FSH Replace Building Furniture Attachments.pdf
PDF 1 MB Posted
- Solicitation number
- 36C78623Q0064
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78623Q0064 Questions and Answers.docx | DOCX document | |
| 36C78623Q0064 Contract Clauses.docx | DOCX document | |
| 36C78623Q0064 Solicitation Provisions.docx | DOCX document | |
| SOW FSH Replace Building Furniture.docx | DOCX document | |
| WD 2015-5253.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WS1
WS1
WS1
WS1
WS1
WS1 WS1
WS1
WS1
WS1
WS1
WS1
WS1
WS2
WS3
C3
C1
C3
C3
C3 WS3
WS3
WS3
C3
C3
C3
C3
C3
C3 C3 C3
C3
C3
C3
C3
C3
C3
C3
C1
C1
C1
C1
C1
C1
WS3
C3
C3
DIRECTOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
GENERAL
DIRECTOR
ASSISTANT
VESTIBULE
100A
ENTRY
OFFICE
GENERAL
TOILET
WOMEN'S
TOILET
MEN'S
CENTER
OPERATIONS
ROOM
LUNCH
HAC
STORAGE
TOILET
PUBLIC
OFFICE
GENERAL
STORAGE
DATA
ELEC.
ROOM
MECHANICAL
OFFICE
GENERAL
NOTE:
1. REFER TO APPENDIX FOR FURNITURE SPECIFICATION DETAILS
2. FURNITURE MANUFACTURE/SELLER WILL INSTALL ITEM.
CONTRACTOR SHALL ASSIT AS NECESSARY WITH ANY ISSUES
DURING INSTALL
LOBBY
100B
ENTRY
ROOM
CONFERENCE
F2000
F2000
M1801
1. REFER TO PROJECT MANUAL SPECIFICATION SECTION 09 06 00
"SCHEDULE FOR FINISHES" FOR SPECIFIC PRODUCT BASIS OF
DESIGN AND OTHER REQUIREMENTS.
2. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP,
BASEBOARDS RADIATION ENCLOSURES, ELECTRICAL PANEL BOARDS
(IN FINISHED SPACES) TO MATCH SURFACE ON WHICH THEY OCCUR
UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH FACTORY
WHITE FINISH, OCCURRING ON WHITE ACT OR WHITE GYPSUM
BOARD CEILING SHALL NOT BE PAINTED.
3. FIELD VERIFY ALL NEW CONDITIONS. NOTIFY ARCHITECT OF ANY
DISCREPANCIES PRIOR
TO INSTALLATION.
4. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE
OF CLOSED DOOR UNLESS OTHERWISE INDICATED.
5. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING
FLOOR DRAINS, CLEAN OUTS, ETC IN RESILIENT AND CERAMIC TILE
FLOORING
6. PROVIDE LATEX SEALANT TO HORIZONTAL AND VERTICAL INTERIOR
CERAMIC TILE CORNERS, COLOR TO MATCH GROUT COLOR,
7. PROVIDE SEALANT AT JOINT BETWEEN COUNTERTOP, BACK OR SIDE
SPLASH WALLS.
8. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME
TO RESILIENT AND CT FLOORING, TYP. SEE PLANS AND ROOM
FINISHED SCHEDULE FOR FLOOR FINISH LOCATIONS.
9. HOLLOW METAL DOORS AND FRAMES TO BE ANTED P-XX, UNLESS
NOTED OTHERWISE IN THE ROOM OPENING SCHEDULE.
10. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO
SPECIFICATION.
11. CEILING HEIGHTS ARE MATERIALS/FINISHES CALLED OUT IN ROOM
FINISH SCHEDULE ARE FOR ENTIRE CEILING OR MAJORITY OF THAT
ROOM, UNLESS OTHERWISE INDICATED. SEE REFLECTED CEILING
PLAN FOR CHANGES IN CEILING MATERIAL AND CEILING HEIGHT.
PAINT ALL SURFACES OF SOFFIT SAME COLOR AS INDICATED.
12. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED
IN THE PROJECT MANUAL SPECIFICATION. IF MANUFACTURERS
OTHER THAN THOSE INDICATED ARE USED, ARCHITECT MAY REVISE
COLOR SELECTIONS OF OTHER FINISHES TO ENSURE PROPER
COORDINATION.
13. PAINT ALL FIRE EXTINGUISHER CABINETS TO MATCH COLOR OF
ADJACENT WALLS.
14. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR.
15. FOR FLOOR FINISH MATERIALS AND PATTERN, SEE FINISH PLAN.
16. SEE INTERIOR ELEVATIONS FOR MORE FINISH INFO.
FURNITURE & FINISH PLAN GENERAL NOTES
ACT ACOUSTICAL CEILING TILE
CT CERAMIC TILE
GWB GYPSUM WALLBORD SYSTEMS
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE
RB RESILIENT BASE
S SOLID SURFACE
WSF WELDED SEAM SHEET
FLOORING (HEAT WELDED WITH ROD)
MATERIAL INSTALL DIRECTION
CORNER GUARD
NOTE: ALL SYMBOLS MAY BE NOT BE USED ON EACH PLAN
CG
CPT VCT
FLOOR FINISH TRANSITION
PLAM PLASTIC LAMINATE
ROOM FINISH LEGEND & ABBREVIATIONS
ST STAIN
CPT MODULAR CARPET TILE
SIGN MESSAGE SCHEDULE
LOCATION SIGN MESSAGE SIGN TYPE
115 OFFICE NC-14.01
116 OFFICE NC-14.01
117 OFFICE NC-14.01
118 OFFICE NC-14.01
EQUIPMENT LEGEND - BUILDING 1003
JSN# DISCRIPTION ACTIVATED BY QUANTITY
M1801 COMPUTER W/ MONITOR VV 21
F2000 WASTEPAPER BASKET VV 21
EQUIPMENT ABBREVIATIONS
CC: CONTRACTOR FURNISHED & INSTALLED
VV: VA FURNISHED & INSTALLED
VC: VA FURNISHED & CONTRACTOR INSTALLED
PC, MPLA
A1003.07
ADMINISTRATION BUILDING
- FINISH & FURNITURE PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le P at h:
y :\1
\1 ft
. s am a rc h\ _0 ca d fil es s he et s\ a1
3.
ad m in is tra tio n bu ild in g ff& e pl an .d w g ed it:
pc ho i s av ed :3
/2 5/
2:
P
M p ub lis he d:
pa m c ho i p rin te d:
3/
/2
:0
PM
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 15274
FORT SAM HOUSTON
NATIONAL CEMETERY PHASE 3
EXPANSION & IMPROVEMENTS
846CM2045
12-18-2020
1520 HARRY WURZBACH RD., SAN ANTONIO, TX 78209
BID DOCUMENTS
Date: Dwg. of 339
BID DOCUMENTS
GEOTECHNICAL:
TERRACON
6911 BLANCO ROAD
SAN ANTONIO, TX 78216
210-641-2112
MICHAEL GHAZAWI
IRRIGATION:
AQUA
375 HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-372-6104
ROBERT BECCARD
COST ESTIMATING:
CPMI
3265 NORTHWOOD CIR
EAGAN, MN 55121
515-697-1048
BRYAN BERTRAND
LAND SURVEY:
PAPE-DAWSON
2000 NW LOOP 410
SAN ANTONIO, TX 78213
210-326-6141
DAVID CASANOVA
STRUCTURAL/MEP:
IMEG CORP.
14755 PRESTON RD STE 845
DALLAS, TX 75254
972-239-6100
WADE ROSS
SCALE:1
ADMINISTRATION BUILDING - FURNITURE & FINISH PLAN
1/4" = 1' 0"
N
SCALE:2
NC-14.01 - PRIMARY
ROOM IDENTIFICATION
6" = 1' 0" SCALE:3
WALL ELEVATION - TYP
NTS
0 2' 4' 8'
ROOM FINISH SCHEDULE - BLDG 1003
ROOM NO. ROOM NAME FLOOR BASE
FINISH
NORTH WALL
FINISH
EAST WALL
FINISH
SOUTH WALL
FINISH
WEST WALL
MARTERIAL FINISH
CEILING
REMARKS
100A 100B
GENERAL OFFICE
ENTRY VESTIBULE
ENTRY LOBBY
CONFERENCE ROOM
PUBLIC TOILET
HAC
STORAGE
STORAGE
OPERATIONS CENTER
LUNCH ROOM
MEN'S TOILET
WOMEN'S TOILET
DIRECTOR
ASSISTANT DIRECTOR
MECHANICAL ROOM
DATA
ELEC.
OFFICE
OFFICE
OFFICE
OFFICE
GENERAL OFFICE
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
RB-2
RB-2
RB-2
RB-2
RB-2
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
P-1 P-1 P-1 P-1 P-1
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
P-1 P-1 P-1 P-1 P-1
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
P-1 P-1 P-1 P-1 P-1
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
EXIST
P-1 P-1 P-1 P-1 P-1
ACT-1
EXIST
EXIST
ACT-1
EXIST
EXIST
EXIST
EXIST
ACT-1
ACT-1
EXIST
EXIST
ACT-1
ACT-1
EXIST
EXIST
EXIST
ACT-1
ACT-1
ACT-1
ACT-1
ACT-1
EXIST
EXIST
P-2 P-2 P-2 P-2
EXIST
EXIST
P-2 P-2
1, 2 2, 3 2, 3 2, 3 2, 3 2, 3 2, 3
1. INSTALL NEW ACT IN EXISTING GRID
2. PATCH FINISHES DISTURBED BY CONSTRUCTION TO MATCH EXISTING AS NECESSARY.
3. PAINT EXISTING GYP BD CEILING.
3"
ROOM NAME
9"
ROOM NUMBER
3"
6"
Text
Text
4' -0
" M
IN
TO
B
AS
EL
IN
E O
F
LO
W
ES
T
TA
C
TI
LE
C
H
AR
AC
TE
R
5' -0
" M
AX
TO
B
AS
EL
IN
E O
F H
IG
H
ES
T
C H
AR
AC
TE
R
4"
C1
C1
C1
C1
F2
C1
PO1
PO1
F2
PO1
F2
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3
F3 F3 F3 F3
F3
C4 C4
C4C4
T1
C4 C4
C4C4
T1
AutoCAD SHX Text K-6710
AutoCAD SHX Text
WHITBY
AutoCAD SHX Text
C_SINKS
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text Assistant Director
AutoCAD SHX Text
CEMDENMayE Callout In each room:
C1 x2 C3 x1 F1 x1 (not shown) F4 x1 (not to scale) C3 x1 PO1 x1
CEMDENMayE Line
CEMDENMayE Callout Chairs only, no desk, workstation or additional furniture C1 x2 C3 x1
CEMDENMayE Callout Reception:
C3 x2 F1 x2 (not shown) F3 x2 (not to scale) WS2 x1
Please note that this particular workstation does not accurately reflect the written information in the scope.
CEMDENMayE Callout TYPICAL for all 13 stations
F1 x1 (not shown) F3 x1 (not to scale) C3 x1 WS1 x1
CEMDENMayE Callout BK1 x1 (not to scale) C1 x2 C3 x1 F5 x1 (not to scale) PO2 x1 (includes 2 pedestal file cabinets not shown)
Use the configuration shown in blue, versus the design drawing.
CEMDENMayE Rectangle
CEMDENMayE Rectangle
CEMDENMayE Rectangle
CEMDENMayE Rectangle
CEMDENMayE Typewritten Text F4
CEMDENMayE Typewritten Text F4
CEMDENMayE Callout C1 x1 C3 x1 F1 x1 (not shown) F2 x1 (not to scale) F4 x1 (not to scale) PO1 x1
CEMDENMayE Line
CEMDENMayE Line
CEMDENMayE Line
CEMDENMayE Line
CEMDENMayE Typewritten Text F4
CEMDENMayE Callout Chairs only, no desk, workstation or additional furniture C1 x2 C3 x1
CEMDENMayE Rectangle
CEMDENMayE Text Box
BK1
CEMDENMayE Rectangle
CEMDENMayE Text Box F5
CEMDENMayE Callout C4 x8 T1 x2
CEMDENMayE Callout C4 x24 T1 x6
CEMDENMayE Text Box Maintenance Building
BREAKROOM •
1 102 1
�i rfctloFFICE � �1103 1
F7
LOBBY
I 101 I
LOCKER
1 10s 1
MEN'S
TOILET
I 106 I
MECHANICAL
ROOM
I 101 I
WOMEN'S
TOILET
10s 1
WS3
CEMDENMayE Callout C1 x12 T1 x3
CEMDENMayE Callout C2 x1 F6 x1 F7 x1 WS3 x1
CEMDENMayE
Honor Guard
CEMDENMayE Callout C2 x14 (only 12 shown) F1 x4 (not shown) T2 x1 (table shown is 84", versus 96" identified in scope) WS4 x4
CEMDENMayE
PIC
| Proposed Furniture Layout - Admin Bldg |
| Proposed Furniture Layout - MX |
| Proposed Furniture Layout - Honor Guard Bldg |
| Proposed Furniture Layout - PIC |
File details come from the government source that posted it. Updated .