About this file

This document outlines the proposed paving plan for the Southampton Bus Garage in Massachusetts. The project includes milling and overlaying approximately 182,790 square feet of asphalt paving over four concurrent phases, with work scheduled to take place over four total weekends. Phase 1 covers Moore Street, Phase 2 addresses the bus maintenance yard, Phase 3 focuses on the TPD parking area, and Phase 4 involves full depth reconstruction of the bus wash exit. The project also includes installing 65 linear feet of 12-inch RCP drainage piping and a new catch basin. Work is to be coordinated with bus operations to maintain access throughout construction.

The contract provides no pricing details, set-asides, or information about the incumbent or funding sources. The document indicates the project is being solicited by the state of Massachusetts, but does not provide the contract ID or other procurement details.

View the file

Other files

File Type Posted
02 C.PDF PDF
Boston PW~9.pdf PDF
Addendum 2~15.pdf PDF
Site visit attendees~3.pdf PDF
Addendum 1~23.pdf PDF
Boston PW~11.pdf PDF
Initial Bid Opening Summary RFP ~5.pdf PDF
Form D v2.xlsx XLSX spreadsheet
RFP Southampton Paving RFP 25C-21 03.03.2021 v2.pdf PDF
Form C v2~1.xlsx XLSX spreadsheet
Form C~3.xlsx XLSX spreadsheet
RFP Southampton Paving RFP 25C-21 03.03.2021.pdf PDF
03 U.PDF PDF
Form D~5.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate 19

SOUTHAMPTON BUS GARAGE PAVING PROJECT

PROPOSED PAVING PLAN

NOTES:

1. LIMITS OF WORK DEPICTED ARE APPROXIMATE. TO BE VERIFIED IN CONSTRUCTION

WITH FIELD STAFF.

2. FOUR (4) TOTAL WEEKENDS WILL BE ALLOWED FOR CONSTRUCTION ACTIVITIES.

3. CONCURRENT PHASES PENDING APPROVAL FROM OPERATIONS.

Phase 1A – Moore St.

Limits: Southampton St - Gate 19 Type: 2.5” Mill & Inlay (19.0 mm) Days: Saturday/Sunday Times: Saturday 12PM-11:59PM Sunday – No Restriction Duration: 1 Weekend 2

2 Consecutive Calendar Days Phasing: Concurrent with all phases. 3 Limitations: Keep one lane access to Moore Street for Bus Operations. Keep access to Waldo Bros as required.

HMA Pvmt. Construction Type

2.5” Mill & Inlay (143,620 SF) Superpave Surface Course 19.0mm Polymer

2” Mill & Inlay (38,500 SF) Surface Course 12.5mm Polymer

Full Depth Reconstruction (670 SF) Install Drainage 10” 19.0mm Poly (SSC 19-P) [ 4 x 2.5” L ifts]

Phase 1B - Moore St.

Limits: Gate 19 to South Bay Ave Type: 2.5” Mill & Inlay (19.0 mm) Days – Saturday/Sunday Times – No Restrictions Duration: 1 Weekend 2

2 Consecutive Calendar Days Phasing: Concurrent with all phases. 3 Limitations – Keep Bus Operation access at intersection with Gate 19 and South Bay Ave.

Phase 2 – Bus Maintenance Yard Limits: Adjacent to Maint. Garage Type – 2.5” Mill & Inlay (19.0 mm) Days – Saturday/Sunday Times – No Restrictions Duration: 2 Weekends 2

2 Consecutive Calendar Days/Wknd Phasing: Concurrent with all phases. 3 Limitations – Keep Bus Operation access at all times.

Phase 3 - TPD Parking Limits: Parking Area and Access Type – 2” Mill & Inlay (12.5 mm) Days – Saturday/Sunday Times – No Restrictions Duration: 2 Weekends 2

2 Consecutive Calendar Days/Wknd Phasing: Concurrent with all phases.3 Limitations – Maintain Access to Transit Police Building

Phase 4 – Bus Wash Exit Limits: Adjacent to Maint. Garage Type – Full Depth Reconstruction Days – Saturday/Sunday Times – No Restrictions Duration: 1 Weekend 2

2 Consecutive Calendar Days Phasing: Concurrent with all phases. 3 Limitations – Coordinate with Bus Maint. for Bus Wash Closure eleguelaff Rectangle eleguelaff Line eleguelaff Text Box

INSTALL 12” RCP

(65LF)

eleguelaff Text Box

INSTALL NEW CATCH BASIN

eleguelaff Line eleguelaff Line