This is a Request for Quote (RFQ) from the U.S. Army Corps of Engineers, Huntsville Center, for the procurement of industrial storage and power strips to be delivered and installed at Fort Gordon, specifically in Vincent Hall Phase 1 and MCA2. The RFQ number is W912DY26QA181, and quotes must be submitted no later than 12:00 PM Central Time on June 22, 2026, with a mandatory 120-day quote validity period. Interested vendors must submit questions by 12:00 PM Central Time on June 1, 2026, to Travian.A.James@usace.army.mil.
Quotes shall be submitted via email to both Travian.A.James@usace.army.mil and CEHNC-FurnitureQuotes@usace.army.mil and must include the completed Standard Form 1449 (SF1449), an Excel version of Attachment 1 with line item pricing, and a Word version of Attachment 8. Vendors must provide unit prices and extended amounts on both the SF1449 and Attachment 1, ensuring alignment between documents. Email subject lines must include the company name, RFQ number, project name and building designations, and email sequence numbers. The SF1449 must be completed with the company name and authorized signature in Block 17a. Quotes may be submitted via FTP site with email notification to the Contract Specialist, though email notification does not substitute for submission of required documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 - W912DY26QA181 - Ft Gordon Vincent Hall PH1 MCA2.pdf | ||
| Ft Gordon MCA2-Furniture Plans SAM.pdf | ||
| RFQ W912DY26QA181 Ft Gordon Vincent Hall PH1 MCA2.pdf | ||
| OPTION ATT1 Ft Gordon MCA2 PN88725 SAM.xlsx | XLSX spreadsheet | |
| Ft Gordon Vincent Hall PH1 Electrical Plans.pdf | ||
| Ft Gordon Vincent Hall PH1 Furniture Plans SAMgov.pdf | ||
| 3RD.pdf | ||
| 4TH.pdf | ||
| 2ND.pdf | ||
| ATT1-Ft Gordon_Vincent Hall PH1-SAM.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Review Round #1 Contractor Name Ft Gordon-Vincent Hall PH1_MCA2 Contractor Instructions: The Technical Documents Checklist must be completed and returned in Word format by the contractor. Each contractor shall demonstrate in written form how they are meeting the FID (Att. 2) requirements. Manufacturer’s published catalogs and CAD drawings are acceptable forms of demonstrations. A blanket statement that the contractor is “meeting the FID requirement” or a quote submitted without the necessary documentation is considered non-conforming. Contractors must comment in the light blue fields only, in black text. HNC’s comments in the white fields will be in either red text when the item is technically unacceptable or black text when the item is technically acceptable. Contractor shall not modify prior rounds or HNC comments. If new products are provided in consequent technical review rounds, in the Attachment 1 the contractor should bold the font in the cells that change in columns E, F, and G, Vendor Quoted, Product Line Quoted, and Model Quoted, respectively.
Technical Documents Checklist
Contractor:
Point of Contact for this RFQ:
Email Address:
Telephone Number:
Contractor: Answer questions 1-3.
1. Are technical documents organized sequentially according to the Furniture Item Descriptions (FID)?
Yes
No
If no, do not continue. To be considered for award, technical documents shall be as stated above.
2. Do all quoted items meet all current required warranties?
Yes
No
If no, do not continue. To be considered for award, all items shall meet current warranties.
3. Are technical documents annotated to draw attention to the construction requirements and item descriptions required in the FID?
Yes
No
If no, do not continue. To be considered for award, technical documents shall be as stated above.
Contractor: Do not go beyond this point until requested as a response to clarifications / communications by HNC.
HNC Clarification/Comment - white fields Contractor Reply- light blue fields
(Insert Excel Table From Att 1 Tech Review Tab)
To be completed by HNC only:
1st Round Technical Review
| Technically Acceptable: |
| Yes: |
No:
Date:
HNC Technical Evaluator:
Comments:
2nd Round Technical Review
| Technically Acceptable: |
| Yes: |
No:
Date:
HNC Technical Evaluator:
Comments:
3rd Round Technical Review
| Technically Acceptable: |
| Yes: |
No:
Date:
HNC Technical Evaluator:
Comments:
4th Round Technical Review
| Technically Acceptable: |
| Yes: |
No:
Date:
HNC Technical Evaluator:
Comments:
Attachment #7 2