This is a Form C Bidder Response for RFP 93-26, a security system enhancement project for the Massachusetts Bay Transportation Authority (MBTA) at the Quincy Adams station. The scope of work encompasses the procurement and installation of a comprehensive security infrastructure, including six dual-sensor IP cameras (Axis P4707-PLVE) with associated pendant and wall-mounted adapters, six 1TB SD cards for storage, and extensive cabling and conduit systems totaling approximately 2,000 linear feet of outdoor-rated CAT6 cable and 550 linear feet of various gauge rigid steel conduit. The project also includes installation of six junction boxes, ethernet surge protectors, a hardened security network switch (Extreme ISW-24W-4X), and one core drill service. Additional components encompass software licensing through Genetec for camera base licenses and yearly device licenses, system testing, configuration and mapping services, project management, shop and as-built drawings, manuals and training, and bucket truck rental for elevated installation work.
The bidder response indicates a base cost structure with line items for material, labor hours, and labor rates, though all pricing fields appear to have been submitted as zero or incomplete in this particular response form. The only itemized cost shown is a $2,500 contractor contingency amount, resulting in a total submitted bid of $2,500.00. The response structure includes provisions for profit, a 1 percent bond requirement, a five-year warranty, and a 1 percent ITC fee, suggesting the final contract value would be significantly higher once all material, labor, and service costs are properly completed by the selected bidder.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 93-26
| Item | Manufacturer / Part Number | Cost | Measurement | Quantity | Material | Labor Hours | Labor Rate | Labor Total | Total |
| Fixed IP Dual sensor Cameras | Axis P4707-PLVE | Each | 6 | $ - 0 | $ - 0 | $ - 0 | |||
| Camera Pendant Mount Adapter | Axis T94N02D | Each | 6 | $ - 0 | $ - 0 | $ - 0 | |||
| Camera Pendant Mount | Axis T91B50 | Each | 3 | $ - 0 | $ - 0 | $ - 0 | |||
| Camera Wall Mount | Axis T91D61 | Each | 3 | $ - 0 | $ - 0 | $ - 0 | |||
| SD Card (1TB) | Each | 6 | $ - 0 | $ - 0 | $ - 0 | ||||
| 316SS 1/4" Screw-Type Concrete Mounting Anchors | Hilti or Approved Equal | Each | 24 | $ - 0 | $ - 0 | $ - 0 | |||
| Outdoor Rated CAT6 Cable | LF | 2,000 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3/4"- RGS Conduit | FT | 250 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1" - RGS Conduit | FT | 50 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1-1/4" - RGS Conduit | FT | 150 | $ - 0 | $ - 0 | $ - 0 | ||||
| 1-5/8" x 1-5/8" Galvanized Strut | FT | 100 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3/4" Liquid Tight Flex Conduit | FT | 25 | $ - 0 | $ - 0 | $ - 0 | ||||
| Conduit Accessories, Fittings, Misc. Hardware | LS | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Core Drill | Each | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4"Sq RGS Junction Boxes (RGS with screw cover) | Each | 6 | $ - 0 | $ - 0 | $ - 0 | ||||
| Ethernet Surge Protector | Ditek or Approved Equal | Each | 6 | $ - 0 | $ - 0 | $ - 0 | |||
| Hardened Securty Network Switch | Extreme ISW-24W-4X | Each | 1 | $ - 0 | $ - 0 | $ - 0 | |||
| $ - 0 | $ - 0 | $ - 0 | |||||||
| Software | |||||||||
| Genetec Camera License - Base Price | Each | 6 | $ - 0 | $ - 0 | $ - 0 | ||||
| Genetec Yearly Device License Fee - 1 Year | Each | 6 | $ - 0 | $ - 0 | $ - 0 | ||||
| Extreme Network Switch License | Each | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| System Testing | N/A | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Genetec Configuration and Maps | N/A | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| $ - 0 | $ - 0 | $ - 0 | |||||||
| Project Management | |||||||||
| Project Management and Admin | N/A | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Shop and As-Built Drawings | N/A | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Manuals/Training | N/A | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Bucket Truck | Each | 1 | $ - 0 | $ - 0 | $ - 0 | ||||
| Sub Total: | $ - 0 | Sub Total: | $ - 0 | $ - 0 | |||||
| Profit | $ - 0 | ||||||||
| Bond | 1% | $ - 0 | |||||||
| 5 Yr. Warranty | LS | ||||||||
| Contractor Contingency | LS | $ 2,500.00 | |||||||
| ITC Fee | 1% | $ - 0 | |||||||
| Total: | $ 2,500.00 |