 FOR CONTINUATION. REFER A6 &

A9/E-501-P1 FOR CONDUIT DETAILS.

5. FEEDER CONDUITS DOWN FROM SECOND FLOOR TO

DISTRIBUTION PANEL NDH1SE1. REFER TO ONE LINE DIAGRAM

SHEET E-601-P1 FOR CONDUIT AND CONDUCTOR SIZES. REFER

TO ENLARGED PLAN SHEET D7/E-401-P1 FOR PANEL LOCATION.

REFER A1/E-501-P1 A1 FOR CONDUIT DETAIL.

6. FEEDER CONDUITS DOWN FROM SECOND FLOOR. REFER TO

SHEET EP-102-P1 FOR CONTINUATION. COORDINATE CONDUIT

INSTALLATION WITH OTHER TRADES.

7. 36x20x14 PULL BOX FOR FEEDERS.

8. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL

QDH1EM1 AND QDH1EM2 IN MECHANICAL ROOM 032. REFER

ONE LINE DIAGRAM SHEET E-601-P1 FOR CONDUIT AND

CONDUCTOR SIZES. REFER TO ENLARGED PLAN SHEET

A1/E-404-P1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1 FOR

CONDUIT DETAIL.

9. FEEDER CONDUITS DOWN FROM SECOND FLOOR FROM

NSG1M1 TO DISTRIBUTON PANEL NDH1NE1. REFER TO ONE

LINE DIAGRAM SHEET E-601-P1 FOR CONDUIT AND CONDUCTOR

SIZES. REFER TO ENLARGED PLAN SHEET D5/E-401-P1 FOR

PANEL LOCATION. REFER A4/E-501-P1 FOR CONDUIT DETAIL.

10. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

CONDUIT INSTALLATION WITH OTHER TRADES. REFER

G9/E-501-P1 A1 FOR CONDUIT DETAIL.

1" = 20'-0"A1 OVERALL ELECTRICAL PLAN - LEVEL 1 - PHASE 1

UP

POWER KEYNOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FEC

FE

FEC

MATCHLINE - SEE:EP101E-P1

MA

TC

HL

IN

E -S

EE

:E

P1

C- P1

PDM

PDM

+18"

PDM

PDM

LOBBY

001001

GFI

GFI

+18"

+66"

+78" +78"

+18"

+18"

+66"

NPL1NET2

1 3

5 7

11 11C C

NPL1NE3-1,3,5,7,9,11

15 17

13 13

C C

CC

NPL1NE3-13,15,17,19,21,23

2 4

6 8

12 12C C

NPL1NE3-2,4,6,8,10,12

16 18

14 14

C C

C C

NPL1NE3-14,16,18,20,22,24

C C

C

C

C

NPL1NE3-25

C

C C

C

C

NPL1NE3-27

VVER8-1027.1

VVER8-1028.1

QPH1NE1-1,3,5

HUM-1

FCU-1

E-401-P1 A5

VVER8-1029.1

NPL1NE3-26

TV

TV

TV

TV

TV

TV

TV

TV

23C 24C

FCU-16

M

QPL1EM1-17

NPL1NE3-28

C C C C

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA B - PHASE 1

(TYP)

(TYP)

(TYP)

(TYP)

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM

LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH

CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON

SHEET E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM

CONNECTION DETAIL. REFER TO SHEET E-502- P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT (ATU).

COORDINATE LOCATION WITH MECHANICAL CONTRACTOR

PRIOR TO INSTALLATION.

4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE

LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO

ROUGH IN.

5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK

POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION

AND LOCATION PRIOR REQUIREMENT.

6. NOT USED.

7. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO

LEARNING ENVIROMENT ROOM 1031 AND ROUTE IN SLAB SAW

CUT TO DESIGNATED PANELS.

(TYP)

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FE

FE

FEC

FEC

FEC

FEC

MA

TC

HL

IN

E -S

EE

:E

P1

B- P1

MATCHLINE - SEE:EP101D-P1

NPL1NET1

NTR1NE1

NDL1NE1

NPH1NE1

GFI

PDM

PDM

PDM

PDM

EPO

PDM

PDM

M

GFIGFI

GFI

GFI

GFI GFI

NPL1NE1

NPL1NE2

NPL1NE3

NPL1NEL1

NDH1NE1

GFI

GFI

QTR1EM1

E-401-P1 D5

CORRIDOR

10201020

LPH1NE1

E-404-P1 A1

RPL1NE1

T

GFI

T

QDH1EM2

+78"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

NPL1NE1-3

NPL1NE1-2

GFI

GFI

NPL1NE1-5

QPL1EM1-2

1 3

5 7

11 11C C

NPL1NE2-1,3,5,7,9,11

21 21

C C

C C

NPL1NE2-13,15,17,19,21,23

2 4

6 8

1212C C

NPL1NE2-2,4,6,8,12,14

22 22

C C

C C

NPL1NE2-14,16,18,20,22,24

QPL1EM1-5,7

QPL1EM1-4

1 3 5

NPL1NEL1-1,3,5,7,9,11

NPL1NEL1-2,4,6,8,10,12,14,16

C

C

C

C C

NPL1NE2-26

NPL1NE2-27

NPL1NE2-28

C C

C

C

C

NPL1NEL1-13

NPL1NEL1-15

NPL1SE1-2

C

C

QPH1NE1

VVER8-1028.1

QPH1NE1-2,4,6

VVER8-1031.1

VVER8-1024.1

QPH1NE1-7,9,11

QPH1NE1-13,15,17

QPH1NE1-8,10,12

VVER12-1304.1

QPH1NE1-14,16,18

QPH1NE1-19,21,23

VVER8-1029.1

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

23C24 C

NPL1NE2-25

CVER4-1017.1

VVER8-1018.1

VVER12-1023.1M

QPL1EM1-15

LMH1NE1

QDH1EM1 QPL1EM1

FCU-2

UH-5

FCU-4

FCU-3

VVER10-1029.2

QPH1NE1-20,22,24

QPH1NE1-25,27,29

HUM-2

QPH1NE1-31

M

QPL1M1-14

PDM

PDM

NPL1NEL1-17,19,21,23,25,27

NPL1NEL1-18,20,22,24,26,28

NPL1NEL1-29

VVER10-1030.1

QPH1NE1-26,28,30

GFI, WP

CCCC

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE CABLE 12' SLACK FOR THE WPM LOCATION

FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH CIRCUITS AS

INDICATED ON DRAWING. REFER TO DETAIL A2 ON SHEET

E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM

CONNECTION DETAIL. REFER TO SHEET E-502-P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT

(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO INSTALLATION.

4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE

LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO

ROUGH IN.

5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK

POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION

AND LOCATION PRIOR REQUIREMENT.

6. NOT USED.

7. POWER CONNECTION FOR ELEVATOR PIT SUMP PUMP.

8. ELEVATOR PIT RECEPTACLE.

9. POWER CONNECTION FOR ROLL UP DOOR.

10. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO

LEARNING ENVIROMENT ROOM 1031 AND ROUTE IN SLAB SAW

CUT TO DESIGNATED PANELS.

11. SAW CUT SLAB TO FACILITATE BRANCH CIRCUITRY FOR

LEARNING ENVIROMENTS.

12. POWER CONNECTION FOR LOOP PUMP ABOVE CEILING.

COORDINATE WITH MECHANICAL CONTRACTOR FOR EXACT

LOCATION.

(TYP)

(TYP)

(TYP)

(TYP)

3 3

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA C - PHASE 1

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FEC

FEC

FEC

MATCHLINE - SEE:EP101C-P1

MA

TC

HL

IN

E -S

EE

:E

P1

E- P1

NPL1SET1

NDH1SE1

NPH1SE1

E-401-P1 D7

E-402-P1 A1

TACSAT

CLASSRM

044044

USMC

CLASS RM

039039

TACSAT

CLASSRM

040040

TACSAT

CLASSRM

043043

CORRIDOR

059059

QPL1SE1

NDL1SE1

T

NPL1SE1

CT-1

CT-2 QDH1EM2-2

QDH1EM2-3

QDH1EM2-4

QDH1EM2-5

QPH1SE1

QTR1SE1

CV4-1045.1

T

UH-1

UH-2

NTR1SE1

HUM-3

FCU-6

FCU-7

UH-6

UH-5

CWP-5 CWP-6

BCS

60A/WP 60A/WP

60A/WP

60A/WP

GFI, WP

GFI, WP

QPL1EM1-18

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA D - PHASE 1

1. PROVIDE NEW DISCONNECT SWITCH FOR EXISTING

MECHANICAL EQUIPMENT. PROVIDE NEW FEEDER TO NEW

DISTRIBUTION PANEL AS INDICATED. FROM THE NEW

DISCONNECT SWITCH UTILIZE EXIST EQUIPMENT FEED TO

EXISTING EQUIPMENT.VERIFY EXACT LOCATION OF EXISTING

DEVICES/EQUIPMENT PRIOR TO ROUGH-IN. REFER TO

ELECTRICAL ONE LINE DIAGRAM SHEET E-604-P1 FOR NEW

CONDUCTOR AND CONDUIT SIZES AND ED101-P1 FOR

DEMOLITION OF EXISTING DEVICES.

2. POWER CONNECTION TO NEW MECHANICAL EQUIPMENT.

REFER TO ELECTRICAL ONE LINE DIAGRAM SHEET E-604-P1

FOR CONDUIT AND CONDUCTOR SIZES.

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FE

FEC

MATCHLINE - SEE:EP101B-P1

MA

TC

HL

IN

E -S

EE

:E

P1

D- P1

NSG1M1

E-401-P1 A1

LDH1M1

BREAK

ROOM

037037

USMC

CLASSRM

038038

TACSAT

CLASSRM

045045

TACSAT

CLASSRM

044044

USMC

CLASS RM

039039

LVR1M1

LTR1M1

LPL1M1

T

FCU-9

FCU-8

T

QPL1M1

QDH1M1

QTR1M1

FCU-10A FCU-10B

QPH1M1

CVER5-1050.1

NPL1NEL1-18,20,22,24,26,28

NPL1NEL1-29

QPH1M1-7,9,11

H2 PNL

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA E - PHASE 1

1. REFER TO SHEET EP101-P1 FOR CONDUIT ROUTING IN THIS

SPACE..

DN

POWER KEYNOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

LEARNING

ENVIRONMENT

20272027

LEARNING

ENVIRONMENT

20382038

ASI1C

LAB/

EQUIPMENT

20372037

LEARNING

ENVIRONMENT

20292029

LEARNING

ENVIRONMENT

20362036

LEARNING

ENVIRONMENT

20352035

LEARNING

ENVIRONMENT

20302030

LEARNING

ENVIRONMENT

20312031

LEARNING

ENVIRONMENT

20342034

LEARNING

ENVIRONMENT

20332033

LEARNING

ENVIRONMENT

20322032

BALCONY

N/AN/A

FEMALE

TOILET

2047A2047A

MALE

TOILET

2047B2047B

INSTRUCT

STORAGE

20462046

ELEC

20452045

STAFF

BREAK

20432043

CONF 8-10

PN

20422042

CAVE

20402040WORK/

COPY

20412041

LEARNING

ENVIRONMENT

20482048

LEARNING

ENVIRONMENT

20492049

INSTRUCTOR

20392039

INSTRUCTOR

20142014

LEARNING

ENVIRONMENT

20152015

LEARNING

ENVIRONMENT

20162016

LEARNING

ENVIRONMENT

20172017

LEARNING

ENVIRONMENT

20182018

LEARNING

ENVIRONMENT

20192019

ELEV #2

22022202

CAVE

20202020

TELECOM

20212021

ELEC

20222022

INSTRUCT

STORAGE

20242024

WORK/

COPY

2025A2025A

INSTRUCTOR

20252025

CORRIDOR

23042304

STAIR 1

21012101

A6 E-501-P1

A1 E-501-P1

QDH2MC3

QDH2MC3

A9 E-501-P1

A4 E-501-P1

D9 E-501-P1

E7 E-501-P1

D7 E-501-P1

POWER KEYNOTES

1" = 20'-0"A1 OVERALL ELECTRICAL PLAN - LEVEL 2 - PHASE 1

1. FEEDER CONDUITS FROM FIRST FLOOR. FOR CONTINUATION

REFER TO SHEET EP-101-P1.

2. 42"x38"x20" PULL BOX FOR FEEDERS.

3. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

WITH OTHER TRADES. REFER A6 & A9/E-501-P1 FOR CONDUIT

DETAILS.

4. 36"x20"x27" PULL BOX FOR FEEDERS.

5. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

CONDUIT INSTALLATION WITH OTHER TRADES. REFER A6 &

A9/E-501-P1 FOR CONDUIT DETAILS.

6. FEEDER CONDUITS DOWN TO FIRST FLOOR DISTRIBUTION PANEL

NDH1SE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1 FOR

CONDUIT AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN

SHEET D7/E-401-P1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1

FOR CONDUIT DETAIL.

7. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL

NDH2SE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1 FOR

CONDUIT AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN

SHEET E-403-P1 A1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1

FOR CONDUIT DETAIL.

8. FEEDER CONDUITS DOWN TO FIRST FLOOR TO DISTRIBUTION

PANELS QDH1EM1 AND QDH1EM2 IN MECHANICAL ROOM 032. REFR

TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT AND CONDUCTOR

SIZES. REFER TO ENLARGED PLAN E-404-P1 A1 FOR PANEL

LOCATION. REFER A1/E-501-P1 A1 FOR CONDUIT DETAIL.

9. 48x48x12 PULL BOX FOR FEEDERS.

10. FEEDER CONDUITS DOWN TO FIRST FLOOR TO DISTRIBUTION

PANEL NDH1NE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1

FOR CONDUIT AND CONDUCTOR SIZES. REFER TO SHEET

D5/E-401-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR

CONDUIT DETAIL.

11. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANE

NDH2NE1. REFER TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT

AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN E5/SHEET

E-403-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR CONDUIT

DETAIL.

12. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL

QDH2NE1. REFER TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT

AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN SHEE

E5/E-403-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR

CONDUIT DETAIL.

13. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

CONDUIT INSTALLATION WITH OTHER TRADES. REFER D9/E-501-

P1 A1 FOR CONDUIT DETAIL.

14. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

CONDUIT INSTALLATION WITH OTHER TRADES. REFER E7/E-501-P1

A1 FOR CONDUIT DETAIL.

15. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE

CONDUIT INSTALLATION WITH OTHER TRADES. REFER D7/E-501-

P1 A1 FOR CONDUIT DETAIL.

DN

POWER KEYNOTES

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FEC

FEC

FE

C

FEC

FEC

MATCHLINE - SEE:EP102E-P1

MA

TC

HL

IN

E -S

EE

:E

P1

C- P1

PDM

PDM

PDM

PDM

EPO

PDM

PDM

PDM

R5B

INSTRUCTOR

20392039

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+78"

+18"

+18"

+66"

+78" NPL2NE3-2,4,6,8,10,12

NPL2NE1-35

8 6 4

21212 C C

PDM

22 22

20C

CC

C

NPL2NE3-14,16,18,20,22

NPL2NE3-1

NPL2NE3-3

NPL2NE3-5

NPL2NE3-11

NPL2NE3-7

NPL2NE3-9

B5E

C10 C

12 12 6 8

C C

NPL2SE6-2,4,6,8,10,12

C C

C

NPL2SE6-14,16,18,20,22,24

15 13

19C 21

C

C

NPL2SE6-13,15,17,19,21,23

7 5

3 1

9 C 9 C

1111 C C

NPL2SE6-1,3,5,7,9,11

C

C

NPL2NE3-13,15,17,19,21,23

NPL2NE1-34

VVER6-2014.1

QPH2NE1-1,3,5

VVER8-2015.1

QPH2NE1-2,4,6

VVER10-2027.1

VVER12-2037.1

QPH2NE1-7,9,11

QPH2NE1-8,10,12

VVER10-2050.1 VVER7-2039.1

C C

C

C C

C

C

NPL2NE3-24

NPL2NE3-26

C

C

CC

C

VVER10-2038.1

QPL2NE1-21,23,25

C

C

C

TV

TV

TV

TV

CC

C C

C

TV

TV

TV

TV

TV

TV

TV

TV

C

C

C C

C

NPL2SE6-28

NPL2SE6-26

NPL2SE6-27

NPL2SE6-25

QPH2NE1-26,28,30

B5E-1

R5B-1

13 15

PDM

B5E-1-9,11,13,15,17

B5E-1-10,12,14,16

TV

TV

TV

+18"

+66"

+18"

TV

B5E-1-20

FCU-17

M

QPL2NE1-27

B5E-1-18

B5E-1-22

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM

LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH

CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON

SHEET E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL) . REFER TO SHEET D-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDUL. FOR WPM

CONNECTION REFER TO SHEET E-502-P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT

(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO INSTALLATION.

4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE

LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO

ROUGH IN.

5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK

POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION

AND LOCATION PRIOR REQUIREMENT.

6. POWER CONNECTION MOUNTED ABOVE CEILING FOR

UPFOLDING PANEL PARTITION.

7. EXISTING POWER PANELS TO BE INSTALLED NEW WALLS.

MODIFY/EXTEND BRANCH CIRCUITS SUB PANEL FEEDERS TO

NEW LOCATIONS. REFER TO ONE LINE DIAGRAM SHEET E- 603-

P1 FOR CONDUIT AND CONDUCTOR SIZES.

8. POWER CONNECTION FOR PRINTER/COPIER.

9. RE-INSTALL ALL EXISTING DEVICES ON NEW WALLS.

(TYP)

(TYP)

(TYP)

(TYP)

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA B - PHASE 1

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FE

C FE

C

FEC

MA

TC

HL

IN

E -S

EE

:E

P1

B- P1

MATCHLINE - SEE:EP102D-P1

NPL2NET1

NDH2NE1NTR2NE1

NDL2NE1

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDM

PDMPDM

PDM

PDM

E-403-P1 E1

INSTRUCTOR

20392039

RPL2NE1NPL2NE2

NPL2NE3

NPL2NE4

NPL2NE5

NPL2NE1

NPH2NE1

T

QPL2NE1

QDH2NE1

+18"

+18"

+66"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+18"

+18"

+66"+78"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+18"

+18"

+66" +78"

+18"

+18"

+66"

+78"

+18"

+18"

+66" +78"

+18"

+18"

+78"+66"

+18"

+18"

+66"+78"

+18"

+18"

+66" +78"

WORK/

COPY

2025A2025A

NPL2NE1-1,3,5,7,9,11

NPL2NE1-2,4,6,8,10,12

NPL2NE1-28

NPL2NE1-31

NPL2NE1-30

NPL2NE1-33

NPL2NE1-32

NPL2NE2-2,4,6,8,10,12

9C 9C

15 17

19 21

C

C C

C21

NPL2NE1-13,15,17,19,21

PDM

8 4 2

PDM

12 C 12C C22

14 16

C20 C20

C22

NPL2NE1-14,16,18,20,22

9 95

C

C C

NPL2NE2-1,3,5,7,9,11

PDM

NPL2NE2-13,15,17,19,21,23

C

12C

C

PDM14 16

20C C

C

NPL2NE2-14,16,18,20,22

NPL2SE1-3

C

C 21 C

C

9 C

C

11C 11 C

NPL2NE4-1,3,5,7,9,11

17 13 15 19C 19 C 21C

NPL2NE4-13,15,17,19,21,23

410 C

10C

12C

12C

NPL2NE4-2,4,6,8,10,12

14 16

20C 20C C22

NPL2NE4-14,18,20,22,24

12C12C

C10

C10

NPL2NE5-2,4,6,8,10,12

14 16

22C 20 C

20C

NPL2NE5-14,16,18,20,22,24

11 11

C

C

C C

NPL2NE5-1,3,5,7,9,11

13 15

C C

C

NPL2NE5-13,15,17,19,21,23

23C

C

11CC

CC

NPL2SE2-1,3,5,7,9,11

C C

C

NPL2SE2-13,15,17,19,21,23

8 6

10 10

C C

CC

NPL2SE2-2,4,6,8,10,12

14 16

20C 22C

22C

NPL2SE2-14,16,18,20,22,24

3 1 11 11

19 21

9 9

C C

CC

NPL2SE3-1,3,5,7,9,11

CC

C

8 6

C C

C C

NPL2SE3-2,4,6,8,10,12

14 16 20 22

C C

C

NPL2SE3-14,16,18,20,24

QTR2NE1

QPH2NE1

CVER4-2020.1

VVER12-2304.1

VVER12-2304.2 NPL2NE1-29

M

QPL2NE1-6

M

QPL2NE1-7

M

QPL2NE1-8

VVER8-2017.1VVER8-2016.1 VVER8-2019.1

VVER8-2018.1

VVER8-2032.1

VVER8-2031.1

VVER8-2030.1

VVER10-2029.1

C

QPH2NE1-25,27,29

VVER8-2033.1

VVER8-2034.1

VVER8-2035.1

VVER10-2036.1

QPH2SE1-4,6,8

NPL2SE2-27

QPL2NE1-9,11,13QPL2NE1-16,18,20QPL2NE1-15,17,19QPL2NE1-10,12,14

C

CC

C

C

NPL2SE2-25

C

CC

C

C

NPL2SE2-28

C

C

C

CC

NPL2SE3-27

NPL2SE3-13,15,17,19,21

NPL2SE3-26

NPL2SE3-28

C

C

CC

C

VVER4-2043.1

CVER12-2047A.1VVER5-2042.1

C

21C

C

C C

C

C C

NPL2NE1-23

NPL2NE1-25

CC

C

C C

C

C

NPL2NE1-24

NPL2NE1-26

CC

C

C

C C

C

NPL2NE2-25 NPL2NE2-27

12C

CC

C

C C

C

C

NPL2NE2-24

NPL2NE2-26

C

NPL2NE3-26

CC

C

C

C

NPL2NE4-25

UH-7

NPL2NE4-27

C C

C

C

C

NPL2NE4-26

C C

C

C

NPL2NE4-28

C C

C

C

C

NPL2NE5-25

NPL2NE5-27

TV

TV

TV

TV

TV

TV

TV

TVTV

TV

TV

TVTV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

TV

QPH2SE1-3,5,7

QPH2NE1-19,21,23

QPH2NE1-31

LMH2NE1

VVER5-2025.1

UH-8

QPH2SE1-27

QPH2NE1-13,15,17

QPH2NE1-14,16,18

CV4-2022.1

NPL2NE5-28

QPH2NE1-20,22,24

HUM-4

FCU-11

FCU-12

NPL2SE3-25 NPL2SE2-26

QPH2NE1-32,34,36

QPH2SE1-28,30,32

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA C - PHASE 1

(TYP)

4 (TYP)

(TYP)

(TYP)

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM

LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH

CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON

SHEET E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL) . REFER TO SHEET E-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM

CONNECTION DETAIL REFER TO SHEET E-502-P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT

(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO INSTALLATION.

4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE

LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO

ROUGH IN.

5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK

POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION

AND LOCATION PRIOR REQUIREMENT.

6. POWER CONNECTION MOUNTED ABOVE CEILING FOR

UPFOLDING PANEL PARTITION.

7. POWER CONNECTION FOR CEILING MOUNTED FLAT SCREEN.

COORDINATE WITH A/V CONTRACTOR PRIOT TO ROUGH-IN.

8. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO

LEARNING ENVIROMENT ROOM 2031 AND ROUTE IN SLAB SAW

CUT TO DESIGNATED PANELS.

9. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO

LEARNING ENVIROMENT 2035 AND ROUTE IN SLAB SAW CUT TO

DESIGNATED PANELS. REFER TO SHEET EP-102D-P1 FOR

CONTINUATION.

10. SAW CUT SLAB TO FACILITATE BRANCH CIRCUITRY FOR

LEARNING ENVIROMENTS.

6 6 6

9 9

3 3

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FE

C

FE

C

FEC

MATCHLINE - SEE:EP102C-P1

MA

TC

HL

IN

E

-S

EE

:E P1

E-

P1

NPL2SET1

NDL2SE1

NTR2SE1 NDH2SE1

PDM

PDM

PDM

PDM

+66"

+48" +48"

GFI GFI GFI GFI

+42" +42"

E-403-P1 A1

E-402-P1 A5

INSTRUCTOR

20392039

LPH2SE1

NPL2SE1

RPL2SE1 NPL2SE2

NPL2SE3

NPL2SE4

NPL2SE5

NPH2SE1T

QPL2SE1

T

QTR2SE1

+18"

+18"

+66" +78"

+18"

+18"

+66"+78"

+66"+66"

NPL2SE1-6

NPL2SE1-7

NPL2SE1-2

NPL2SE1-5

NPL2SE1-11

NPL2SE1-13

9 9

7 5

C C

C C

NPL2SE4-1,3,5,7,9,11

C C

C PDM

NPL2SE4-13,15,17,19,21,23

1212C C

NPL2SE4-2,4,6,8,10,12

18 16

22 20

C C

C

NPL2SE4-14,16,18,20,22,24

NPL2SE1-15

NPL2SE1-17

NPL2SE1-19

NPL2SE1-21

NPL2SE1-8

14 C

C

NPL2SE5-2,4,6,8,10,14

QPH2SE1

VVER8-2033.1

VVER8-2034.1

VVER8-2035.1

VVER10-2036.1

NPL2SE4-25

CC

C

C

C C

C

VVER8-2048.1VVER8-2049.1

QPH2SE1-9,11,13

C C

CC

C

C C

C

C

NPL2SE4-26

NPL2SE4-28

VVER4-2043.1

CVER6-2046.1

CVER12-2047A.1VVER5-2042.1

VVER14-2305.1 +30"

CVER4-2040.1

VVER5-2041.1C

C

C

C

NPL2SE5-12

QPH2SE1-15,17,19

M M

M

NPL2SE1-9

NPL2SE1-10

UH-3

UH-4

TV

TV

TV

TV TV

TV

TV

TV

NPL2SE6

TV

TV TV TV

QPL2SE1-34

QPL2SE1-36

QPL2SE1-38

M

QPL2SE1-29

QPH2SE1-16,18,20

LMH2SE1

UH-8

BCS

FCU-14A

NPL2SE1-4

FCU-13

HUM-5

NPL2SE1-23

NPL2SE1-25

QPH2SE1-28,30,32

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA D - PHASE 1

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM

LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH

CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON

SHEET E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNETED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM

CONNECTION DETAIL REFER TO SHEET E-502-P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT

(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO INSTALLATION.

4. POWER CONNECTION TO FLAT PANEL SCREEN.

5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK

POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION

PRIOR REQUIREMENT.

6. POWER CONNECTION FOR REFRIGERATOR.

7. POWER CONNECTION FOR MICROWAVE. VERIFY MOUNTING

HEIGHT PRIOR TO ROUGH-IN.

8. POWER CONNECTION FOR VENDING MACHINE.

9. POWER CONNECTION MOUNTED ABOVE CEILING FOR

UPFOLDING PANEL PARTITION.

10. POWER CONNECTION FOR CEILING MOUNTED FLAT SCREEN.

11. POWER CONNECTION FOR PRINTER/COPIER.

12. POWER CONNECTION FOR CREDENZA EQUIPMENT.

13. PROVIDE NEMA TYPE L5-30R RECEPTACLE.

(TYP)

(TYP)

(TYP)

(TYP)

(TYP)

A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,

ABBREVIATIONS AND ADDITIONAL INSTALLATION

REQUIREMENTS.

B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-

LINE DIAGRAMS.

C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND

TRANSFORMER SCHEDULE.

D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED

OTHERWISE.

E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL

ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE

DETERMINED BY THE CONTRACTOR.

F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO

NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT

CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL

IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO

ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.

G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING

CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.

(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)

H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH

AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM

APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN

ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.

I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING

OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK

FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN

CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE

CONCEALMENT OF CONDUITS.

J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY

ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE

EQUIPMENT.

K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM

TO BUILDING ELEMENTS.

L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED

IN ANY CONDUIT RUN..

M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL

AND CIRCUIT NUMBER.

N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE

INSTALLED WITHIN A SINGLE CONDUIT DERATE THE

CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR

SHALL UPSIZE CONDUCTORS AS REQUIRED.

FEC

FEC

FEC

FE

MATCHLINE - SEE:EP102B-P1

PDMPDM

INSTRUCTOR

20392039

1 5

7 4

11 10

9 C

C

C

C

NPL2SE5-1,3,5,7,9,11

C

C

NPL2SE5-2,4,6,8,10,14

VVER10-2050.1 VVER7-2039.1

CC

C

C

QPH2SE1-10,12,14

VVER10-2038.1

QPH2SE1-21,23,25

EF-2

M

QPL1M1-10

GFI

WP

QPL1M1-12

PMV-2, PW-3PMV-1, PW-2

PH-1

PET-1

MCC-B

M MM

M

QPL1M1-11

QPL1M1-17

QPL1M1-15

QPL1M1-13

B5E-1-22

1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA E - PHASE 1

(TYP)

(TYP)

1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED

UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL

BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER

CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM

LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH

CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON

SHEET E-502-P1 FOR CONNECTION DETAIL.

2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT

ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS

SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)

RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)

RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD

CONTROLLER (RELAY PANEL) . REFER TO SHEET E-651-P1 FOR

PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM

CONNECTION DETAIL REFER TO SHEET E-502-P1.

3. POWER CONNECTION FOR MECHANICAL EQUIPMENT

(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL

CONTRACTOR PRIOR TO INSTALLATION.

3 3