(Attachment_1)_Schedule_of_Unit_Pricing.xlsx

XLSX spreadsheet 210 KB Posted

Attached to
DAY DOCK AT RIVERWALK PARK
Solicitation number
ITB-26-26-CW
Issued by
Volusia County, Florida

About this file

This is a Schedule of Unit Pricing form (Attachment 1) for Invitation to Bid (ITB) 26-26-CW issued by the City of Port Orange, Florida, for the Day Dock at Riverwalk Park project. The project encompasses the development of a transient docking facility designed to provide recreational boaters access to the city's waterfront park amenities and accommodate vessels up to 35 feet in length with capacity for up to ten mooring slips. The scope of work includes 21 line items spanning mobilization and demobilization, survey work, demolition and disposal, environmental compliance, mechanical dredging (2,750 cubic yards), timber dock construction (880 square feet), a concrete floating dock system (1,315 square feet), an aluminum gangway, navigation aids, concrete work, utilities installation including fire protection systems, dock lighting and electrical infrastructure, and environmental restoration including mangrove plantings. All line items are currently shown with zero dollar amounts and require vendor completion as part of the bidding process.

The pricing structure requires bidders to submit unit costs and total costs for each line item in accordance with the stated quantities and units of measure. Modification to this attachment may render a bid non-responsive. The form does not indicate specific response deadlines, due dates, site visit requirements, or award dates within the attachment itself. No set-asides, incumbent information, or specific funding sources are identified in this pricing schedule document.

View the file

Other files

File Type Posted
DAY_DOCK_AT_RIVERWALK_PARK.pdf PDF
(Attachment_8)_EJCDC_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_2018_General_Conditions.pdf PDF
(Attachment_7)_Draft_EJCDC_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_2018_EJCDC_C520_Agreement_version_dated_120524_clean_copy.pdf PDF
(Attachment_6)_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_Bonding_Capacity_and_Payment_and_Performance_Bond.pdf PDF
(Attachment_5)_Environmental_Permits.pdf PDF
(Attachment_4)_Geotechnical_Evaluation.pdf PDF
(Attachment_3)_Construction_Drawings.pdf PDF
(Attachment_2)_Project_Technical_Specifications.pdf PDF
Cover_Page_Label(Final).pdf PDF
Form_7.10_-_Scrutinized_Companies_Certification.pdf PDF
Current_Bonding_Capacity_Letter_(as_outlined_in_Section_6).pdf PDF
Exhibit_A_-_Description_of_Confidential_Materials.pdf PDF
Affidavit_Regarding_Workers'_Compensation.pdf PDF
Form_7.13_-_Debarment_Suspension_and_Other_Responsibility_Matters.pdf PDF
Human_Trafficking_Affidavit.pdf PDF
APPENDIX_A_-_44_C.F.R_PART_18_CERTIFICATION_REGARDING_LOBBYING.pdf PDF
Leased_Employee_Affidavit.pdf PDF
Form_7.8_-_Professional_References_for_Previous_Experience.pdf PDF
Form_7.14_-_Affidavit_of_Compliance_with_F.S._287.138.pdf PDF
Form_7.12_-_E-Verify_Affidavit.pdf PDF
Form_7.15_-_No_Submittal.pdf PDF
Form_7.9_-_List_of_Subcontractors.pdf PDF
Form_7.11_-_Local_Business_Affidacit_of_Eligibility.pdf PDF
Form_7.7_-_Statement_of_Bidder's_Qualification.pdf PDF
Form_7.6_-_Anti-Collusion.pdf PDF
Form_7.16_-_Representative_Certification_Form.pdf PDF
Form_7.3_-_Addendum_and_Change_Order_Procedure_Acknowledgement.pdf PDF
Form_7.4_-_Drug_Free_Preference_Statement.pdf PDF
Forn_7.2_-_Bidder's_Acknowledgement.pdf PDF
Form_7.5_-_Public_Entity_Crimes_Statement.pdf PDF
Form_7.1_-_Bid_Submittal_Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Untitled

ATTACHMENT 1 SCHEDULE OF UNIT PRICING
ERROR:#VALUE!
TITLE: ITB -26-26-CW - DAY DOCK AT RIVERWALK PARK
VENDOR NAME:______________________________________________________________
DATE:________________________________________
Modification to "Attachment 1" may cause your bid to be non-responsive
Line ItemDescriptionQuantityUnit of MeasureUnit CostTotal
1Mobilization and Demobilization1LS$ - 0$ - 0
2Construction, As-Built Survey, and Pre/Post Survey1LS$ - 0$ - 0
3Demolition, Hauling, and Disposal1LS$ - 0$ - 0
4Vibration Monitoring1LS$ - 0$ - 0
5Environmental Compliance (Including FDOT Type II Floating Turbidity Barrier)1LS$ - 0$ - 0
6Temporary Traffic Control1LS$ - 0$ - 0
7Clearing, Grubbing, and Restoration1LS$ - 0$ - 0
8Mechanical Dredging (Hauling and Placement at Final Disposal Site)2750CY$ - 0$ - 0
9Timber Dock (Includes 12-inch Timber Piles)880SF$ - 0$ - 0
10Aluminum Gangway (30' x 7')1EA$ - 0$ - 0
11Concrete Floating Dock System (Includes 14" Concrete & 12" Timber Mooring Piles, Aluminum Railing)1315SF$ - 0$ - 0
12Private Aids to Navigation (Includes Piles, Lights, and Signs)8EA$ - 0$ - 0
13Concrete Sidewalk53SY$ - 0$ - 0
14Concrete Grade Beam12LF$ - 0$ - 0
15Concrete Flush Curb30LF$ - 0$ - 0
16Pavement Marking1LS$ - 0$ - 0
17Fire Hydrant (Includes 6" fire main and connection to existing system)1LS$ - 0$ - 0
18FDC & Standpipe System (Includes pipes, appurtenances, testing & signs)1LS$ - 0$ - 0
19Dock Lighting & Electrical Utilities1LS$ - 0$ - 0
20Environmental Signs1LS$ - 0$ - 0
21Mangrove Plantings1LS$ - 0$ - 0
Total$0.00