ATTACHMENT_F_-_Swing_Loaders_Compliance_Matrix.xlsx
XLSX spreadsheet 39 KB Posted
- Attached to
- FQ19210/WJ Railroad Maintenance Machinery
- Solicitation number
- FQ19210_WJ
About this file
ATTACHMENT F - Swing Loaders Compliance Matrix
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CCENV19003 Swing Loader Vehicle Evaluation Form | |
| Offeror: | Evaluator: |
| Date: |
| Section | Title | Requirement | Meets Criteria | |
| Y/N | Notes | |||
| 1 | General Requirements | The proposal shall include layout and arrangement drawings showing all major equipment, a description of each major subsystem of the unit, and a list of the make and model of all major components. | ||
| 2 | System Design | The unit shall fit in the dimensions of WMATA’s Track System as defined in section 2.1.3 | ||
| The unit shall meet the specified dimensions referenced in Figure 17.1.1 | ||||
| The unit cab shall be climate controlled, fully enclosed | ||||
| The unit shall be capable of clearing all of WMATA’s tracks, tunnels and structures as shown in Figures 17.1.3 and 17.1.4 | ||||
| The unit shall have handrails or grab irons installed per section 2.2.7 | ||||
| The proposal shall demonstrate that the vehicle meets traction requirements in section 2.3.1 The proposal shall include data/calculations used to prepare the proposal. | ||||
| The unit shall be capable of operating at max speed of 25 mph | ||||
| The proposal shall demonstrate that the vehicle meets braking requirements in section 2.3.2 The proposal shall include data/calculations used to prepare the proposal. | ||||
| The proposal shall demonstrate that the vehicle meets weight requirements in section 2.5 and drawing 17.1.2. The proposal shall include data/calculations used to prepare the proposal. | ||||
| The unit shall have a VMDS per section 2.8 | ||||
| 3 | Construction and Assembly | The unit shall meet lifting point requirements per section 3.1.1 | ||
| The unit shall meet towing requirements per section 3.1.2 | ||||
| The frame and members of the vehicle shall meet the strength requirements contained in Section 3.2. A frame loading diagram of structural members including material type and thicknesses shall be submitted with the proposal. | ||||
| The unit shall meet Underframe equipment mounting requirements per section 3.3 | ||||
| The unit shall meet ride quality requirements per section 4.2 | ||||
| The unit shall meet Hi-rail system requirements per section 4.3 | ||||
| The unit shall meet wheels, tries, and axle requiremenmts per section 4.4 | ||||
| The unit shall meet suspension requiremenmts per section 4.5 | ||||
| The unit shall meet steering requiremenmts per section 4.6 | ||||
| 5 | Cab and Controls | The unit shall meet cab requirements per section 5.1 | ||
| The unit shall provide Seating for two perssons | ||||
| The unit shall meet cab Window requirmeents per section 5.3 | ||||
| The unit shall meet HVAC requirements per section 5.4 | ||||
| The unit shall meet cab equipment requirements per section 5.5 | ||||
| The unit shall meet cab control and indications requirements per section 5.6 | ||||
| 6 | Diagnostic System | The unit shall meet Diagnostics requirements per section 6.1 | ||
| The diagnostic system shall meet signals requirements per section 6.2 | ||||
| The diagnostic system shall meet sampling and storage requirements per section 6.3 | ||||
| The diagnostic system shall meet Download requirements per section 6.4 | ||||
| 7 | Electrical System | The unit shall meet grounding rerquirements per section 7.1 | ||
| The unit shall meet electrical rerquirements per section 7.3 | ||||
| The unit shall meet batteries rerquirements per section 7.5 | ||||
| 8 | Propulsion System | The engine shall meet the requirements per section 8.2. The proposal shall demonstrate that the vehicle meets traction requirements. The proposal shall include data/calculations used to prepare the proposal. | ||
| The exhaust system shall meet the requirements per section 8.3 | ||||
| The fuel tank shall meet the requirements per section 8.5 | ||||
| The air compressor system shall meet the requirements per section 8.6 | ||||
| The hydraulic system shall meet the requirements per section 8.7 | ||||
| 9 | Brake System | Parking brake shall be spring applied and hold on a 6% grade | ||
| Service shall provide a deceleration of a least 3.0 mph/s | ||||
| 10 | Communications | The camera system shall meet radio specifications per section 10.1 | ||
| The radio shall meet radio specifications per section 10.2 | ||||
| 11 | Lighting System | The unt shall have Exterior, interior work and perimeter lighting per section 11 | ||
| The unit shall have Emergency lighting per specification section 11.4 | ||||
| 12 | Work Tools | The unit shall have work head that has a single boom with lift and rotate (swing) | ||
| The unit shall have Work head capable of lifting loads per the specification. | ||||
| The unit shall have Work head capable of rotating 90 degrees to each side | ||||
| The unit shall have work head capable of having attachments istallations per the specificaiton | ||||
| The unit shall have work heads Including rigid boom, extended boom and stiff hook | ||||
| The work heads shall meet or exceed specified lowering and swinging speeds per section 12.1.8 | ||||
| The work heads shall meet or exceed specified lifting heights per section 12.1.9 | ||||
| The unit shall have meet specified visibility requirements | ||||
| The unit shall have electric over hydraulic controls | ||||
| The Unit shall incorporate manual pin locks on the work head components to assure they are secured in the stowed position for travel. | ||||
| 16 | Manuals | The supplier shall comply with Section 16.1, manuals for Operations, Service and Overhaul, Preventive Maintenance and Parts Catalog. | ||
| Training | The supplier shall comply with Section 16.2, training for Operation and Maintenance | |||
| Drawings | The supplier shall comply with Section 16.4, Drawing Package. | |||
| Warranty | The proposal shall confirm the warranty for the vehicle per section 16.7 |
Sheet2
| (5) Ton and (10) Ton Swing Loaders Compliance Matrix | |
| Offeror: | ______________________________________________________ |
| Date: | _______________________________________________________ |
| Section | Title | Technical Specifications Reference | Requirement | Compliance Y/N/NA *Does your proposal meet the Specifications detailed in the Technical Specifications* | Notes |
| 1 | General Requirements | All Compliance Requirements in this Section refer to "Section 1 General Requirments" of the "Technical Requirements" starting on Page 7. | The proposal shall include layout and arrangement drawings showing all major equipment, a description of each major subsystem of the unit, and a list of the make and model of all major components. | ||
| 2 | System Design | All Compliance Requirements in this Section refer to "Section 2 System Design" of the "Technical Requirements" starting on Page 11. | The unit shall fit in the dimensions of WMATA’s Track System as defined in section 2.1.3 | ||
| The unit shall meet the specified dimensions referenced in Figure 17.1.1 | |||||
| The unit cab shall be climate controlled, fully enclosed | |||||
| The unit shall be capable of clearing all of WMATA’s tracks, tunnels and structures as shown in Figures 17.1.3 and 17.1.4 | |||||
| The unit shall have handrails or grab irons installed per section 2.2.7 | |||||
| The proposal shall demonstrate that the vehicle meets traction requirements in section 2.3.1 The proposal shall include data/calculations used to prepare the proposal. | |||||
| The unit shall be capable of operating at max speed of 25 mph | |||||
| The proposal shall demonstrate that the vehicle meets braking requirements in section 2.3.2 The proposal shall include data/calculations used to prepare the proposal. | |||||
| The proposal shall demonstrate that the vehicle meets weight requirements in section 2.5 and drawing 17.1.2. The proposal shall include data/calculations used to prepare the proposal. | |||||
| The unit shall have a VMDS per section 2.8 | |||||
| 3 | Construction and Assembly | All Compliance Requirements in this Section refer to "Section 3 Construction and Assembly" of the "Technical Requirements" starting on Page 19. | The unit shall meet lifting point requirements per section 3.1.1 | ||
| The unit shall meet towing requirements per section 3.1.2 | |||||
| The frame and members of the vehicle shall meet the strength requirements contained in Section 3.2.a. A frame loading diagram of structural members including material type and thicknesses shall be submitted with the proposal. | |||||
| The unit shall meet Underframe equipment mounting requirements per section 3.3 |
| The unit shall meet Hi-rail system requirements per section 4.3 | |||
| The unit shall meet wheels, tires, and axle requiremenmts per section 4.4 | |||
| The unit shall meet suspension requiremenmts per section 4.5 | |||
| The unit shall meet steering requiremenmts per section 4.6 | |||
| 5 | Cab and Controls | All Compliance Requirements in this Section refer to "Section 5 Cab and Controls" of the "Technical Requirements" starting on Page 25. | The unit shall meet cab requirements per section 5.1 |
| The unit shall provide Seating for two persons per section 5.2 | |||
| The unit shall meet cab Window requirmeents per section 5.3 | |||
| The unit shall meet HVAC requirements per section 5.4 | |||
| The unit shall meet cab equipment requirements per section 5.5 | |||
| The unit shall meet cab control and indications requirements per section 5.6 | |||
| 6 | Diagnostic System | All Compliance Requirements in this Section refer to "Section 6 Diagnostic System" of the "Technical Requirements" starting on Page 32. | The unit shall meet Diagnostics requirements per section 6.1 |
| The diagnostic system shall meet signals requirements per section 6.2 | |||
| The diagnostic system shall meet sampling and storage requirements per section 6.3 | |||
| The diagnostic system shall meet Download requirements per section 6.4 | |||
| 7 | Electrical System | All Compliance Requirements in this Section refer to "Section 7 Auxillary Electrical Equiptment" of the "Technical Requirements" starting on Page 35. | The unit shall meet grounding rerquirements per section 7.1 |
| The unit shall meet electrical rerquirements per section 7.3 | |||
| The unit shall meet batteries rerquirements per section 7.5 | |||
| 8 | Propulsion System | All Compliance Requirements in this Section refer to "Section 8 Propulsion and Hydraulic Equiptment" of the "Technical Requirements" starting on Page 38. | The engine shall meet the requirements per section 8.2. The proposal shall demonstrate that the vehicle meets traction requirements. The proposal shall include data/calculations used to prepare the proposal. |
| The exhaust system shall meet the requirements per section 8.3 | |||
| The air compressor system shall meet the requirements per section 8.5 | |||
| The fuel tank shall meet the requirements per section 8.6 | |||
| The hydraulic system shall meet the requirements per section 8.7 | |||
| 9 | Brake System | All Compliance Requirements in this Section refer to "Section 9 Brake System" of the "Technical Requirements" starting on Page 49. | Parking brake shall be spring applied and hold on a 6% grade |
| Service shall provide a deceleration of a least 2.5 mph/s | |||
| 10 | Communications | All Compliance Requirements in this Section refer to "Section 10 Communications" of the "Technical Requirements" starting on Page 51. | The radio system shall meet radio specifications per section 10.1 |
| The camera system shall meet specifications per section 10.2 | |||
| 11 | Lighting System | All Compliance Requirements in this Section refer to "Section 11 Lighting System" of the "Technical Requirements" starting on Page 53. | The unt shall have Exterior, interior work and perimeter lighting per section 11 |
| The unit shall have Emergency lighting per specification section 11.4 | |||
| 12 | Work Tools | All Compliance Requirements in this Section refer to "Section 12 Work Tools" of the "Technical Requirements" starting on Page 56. | The unit shall have work head that has a single boom with lift and rotate (swing) |
| The unit shall have Work head capable of lifting loads per the specification. | |||
| The unit shall have Work head capable of rotating 90 degrees to each side |
| The unit shall have quick attachment system for work heads Including rigid boom, extended boom and stiff hook |
| The work heads shall meet or exceed specified lowering and swinging speeds per section 12.1.8 |
| The work heads shall meet or exceed specified lifting heights per section 12.1.9 |
| The unit shall have meet specified visibility requirements |
| The unit shall have electric over hydraulic controls |
| The Unit shall incorporate manual pin locks on the work head components to assure they are secured in the stowed position for travel. |
image1.jpeg
File details come from the government source that posted it.