This is a technical specifications document for the City of Port Orange's Day Dockage facility project at Riverwalk Park in Florida. The project involves construction of a transient docking facility to accommodate up to ten vessels with potential for expansion, providing recreational boaters access to park amenities. The scope of work is divided into 21 distinct bid items covering mobilization and demobilization, construction and surveying, demolition and hauling, vibration monitoring, environmental compliance, temporary traffic control, clearing and grubbing, mechanical dredging, timber dock construction with piles, aluminum gangway installation, concrete floating dock system with mooring piles, private aids to navigation, concrete sidewalk, concrete grade beam, concrete flush curb, pavement marking, fire hydrant installation, FDC and standpipe system, dock lighting and electrical utilities, environmental signage, and mangrove plantings. Payment terms vary by item, with mobilization paid 50 percent upon equipment arrival, 30 percent during construction, and 20 percent upon demobilization; construction and survey work paid 30 percent upon initial stakeout approval with remainder as work progresses; and other items such as dredging paid per cubic yard and dock construction paid per square foot upon completion and acceptance.
The specifications establish detailed technical requirements for materials, including southern yellow pine lumber treated to 0.6-pound retention, 316 stainless steel hardware, concrete with minimum 5,000 psi compressive strength for floats and 4,000 psi for curbing, and pre-stressed concrete piles. The contractor must obtain all necessary permits including NPDES permits, mangrove trimming and removal permits, and dewatering permits at no additional cost. Concrete must be placed within 90 minutes of batch time and cured for at least seven days, with trucks rejected if they sit on-site longer than 45 minutes. All shop drawings and submittals require engineer approval prior to procurement and installation, with unapproved materials subject to replacement at contractor expense. The contractor is responsible for all vibration monitoring, turbidity control, environmental protection measures, and weekly reporting to the engineer, and must maintain a pile-driving log throughout construction. Workforce qualifications include requirements for state-licensed surveyors, FDOT-approved temporary traffic control personnel, and manufacturer certifications such as ISO 9001 compliance for concrete float manufacturing facilities and at least ten years of consecutive experience in float design and manufacturing.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Port Orange Riverwalk Park Day Dockage
Technical Specifications
The City of Port Orange
October 9, 2026
City of Port Orange Riverwalk Park Day Dockage
Item 1 Mobilization and Demobilization:
The work specified in this section consists of the preparatory work and operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for the establishment of temporary offices, buildings, safety equipment and first aid supplies, sanitary and other facilities, as required by these technical specifications, the construction plans, and State and local laws and regulations. All costs for the necessary bonds as indicated in the bid document shall be included in this item.
All costs for permits and any required insurance, and any other pre-construction expense necessary for the start of the work, as well as the cost of the removal of the above items, shall also be included in this item. All costs associated with trimming/clearing of trees, other vegetation, turf removal, any other materials, and any other site preparation tasks necessary to allow construction of the project, shall also be included in this item. The CONTRACTOR is responsible for all work and costs associated with acquiring all necessary documents including but not limited to permits required for dewatering, mangrove trimming, mangrove removal, etc. as necessary for the removal of the existing structures and construction of the proposed structures. All costs associated with collecting complete photographic and video documentation of the site prior to construction shall also be included in this item. All costs associated with grading and grassing the project site once work is complete to restore the site to pre-work conditions shall also be included in the cost of this bid item. The CONTRACTOR shall be responsible for irrigating newly placed grass to ensure establishment and long-term viability of grass cover.
At the pre-construction meeting, the CONTRACTOR shall submit a tentative work schedule, safety plan, a shipping, stockpile and site administration plan (SSSAP), a complete list of all SUBCONTRACTORS that will be employed by the PRIME CONTRACTOR, and complete contact information for PRIME CONTRACTOR staff and all SUBCONTRACTOR staff. Personnel to be included in the contact lists shall include, but not necessarily be limited to: CONTRACTOR and SUBCONTRACTOR Principals, CONTRACTOR and SUBCONTRACTOR Project Managers, CONTRACTOR and SUBCONTRACTOR Site Superintendents and/or Foremen. In addition, emergency contact information should be included for the PRIME CONTRACTOR and all SUBCONTRACTORS.
The basis of payment for Mobilization and Demobilization shall be LUMP SUM.
Fifty (50%) percent of this lump sum cost shall be paid upon mobilization of equipment to the project site. An additional 30% of this cost shall be paid as the project progresses. The final 20% of this cost, less retainage, shall be paid upon removal of all equipment from the project site.
Item 2 Construction, As-Built Survey, and Pre/Post Survey:
The bid price for this item shall include all necessary survey work for the CONTRACTOR to complete all construction activities. Elevations for the construction plans are based on the North American Vertical Datum 1988 (NAVD
88) and Mean Low Water (MLW).
The CONTRACTOR shall furnish the services of a State of Florida licensed land surveyor for the field layout of all work. The CONTRACTOR’S licensed land surveyor shall perform all initial site layout and shall provide follow-up verification of all work underway at a frequency of no less than once a week. All deviations from the construction plans, no matter how minor, that are noted during the follow-up verifications shall be recorded on the project redline plan set which shall always be maintained on the site and submitted to the ENGINEER prior to project close-out. The ENGINEER must approve the initial site stakeout before any work begins;
the CONTRACTOR shall provide a minimum of 5 Business Days’ notice to the ENGINEER of the anticipated completion of the initial stake-out so the inspection and field verification can be scheduled. Prior to start of construction, the surveyor shall also locate any mangroves and other protected/threatened vegetative species located within or adjacent to (within 25 feet) the project area so these may be flagged, and appropriate protective measures set up prior to starting work. All intermediate construction surveys shall be included in this item. The CONTRACTOR is cautioned that the survey must be conducted with respect to adjacent site aspects and must contact the ENGINEER for any clarification prior to any construction.
The bid price for this item shall include all necessary survey work for the CONTRACTOR to furnish an as-built survey of the completed project. The as-built survey shall be referenced to the North American Vertical Datum 1988 (NAVD 88).
The CONTRACTOR shall submit one (1) electronic copy in pdf format and provide associated AUTOCAD civil 3d .dwg file (Version 2021 or later) of the completed project. These documents shall be signed and sealed by a professional surveyor registered in the State of Florida and then submitted to the ENGINEER for approval. The CONTRACTOR shall accurately record the location and elevations of all constructed grades and structures including but not limited to: pavement marking, proposed environmental sign, mangroves, concrete sidewalk, concrete flush curb, channel and warning markers, fire hydrant, FDC and standpipe system, Dock lighting and electrical utilities, fixed timber docks (elevations at minimum 10-foot intervals, all landings/change in slope, and at all corners), gangways (at all corners), concrete floating dock (at all corners of section), all pre-stressed concrete pile and timber pile locations and finished top elevations.
In addition, the CONTRACTOR shall coordinate a pre and post dredge survey of the access channel, referenced to Mean Low Water (MLW) vertical datum. These surveys will be used to determine the dredging and disposal quantity in Item 8 “Mechanical Dredging (Hauling and Placement at Final Disposal Site)”.
The basis of payment for Construction, As-Built Survey, and Pre/Post Survey shall be LUMP SUM. Thirty (30%) percent of the lump sum cost shall be paid upon acceptance of the initial site stakeout by the ENGINEER. The remainder of the cost, less retainage, shall be paid as the project progresses.
Item 3 Demolition, Hauling, and Disposal:
The bid price for this item shall include the required manpower, equipment, materials and other costs involved in the removal and disposal of all items indicated for demolition in the construction plans, including but not limited to;
concrete sidewalk and any base or subbase material, and all other demolition, hauling, and disposal required to construct the project as indicated in the construction plans.
The CONTRACTOR shall take all necessary precautions to avoid damage to upland and wetland vegetation and trees to be preserved during removal, demolition and hauling of debris. In addition, the CONTRACTOR shall take all necessary precautions to avoid impacts to in-water resources during demolition and removal of the existing structures. All environmental protection measures shall be in place before any demolition or other construction activity commences. The CONTRACTOR shall be responsible for requesting utility locates from Sunshine 811 prior to commencing any demolition or other earthwork activities. All silt fence, turbidity curtains and other erosion and sediment control measures must be in place prior to commencing construction and demolition activities.
The basis of payment for Demolition, Hauling, and Disposal shall be LUMP
SUM.
Item 4 Vibration Monitoring:
The bid price for this item shall include the required manpower, equipment, materials and other costs involved in vibration monitoring throughout construction duration.
CONTRACTOR shall provide a third-party monitoring service with a calibrated seismograph; costs of seismograph/vibration monitoring shall be included in the bid price for this item. Vibration monitoring reports shall be submitted to the ENGINEER weekly for approval, and copies of the reports shall be made available to the CITY OF PORT ORANGE and the ENGINEER at any time upon request.
CONTRACTOR is responsible for ensuring vibration monitoring measures and means/methods utilized during construction are non-destructive and will not compromise or create any adverse impacts to all existing structures.
The basis of payment for Vibration Monitoring shall be LUMP SUM. Fifty (50%) percent of the lump sum cost shall be paid upon mobilizing and properly installing all vibration monitoring control measures. The remainder of the cost (less retainage) shall be paid as the project progresses. Removal of all vibration monitoring control measures from the project site once the work has been completed is required before final acceptance of the project by the CITY OF PORT
ORANGE.
Item 5 Environmental Compliance (Including FDOT Type II Floating Turbidity
Barrier):
The bid price for this item shall include, but not be limited to, the necessary manpower, equipment and materials needed to maintain regulatory compliance and environmental protection during all phases of construction. This item includes all costs related to obtaining an NPDES permit and complying with all NPDES permit requirements. FDOT Type II Turbidity curtains and silt fencing shall always be installed around dredging and construction areas and the CONTRACTOR shall take all proactive measures to reduce loss of sediment and turbidity generation in receiving waters during all dredging activities and construction activities.
The bid price for this item shall include all costs for monitoring and reporting turbidity of water discharged from the site as required by the NPDES or other permits, as well as all costs for corrective measures taken to correct measured turbidity levels in excess of permitted conditions. These monitoring and testing requirements also apply to discharges from the site from any required dewatering measures. Turbidity monitoring reports shall be submitted to the ENGINEER weekly, and copies of the reports shall be made available to the CITY OF PORT ORANGE and the ENGINEER at any time upon request.
The bid price for this item shall also include all costs associated with regularly inspecting and maintaining all other erosion, sediment, and turbidity control measures employed during construction of this project, as well as any necessary repairs and/or replacement of these measures, with the need determined through regular inspections conducted at minimum intervals as specified in the project permits, and/or at the direction of the ENGINEER and/or CITY OF PORT ORANGE. Copies of the control measure inspection reports shall be submitted to the ENGINEER within one week of the inspection, and a summary of corrective measures taken to address noted deficiencies shall be included. A weekly log of these inspections shall be provided to the ENGINEER.
In addition, the CONTRACTOR shall comply with all permits for this project and all federal, state, and local water quality standards throughout the duration of the project.
The CONTRACTOR shall take all necessary precautions to avoid damage to wetland vegetation and trees to be preserved. This item includes costs related to flagging and marking protected vegetation, as well as protective measures for these.
The basis of payment for Environmental Compliance (Including FDOT Type II Floating Turbidity Barrier) shall be LUMP SUM. Fifty (50%) percent of the lump sum cost shall be paid upon obtaining an NPDES permit and properly installing all erosion and turbidity control measures. The remainder of the cost (less retainage) shall be paid as the project progresses. Removal of all control measures from the project site once the work has been completed is required before final acceptance of the project by the CITY OF PORT ORANGE.
Item 6 Temporary Traffic Control:
The bid price for this item shall include, but not be limited to, the necessary manpower, equipment and materials needed to provide temporary traffic control through the project area for the duration of construction. Public access to businesses adjacent to the project area must be maintained at all times, and parking for these businesses shall be made available at all times. The CONTRACTOR shall give a minimum of 2 weeks’ advance notice to the CITY OF PORT ORANGE and the ENGINEER for any request for lane closures on nearby streets.
At the preconstruction meeting, the CONTRACTOR shall submit a temporary traffic control plan (TTC) to the ENGINEER and the CITY OF PORT ORANGE for approval. This TTC Plan shall conform to the requirements of Standard Plans Indexes 102-000, 102-005, and other applicable indexes of the Florida Department of Transportation Standard Plans (FY 2026-27). The TTC Plan shall also include details ensuring the safe delivery and removal of materials by trucks from temporary stockpile areas established near the project area. Any personnel utilized as flaggers must have completed a Temporary Traffic Control Flagger Training course offered by an FDOT-approved provider, and set-up, inspection and maintenance of temporary traffic control devices must be performed under the supervision of personnel who have completed an Intermediate level TTC course offered by an FDOT-approved provider. The CONTRACTOR shall maintain copies of all training certificates on the project site at all times. The ENGINEER must be informed once TTC measures have been fully implemented so an inspection may be scheduled. The CONTRACTOR shall regularly inspect barricades, signs, fencing and other TTC devices employed on the job site, and shall repair or replace these as needed.
The basis of payment for Temporary Traffic Control shall be LUMP SUM. Fifty (50%) percent of the lump sum cost shall be paid once TTC devices and signage have been deployed per the approved TTC plan. The remainder of the cost (less retainage) shall be paid as the project progresses. Removal of TTC devices and signage from the project site once the work has been completed is required before final acceptance of the project by the CITY OF PORT ORANGE.
Item 7 Clearing, Grubbing, and Restoration:
The bid price for this item shall include, but not be limited to, the required manpower, equipment, material, and other costs involved in clearing and stripping the project area for the proposed construction as indicated in the construction plans. The work shall include the complete removal and legal disposal of all sod, brush, rubbish, vegetation, roots, debris, borrowed material and any other remaining obstructions, AS NEEDED, within the project limits.
The CONTRACTOR shall take all necessary precautions to avoid damage to existing utilities and structures that are to remain. Any damage to utilities or existing structures shall be repaired at the CONTRACTOR’S expense.
The basis of payment for Clearing, Grubbing, and Restoration is LUMP SUM.
Item 8 Mechanical Dredging (Hauling and Placement at Final Disposal Site):
The bid price for this item shall include, but not be limited to the required manpower, equipment, materials, and any other items necessary, including any dewatering techniques, and all applicable safety measures to dredge and dispose of the material as indicated in the construction plans.
The material quantity indicated in the bid sheet is approximate and based on a survey indicated in the construction plan set included in the bid. The actual total and section quantities of material to be dredged will be determined by the CONTRACTOR's pre/post dredge surveys. The pre-dredge survey must be submitted to the ENGINEER for approval prior to starting any dredging activities.
It is the CONTRACTOR'S responsibility to investigate the existing material and determine the equipment needed to successfully complete the dredging, however, a geotechnical report has been provided.
The limits of dredging are shown on the construction plans. CONTRACTOR shall be paid per cubic yard of sediment removed within the dredge template as determined by comparison of the initial and final mudline elevations within the dredge template area as determined by the pre- and post-dredge surveys.
CONTRACTOR will not be paid for any material dredged outside the proposed dredge template indicated in the construction plans and permits.
CONTRACTOR shall provide, operate, and maintain for the entire duration of the dredging project portable dredging equipment capable of completing the work outlined in these specifications and in the construction plans. It is CONTRACTOR’S responsibility to determine the size of barge, dredge, and support equipment necessary to complete the project based on their assessment of the project site conditions and time limitations. The CONTRACTOR shall account for all tidal conditions and size all equipment accordingly.
The dredge and off load location must be surrounded by turbidity barriers at times when dredging. The dredge barge must be lit and marked in accordance with FWC rules and regulations for navigation. CONTRACTOR and CITY OF PROT ORANGE will confirm the location of offloading the dredged material during the pre-construction meeting.
The CONTRACTOR is responsible for hauling and disposing of the dredge material. The spilling of the material will not be tolerated; the CONTRACTOR shall bear sole responsibility for any and all costs associated with the clean-up of spilled material. All precautions and best management practices for erosion and turbidity control must be in place at all times; the CONTRACTOR shall take all measures necessary to ensure sediments or turbid water do not enter nearby storm sewers or inlets. Trucks must be sealed; spilling and loss of material will not be acceptable.
During hauling operations and loading activities at the proposed dredged material off-loading area, no heavy equipment operation, truck loading activity, or material stockpiling shall occur within twenty (20) feet of the existing bulkhead. The 20-foot minimum setback shall be maintained on both the waterward and landward sides of the existing bulkhead to prevent excessive surcharge loading and potential impacts to the existing bulkhead structure.
The basis of payment for Mechanical Dredging (Hauling and Placement at Final Disposal Site) shall be paid per CUBIC YARD.
Item 9 Timber Dock (Includes 12-Inch Timber Piles):
manpower, equipment, materials, hardware and incidentals needed to construct all components of the timber pier, as indicated in the construction plans.
Components to be constructed include, but are not limited to: timber piles, cap boards, stringers, deck boards, handrail posts, splice blocks, mid-post spacer boards, vertical rails, horizontal rails, and the stainless-steel cable rail system, etc.
All timber must be free of splinters, cracks, knots, or sap. All timber must be treated with wood preservative products as indicated in the construction plans, to the treatment retention levels indicated in the construction plans and must be southern yellow pine (SYP) meeting the grade requirements indicated in the construction plans. Any timber deemed unsuitable by the ENGINEER will be replaced at the CONTRACTOR'S expense.
The CONTRACTOR shall furnish timber piles meeting the dimensions and specifications indicated in the construction plans. The CONTRACTOR shall submit shop drawings and technical data sheets for the piles to the ENGINEER for approval prior to ordering or driving piles. Any piles driven without this approval shall be removed and replaced by the CONTRACTOR at the CONTRACTOR’S expense. The CONTRACTOR shall be responsible providing pile-driving equipment and methodology which is capable of delivering sufficient energy to drive the piles to the design tip elevation without excessive impacts which may damage the piles and shall be responsible for maintaining the equipment in a safe and operable condition. The CONTRACTOR shall submit technical data and specifications on the vibratory or impact hammer to be used for driving to the ENGINEER for approval prior to starting any pile driving activity.
All in-water piles must be wrapped with a mechanically tensioned PVC membrane as per the details in the construction plans. All pile wraps must have a rolled, positive vertical closure that significantly restricts leeching of pile preservative from the pile into the surrounding environment while preventing oxygenated water from entering the wrap. In addition, all piles must be wrapped with a hermetic top seal (compressed and banded).
Jetting of piles is not permitted without prior approval of the ENGINEER, and in all cases where jetting of piles is approved, the final five (5) feet of the piles must be driven. If solid rock, debris, or refusal is encountered prior to achieving design tip elevation, the pile must be tool punched into the strata. The ENGINEER will make the final determination on if refusal is encountered.
Absolutely no piles shall be cut to design top elevation, beyond the top six (6) inches of the pile, which is damaged by driving, without prior written approval of the ENGINEER. If the CONTRACTOR requests to cut off piles, the piles must remain “in-place, as-is”, and the ENGINEER notified a minimum of 5 Business days in advance so a site visit and recommendations based on observed field conditions can be made. Any pile cut off without prior written approval from the ENGINEER shall be removed and replaced at the CONTRACTOR’S expense.
The CONTRACTOR shall always maintain a pile driving log on the site, and this log shall be available for inspection by the CITY OF PORT ORANGE or the ENGINEER at any time on request. The information to be recorded in the log shall be per the general notes of the construction plans. The CONTRACTOR shall submit the final pile driving logs so the ENGINEER may review them prior to final project acceptance. The ENGINEER shall not make a structural certification without this submittal.
The CONTRACTOR shall survey the location of each pile, and once all piles have been installed, shall submit this survey to the ENGINEER for approval prior to starting any additional work on the observation pier. Any pile located more than ¾ inches from its design position as indicated in the construction plans shall be removed and reinstalled by the CONTRACTOR at no additional cost to the CITY
OF PORT ORANGE.
All hardware used for the construction of the dock system must be grade 316-alloy stainless-steel; under no circumstances will any alternative materials or other stainless-steel alloys be accepted. The CONTRACTOR shall ensure that all handrail components fight tightly and are sanded, beveled, and finished as needed to eliminate the potential for injury to observation pier users from gouges or contact with sharp edges.
The CONTRACTOR must make submittals of the timber, hardware, pile wraps, stainless steel cable rail system, and stainless-steel hardware, etc. to the ENGINEER prior to purchase or construction. Absolutely no piles shall be cut to final top elevation without the approval of the ENGINEER. Any products or materials manufactured, purchased, or installed prior to shop drawing approval will be replaced at the CONTRACTOR’S expense if the above noted approvals have not been obtained.
The basis of payment for Timber Dock (Includes 12-Inch Timber Piles) shall be per SQUARE FOOT.
Item 10 Aluminum Gangway (30’ x 7’):
manpower, equipment, materials and hardware needed to properly furnish and install the aluminum gangway as indicated in the construction plans. The gangway kick plates must provide smooth transitions to the floating dock system for all water elevation conditions. The gangway shall have fixed railings with ADA-compliant grab rails on both sides.
The CONTRACTOR shall submit a shop drawing of the gangway, connection detail to the timber dock and roller detail at the termination of the gangway to the ENGINEER for approval prior to manufacturing, purchase, or installation. Any products or materials manufactured, purchased, or installed prior to shop drawing approval will need to be replaced at the CONTRACTOR’S expense if the ENGINEER does not approve corresponding shop drawings.
The CONTRACTOR is responsible for rejecting any gangway sections that are delivered to the project site damaged to an extent where they are unusable. Any repairs to damaged gangways shall be made by or under the supervision of the manufacturer, using methods and materials approved by the manufacturer, and a letter from the manufacturer stating that the repaired items will meet the structural requirements of the project shall be submitted to the ENGINEER before they will be accepted. Any damaged gangway sections that have been installed without this acceptance by the ENGINEER will be removed and replaced at the CONTRACTOR’S expense.
The basis of payment for Aluminum Gangways (30’ X 7’) is per EACH.
Item 11 Concrete Floating Dock system (Includes 14" Concrete & 12" Timber
Mooring Piles, Aluminum Railing):
The bid price for this item shall include, but not be limited to, the required manpower, equipment and material involved in purchasing and properly installing the floating concrete dock system as indicated in the construction plans. Proper installation of the floating system is the responsibility of the CONTRACTOR, and such installation methodology must be submitted to the ENGINEER for verification before proceeding. Dock segments should be properly supported during transportation and installation, and the CONTRACTOR is responsible for replacing any damaged segments at their own expense.
All shop drawings must be submitted to the ENGINEER for approval prior to manufacturing, purchase, or installation. Any products or materials manufactured, purchased, or installed prior to shop drawing approval will need to be replaced at the CONTRACTOR’S expense if corresponding shop drawings are not approved by the ENGINEER.
In addition, this item shall include the required manpower, equipment and materials needed to purchase and properly install the 14" Square FDOT Marine Grade Pre- Stressed Concrete Piles with White Composite Pile Caps for the floating concrete dock system, in the locations identified in the construction plans. The CONTRACTOR is responsible for providing pile driving equipment and methods that will deliver sufficient energy to drive the piles to the indicated embedment depth without causing excessive damage to the piles. Piles should be properly supported during transportation and installation, and the CONTRACTOR will be responsible for replacing any damaged piles at their own expense.
If solid rock, debris, or refusal is encountered prior to achieving design tip elevation, the pile must be tool punched through the strata. The ENGINEER will make the final determination on if refusal is encountered.
Jetting of piles is not permitted without prior approval of the ENGINEER, and in all cases where jetting of piles is approved, the final five (5) feet of the piles must be driven. If solid rock, debris, or refusal is encountered prior to achieving design tip elevation, the pile must be tool punched into the strata. The ENGINEER will make the final determination on if refusal is encountered.
Absolutely no piles shall be cut to design top elevation, beyond the top six (6) inches of the pile, which is damaged by driving, without prior written approval of the ENGINEER. If the CONTRACTOR requests to cut off piles, the piles must remain “in-place, as-is”, and the ENGINEER notified a minimum of 5 Business days in advance so a site visit and recommendations based on observed field conditions can be made. Any pile cut off without prior written approval from the ENGINEER shall be removed and replaced at the CONTRACTOR’S expense.
The CONTRACTOR shall maintain a pile driving log on the site at all times, and this log shall be available for inspection by the CITY OF PORT ORANGE or the ENGINEER on request. The information to be recorded in the log shall be per the general notes of the construction plans. The CONTRACTOR shall submit the final pile driving logs immediately after the installation of the piles so the ENGINEER may review them prior to next step for acceptance. The ENGINEER shall not make a structural certification without this submittal.
Shop drawings and technical data sheets for the floating dock sections and the piles, and the FDOT certification for the pre-cast plant supplying the prestressed concrete piles, must be submitted to the ENGINEER for approval prior to manufacturing, purchase, or installation.
The CONTRACTOR is responsible for rejecting any piles or floating dock sections that are delivered to the project site damaged to an extent where they are unusable. Any repairs to damaged piles or floating dock sections shall be made by or under the supervision of the manufacturer, using methods and materials approved by the manufacturer, and a letter from the manufacturer stating that the repaired items will meet the structural requirements of the project shall be submitted to the ENGINEER before they will be accepted. Any damaged piles or floating dock sections that have been installed without this acceptance by the ENGINEER will be removed and replaced at the CONTRACTOR’S expense.
The CONTRACTOR is responsible for ensuring required submittals are made promptly so that fabrication time for the piles does not adversely impact the project schedule. Any products or materials manufactured, purchased, or installed prior to shop drawing approval will need to be replaced at the CONTRACTOR’S expense if the ENGINEER does not approve corresponding shop drawings.
CONCRETE FLOATING DOCK SYSTEM
TECHNICAL SPECIFICATIONS
1. GENERAL
1.1 THE SCOPE
The Contractor shall furnish all tools, equipment, materials, and supplies and shall perform all labor, supervision, fabrication, assembly, and installation of a complete concrete float system.
1.2 CONTRACTOR SITE INSPECTION
The Contractor shall examine the jobsite before preparing their shop drawings to verify all physical conditions and surroundings.
1.3 TECHNICAL
The flotation system shall consist of modular sections designed in such a manner that modules may be replaced with standard modules in case of repairs.
Float modules shall be structurally connected by a treated timber or other approved type of waler system that will allow replacement without affecting the float modules.
Connection methods that create structural failure of the float module when over stressed will not be allowed. Concrete float modules must have concrete cover for protection on all six sides. Floats without concrete bottoms will not be allowed.
Minimum concrete deck, bottom and wall sections shall be as follows:
Deck: 2.00 inches Walls: 1.50 inches Bottom: 1.25 inches
Sufficient flotation shall be provided to support a live load of fifty (50) pounds per square foot of deck area with a minimum freeboard of nine (9) inches.
Freeboard under dead load only shall not be less than seventeen (17) inches or exceed twenty (20) inches.
The Contractor should exercise caution to ensure that all deadloads are accurately determined and included in buoyancy calculations. These loads should include appropriate safety factors if used and any specific manufacturing considerations that will affect the final freeboard.
Dead loads shall consist of the floats, framing, waler system, attachment steel, miscellaneous connection devices, and all other permanently attached equipment such as utilities, boxes, fire protection equipment, etc.
Special floats must be designed to support the additional concentrated loads as imposed by gangways, transformers, or other equipment. Floats with special loadings shall have the same freeboard as floats with no such loading, so that there will be residual stresses or tilting when such floats are interconnected unless specifically approved by the float system engineer.
The weight of lumber for these calculations shall be assumed at no less than forty
(40) pounds per cubic foot.
The walking surface of concrete floats shall be level and flush with respect to the adjacent floats.
Floats shall be designed to float level under dead load only. The decks of the floats shall be within the followings tolerances of being level:
• Maximum transverse slope for main floats: two (2) inches per ten (10) feet of width
• Maximum longitudinal slope: two (2) inches per ten (10) feet
Flotation units shall be located within the structure so as to be capable of supporting a 300-pound point load moving in any area on a float without excessive rolling or tilting on the dock. When a 400-pound load is applied one foot from the end of the finger, that finger will lose no more than four inches of freeboard. When a 300-pound load is applied to one outer corner of the finger there should be no more than 2 inches in freeboard differential per three feet of width between the outer corners of the finger. This should be done once the system is totally connected and in its final intended condition.
Float and anchorage systems shall be designed for the following load cases as a minimum:
• Wind pressure of 15 PSF (77 MPH fastest mile wind at 33 feet standard elevation, Exposure C, per ASCE 7-16) acting on the projected area of all docks and moored vessels assuming full occupancy of the marina.
• Minimum current pressure of 15 PSF (5 feet per second current velocity) acting on the projected area of all docks and moored vessels assuming occupancy levels will reflect those expected during the flood season.
• Vertical wave loads, as they exist at the specific site.
• Lateral wave loads for waves having a significant wave height exceeding one foot if they are expected to occur at the specific site.
• Load cases should be combined based upon the probability of simultaneous occurrence of the events.
• Lateral pile loads at the maximum surge level.
1.4 STANDARDS
All docks, structures and components must be designed per one of the following codes or authorities, depending upon the application:
UBC (Uniform Building Code) SBC (Standard Building Code) MBMA (Metal Building Mfg. Assoc.)
BOCA (Building Official Congress of America) City/State/City Building Code Army Corps Manual SR-2 ASTM Standards AISI (American Iron and Steel Institute) AISC (American Institute of Steel Construction) AWPA (American Wood Preservers Assoc.)
PCI (Prestressed Concrete Institute) CRSI (Concrete Reinforcing Steel Institute)
Parameters
• Wind load calculations shall be based on an average vessel profile height equal to 15% of the slip length.
• Current load calculations shall be based on the average vessel draft determined by the intended vessel types.
• Calculations are to be performed for wind and current loads both parallel to and perpendicular to the slips.
• Full wind and current loads shall be applied to all exposed vessels. To account for sheltering effects, 15% of the full load shall be applied to all vessels sheltered by the exposed vessel.
• Calculations shall assume that any given boat/slip may be exposed during a design event.
• Allowable material stresses shall be based on the latest edition of the Uniform Building Code.
• Minimum evaluation of the design wave environment shall include identifying the Significant Wave Height, Peak Spectral Wavelength, Wave Period and Wave Approach Angle.
1.5 DRAWINGS
Prior to fabrication or construction, the Contractor shall furnish sufficient information to describe the floating dock system and shall submit complete shop drawings and calculations for approval by the CITY OF PORT ORANGE. Dock and anchorage drawings and calculations shall be affixed with the appropriate stamps and signatures of a registered professional coastal engineer, maintaining professional liability insurance with a minimum policy limit of $2,000,000. The Engineer of Record shall seal all drawings with a stamp identifying him/her as a registered Professional Engineer licensed in the state in which the project is located. The Engineer shall have designed at least ten previous marina projects of a size and function similar to this project that has been in use for a minimum of five years.
Shop drawings shall show the layout of the dock system, layout of complete mooring/anchoring system, details of all connections, waler sizing and splice pattern, anchorage connections, utility routings and all other details necessary and pertinent to the construction of the floating dock system.
1.6 CALCULATIONS
All design calculations shall assume that all slips are occupied, that any individual slip may be exposed during a design event and that all reasonable deadloads have been incorporated into the system.
Once the loads are determined by the applicable codes listed above, the design and calculations shall be prepared in accordance with AISI and AISC specifications and guidelines.
All engineering and calculations shall be done in accordance with these guidelines using the appropriate allowable capacities and safety factors. Calculations are to be stamped by a registered professional coastal engineer, maintaining professional liability insurance with a minimum policy limit of $2,000,000. The engineer of record shall seal all calculations with a stamp identifying him/her as a registered Professional Engineer licensed in the state in which the project is located. The Engineer shall have designed at least ten previous marina projects of a size and function similar to this project that has been in use for a minimum of five years.
In addition to sizing all members for these codes and specifications, the following calculations shall be submitted as a minimum for the dock system:
• Anchorage attachment points to insure reactions shall be appropriately and rationally distributed throughout the system.
• Finger lateral loads from current and wind in the shielded and unshielded condition for each finger length. Calculations will provide transfer assumptions for both cantilever and non-cantilever type fingers, including finger-to-walk connections.
• Overall system loads under full occupancy with consideration for shielding factors and deflections of the system and its effects on anchor loading.
• Anchorage system capacity for individual and overall load considerations.
• If anchor piles are utilized for mooring, the special design information should include:
Pile size and cross section.
Overall pile length Minimum embedment
• Vertical loading due to wave action and live load requirements including both walkways and fingers.
1.7 QUALITY ASSURANCE
The manufacturer must have an ongoing quality management system. This quality system must be regularly assessed and currently certified as meeting the ISO 9001 Standard. The scope of this certification must be for the design and manufacture of floating docks and pertain to the company or portion of the company providing the products and services for the project. The registrar providing this certification must be accredited according to EN 45012.
All steel fabrication and welding will be performed in a facility currently certified as meeting the ISO 9001 Standard. All structural steel welders shall be qualified in accordance with the requirements of ANSI/AWS D1.1, 2010 Structural Welding Code.
All structural steel welding shall be completed in accordance with requirements of ANSI/AWS D1.1, 2010 Structural Welding Code-Steel, and utilizing 0.035 welding wire AWS A5.18, ABS ER70S-6.
All aluminum welding shall be completed in accordance with requirements of ANSI/AWS D1.2 Structural Welding-Aluminum, utilizing 3/64” ER4043 Welding Wire, ANSI/AWS A5.10.
2. MATERIALS
2.1 GENERAL
The Contractor shall submit for approval by the CITY OF PORT ORANGE, all he/she intends on using for the construction of this project, as well as any alternate materials.
The CITY OF PORT ORANGE will be allowed access to all sites where materials pertaining to this contract are manufactured or constructed for purposes of inspection.
Materials delivered and stored at either the manufacturing facility, staging area, or jobsite shall be properly stored on dunnage or by other appropriate means to prevent direct contact with the ground and unnecessary damage.
2.2 CONCRETE FLOATS
Manufacturing The float manufacturer has a minimum of ten (10) consecutive years’ experience in the design and manufacturing of concrete floats as their primary business.
The manufacturing facility shall be located in the United States and meet the requirements for the designation of “Made in the USA” as designated by the US Federal Trade Commission. The facility shall be designed to provide the proper environment and physical conditions necessary for float casting. The facility shall provide adequate workspace, equipment, level casting surfaces, and protection from direct sunlight, wind, moisture and freezing.
The manufacturing facility must have an ongoing quality management system. This quality system must be regularly assessed and currently certified as meeting the ISO 9001 Standard. The scope of this certification must be for the design and manufacture of floating docks and pertain to the company or portion of the company providing the products and services for the project. The registrar providing this certification must be accredited according to EN 45012.
Float modules shall be cast monolithically in a single pour. There shall be no cold joints of any type. All modules are to have concrete bottoms and walls.
Float modules shall have a minimum deck thickness of 2" inches and a minimum side wall, end wall thickness of 1-1/2” and bottom thickness of 1-1/4" inches.
Forms Floats shall be cast in steel forms, with a smooth, true surface.
Forms shall be designed in such a way to prevent unsightly finished surfaces or definite lines that could result in crack planes. Any rough edges, form marks, or defects shall be cleaned, ground smooth, or patched.
Float forms shall have a tolerance of not more than 1/4 inch from the dimensions shown on the shop drawings. Floats cast from forms more than ½” out of square (when measured diagonally) shall be rejected.
Concrete shall be vibrated internally and/or externally to assure a smooth dense finish. The placement will be such that the concrete float is monolithic with no cold joints in any part of the finished float.
Concrete Mix Design Prior to the manufacturing of any flotation units, the concrete mix design shall be approved by the CITY OF PORT ORANGE.
Concrete shall have a minimum twenty-eight (28) day compressive strength of 5,000 psi, per ASTM C-94. Floats made of concrete with less than specified strength may be rejected by the CITY OF PORT ORANGE.
The mix shall contain a minimum of 611 pounds (six and one-half sacks) of Portland cement per cubic yard, either Type I or Type II modified, and low alkali.
Type III cement may be used if the Tri-Calcium Aluminate of the cement is certified by the manufacturer to be between five (5) and eight (8) percent, and alkali content (Na20) and (K20) is less than 0.6 percent.
Concrete for the flotation units shall contain polypropylene fibrous reinforcement in the deck area at a rate recommended by its supplier.
The theoretical concrete unit weight shall not be more than 120 pounds per cubic foot.
Coarse and fine aggregates shall conform to ASTM C-33-86, ASTM C-330 lightweight aggregates for structural concrete.
All concrete shall be air-entrained from four (4) to seven (7) percent and shall be tested in accordance with ASTM C-138, C-173, or C-231.
The water/cement ratio shall not exceed 0.45 for light-weight concrete.
The slump range shall be three (3) inches to six (6) inches when tested in accordance with ASTM C-143-78.
Concrete Testing All concrete testing shall be done under the guidance of certified personnel.
Certification shall be in accordance with the National Ready Mix Concrete Association guidelines or equivalent. All concrete testing methods shall be done in accordance with the respective ASTM specifications.
Four (4) compressive test cylinders shall be taken daily per mix, cured, and tested by either an independent testing laboratory or by an on-site, CITY OF PORT ORANGE approved, certified testing facility. Test results will be submitted on one
(1) each, seven (7) day; one (1) each, 14-day, one (1) each, twenty-eight (28) day;
and one (1) hold cylinder.
Unit weight and entrained air tests will be taken daily from the same material sample used for the compressive test cylinders.
Daily concrete cylinder test reports shall be submitted to the CITY OF PORT ORANGE on a job complete basis. All concrete testing shall be done at the Contractor's expense.
Concrete Reinforcement Galvanized welded wire fabrication used as concrete reinforcement shall be 2" X 2" - 14/14. Welded wire fabric is required in the deck and the bottom sections with a minimum of a two (2) inch return to the sides and ends. Where splicing occurs, the overlap will be a minimum of four (4) inches. Galvanized wire mesh shall meet
ASTM A-185.
Reinforcing steel bars shall be grade 40 or 60, conform to ASTM 615, and shall be epoxy coated in accordance with ASTM A775 or galvanized in accordance with
ASTM A 767.
Expanded Polystyrene Core (EPS) The closed cell expanded polystyrene core used inside the concrete unit shall meet Federal Specification C-578-85, which superseded Federal Specification HH-I- 524C. The expanded polystyrene core must be fully encapsulated by concrete (all six sides).
The foam shall weigh between .95 and 1.10 pounds per cubic foot.
EPS to have a maximum absorption of three (3) percent by volume as tested by ASTM Method C-272.
The foam core shall be held in a true position during the casting operation with an allowable variation of 1/8 inch from the dimensions shown on the shop drawings.
Foam billets will have a dimensional tolerance of plus 0.125 inch and minus 0.125 inch.
Foam core may not have more than ten (10) percent reground EPS foam material.
Reground foam pieces shall not exceed 3/8 inch in diameter.
Foam core shall be made up of not more than four (4) laminated sections.
The laminated foam core shall be glued with low solvent glue and shall be strapped to prevent delamination during transportation and handling.
No horizontal lamination may occur in the upper ten (10) inches of the foam core.
Utility Raceways Utilities have been shown in the construction plans. Please ensure all utilities shown in the construction plans can be accommodated for. CONTRACTOR shall submit shop drawings to the engineer of record for approval prior to ordering and installing concrete floating dock.
FRP Thru-Rod Connections The minimum dimension for all thru-rods for structural attachment is 3/4-inch thread diameter.
All thru-rods shall be placed within PVC sleeves cast in the float units. The maximum inside diameter of PVC shall not exceed 7/8 inch.
All cast in inserts will be stainless steel, 3/4-inch diameter, with a welded loop or horizontal restraining bar.
Walers shall be securely fastened to the concrete floats using fiber reinforced plastic (FRP) of high strength pultruded rods. At the time of manufacture the pultruded tie rods shall meet the following specifications:
1. Profile Dimensions and Tolerances
• Diameter 0.782 ± 0.008 in
• Nominal weight 0.405 lb/ft ± 5% (weight is for rod before grinding)
• Density (nominal) 125 lb./ft3 ± 5%
• Cut length Customer advised length ± 0.1 in up to 6.6 ft lengths ± 0.2 in for lengths above 6.6 ft.
• Straightness Customer advised length ± 0.1 in up to 6.6 ft lengths ± 0.2 in for lengths above 6.6 ft.
2. Raw Materials
• Matrix is based on hybrid epoxy vinyl ester resin.
• ECR glass
3. Resin matrix properties.
• Glass transition temperature of resin ≥ 291 ˚F
• Onset reaction temp ≥ 212 ˚F
• Heat of cure ≥ 72 kJ/lb.
• Peak Exotherm ≥ 248 ˚F
4. Reinforcement properties
• Direct roving’s, Boron-free ECR glass ASTM D5780
• Single filament tensile Strength 450 to 550 ski, ASTM D2101
• Young’s modulus 11.5 to 11.7 mis Sonic method
5. Physical Properties
• Transverse shear > 13.5 kip (single sided shear), ASTM D7617/D7617M
• Nut pull off strength > 15.7 kip, In house test.
• Dynamic Flexural Modulus > 6 mis, ASTM E1640
• Moisture absorption < 0.1%, ASTM D570 Method 7.1
• Glass transition temperature of finished rod measured by Dynamic Mechanical Thermal Analysis 284˚F Storage modulus curve, 320˚F Tan curve peak ASTM E1640
• Cure Ratio >95% CSA S870-10
6. Other
• Color - Dark Grey
• Surface finish - Surface to be free from cracking, loose fibers, and blistering.
7. Test Certificate. A test certificate for each production batch shall include:
• QA/QC Inward Raw Materials
• Glass type
• Resin type
• Resin release number.
• Incoming Resin QC Differential Scanning Calorimeter (DSC)
• Test & Analysis (ASTM E1356)
• Onset reaction temperature
• Heat of cure
• Peak exothermic
• Glass transition temperature (Tag)
• QA/QC Product and Production
• Surface finish
• Diameter (Ø)
• Product glass transition temperature (Tag) (ASTM E1640)
• Nut pull off strength.
• Transverse shear strength
• DSC and DMTA Thermogram graphs
All bolted connections shall include ¾” (nominal) nylon nuts manufactured from a high toughness 50% glass filled nylon 6 and contain high quality UV stabilizers for maximum longevity.
A minimum of four (4) thru-rods per float unit are required, with a minimum average of one (1) thru-rod per two (2) lineal feet of float length. The quantity and configuration of the thru-rods will be determined by the float system structural engineer’s load calculations on each dock section.
Thru-rods shall be placed through each float unit within six (6) inches of each end of that unit, and within six (6) inches of each lumber splice.
No connecting device shall protrude beyond the fascia into the berth area. Any connecting device protruding above the surface of the deck shall have a low, rounded profile.
All nuts at triangle frame connections shall Bracket ¾” (nominal) Nylon Nuts. Nuts at the triangle frame shall be re-tightened immediately before receiving utility…