Form D~5.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Bus facility paving - Southampton
- Solicitation number
- BD-21-1206-40000-40000-58890
- Issued by
- Suffolk County, Massachusetts
About this file
This document appears to be a Form D Invoice Backup related to a state and local contract opportunity for bus facility paving in Southampton, Massachusetts. The contract includes line items for various paving and infrastructure activities such as hot mix asphalt milling, excavation, gravel base course, manhole/catch basin/valve cover adjustments, crack repair, tack coat application, pavement marking, and drainage work. The contract also includes contingency and other administrative line items. No specific quantities or unit pricing are provided, as this appears to be a standard invoice form template. The related state and local contract opportunity has an ID of 66ab70e524b406932d029c45 and involves the state of Massachusetts.
The pricing terms and other salient details about the contract opportunity are not included in this document. However, it can be assumed that this contract would be awarded to a construction or paving contractor to perform the specified work at a bus facility in Southampton, Massachusetts. Funding sources and any set-asides or preferences are not indicated in this particular file.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 02 C.PDF | ||
| Boston PW~9.pdf | ||
| Addendum 2~15.pdf | ||
| Site visit attendees~3.pdf | ||
| 210302 Southampton Paving Plan 002.pdf | ||
| Addendum 1~23.pdf | ||
| Boston PW~11.pdf | ||
| Initial Bid Opening Summary RFP ~5.pdf | ||
| Form D v2.xlsx | XLSX spreadsheet | |
| RFP Southampton Paving RFP 25C-21 03.03.2021 v2.pdf | ||
| Form C v2~1.xlsx | XLSX spreadsheet | |
| Form C~3.xlsx | XLSX spreadsheet | |
| RFP Southampton Paving RFP 25C-21 03.03.2021.pdf | ||
| 03 U.PDF |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Form D Invoice Backup
| Form D: Standard Invoice Backup |
| CONTRACTOR NAME: |
| LOCATION: |
| DATE: |
| No. | Item Description | Inv. Qty. | Unit | Unit Cost | Invoice Amount |
| 1 | Hot Mix Asphalt Pavement Milling 0-4" | SY | $ - 0 | $ - 0 | |
| 2 | Unclassified Excavation | CY | $ - 0 | $ - 0 | |
| 3 | Gravel Base Course | CY | $ - 0 | $ - 0 | |
| 4 | Adjust Manhole/Catch Basin/Valve Cover | EA | $ - 0 | $ - 0 | |
| 5 | Install New Frame and Cover/Grate | EA | $ - 0 | $ - 0 | |
| 6 | Crack Repair | LF | $ - 0 | $ - 0 | |
| 7 | Tack Coat | GAL | $ - 0 | $ - 0 | |
| 8 | 2.0" Superpave Surface Course 12.5 Polymer (SSC-12.5-P) | TON | $ - 0 | $ - 0 | |
| 9 | 2.5" Superpave Surface Course 19.0 Polymer (SSC-19-P) | TON | $ - 0 | $ - 0 | |
| 10 | Saw Cut/Crack Seal | LF | $ - 0 | $ - 0 | |
| 11 | Pavement Markings | LF | $ - 0 | $ - 0 | |
| 12 | Hydrant | EA | $ - 0 | $ - 0 | |
| 13 | Wire Loop Installation | LF | $ - 0 | $ - 0 | |
| 14 | Safety/Quality/Construction Management Plan | LS | $ - 0 | $ - 0 | |
| 15 | Contingency (10%) | LS | $ - 0 | $ - 0 | |
| 16 | Drainage Install Contigency/Permitting | ALL | $ - 0 | $ - 0 | |
| 17 | Monitoring Well Decommissioning | ALL | $ - 0 | $ - 0 | |
| 18 | Police Details | ALL | $ - 0 | $ - 0 | |
| TOTAL LUMP SUM (lines 1-18) | $ - 0 | ||||
| CONTRACTOR SIGNATURE | Contingency Explanation (if needed) |
MBTA REPRESENTATIVE
File details come from the government source that posted it. Updated .