Form C~3.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Bus facility paving - Southampton
Solicitation number
BD-21-1206-40000-40000-58890
Issued by
Suffolk County, Massachusetts

About this file

This document is a Form C Pricing Form related to a Bus Garage Paving Project for the Massachusetts Bay Transportation Authority (MBTA). The project involves paving work at the Southampton Bus Garage, including hot mix asphalt pavement milling, excavation, gravel base course, manhole/catch basin/valve cover adjustments, crack repair, tack coat, superpave surface course, pavement markings, and other related work. The total quantity estimates for the various line items are provided. The MBTA reserves the right to increase or decrease the quantities by up to 125%. Contingency items are included for drainage, monitoring well decommissioning, and police details, with set amounts allocated for these items.

The pricing form requires vendors to provide firm fixed unit costs for the various line items. The quoted prices must be inclusive of all associated charges such as prevailing wages, transportation, and other costs. The MBTA reserves the right to reject any bid if one or more line items are left blank by the vendor. Pricing for the contingency items is provided as lump sum amounts.

View the file

Other files

File Type Posted
02 C.PDF PDF
Boston PW~9.pdf PDF
Addendum 2~15.pdf PDF
Site visit attendees~3.pdf PDF
210302 Southampton Paving Plan 002.pdf PDF
Addendum 1~23.pdf PDF
Boston PW~11.pdf PDF
Initial Bid Opening Summary RFP ~5.pdf PDF
Form D v2.xlsx XLSX spreadsheet
RFP Southampton Paving RFP 25C-21 03.03.2021 v2.pdf PDF
Form C v2~1.xlsx XLSX spreadsheet
RFP Southampton Paving RFP 25C-21 03.03.2021.pdf PDF
03 U.PDF PDF
Form D~5.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C Pricing Form

Form C: Requested RFP Pricing Form
Southampton Bus Garage Paving Project
DATE:2/2/21
Vendor to Fill-in Unit Costs
1. Bidders are required to quote firm fixed Unit Cost(s) in the Unit Cost column below. The quoted prices shall be inclusive of ancillary charges including but not limited to prevailing wages, tooling, equipment, transportation costs, customs, duty charges, and other associated charges. Bidders shall quote only on goods and services in strict accordance with the specifications / requirements. Bidders must fill in each individual item. The MBTA reserves the right to reject any bid if one or more individual item is left blank.

2. The quantities set forth herein are merely estimates of what may be required under the contract, and the MBTA reserves the right to increase or diminish the quantities in any of the items as he/she may deem necessary, without change of price per unit, provided the increase of the sum of all said items does not exceed one hundred and twenty-five (125%) percent of the sum of all said items of all unit prices.

3. Contingencies are used at the sole discretion of the MBTA. Contingencies are used when conditions are not included in the scope of work, unforseen conditions or not clearly defined. Contractor will submit a proposal for the use of contingency to be approved by the MBTA representative. The MBTA reserves the right to self-perform the contingency work or solict other proposals.

No.Item Description264 QtyNon-264 QtyTotal QtyUnitUnit CostExtended Cost
1Hot Mix Asphalt Pavement Milling 0-4"15960428020240SY$ - 0$ - 0
2Unclassified Excavation1000100CY$ - 0$ - 0
3Gravel Base Course50050CY$ - 0$ - 0
4Adjust Manhole/Catch Basin/Valve Cover40343EA$ - 0$ - 0
5Install New Frame and Cover/Grate213EA$ - 0$ - 0
6Crack Repair200100300LF$ - 0$ - 0
7Tack Coat13004001700GAL$ - 0$ - 0
82.0" Superpave Surface Course 12.5 Polymer (SSC-12.5-P)0500500TON$ - 0$ - 0
92.5" Superpave Surface Course 19.0 Polymer (SSC-19-P)240002400TON$ - 0$ - 0
10Saw Cut/Crack Seal2500250LF$ - 0$ - 0
11Pavement Markings320035006700LF$ - 0$ - 0
12Hydrant044EA$ - 0$ - 0
13Wire Loop Installation7003001000LF$ - 0$ - 0
14Safety/Quality/Construction Management Plan101LS$ - 0$ - 0
15Contingency (10%) Lines 1-14101LS$ - 0$ - 0
16Drainage Install Contigency/Permitting101ALLNA$ 100,000.00
17Monitoring Well Decommissioning101ALLNA$ 20,000.00
18Police Details101ALLNA$ 10,000.00
TOTAL LUMP SUM (lines 1-18)$ 130,000.00