Form_C_-_Subcontractor_Utilization_Plan_(4).pdf

PDF 58 KB Posted

Attached to
Municipal Electric Utility (MEU) Feasibility Study
Solicitation number
RFP- 26 - 118
Issued by
Pinellas County, Florida

About this file

Subcontractor Utilization Plan Summary

This is a Subcontractor Utilization Plan form issued by the City of St. Petersburg, Florida for the Municipal Electric Utility (MEU) Feasibility Study procurement (RFP No. 26133-130). The form requires proposers to demonstrate their intent to engage Small Business Enterprises (SBEs), Women Business Enterprises (WBEs), Veteran-Owned Businesses, and Minority Business Enterprises (MBEs) within the Tampa Bay Region. Proposers must describe their efforts in engaging these business categories and reducing barriers to participation through outreach, education, mentorship, and process improvements. The form provides designated fields for proposers to list anticipated percentages of contract amounts and specific subcontractors in each business category. Proposal submissions are due by March 19, 2026, at 3:00 p.m. through the City's online bidding portal. The evaluation of the business outreach plan is weighted at 15 points within the overall point-based scoring system.

Participation by small, veteran, minority, and women-owned businesses is voluntary with no minimum participation requirements mandated as a condition for contract award. Proposers will not be deemed non-responsive if the Subcontractor Utilization Plan shows zero participation from these business categories; however, the City encourages proactive engagement. No specific contract set-asides are established for disadvantaged enterprises. The allocated budget for this feasibility study procurement is $750,000 from Fund 0001, Department 130, Division 1341. The City reserves the right to award to one or multiple vendors and retains flexibility in final contract negotiations. All responding firms must demonstrate the minimum qualifications and comply with insurance, licensing, E-Verify, and criminal background screening requirements specified in the solicitation materials.

View the file

Other files

File Type Posted
Form_C_-_Subcontractor_Utilization_Plan_(4).pdf PDF
Form_C_-_Subcontractor_Utilization_Plan_(4).pdf PDF
Municipal_Electric_Utility_(MEU)_Feasibility_Study_(Addendum_#1_Revision).pdf PDF
Municipal_Electric_Utility_(MEU)_Feasibility_Study_(Addendum_#1_Revision).pdf PDF
Municipal_Electric_Utility_(MEU)_Feasibility_Study_(Addendum_#1_Revision).pdf PDF
Municipal_Electric_Utility_(MEU)_Feasibility_Study_(Addendum_#1_Revision).pdf PDF
Proposal_Requirements.pdf PDF
Proposal_Requirements.pdf PDF
Proposal_Requirements.pdf PDF
Proposal_Requirements.pdf PDF
3_Appendix_C_-_SOQ_Requirements_-_MEU_Feasibility_Study.docx DOCX document
4_SF330-21a_(2).pdf PDF
3_Appendix_C_-_SOQ_Requirements_-_MEU_Feasibility_Study.docx DOCX document
4_SF330-21a_(2).pdf PDF
1_Appendix_A_-_Scope_-_MEU_Feasibility_Study.docx DOCX document
3_Appendix_C_-_SOQ_Requirements_-_MEU_Feasibility_Study.docx DOCX document
4_SF330-21a_(2).pdf PDF
1_Appendix_A_-_Scope_-_MEU_Feasibility_Study.docx DOCX document
4_SF330-21a_(2).pdf PDF
1_Appendix_A_-_Scope_-_MEU_Feasibility_Study.docx DOCX document
1_Appendix_A_-_Scope_-_MEU_Feasibility_Study.docx DOCX document
3_Appendix_C_-_SOQ_Requirements_-_MEU_Feasibility_Study.docx DOCX document
2_Appendix_B_-_Single_Project_-_Proff_Services_Example.docx DOCX document
_Solicitation_Development_Form.docx DOCX document
_Solicitation_Development_Form.docx DOCX document
2_Appendix_B_-_Single_Project_-_Proff_Services_Example.docx DOCX document
2_Appendix_B_-_Single_Project_-_Proff_Services_Example.docx DOCX document
2_Appendix_B_-_Single_Project_-_Proff_Services_Example.docx DOCX document
_Solicitation_Development_Form.docx DOCX document
_Solicitation_Development_Form.docx DOCX document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C

Subcontractor Utilization Plan

Project ID:

Contractor Name:

Subcontractor Utilization Plans require proposers to show intent to use minority, women, veteran, and small businesses in the Tampa Bay Region.

Proposers must describe their efforts in engaging and reducing any barriers to participation by small/veteran/minority/women business enterprises, including outreach, education, mentorship, and process changes designed to increase small/veteran/diverse business participation.

The small/veteran/minority/women business goals set forth herein are voluntary. Proposers will not be considered non-responsive if the Subcontractor Utilization Plan has a zero small/veteran/diverse business participation amount. The City, however, encourages proposers to be proactive in engaging small/veteran/minority/women business enterprise participation. No minimum level of small/veteran/ minority/women business enterprise participation is required as a condition for receiving a Contract award.

Subcontractor Utilization Plan Subcontractor Category As Described Below

Anticipated % of Contract Amount (Determined by the Proposers)

Anticipated Subcontractors (List all in the applicable boxes below)

Small Business Enterprise

(SBE)

Women Business Enterprise (WBE)

Veteran Owned Business

Minority Business Enterprise (MBE)

File details come from the government source that posted it. Updated .