Form_7.1_-_Bid_Submittal_Checklist.pdf
PDF 152 KB Posted
- Attached to
- DAY DOCK AT RIVERWALK PARK
- Solicitation number
- ITB-26-26-CW
- Issued by
- Volusia County, Florida
About this file
This is a Bid Submittal Checklist form for the City of Port Orange, Florida, related to the Day Dock at Riverwalk Park project. The checklist outlines the required documentation and compliance items that bidders must submit with their proposals for the construction of a transient docking facility designed to accommodate up to ten vessels with potential for expansion. The form serves as a verification tool to ensure all bidders provide complete and compliant submissions, including required certifications, insurance documentation, contractor qualifications, and project-specific compliance items. Bidders are required to verify completion of each checklist item and submit the form with their bid packages to demonstrate adherence to all solicitation requirements.
The checklist format provides a systematic approach for bid evaluation and helps streamline the review process by establishing uniform submission standards across all responses. By requiring bidders to complete and submit this checklist, the City ensures that all proposals contain necessary supporting documentation and meet baseline compliance requirements before substantive bid evaluation occurs. This approach reduces administrative burden during evaluation and minimizes the risk of bid protests related to incomplete submissions.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 7 – REQUIRED FORMS
FORM 7.1 – BID SUBMITTAL CHECKLIST
_____ Form 7.2 – Bidder’s Acknowledgement
_____ Form 7.3 – Addendum and Change Order Procedure Acknowledgement
_____ Form 7.4 – Drug Free Preference Statement
_____ Form 7.5 – Public Entity Crimes Statement
_____ Form 7.6 – Anti-Collusion
_____ Form 7.7 – Statement of Bidder’s Qualifications
_____ Form 7.8 – Professional References for Previous Experience
_____ Form 7.9 – List of Subcontractors
_____ Form 7.10 – Scrutinized Companies Certification
_____ Form 7.11 – Local Business Affidavit of Eligibility
_____ Form 7.12 – E-Verify Affidavit
_____ Form 7.13 – Debarment, Suspension and Other Responsibility Matters
_____ Form 7.14 – Affidavit of Compliance With F.S. 287.138
_____ Form 7.15 – No Submittal Response
_____Form 7.16 - Representations/Certifications
_____ APPENDIX A – 44 C.F.R. PART 18 CERTIFICATION REGARDING LOBBYING
_____ (Attachment 1) – Schedule of Unit Pricing
_____ Current Bonding Capacity Letter (as outlined in Section 6)
_____ Copy of all currently held Licenses (Contractor, Sunbiz, etc.)
_____ Current Tax Receipt of Bidder’s municipality
_____ Original Bid Bond or certified check or bank draft (as outlined in Section 6)
_____ Submission of one (1) original marked “ORIGINAL” and one (1) digital (flash drive) version in PDF format
BY: _________________________________________________________
Name of Business
Authorized Signature
Date
This document must be completed and returned with your Submittal
File details come from the government source that posted it. Updated .