Ft Gordon Vincent Hall PH1 Electrical Plans.pdf
PDF 1 MB Posted
- Solicitation number
- W912DY26QA181
About this file
Summary: Electrical Plans - Level 1 and Level 2, Phase 1
These documents are electrical construction drawings for a multi-level facility project, presented as detailed plans for Level 1 and Level 2, Phase 1. The drawings provide comprehensive electrical system design specifications, including power distribution, lighting, receptacles, telecommunications, and specialized systems across multiple functional areas within the building. The project appears to be a military or government training facility, as indicated by room designations such as TACSAT classrooms, Navy classrooms, Common Core Labs, Learning Environments, and administrative spaces.
The electrical plans are organized by area (Areas B through E) at each level and include detailed keynotes for power distribution, conduit routing, equipment specifications (including various VVER panels, QPH/QPL/QDH circuits, and FCU units), and installation requirements. Key electrical components documented include panel designations (NPL, NDL, NPH designations for various circuits), voltage specifications (ranging from 4 to 12 volts for various applications), equipment locations marked with elevation heights (+18", +66", +78"), and specialized installations for telecommunications, emergency power systems, and data distribution. The drawings reference coordination with other trades and specify that feeder conduits are installed above ceilings with coordination requirements noted for proper installation procedures, indicating a complex, coordinated construction effort requiring coordination among multiple mechanical, electrical, and structural trades.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - W912DY26QA181 - Ft Gordon Vincent Hall PH1 MCA2.pdf | ||
| Ft Gordon MCA2-Furniture Plans SAM.pdf | ||
| RFQ W912DY26QA181 Ft Gordon Vincent Hall PH1 MCA2.pdf | ||
| OPTION ATT1 Ft Gordon MCA2 PN88725 SAM.xlsx | XLSX spreadsheet | |
| Ft Gordon Vincent Hall PH1 Furniture Plans SAMgov.pdf | ||
| 3RD.pdf | ||
| 4TH.pdf | ||
| 2ND.pdf | ||
| ATT1-Ft Gordon_Vincent Hall PH1-SAM.xlsx | XLSX spreadsheet | |
| ATT7 Contractor Ft Gordon Vincent Hall PH1 MCA2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POWER GENERAL NOTES
POWER KEYNOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
CENTRAL
STORAGE
10231023
CORRIDOR
10201020
A6 E-501-P1
A1 E-501-P1
E9 E-501-P1
A9 E-501-P1
A4 E-501-P1
G9 E-501-P1
NSG1M1
1. SEE ENLARGED PLAN SHEET E-401-P1 A1 FOR INFORMATION.
PROVIDE 42x32x14 PULL BOX FOR FEEDERS REFER TO ONE
LINE DIAGRAM. REFER E-601-P1 FOR CONDUIT AND
CONDUCTOR SIZES.
2. 42x38x27 PULL BOX FOR FEEDERS.
3. FEEDER CONDUITS FROM MAIN SWITCHGEAR NSG1M1 UP TO
2ND FLOOR. REFER TO ONE LINE DIAGRAM E-601-P1 FOR
CONDUIT AND CONDUCTOR SIZES. REFER E9/E-501-P1 FOR
MOUNTING SUPPORT DETAIL.
4. FEEDER CONDUITS UP TO SECOND FLOOR MECHANICAL ROOM.
REFER TO SHEET EP-102-P1 FOR CONTINUATION. REFER A6 &
A9/E-501-P1 FOR CONDUIT DETAILS.
5. FEEDER CONDUITS DOWN FROM SECOND FLOOR TO
DISTRIBUTION PANEL NDH1SE1. REFER TO ONE LINE DIAGRAM
SHEET E-601-P1 FOR CONDUIT AND CONDUCTOR SIZES. REFER
TO ENLARGED PLAN SHEET D7/E-401-P1 FOR PANEL LOCATION.
REFER A1/E-501-P1 A1 FOR CONDUIT DETAIL.
6. FEEDER CONDUITS DOWN FROM SECOND FLOOR. REFER TO
SHEET EP-102-P1 FOR CONTINUATION. COORDINATE CONDUIT
INSTALLATION WITH OTHER TRADES.
7. 36x20x14 PULL BOX FOR FEEDERS.
8. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL
QDH1EM1 AND QDH1EM2 IN MECHANICAL ROOM 032. REFER
ONE LINE DIAGRAM SHEET E-601-P1 FOR CONDUIT AND
CONDUCTOR SIZES. REFER TO ENLARGED PLAN SHEET
A1/E-404-P1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1 FOR
CONDUIT DETAIL.
9. FEEDER CONDUITS DOWN FROM SECOND FLOOR FROM
NSG1M1 TO DISTRIBUTON PANEL NDH1NE1. REFER TO ONE
LINE DIAGRAM SHEET E-601-P1 FOR CONDUIT AND CONDUCTOR
SIZES. REFER TO ENLARGED PLAN SHEET D5/E-401-P1 FOR
PANEL LOCATION. REFER A4/E-501-P1 FOR CONDUIT DETAIL.
10. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
CONDUIT INSTALLATION WITH OTHER TRADES. REFER
G9/E-501-P1 A1 FOR CONDUIT DETAIL.
1" = 20'-0"A1 OVERALL ELECTRICAL PLAN - LEVEL 1 - PHASE 1
UP
POWER KEYNOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FEC
FE
FEC
MATCHLINE - SEE:EP101E-P1
MA
TC
HL
IN
E -S
EE
:E
P1
C- P1
PDM
PDM
+18"
PDM
PDM
LOBBY
001001
GFI
GFI
+18"
+66"
+78" +78"
+18"
+18"
+66"
NPL1NET2
1 3
5 7
11 11C C
NPL1NE3-1,3,5,7,9,11
15 17
13 13
C C
CC
NPL1NE3-13,15,17,19,21,23
2 4
6 8
12 12C C
NPL1NE3-2,4,6,8,10,12
16 18
14 14
C C
C C
NPL1NE3-14,16,18,20,22,24
C C
C
C
C
NPL1NE3-25
C
C C
C
C
NPL1NE3-27
VVER8-1027.1
VVER8-1028.1
QPH1NE1-1,3,5
HUM-1
FCU-1
E-401-P1 A5
VVER8-1029.1
NPL1NE3-26
TV
TV
TV
TV
TV
TV
TV
TV
23C 24C
FCU-16
M
QPL1EM1-17
NPL1NE3-28
C C C C
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA B - PHASE 1
(TYP)
(TYP)
(TYP)
(TYP)
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM
LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH
CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON
SHEET E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM
CONNECTION DETAIL. REFER TO SHEET E-502- P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT (ATU).
COORDINATE LOCATION WITH MECHANICAL CONTRACTOR
PRIOR TO INSTALLATION.
4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE
LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO
ROUGH IN.
5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK
POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION
AND LOCATION PRIOR REQUIREMENT.
6. NOT USED.
7. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO
LEARNING ENVIROMENT ROOM 1031 AND ROUTE IN SLAB SAW
CUT TO DESIGNATED PANELS.
(TYP)
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FE
FE
FEC
FEC
FEC
FEC
MA
TC
HL
IN
E -S
EE
:E
P1
B- P1
MATCHLINE - SEE:EP101D-P1
NPL1NET1
NTR1NE1
NDL1NE1
NPH1NE1
GFI
PDM
PDM
PDM
PDM
EPO
PDM
PDM
M
GFIGFI
GFI
GFI
GFI GFI
NPL1NE1
NPL1NE2
NPL1NE3
NPL1NEL1
NDH1NE1
GFI
GFI
QTR1EM1
E-401-P1 D5
CORRIDOR
10201020
LPH1NE1
E-404-P1 A1
RPL1NE1
T
GFI
T
QDH1EM2
+78"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
NPL1NE1-3
NPL1NE1-2
GFI
GFI
NPL1NE1-5
QPL1EM1-2
1 3
5 7
11 11C C
NPL1NE2-1,3,5,7,9,11
21 21
C C
C C
NPL1NE2-13,15,17,19,21,23
2 4
6 8
1212C C
NPL1NE2-2,4,6,8,12,14
22 22
C C
C C
NPL1NE2-14,16,18,20,22,24
QPL1EM1-5,7
QPL1EM1-4
1 3 5
NPL1NEL1-1,3,5,7,9,11
NPL1NEL1-2,4,6,8,10,12,14,16
C
C
C
C C
NPL1NE2-26
NPL1NE2-27
NPL1NE2-28
C C
C
C
C
NPL1NEL1-13
NPL1NEL1-15
NPL1SE1-2
C
C
QPH1NE1
VVER8-1028.1
QPH1NE1-2,4,6
VVER8-1031.1
VVER8-1024.1
QPH1NE1-7,9,11
QPH1NE1-13,15,17
QPH1NE1-8,10,12
VVER12-1304.1
QPH1NE1-14,16,18
QPH1NE1-19,21,23
VVER8-1029.1
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
23C24 C
NPL1NE2-25
CVER4-1017.1
VVER8-1018.1
VVER12-1023.1M
QPL1EM1-15
LMH1NE1
QDH1EM1 QPL1EM1
FCU-2
UH-5
FCU-4
FCU-3
VVER10-1029.2
QPH1NE1-20,22,24
QPH1NE1-25,27,29
HUM-2
QPH1NE1-31
M
QPL1M1-14
PDM
PDM
NPL1NEL1-17,19,21,23,25,27
NPL1NEL1-18,20,22,24,26,28
NPL1NEL1-29
VVER10-1030.1
QPH1NE1-26,28,30
GFI, WP
CCCC
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE CABLE 12' SLACK FOR THE WPM LOCATION
FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH CIRCUITS AS
INDICATED ON DRAWING. REFER TO DETAIL A2 ON SHEET
E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM
CONNECTION DETAIL. REFER TO SHEET E-502-P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT
(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO INSTALLATION.
4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE
LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO
ROUGH IN.
5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK
POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION
AND LOCATION PRIOR REQUIREMENT.
6. NOT USED.
7. POWER CONNECTION FOR ELEVATOR PIT SUMP PUMP.
8. ELEVATOR PIT RECEPTACLE.
9. POWER CONNECTION FOR ROLL UP DOOR.
10. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO
LEARNING ENVIROMENT ROOM 1031 AND ROUTE IN SLAB SAW
CUT TO DESIGNATED PANELS.
11. SAW CUT SLAB TO FACILITATE BRANCH CIRCUITRY FOR
LEARNING ENVIROMENTS.
12. POWER CONNECTION FOR LOOP PUMP ABOVE CEILING.
COORDINATE WITH MECHANICAL CONTRACTOR FOR EXACT
LOCATION.
(TYP)
(TYP)
(TYP)
(TYP)
3 3
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA C - PHASE 1
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FEC
FEC
FEC
MATCHLINE - SEE:EP101C-P1
MA
TC
HL
IN
E -S
EE
:E
P1
E- P1
NPL1SET1
NDH1SE1
NPH1SE1
E-401-P1 D7
E-402-P1 A1
TACSAT
CLASSRM
044044
USMC
CLASS RM
039039
TACSAT
CLASSRM
040040
TACSAT
CLASSRM
043043
CORRIDOR
059059
QPL1SE1
NDL1SE1
T
NPL1SE1
CT-1
CT-2 QDH1EM2-2
QDH1EM2-3
QDH1EM2-4
QDH1EM2-5
QPH1SE1
QTR1SE1
CV4-1045.1
T
UH-1
UH-2
NTR1SE1
HUM-3
FCU-6
FCU-7
UH-6
UH-5
CWP-5 CWP-6
BCS
60A/WP 60A/WP
60A/WP
60A/WP
GFI, WP
GFI, WP
QPL1EM1-18
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA D - PHASE 1
1. PROVIDE NEW DISCONNECT SWITCH FOR EXISTING
MECHANICAL EQUIPMENT. PROVIDE NEW FEEDER TO NEW
DISTRIBUTION PANEL AS INDICATED. FROM THE NEW
DISCONNECT SWITCH UTILIZE EXIST EQUIPMENT FEED TO
EXISTING EQUIPMENT.VERIFY EXACT LOCATION OF EXISTING
DEVICES/EQUIPMENT PRIOR TO ROUGH-IN. REFER TO
ELECTRICAL ONE LINE DIAGRAM SHEET E-604-P1 FOR NEW
CONDUCTOR AND CONDUIT SIZES AND ED101-P1 FOR
DEMOLITION OF EXISTING DEVICES.
2. POWER CONNECTION TO NEW MECHANICAL EQUIPMENT.
REFER TO ELECTRICAL ONE LINE DIAGRAM SHEET E-604-P1
FOR CONDUIT AND CONDUCTOR SIZES.
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FE
FEC
MATCHLINE - SEE:EP101B-P1
MA
TC
HL
IN
E -S
EE
:E
P1
D- P1
NSG1M1
E-401-P1 A1
LDH1M1
BREAK
ROOM
037037
USMC
CLASSRM
038038
TACSAT
CLASSRM
045045
TACSAT
CLASSRM
044044
USMC
CLASS RM
039039
LVR1M1
LTR1M1
LPL1M1
T
FCU-9
FCU-8
T
QPL1M1
QDH1M1
QTR1M1
FCU-10A FCU-10B
QPH1M1
CVER5-1050.1
NPL1NEL1-18,20,22,24,26,28
NPL1NEL1-29
QPH1M1-7,9,11
H2 PNL
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 1 - AREA E - PHASE 1
1. REFER TO SHEET EP101-P1 FOR CONDUIT ROUTING IN THIS
SPACE..
DN
POWER KEYNOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
LEARNING
ENVIRONMENT
20272027
LEARNING
ENVIRONMENT
20382038
ASI1C
LAB/
EQUIPMENT
20372037
LEARNING
ENVIRONMENT
20292029
LEARNING
ENVIRONMENT
20362036
LEARNING
ENVIRONMENT
20352035
LEARNING
ENVIRONMENT
20302030
LEARNING
ENVIRONMENT
20312031
LEARNING
ENVIRONMENT
20342034
LEARNING
ENVIRONMENT
20332033
LEARNING
ENVIRONMENT
20322032
BALCONY
N/AN/A
FEMALE
TOILET
2047A2047A
MALE
TOILET
2047B2047B
INSTRUCT
STORAGE
20462046
ELEC
20452045
STAFF
BREAK
20432043
CONF 8-10
PN
20422042
CAVE
20402040WORK/
COPY
20412041
LEARNING
ENVIRONMENT
20482048
LEARNING
ENVIRONMENT
20492049
INSTRUCTOR
20392039
INSTRUCTOR
20142014
LEARNING
ENVIRONMENT
20152015
LEARNING
ENVIRONMENT
20162016
LEARNING
ENVIRONMENT
20172017
LEARNING
ENVIRONMENT
20182018
LEARNING
ENVIRONMENT
20192019
ELEV #2
22022202
CAVE
20202020
TELECOM
20212021
ELEC
20222022
INSTRUCT
STORAGE
20242024
WORK/
COPY
2025A2025A
INSTRUCTOR
20252025
CORRIDOR
23042304
STAIR 1
21012101
A6 E-501-P1
A1 E-501-P1
QDH2MC3
QDH2MC3
A9 E-501-P1
A4 E-501-P1
D9 E-501-P1
E7 E-501-P1
D7 E-501-P1
POWER KEYNOTES
1" = 20'-0"A1 OVERALL ELECTRICAL PLAN - LEVEL 2 - PHASE 1
1. FEEDER CONDUITS FROM FIRST FLOOR. FOR CONTINUATION
REFER TO SHEET EP-101-P1.
2. 42"x38"x20" PULL BOX FOR FEEDERS.
3. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
WITH OTHER TRADES. REFER A6 & A9/E-501-P1 FOR CONDUIT
DETAILS.
4. 36"x20"x27" PULL BOX FOR FEEDERS.
5. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
CONDUIT INSTALLATION WITH OTHER TRADES. REFER A6 &
A9/E-501-P1 FOR CONDUIT DETAILS.
6. FEEDER CONDUITS DOWN TO FIRST FLOOR DISTRIBUTION PANEL
NDH1SE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1 FOR
CONDUIT AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN
SHEET D7/E-401-P1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1
FOR CONDUIT DETAIL.
7. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL
NDH2SE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1 FOR
CONDUIT AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN
SHEET E-403-P1 A1 FOR PANEL LOCATION. REFER A1/E-501-P1 A1
FOR CONDUIT DETAIL.
8. FEEDER CONDUITS DOWN TO FIRST FLOOR TO DISTRIBUTION
PANELS QDH1EM1 AND QDH1EM2 IN MECHANICAL ROOM 032. REFR
TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT AND CONDUCTOR
SIZES. REFER TO ENLARGED PLAN E-404-P1 A1 FOR PANEL
LOCATION. REFER A1/E-501-P1 A1 FOR CONDUIT DETAIL.
9. 48x48x12 PULL BOX FOR FEEDERS.
10. FEEDER CONDUITS DOWN TO FIRST FLOOR TO DISTRIBUTION
PANEL NDH1NE1. REFER TO ONE LINE DIAGRAM SHEET E-601-P1
FOR CONDUIT AND CONDUCTOR SIZES. REFER TO SHEET
D5/E-401-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR
CONDUIT DETAIL.
11. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANE
NDH2NE1. REFER TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT
AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN E5/SHEET
E-403-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR CONDUIT
DETAIL.
12. FEEDER CONDUITS FROM NSG1M1 TO DISTRIBUTION PANEL
QDH2NE1. REFER TO ONE LINE DIAGRAM E-601-P1 FOR CONDUIT
AND CONDUCTOR SIZES. REFER TO ENLARGED PLAN SHEE
E5/E-403-P1 FOR PANEL LOCATION. REFER A4/E-501-P1 FOR
CONDUIT DETAIL.
13. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
CONDUIT INSTALLATION WITH OTHER TRADES. REFER D9/E-501-
P1 A1 FOR CONDUIT DETAIL.
14. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
CONDUIT INSTALLATION WITH OTHER TRADES. REFER E7/E-501-P1
A1 FOR CONDUIT DETAIL.
15. FEEDER CONDUITS INSTALLED ABOVE CEILING. COORDINATE
CONDUIT INSTALLATION WITH OTHER TRADES. REFER D7/E-501-
P1 A1 FOR CONDUIT DETAIL.
DN
POWER KEYNOTES
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FEC
FEC
FE
C
FEC
FEC
MATCHLINE - SEE:EP102E-P1
MA
TC
HL
IN
E -S
EE
:E
P1
C- P1
PDM
PDM
PDM
PDM
EPO
PDM
PDM
PDM
R5B
INSTRUCTOR
20392039
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+78"
+18"
+18"
+66"
+78" NPL2NE3-2,4,6,8,10,12
NPL2NE1-35
8 6 4
21212 C C
PDM
22 22
20C
CC
C
NPL2NE3-14,16,18,20,22
NPL2NE3-1
NPL2NE3-3
NPL2NE3-5
NPL2NE3-11
NPL2NE3-7
NPL2NE3-9
B5E
C10 C
12 12 6 8
C C
NPL2SE6-2,4,6,8,10,12
C C
C
NPL2SE6-14,16,18,20,22,24
15 13
19C 21
C
C
NPL2SE6-13,15,17,19,21,23
7 5
3 1
9 C 9 C
1111 C C
NPL2SE6-1,3,5,7,9,11
C
C
NPL2NE3-13,15,17,19,21,23
NPL2NE1-34
VVER6-2014.1
QPH2NE1-1,3,5
VVER8-2015.1
QPH2NE1-2,4,6
VVER10-2027.1
VVER12-2037.1
QPH2NE1-7,9,11
QPH2NE1-8,10,12
VVER10-2050.1 VVER7-2039.1
C C
C
C C
C
C
NPL2NE3-24
NPL2NE3-26
C
C
CC
C
VVER10-2038.1
QPL2NE1-21,23,25
C
C
C
TV
TV
TV
TV
CC
C C
C
TV
TV
TV
TV
TV
TV
TV
TV
C
C
C C
C
NPL2SE6-28
NPL2SE6-26
NPL2SE6-27
NPL2SE6-25
QPH2NE1-26,28,30
B5E-1
R5B-1
13 15
PDM
B5E-1-9,11,13,15,17
B5E-1-10,12,14,16
TV
TV
TV
+18"
+66"
+18"
TV
B5E-1-20
FCU-17
M
QPL2NE1-27
B5E-1-18
B5E-1-22
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM
LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH
CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON
SHEET E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL) . REFER TO SHEET D-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDUL. FOR WPM
CONNECTION REFER TO SHEET E-502-P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT
(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO INSTALLATION.
4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE
LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO
ROUGH IN.
5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK
POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION
AND LOCATION PRIOR REQUIREMENT.
6. POWER CONNECTION MOUNTED ABOVE CEILING FOR
UPFOLDING PANEL PARTITION.
7. EXISTING POWER PANELS TO BE INSTALLED NEW WALLS.
MODIFY/EXTEND BRANCH CIRCUITS SUB PANEL FEEDERS TO
NEW LOCATIONS. REFER TO ONE LINE DIAGRAM SHEET E- 603-
P1 FOR CONDUIT AND CONDUCTOR SIZES.
8. POWER CONNECTION FOR PRINTER/COPIER.
9. RE-INSTALL ALL EXISTING DEVICES ON NEW WALLS.
(TYP)
(TYP)
(TYP)
(TYP)
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA B - PHASE 1
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FE
C FE
C
FEC
MA
TC
HL
IN
E -S
EE
:E
P1
B- P1
MATCHLINE - SEE:EP102D-P1
NPL2NET1
NDH2NE1NTR2NE1
NDL2NE1
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDM
PDMPDM
PDM
PDM
E-403-P1 E1
INSTRUCTOR
20392039
RPL2NE1NPL2NE2
NPL2NE3
NPL2NE4
NPL2NE5
NPL2NE1
NPH2NE1
T
QPL2NE1
QDH2NE1
+18"
+18"
+66"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+18"
+18"
+66"+78"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+18"
+18"
+66" +78"
+18"
+18"
+66"
+78"
+18"
+18"
+66" +78"
+18"
+18"
+78"+66"
+18"
+18"
+66"+78"
+18"
+18"
+66" +78"
WORK/
COPY
2025A2025A
NPL2NE1-1,3,5,7,9,11
NPL2NE1-2,4,6,8,10,12
NPL2NE1-28
NPL2NE1-31
NPL2NE1-30
NPL2NE1-33
NPL2NE1-32
NPL2NE2-2,4,6,8,10,12
9C 9C
15 17
19 21
C
C C
C21
NPL2NE1-13,15,17,19,21
PDM
8 4 2
PDM
12 C 12C C22
14 16
C20 C20
C22
NPL2NE1-14,16,18,20,22
9 95
C
C C
NPL2NE2-1,3,5,7,9,11
PDM
NPL2NE2-13,15,17,19,21,23
C
12C
C
PDM14 16
20C C
C
NPL2NE2-14,16,18,20,22
NPL2SE1-3
C
C 21 C
C
9 C
C
11C 11 C
NPL2NE4-1,3,5,7,9,11
17 13 15 19C 19 C 21C
NPL2NE4-13,15,17,19,21,23
410 C
10C
12C
12C
NPL2NE4-2,4,6,8,10,12
14 16
20C 20C C22
NPL2NE4-14,18,20,22,24
12C12C
C10
C10
NPL2NE5-2,4,6,8,10,12
14 16
22C 20 C
20C
NPL2NE5-14,16,18,20,22,24
11 11
C
C
C C
NPL2NE5-1,3,5,7,9,11
13 15
C C
C
NPL2NE5-13,15,17,19,21,23
23C
C
11CC
CC
NPL2SE2-1,3,5,7,9,11
C C
C
NPL2SE2-13,15,17,19,21,23
8 6
10 10
C C
CC
NPL2SE2-2,4,6,8,10,12
14 16
20C 22C
22C
NPL2SE2-14,16,18,20,22,24
3 1 11 11
19 21
9 9
C C
CC
NPL2SE3-1,3,5,7,9,11
CC
C
8 6
C C
C C
NPL2SE3-2,4,6,8,10,12
14 16 20 22
C C
C
NPL2SE3-14,16,18,20,24
QTR2NE1
QPH2NE1
CVER4-2020.1
VVER12-2304.1
VVER12-2304.2 NPL2NE1-29
M
QPL2NE1-6
M
QPL2NE1-7
M
QPL2NE1-8
VVER8-2017.1VVER8-2016.1 VVER8-2019.1
VVER8-2018.1
VVER8-2032.1
VVER8-2031.1
VVER8-2030.1
VVER10-2029.1
C
QPH2NE1-25,27,29
VVER8-2033.1
VVER8-2034.1
VVER8-2035.1
VVER10-2036.1
QPH2SE1-4,6,8
NPL2SE2-27
QPL2NE1-9,11,13QPL2NE1-16,18,20QPL2NE1-15,17,19QPL2NE1-10,12,14
C
CC
C
C
NPL2SE2-25
C
CC
C
C
NPL2SE2-28
C
C
C
CC
NPL2SE3-27
NPL2SE3-13,15,17,19,21
NPL2SE3-26
NPL2SE3-28
C
C
CC
C
VVER4-2043.1
CVER12-2047A.1VVER5-2042.1
C
21C
C
C C
C
C C
NPL2NE1-23
NPL2NE1-25
CC
C
C C
C
C
NPL2NE1-24
NPL2NE1-26
CC
C
C
C C
C
NPL2NE2-25 NPL2NE2-27
12C
CC
C
C C
C
C
NPL2NE2-24
NPL2NE2-26
C
NPL2NE3-26
CC
C
C
C
NPL2NE4-25
UH-7
NPL2NE4-27
C C
C
C
C
NPL2NE4-26
C C
C
C
NPL2NE4-28
C C
C
C
C
NPL2NE5-25
NPL2NE5-27
TV
TV
TV
TV
TV
TV
TV
TVTV
TV
TV
TVTV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
QPH2SE1-3,5,7
QPH2NE1-19,21,23
QPH2NE1-31
LMH2NE1
VVER5-2025.1
UH-8
QPH2SE1-27
QPH2NE1-13,15,17
QPH2NE1-14,16,18
CV4-2022.1
NPL2NE5-28
QPH2NE1-20,22,24
HUM-4
FCU-11
FCU-12
NPL2SE3-25 NPL2SE2-26
QPH2NE1-32,34,36
QPH2SE1-28,30,32
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA C - PHASE 1
(TYP)
4 (TYP)
(TYP)
(TYP)
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM
LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH
CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON
SHEET E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL) . REFER TO SHEET E-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM
CONNECTION DETAIL REFER TO SHEET E-502-P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT
(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO INSTALLATION.
4. POWER CONNECTION TO FLAT PANEL SCREEN. COORDINATE
LOCATION/ELEVATION WITH A/V CONTRACTOR PRIOR TO
ROUGH IN.
5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK
POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION
AND LOCATION PRIOR REQUIREMENT.
6. POWER CONNECTION MOUNTED ABOVE CEILING FOR
UPFOLDING PANEL PARTITION.
7. POWER CONNECTION FOR CEILING MOUNTED FLAT SCREEN.
COORDINATE WITH A/V CONTRACTOR PRIOT TO ROUGH-IN.
8. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO
LEARNING ENVIROMENT ROOM 2031 AND ROUTE IN SLAB SAW
CUT TO DESIGNATED PANELS.
9. ROUTE BRANCH CIRCUITRY UNDER RAISED FLOOR TO
LEARNING ENVIROMENT 2035 AND ROUTE IN SLAB SAW CUT TO
DESIGNATED PANELS. REFER TO SHEET EP-102D-P1 FOR
CONTINUATION.
10. SAW CUT SLAB TO FACILITATE BRANCH CIRCUITRY FOR
LEARNING ENVIROMENTS.
6 6 6
9 9
3 3
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FE
C
FE
C
FEC
MATCHLINE - SEE:EP102C-P1
MA
TC
HL
IN
E
-S
EE
:E P1
E-
P1
NPL2SET1
NDL2SE1
NTR2SE1 NDH2SE1
PDM
PDM
PDM
PDM
+66"
+48" +48"
GFI GFI GFI GFI
+42" +42"
E-403-P1 A1
E-402-P1 A5
INSTRUCTOR
20392039
LPH2SE1
NPL2SE1
RPL2SE1 NPL2SE2
NPL2SE3
NPL2SE4
NPL2SE5
NPH2SE1T
QPL2SE1
T
QTR2SE1
+18"
+18"
+66" +78"
+18"
+18"
+66"+78"
+66"+66"
NPL2SE1-6
NPL2SE1-7
NPL2SE1-2
NPL2SE1-5
NPL2SE1-11
NPL2SE1-13
9 9
7 5
C C
C C
NPL2SE4-1,3,5,7,9,11
C C
C PDM
NPL2SE4-13,15,17,19,21,23
1212C C
NPL2SE4-2,4,6,8,10,12
18 16
22 20
C C
C
NPL2SE4-14,16,18,20,22,24
NPL2SE1-15
NPL2SE1-17
NPL2SE1-19
NPL2SE1-21
NPL2SE1-8
14 C
C
NPL2SE5-2,4,6,8,10,14
QPH2SE1
VVER8-2033.1
VVER8-2034.1
VVER8-2035.1
VVER10-2036.1
NPL2SE4-25
CC
C
C
C C
C
VVER8-2048.1VVER8-2049.1
QPH2SE1-9,11,13
C C
CC
C
C C
C
C
NPL2SE4-26
NPL2SE4-28
VVER4-2043.1
CVER6-2046.1
CVER12-2047A.1VVER5-2042.1
VVER14-2305.1 +30"
CVER4-2040.1
VVER5-2041.1C
C
C
C
NPL2SE5-12
QPH2SE1-15,17,19
M M
M
NPL2SE1-9
NPL2SE1-10
UH-3
UH-4
TV
TV
TV
TV TV
TV
TV
TV
NPL2SE6
TV
TV TV TV
QPL2SE1-34
QPL2SE1-36
QPL2SE1-38
M
QPL2SE1-29
QPH2SE1-16,18,20
LMH2SE1
UH-8
BCS
FCU-14A
NPL2SE1-4
FCU-13
HUM-5
NPL2SE1-23
NPL2SE1-25
QPH2SE1-28,30,32
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA D - PHASE 1
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM
LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH
CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON
SHEET E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNETED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL). REFER TO SHEET E-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM
CONNECTION DETAIL REFER TO SHEET E-502-P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT
(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO INSTALLATION.
4. POWER CONNECTION TO FLAT PANEL SCREEN.
5. PROVIDE WPM WITH NEMA 5-30R RECEPTACLE FOR AV RACK
POWER CONNECTION. VERIFY EXACT NEMA CONFIGURATION
PRIOR REQUIREMENT.
6. POWER CONNECTION FOR REFRIGERATOR.
7. POWER CONNECTION FOR MICROWAVE. VERIFY MOUNTING
HEIGHT PRIOR TO ROUGH-IN.
8. POWER CONNECTION FOR VENDING MACHINE.
9. POWER CONNECTION MOUNTED ABOVE CEILING FOR
UPFOLDING PANEL PARTITION.
10. POWER CONNECTION FOR CEILING MOUNTED FLAT SCREEN.
11. POWER CONNECTION FOR PRINTER/COPIER.
12. POWER CONNECTION FOR CREDENZA EQUIPMENT.
13. PROVIDE NEMA TYPE L5-30R RECEPTACLE.
(TYP)
(TYP)
(TYP)
(TYP)
(TYP)
A. REFER TO SHEET E-001-P1 AND E-002-P1 FOR SYMBOLS,
ABBREVIATIONS AND ADDITIONAL INSTALLATION
REQUIREMENTS.
B. REFER TO SHEET E-601-P1 - E-604-P1 FOR ELECTRICAL ONE-
LINE DIAGRAMS.
C. REFER TO SHEET E-606-P1 FOR FEEDER, MOTOR STARTER AND
TRANSFORMER SCHEDULE.
D. ALL ELECTRICAL EQUIPMENT IS NEW UNLESS NOTED
OTHERWISE.
E. CONDUIT AND WIRE IS SHOWN DIAGRAMMATICALLY. ACTUAL
ROUTING AND REQUIRED NUMBER OF SUPPORTS SHALL BE
DETERMINED BY THE CONTRACTOR.
F. UNLESS CONDUIT ROUTING CLEARLY INDICATES AS SUCH, DO
NOT ROUTE CONDUIT ON OR ABOVE ROOFTOPS WITHOUT
CONSULTING ENGINEER TO DETERMINE ANY POTENTIAL
IMPACT TO RACEWAY OR CONDUCTOR SIZE DUE TO
ADDITIONAL AMBIENT DERATING FOR ROOFTOP INSTALLATION.
G. CONCEAL CONDUITS IN ALL FINISHED AREAS INCLUDING
CONCEALMENT WITHIN MASONARY WALLS WHEN PRESENT.
(EXCEPTION: ELECTRICAL, MECHANICAL AND JANITOR ROOMS)
H. FLOOR AND FIRE WALL PENETRATIONS MUST BE SEALED WITH
AN APPROVED DESIGN TESTED FIRE STOPPING SYSTEM
APPROPRIATE TO PENETRATED WALL TYPE INSTALLED IN
ACCORDANCE WITH MANUFACTUER'S REQUIREMENTS.
I. WHEN OVERHEAD ELECTRICAL WORK IS EXPOSED: MOUNTING
OF ALL ELECTRICAL WORK/CONDUIT SHALL BE RUN IN DECK
FLUTES AND /OR TIGHT WITH DECK. CONTRACTOR MAY RUN
CONDUIT UNDER FLOOR AS NECESSARY TO FACILITATE
CONCEALMENT OF CONDUITS.
J. PRIOR TO ROUGH-IN AND FINAL CONNECTION, VERIFY
ELECTRICAL CHARACTERISTICS AND EXACT LOCATION OF THE
EQUIPMENT.
K. INSTALL CONDUITS PARALLEL, PERPENDICULAR AND UNIFORM
TO BUILDING ELEMENTS.
L. NO MORE THAN 180 DEGREE OF CONDUIT BENDS ARE ALLOWED
IN ANY CONDUIT RUN..
M. IDENTIFY ALL DEDICATED CIRCUITS WITH RESPECTIVE PANEL
AND CIRCUIT NUMBER.
N. WHEN MORE THAN 3 CURRENT CARRYING CONDUCTORS ARE
INSTALLED WITHIN A SINGLE CONDUIT DERATE THE
CONDUCTOR AMPACITY PER NEC 310.15. (C) CONTRACTOR
SHALL UPSIZE CONDUCTORS AS REQUIRED.
FEC
FEC
FEC
FE
MATCHLINE - SEE:EP102B-P1
PDMPDM
INSTRUCTOR
20392039
1 5
7 4
11 10
9 C
C
C
C
NPL2SE5-1,3,5,7,9,11
C
C
NPL2SE5-2,4,6,8,10,14
VVER10-2050.1 VVER7-2039.1
CC
C
C
QPH2SE1-10,12,14
VVER10-2038.1
QPH2SE1-21,23,25
EF-2
M
QPL1M1-10
GFI
WP
QPL1M1-12
PMV-2, PW-3PMV-1, PW-2
PH-1
PET-1
MCC-B
M MM
M
QPL1M1-11
QPL1M1-17
QPL1M1-15
QPL1M1-13
B5E-1-22
1/8" = 1'-0"A1 ELECTRICAL PLAN - LEVEL 2 - AREA E - PHASE 1
(TYP)
(TYP)
1. POWER DISTRIBUTION MODULE (PDM). FLOOR MOUNTED
UNDER RAISED FLOOR. WORKSTATION POWER MODULE WILL
BE CONNECTED TO THE PDM USING PLUG AND PLAY POWER
CABLES. PROVIDE MINIMUM OF 12' CABLE SLACK FOR THE WPM
LOCATION FLEXIBILITY. EACH PDM SHALL BE PROVIDED WITH
CIRCUITS AS INDICATED ON DRAWING. REFER TO DETAIL A2 ON
SHEET E-502-P1 FOR CONNECTION DETAIL.
2. WORKSTATION POWER MODULE (WPM) FLUSH MOUNTED AT
ACCESS FLOOR CONTAINING (4) DUPLEX RECEPTACLES AS
SHOWN. PROVIDE (2) CIRCUITS TO EACH WPM WITH (2)
RECEPTACLES CONNECTED TO NORMAL CIRCUIT AND (2)
RECEPTACLES TO A CONTROL CIRCUIT VIA PLUG LOAD
CONTROLLER (RELAY PANEL) . REFER TO SHEET E-651-P1 FOR
PLUG LOAD CONTROLLER PANEL SCHEDULE. FOR WPM
CONNECTION DETAIL REFER TO SHEET E-502-P1.
3. POWER CONNECTION FOR MECHANICAL EQUIPMENT
(ATU,VVR'S). COORDINATE LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO INSTALLATION.
3 3