Geotechnical Evaluation Report Summary

This is a geotechnical evaluation report prepared by Universal Engineering Sciences (UES) for the City of Port Orange, Florida, in support of the proposed Day Dock at Riverwalk Park project. The report, dated April 18, 2024 (UES Report No. 2072058), documents subsurface conditions and provides geotechnical design parameters for the construction of a new bulkhead along the shoreline of Riverwalk Park. The investigation comprised four Standard Penetration Test (SPT) borings (designated B-1 through B-4) advanced to approximately 40 feet below mudline adjacent to the bulkhead alignment. The report includes detailed boring logs, subsurface profiles, soil classifications per the Unified Soil Classification System, and soil design parameters necessary for bulkhead design and sheet pile wall installation.

The subsurface conditions at the site consist of intermittent layers of loose to very dense fine sand with various shell fragments, fine sand with silt and shell fragments, and silty fine sand. Soil design parameters are provided for multiple soil layers, including angles of internal friction ranging from 28 to 42 degrees, effective unit weights from 104 to 130 pounds per cubic foot, and corresponding lateral earth pressure coefficients. The report recommends that contractors account for dense and very dense sandy soil conditions during installation, with potential vibration monitoring services available to protect adjacent structures. UES recommends retention of the firm for construction materials testing, observations during construction, and geotechnical construction observation to monitor field conditions and verify design assumptions. The report contains standard limitations and constraints typical of geotechnical engineering investigations, noting that recommendations are confirmation-dependent and subject to revision based on actual subsurface conditions encountered during construction.

View the file

Other files

File Type Posted
DAY_DOCK_AT_RIVERWALK_PARK.pdf PDF
(Attachment_8)_EJCDC_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_2018_General_Conditions.pdf PDF
(Attachment_7)_Draft_EJCDC_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_2018_EJCDC_C520_Agreement_version_dated_120524_clean_copy.pdf PDF
(Attachment_6)_EXAMPLE_FOR_SOLICITATION_PUBLICATION_-_Bonding_Capacity_and_Payment_and_Performance_Bond.pdf PDF
(Attachment_5)_Environmental_Permits.pdf PDF
(Attachment_3)_Construction_Drawings.pdf PDF
(Attachment_2)_Project_Technical_Specifications.pdf PDF
Cover_Page_Label(Final).pdf PDF
(Attachment_1)_Schedule_of_Unit_Pricing.xlsx XLSX spreadsheet
Form_7.10_-_Scrutinized_Companies_Certification.pdf PDF
Current_Bonding_Capacity_Letter_(as_outlined_in_Section_6).pdf PDF
Exhibit_A_-_Description_of_Confidential_Materials.pdf PDF
Affidavit_Regarding_Workers'_Compensation.pdf PDF
Form_7.13_-_Debarment_Suspension_and_Other_Responsibility_Matters.pdf PDF
Human_Trafficking_Affidavit.pdf PDF
APPENDIX_A_-_44_C.F.R_PART_18_CERTIFICATION_REGARDING_LOBBYING.pdf PDF
Leased_Employee_Affidavit.pdf PDF
Form_7.8_-_Professional_References_for_Previous_Experience.pdf PDF
Form_7.14_-_Affidavit_of_Compliance_with_F.S._287.138.pdf PDF
Form_7.12_-_E-Verify_Affidavit.pdf PDF
Form_7.15_-_No_Submittal.pdf PDF
Form_7.9_-_List_of_Subcontractors.pdf PDF
Form_7.11_-_Local_Business_Affidacit_of_Eligibility.pdf PDF
Form_7.7_-_Statement_of_Bidder's_Qualification.pdf PDF
Form_7.6_-_Anti-Collusion.pdf PDF
Form_7.16_-_Representative_Certification_Form.pdf PDF
Form_7.3_-_Addendum_and_Change_Order_Procedure_Acknowledgement.pdf PDF
Form_7.4_-_Drug_Free_Preference_Statement.pdf PDF
Forn_7.2_-_Bidder's_Acknowledgement.pdf PDF
Form_7.5_-_Public_Entity_Crimes_Statement.pdf PDF
Form_7.1_-_Bid_Submittal_Checklist.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GEOTECHNICAL EVALUATION

Port Orange River Walk Port Orange, Volusia County, Florida

UES Project No. 0430.2400043.0000

UES Report No. 2072058

April 18, 2024

Prepared For:

Mr. Shailesh Patel Dredging & Marine Consultants

4643 Clyde Morris Boulevard, Suite 302 Port Orange, Florida 32129

Prepared By:

UES

911 Beville Road, Suite 3

South Daytona, Florida 32119

(386) 756-1105 i

1.0 PROJECT DESCRIPTION

2.0 PURPOSE AND SCOPE

2.1 PURPOSE

2.2 FIELD INVESTIGATION

2.3 LABORATORY TESTING

3.0 FINDINGS

3.1 SUBSURFACE CONDITIONS

3.2 GROUNDWATER .............................................................................................................. ERROR! BOOKMARK NOT DEFINED.

4.0 PILING RECOMMENDATIONS ........................................................................ ERROR! BOOKMARK NOT DEFINED.

5.0 BULKHEAD DESIGN RECOMMENDATIONS

6.0 CONSTRUCTION RELATED SERVICES

7.0 LIMITATIONS

APPENDICES

APPENDIX A

Boring Location Plan .................................................................................................................................... A-1 Boring Logs .................................................................................................................................................. A-2 Key to Boring Logs Sheet ............................................................................................................................. A-3

APPENDIX B

Geotechnical Business Council Document .................................................................................................. B-1 Constraints and Restrictions........................................................................................................................ B-2

Port Orange River Walk Bulkhead UES Project No. 0430.2400043.0000 Port Orange, Volusia County, Florida UES Report No. 2072058

1.0 PROJECT DESCRIPTION

Project information has been provided to us in correspondence with you. We were provided with an aerial photograph indicating the requested boring locations. We understand that the proposed project will consist of constructing a new bulkhead along the shoreline of Riverwalk Park in Port Orange, Florida.

We anticipate that the proposed bulkhead will consist of a composite sheet pile wall. We assume that the sheets will be jetted and vibrated into place.

Our recommendations are based upon the above considerations. If any of this information is incorrect, or if you anticipate any changes, inform UES so that we may review our recommendations.

2.0 PURPOSE AND SCOPE

2.1 PURPOSE

The purposes of this investigation were:

• to investigate the general subsurface conditions at the site;

• to interpret and review the subsurface conditions with respect to the proposed construction;

and

• to provide soil design parameters for bulkhead design.

This report presents an evaluation of site conditions on the basis of traditional geotechnical procedures for site characterization. The recovered samples were not examined, either visually or analytically, for chemical composition or environmental hazards. UES would be pleased to perform these services, at your request.

Our investigation was confined to the zone of soil likely to be influenced by the proposed construction.

Our work did not address the potential for surface expression of deep geological conditions, such as sinkhole development related to karst activity. A deep geological evaluation requires a more extensive range of field services than performed in this study.

2.2 FIELD INVESTIGATION

2.2.1 BORINGS

The subsurface conditions were investigated with:

• Four (4) in-water Standard Penetration Test (SPT) borings (designated B-1 through B-4) advanced to a depth of approximately 40 feet below mudline adjacent to the bulkhead alignment;

We performed the SPT borings according to the procedures of ASTM D-1586.

The borings were located by our field personnel using measurements from established landmarks and should be considered accurate only to the degree implied by the method used. The location of the borings is presented on the attached Boring Location Plan in Appendix A.

Samples obtained from the borings were transported to our laboratory for further evaluation. Samples of the soils encountered will be held in our laboratory for your inspection for 60 days unless we are notified otherwise.

2.3 LABORATORY TESTING

2.3.1 INDEX TESTING

The soil samples recovered from the soil borings were returned to our laboratory and then a UES Engineer visually examined and reviewed the field descriptions. The soils were classified in accordance with the Unified Soil Classification System (USCS).

3.0 FINDINGS

3.1 SUBSURFACE CONDITIONS

The boring locations and detailed subsurface conditions are illustrated in Appendix A: Boring Location Plan and Subsurface Profiles. The classifications and descriptions shown on the profiles are based upon visual characterizations of the recovered soil samples. Also, see Appendix A: Key to Boring Log, for further explanation of the symbols and placement of data on the Subsurface Profiles. The following discussion summarizes the soil conditions encountered.

The results of the in-water SPT borings, B-1 and B-4, generally indicated 1 to 4 feet of water above the mudline. The soils generally consist of intermittent layers of loose to very dense fine sand with various shell fragments (SP), fine sand with silt with various shell fragments (SP-SM) and silty fine sand with various shell fragments (SM).

4.0 BULKHEAD DESIGN RECOMMENDATIONS

General soil design parameters for bulkhead wall design consisting of phi angle (degrees), soil unit weight (lb/cubic ft.), Cohesion (lb/square ft.) and Earth Pressure coefficients are provided on the attached Soil Design Parameters, Appendix A. The contractor should take into consideration the dense and very dense sandy soil conditions with respect to installation.

Vibrations from the earthwork equipment and wall sheet installation operations need to be considered to preclude any damage to adjacent structures. UES can provide property condition surveys prior to sheet pile installation. Also, UES can provide vibration monitoring services during the installation process to aid in protecting the existing adjacent structures from structural distress.

5.0 CONSTRUCTION RELATED SERVICES

We recommend the owner retain UES to perform construction materials tests and observations on this project. Field tests and observations include verification of foundation subgrades by monitoring filling operations and performing quality assurance tests on the placement of compacted natural soils and structural fill. We can also perform concrete testing, pavement section testing, structural steel testing and other construction materials testing services.

The geotechnical engineering design does not end with the advertisement of the construction documents. The design is an on-going process throughout construction. Because of our familiarity with the site conditions and the intent of the engineering design, we are most qualified to address problems that might arise during construction in a timely and cost-effective manner.

6.0 LIMITATIONS

During the early stages of most construction projects, geotechnical issues not addressed in this report may arise. Because of the natural limitations inherent in working with the subsurface, it is not possible for a geotechnical engineer to predict and address all possible problems. An Association of Engineering Firms Practicing in the Geosciences (ASFE) publication, "Important Information about Your Geotechnical Engineering Report" appears in Appendix B, and will help explain the nature of geotechnical issues.

Further, we present documents in Appendix B: Constraints and Restrictions, to bring to your attention the potential concerns and the basic limitations of a typical geotechnical report.

S. RIDG

EW

O O

D AVENUE

B-1

B-2

B-3

B-4

E. OCEAN AVENUE

GRAPHIC SCALE

0 75 150

(IN FEET)

1 INCH ~ 150 ft.~

APPROXIMATE LOCATION OF STANDARD PENETRATION TEST (SPT) BORING

LEGEND

PROJECT:

CHECKED BY:

DRAWN BY:

TITLE:

REPORT NO.:

PROJECT NO.:

DATE:

DATE:

PAGE/FIG. NO.:

MKL

A-1

SCALE:

1" ~ 150'~

BP

GEOTECHNICAL EVALUATION

PORT ORANGE RIVERWALK

PORT ORANGE, FLORIDA

2072058 0430.2400043.000004/18/24

04/18/24

BORING LOCATION PLAN

N

50/1

25'25'

20'20'

15'15'

E.O.B. @ 40.0'

B-1

10'

5'

0'

10'

5'

0'

MUDLINE

30'30'

35'35'

40'40'

50/2

50/3

DRAWN BY:

CHECKED BY:

DATE:

DATE:

PROJECT NO.:

REPORT NO.:

MKL SCALE:

TITLE:

PAGE/FIG. NO.:

SUBSURFACE PROFILE

NA (in feet) A-2

PROJECT:

BP

GEOTECHNICAL EVALUATION

PORT ORANGE RIVERWALK

PORT ORANGE, FLORIDA

2072058

0430.2400043.000004/18/24

04/18/24

Fine SAND (SP)

Fine SAND with some to many SHELL fragments (SP)

SHELL

Fine SAND with

SILT (SP-SM)

SILTY fine SAND (SM)

NOTES:

Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.

Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve

(SP)

EOB

N

HA

WOH

Kv

-200

N

50/1

E.O.B. @ 40.0'

B-2

Loose gray SILTY fine SAND with few SHELL fragments (SM)

Very loose gray fine SAND with SILT and few SHELL fragments (SP-SM)

Loose gray fine SAND with trace SILT and trace SHELL fragments (SP)

Dense gray fine SAND with trace SILT and trace SHELL fragments (SP)

Very dense gray fine SAND with trace SILT and trace SHELL fragments (SP)

Very dense light gray fine SAND with trace SILT and some SHELL fragments (SP)

Dense light gray fine SAND with trace SILT and some SHELL fragments (SP)

Very dense light gray SANDY SHELL

Very dense gray SANDY SHELL

MUDLINE

Loose gray SANDY SHELL

Medium dense gray SANDY SHELL

Very dense gray SANDY SHELL

Very dense gray fine SAND with many SHELL fragments (SP)

Very dense gray SANDY SHELL

Dense gray fine SAND with trace SILT

(SP)

Dense light gray fine SAND with trace SILT and some SHELL fragments (SP)

Dense gray fine SAND with trace SILT and few SHELL fragments (SP)

Very dense gray fine SAND with trace SILT and few SHELL fragments (SP)

-200 = 17.3%

-200 = 0.8%

30'30'

35'35'

40'40'

50/1

DRAWN BY:

CHECKED BY:

DATE:

DATE:

PROJECT NO.:

REPORT NO.:

MKL SCALE:

TITLE:

PAGE/FIG. NO.:

SUBSURFACE PROFILE

NA (in feet) A-3

PROJECT:

BP

GEOTECHNICAL EVALUATION

PORT ORANGE RIVERWALK

PORT ORANGE, FLORIDA

2072058

0430.2400043.000004/18/24

04/18/24

NOTES:

Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.

Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve

(SP)

EOB

N

HA

WOH

Kv

-200

N

25'25'

20'20'

15'15'

E.O.B. @ 40.0'

B-3

10'

5'

0'

10'

5'

0' MUDLINE N

E.O.B. @ 40.0'

B-4

Fine SAND (SP)

Fine SAND with some to many SHELL fragments (SP)

SHELL

Fine SAND with

SILT (SP-SM)

SILTY fine SAND (SM)

-200 = 18.4%

MUDLINE

Very loose gray fine SAND with SILT

(SP-SM)

Loose gray SILTY fine SAND with some SHELL fragments (SM)

Loose gray fine SAND with SILT and few SHELL fragments (SP-SM)

Medium dense gray fine SAND with SILT and few SHELL fragments (SP-SM)

Dense gray fine SAND with SILT and few SHELL fragments (SP-SM)

Very dense gray fine SAND with SILT and few SHELL fragments (SP-SM)

Dense gray SANDY SHELL

Medium dense gray SANDY SHELL

Very dense gray fine SAND with SILT and many SHELL fragments (SP-SM)

Dense gray fine SAND with trace SILT

(SP)

Dense gray SILTY fine SAND (SM)

Loose brown fine SAND with SILT and some SHELL fragments (SP-SM)

Loose gray fine SAND with many SHELL fragments (SP)

Medium dense gray fine SAND with many SHELL fragments (SP)

Dense gray fine SAND with many SHELL fragments (SP)

Dense gray SANDY SHELL

Very dense gray fine SAND with trace SILT and few SHELL fragments (SP)

Very dense gray fine SAND with SILT and trace SHELL fragments (SP-SM)

-200 = 15.4%

-200 = 1.0%

50/1

25'25'

20'20'

15'15'

E.O.B. @ 40.0'

B-1

10'

5'

0'

10'

5'

0'

MUDLINE

30'30'

35'35'

40'40'

50/2

50/3

DRAWN BY:

CHECKED BY:

DATE:

DATE:

PROJECT NO.:

REPORT NO.:

MKL SCALE:

TITLE:

PAGE/FIG. NO.:

SOIL DESIGN PARAMETERS

NA (in feet) A-4

PROJECT:

BP

GEOTECHNICAL EVALUATION

PORT ORANGE RIVERWALK

PORT ORANGE, FLORIDA

2072058

0430.2400043.000004/18/24

04/18/24

Fine SAND (SP)

Fine SAND with some to many SHELL fragments (SP)

SHELL

Fine SAND with

SILT (SP-SM)

SILTY fine SAND (SM)

NOTES:

Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.

Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve

(SP)

EOB

N

HA

WOH

Kv

-200

N

50/1

E.O.B. @ 40.0'

B-2

MUDLINEN

= Angle of Internal Friction (degrees) = Effective Unit Weight (PCF) = Unit Weight Below Water Table (PCF) = Coefficient of Active Lateral Earth Pressure = Coefficient of Passive Lateral Earth Pressure = Coefficient at Rest Lateral Earth Pressure = Cohesion (psf) f g gb Ka Kp Ko C

= 29 = 109 = 50 f g gb

= 0.52 = 0.35 = 2.88

Ko Ka Kp

= 29 = 109 = 50 f g gb

= 0.52 = 0.35 = 2.88

Ko Ka Kp

= 28 = 104 = 45 f g gb

= 0.53 = 0.36 = 2.77

Ko Ka Kp

= 36 = 121 = 60 f g gb

= 0.41 = 0.26 = 3.85

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 38 = 127 = 65 f g gb

= 0.38 = 0.24 = 4.20

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 28 = 104 = 45 f g gb

= 0.53 = 0.36 = 2.77

Ko Ka Kp

= 32 = 115 = 55 f g gb

= 0.47 = 0.31 = 3.25

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 36 = 121 = 60 f g gb

= 0.41 = 0.26 = 3.85

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

30'30'

35'35'

40'40'

50/1

DRAWN BY:

CHECKED BY:

DATE:

DATE:

PROJECT NO.:

REPORT NO.:

MKL SCALE:

TITLE:

PAGE/FIG. NO.:

SOIL DESIGN PARAMETERS

NA (in feet) A-5

PROJECT:

BP

GEOTECHNICAL EVALUATION

PORT ORANGE RIVERWALK

PORT ORANGE, FLORIDA

2072058

0430.2400043.000004/18/24

04/18/24

NOTES:

Measured Groundwater Level 24 (+) Hours Subsequent to Time of Drilling Unified Soil Classification System End of Boring Penetr. Resistance, Blows/ft.

Hand Auger Method Weight of Hammer Coefficient of Permeability, (ft/day) % Passing No. 200 Sieve

(SP)

EOB

N

HA

WOH

Kv

-200

N

25'25'

20'20'

15'15'

E.O.B. @ 40.0'

B-3

10'

5'

0'

10'

5'

0' MUDLINE N

E.O.B. @ 40.0'

B-4

Fine SAND (SP)

Fine SAND with some to many SHELL fragments (SP)

SHELL

Fine SAND with

SILT (SP-SM)

SILTY fine SAND (SM)

MUDLINE

= Angle of Internal Friction (degrees) = Effective Unit Weight (PCF) = Unit Weight Below Water Table (PCF) = Coefficient of Active Lateral Earth Pressure = Coefficient of Passive Lateral Earth Pressure = Coefficient at Rest Lateral Earth Pressure = Cohesion (psf) f g gb Ka Kp Ko C

= 28 = 104 = 45 f g gb

= 0.53 = 0.36 = 2.77

Ko Ka Kp

= 28 = 104 = 45 f g gb

= 0.53 = 0.36 = 2.77

Ko Ka Kp

= 29 = 109 = 50 f g gb

= 0.52 = 0.35 = 2.88

Ko Ka Kp

= 30 = 109 = 50 f g gb

= 0.50 = 0.33 = 3.00

Ko Ka Kp

= 38 = 127 = 65 f g gb

= 0.38 = 0.24 = 4.20

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 38 = 127 = 65 f g gb

= 0.38 = 0.24 = 4.20

Ko Ka Kp

= 32 = 115 = 55 f g gb

= 0.47 = 0.31 = 3.25

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 29 = 109 = 50 f g gb

= 0.52 = 0.35 = 2.88

Ko Ka Kp

= 30 = 109 = 50 f g gb

= 0.50 = 0.33 = 3.00

Ko Ka Kp

= 36 = 121 = 60 f g gb

= 0.41 = 0.26 = 3.85

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 38 = 127 = 65 f g gb

= 0.38 = 0.24 = 4.20

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

= 36 = 121 = 60 f g gb

= 0.41 = 0.26 = 3.85

Ko Ka Kp

= 42 = 130 = 68 f g gb

= 0.33 = 0.20 = 5.04

Ko Ka Kp

= 40 = 127 = 65 f g gb

= 0.36 = 0.22 = 4.60

Ko Ka Kp

KEY TO BORING LOGS

UNIFIED SOIL CLASSIFICATION SYSTEM

MAJOR DIVISIONS GROUP

SYMBOLS TYPICAL NAMES

GW Well-graded gravels and gravel-sand mixtures, little or no fines CLEAN

GRAVELS

GP

Poorly graded gravels and gravel-sand mixtures, little or no fines

GM Silty gravels and gravel-sand-silt mixtures

GRAVELS

50% or more of coarse fraction retained on No. 4 sieve

GRAVELS

WITH FINES

GC Clayey gravels and gravel-sand-clay mixtures

SW** Well-graded sands and gravelly sands, little or no fines

CLEAN

SANDS

5% or less passing No.

200 sieve SP** Poorly graded sands and gravelly sands, little or no fines

SM** Silty sands, sand-silt mixtures

C O

A R

S E

G R

A

IN

E D

S O

IL

S

M or e th an

0% re ta in ed o n th e

N o.

s ie ve

SANDS

More than

50% of coarse fraction passes No.

4 sieve

SANDS with 12% or more passing No.

200 sieve SC** Clayey sands, sand-clay mixtures

ML

Inorganic silts, very fine sands, rock flour, silty or clayey fine sands

CL

Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, lean clays

SILTS AND CLAYS

Liquid limit 50% or less

OL Organic silts and organic silty clays of low plasticity

MH

Inorganic silts, micaceous or diamicaceous fine sands or silts, elastic silts

CH Inorganic clays or clays of high plasticity, fat clays

OH Organic clays of medium to high plasticity

FI

N

E -G

R A

IN

E

D S

IO

LS

o r m or e pa ss es th e

N o.

s ie ve

SILTS AND CLAYS

Liquid limit greater than 50%

PT Peat, muck and other highly organic soils

*Based on the material passing the 3-inch (75 mm) sieve ** Use dual symbol (such as SP-SM and SP-SC) for soils with more than 5% but less than 12% passing the No. 200 sieve

RELATIVE DENSITY

(Sands and Gravels)

Very loose – Less than 4 Blow/Foot Loose – 4 to 10 Blows/Foot

Medium Dense – 11 to 30 Blows/Foot Dense – 31 to 50 Blows/Foot

Very Dense – More than 50 Blows/Foot

CONSISTENCY

(Silts and Clays)

Very Soft – Less than 2 Blows/Foot Soft – 2 to 4 Blows/Foot Firm – 5 to 8 Blows/Foot Stiff – 9 to 15 Blows/Foot

Very Stiff – 16 to 30 Blows/Foot Hard – More than 30 Blows/Foot

RELATIVE HARDNESS

(Limestone)

Soft – 100 Blows for more than 2 Inches Hard – 100 Blows for less than 2 Inches

MODIFIERS

These modifiers Provide Our Estimate of the Amount of Minor Constituents (Silt or Clay Size Particles) in the Soil Sample

Trace – 5% or less With Silt or With Clay – 6% to 11%

Silty or Clayey – 12% to 30% Very Silty or Very Clayey – 31% to 50%

These Modifiers Provide Our Estimate of the Amount of Organic Components in the Soil Sample

Trace – Less than 3% Few – 3% to 4%

Some – 5% to 8% Many – Greater than 8%

These Modifiers Provide Our Estimate of the Amount of Other Components (Shell, Gravel, Etc.) in the Soil Sample

Trace – 5% or less Few – 6% to 12%

Some – 13% to 30% Many – 31% to 50%

SYMBOLS AND ABBREVIATIONS

SYMBOL DESCRIPTION

N-Value No. of Blows of a 140-lb. Weight Falling 30 Inches Required to Drive a Standard Spoon 1 Foot

WOR Weight of Drill Rods

WOH Weight of Drill Rods and Hammer

Sample from Auger Cuttings

Standard Penetration Test Sample

Thin-wall Shelby Tube Sample (Undisturbed Sampler Used)

RQD Rock Quality Designation

Stabilized Groundwater Level

Seasonal High Groundwater Level (also referred to as the W.S.W.T.)

NE Not Encountered

GNE Groundwater Not Encountered

BT Boring Terminated

-200 (%) Fines Content or % Passing No. 200 Sieve

MC (%) Moisture Content

LL Liquid Limit (Atterberg Limits Test)

PI Plasticity Index (Atterberg Limits Test)

NP Non-Plastic (Atterberg Limits Test)

K Coefficient of Permeability

Org. Cont. Organic Content

G.S. Elevation Ground Surface Elevation

Geotechnical-Engineering Report

Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a civil engineer may not fulfill the needs of a constructor — a construction contractor — or even another civil engineer. Because each geotechnical- engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. No one except you should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one

— not even you — should apply this report for any purpose or project except the one originally contemplated.

Read the Full Report Serious problems have occurred because those relying on a geotechnical-engineering report did not read it all. Do not rely on an executive summary. Do not read selected elements only.

Geotechnical Engineers Base Each Report on a Unique Set of Project-Specific Factors Geotechnical engineers consider many unique, project-specific factors when establishing the scope of a study. Typical factors include: the client’s goals, objectives, and risk-management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates otherwise, do not rely on a geotechnical-engineering report that was:

• not prepared for you;

• not prepared for your project;

• not prepared for the specific site explored; or

• completed before important project changes were made.

Typical changes that can erode the reliability of an existing geotechnical-engineering report include those that affect:

• the function of the proposed structure, as when it’s changed from a parking garage to an office building, or from a light-industrial plant to a refrigerated warehouse;

• the elevation, configuration, location, orientation, or weight of the proposed structure;

• the composition of the design team; or

• project ownership.

As a general rule, always inform your geotechnical engineer of project changes—even minor ones—and request an assessment of their impact. Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed.

Subsurface Conditions Can Change A geotechnical-engineering report is based on conditions that existed at the time the geotechnical engineer performed the study. Do not rely on a geotechnical-engineering report whose adequacy may have been affected by: the passage of time;

man-made events, such as construction on or adjacent to the site; or natural events, such as floods, droughts, earthquakes, or groundwater fluctuations. Contact the geotechnical engineer before applying this report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems.

Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engineers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ — sometimes significantly — from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide geotechnical-construction observation is the most effective method of managing the risks associated with unanticipated conditions.

A Report’s Recommendations Are Not Final Do not overrely on the confirmation-dependent recommendations included in your report. Confirmation-dependent recommendations are not final, because geotechnical engineers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report’s confirmation-dependent recommendations if that engineer does not perform the geotechnical-construction observation required to confirm the recommendations’ applicability.

A Geotechnical-Engineering Report Is Subject to Misinterpretation Other design-team members’ misinterpretation of geotechnical-engineering reports has resulted in costly

Important Information about This

Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.

While you cannot eliminate all such risks, you can manage them. The following information is provided to help.

problems. Confront that risk by having your geotechnical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review pertinent elements of the design team’s plans and specifications. Constructors can also misinterpret a geotechnical-engineering report. Confront that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing geotechnical construction observation.

Do Not Redraw the Engineer’s Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical-engineering report should never be redrawn for inclusion in architectural or other design drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk.

Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make constructors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation.

To help prevent costly problems, give constructors the complete geotechnical-engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise constructors that the report was not prepared for purposes of bid development and that the report’s accuracy is limited;

encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/ or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure constructors have sufficient time to perform additional study. Only then might you be in a position to give constructors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions.

Read Responsibility Provisions Closely Some clients, design professionals, and constructors fail to recognize that geotechnical engineering is far less exact than other engineering disciplines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly.

Environmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform an environmental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical-engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk-management guidance. Do not rely on an environmental report prepared for someone else.

Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces.

To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a comprehensive plan, and executed with diligent oversight by a professional mold-prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, many mold- prevention strategies focus on keeping building surfaces dry. While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical- engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant;

none of the services performed in connection with the geotechnical engineer’s study were designed or conducted for the purpose of mold prevention. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved.

Rely, on Your GBC-Member Geotechnical Engineer for Additional Assistance Membership in the Geotechnical Business Council of the Geoprofessional Business Association exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project. Confer with you GBC-Member geotechnical engineer for more information.

8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@geoprofessional.org www.geoprofessional.org

Copyright 2015 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, or its contents, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document as a complement to or as an element of a geotechnical-engineering report. Any other firm, individual, or other entity that so uses this document without being a GBA member could be commiting negligent or intentional (fraudulent) misrepresentation.

WARRANTY

Universal Engineering Sciences has prepared this report for our client for his exclusive use, in accordance with generally accepted soil and foundation engineering practices, and makes no other warranty either expressed or implied as to the professional advice provided in the report.

UNANTICIPATED SOIL CONDITIONS

The analysis and recommendations submitted in this report are based upon the data obtained from soil borings performed at the locations indicated on the Boring Location Plan. This report does not reflect any variations which may occur between these borings.

The nature and extent of variations between borings may not become known until excavation begins. If variations appear, we may have to re-evaluate our recommendations after performing on-site observations and noting the characteristics of any variations.

CHANGED CONDITIONS

We recommend that the specifications for the project require that the contractor immediately notify Universal Engineering Sciences, as well as the owner, when subsurface conditions are encountered that are different from those present in this report.

No claim by the contractor for any conditions differing from those anticipated in the plans, specifications, and those found in this report, should be allowed unless the contractor notifies the owner and Universal Engineering Sciences of such changed conditions. Further, we recommend that all foundation work and site improvements be observed by a representative of Universal Engineering Sciences to monitor field conditions and changes, to verify design assumptions and to evaluate and recommend any appropriate modifications to this report.

MISINTERPRETATION OF SOIL ENGINEERING REPORT

Universal Engineering Sciences is responsible for the conclusions and opinions contained within this report based upon the data relating only to the specific project and location discussed herein. If the conclusions or recommendations based upon the data presented are made by others, those conclusions or recommendations are not the responsibility of Universal Engineering Sciences.

CHANGED STRUCTURE OR LOCATION

This report was prepared in order to aid in the evaluation of this project and to assist the architect or engineer in the design of this project. If any changes in the design or location of the structure as outlined in this report are planned, or if any structures are included or added that are not discussed in the report, the conclusions and recommendations contained in this report shall not be considered valid unless the changes are reviewed and the conclusions modified or approved by Universal Engineering Sciences.

USE OF REPORT BY BIDDERS

Bidders who are examining the report prior to submission of a bid are cautioned that this report was prepared as an aid to the designers of the project and it may affect actual construction operations.

Bidders are urged to make their own soil borings, test pits, test caissons or other investigations to determine those conditions that may affect construction operations. Universal Engineering Sciences cannot be responsible for any interpretations made from this report or the attached boring logs with regard to their adequacy in reflecting subsurface conditions which will affect construction operations.

STRATA CHANGES

Strata changes are indicated by a definite line on the boring logs which accompany this report. However, the actual change in the ground may be more gradual. Where changes occur between soil samples, the location of the change must necessarily be estimated using all available information and may not be shown at the exact depth.

OBSERVATIONS DURING DRILLING

Attempts are made to detect and/or identify occurrences during drilling and sampling, such as: water level, boulders, zones of lost circulation, relative ease or resistance to drilling progress, unusual sample recovery, variation of driving resistance, obstructions, etc.; however, lack of mention does not preclude their presence.

WATER LEVELS

Water level readings have been made in the drill holes during drilling and they indicate normally occurring conditions. Water levels may not have been stabilized at the last reading. This data has been reviewed and interpretations made in this report. However, it must be noted that fluctuations in the level of the groundwater may occur due to variations in rainfall, temperature, tides, and other factors not evident at the time measurements were made and reported. Since the probability of such variations is anticipated, design drawings and specifications should accommodate such possibilities and construction planning should be based upon such assumptions of variations.

LOCATION OF BURIED OBJECTS

All users of this report are cautioned that there was no requirement for Universal Engineering Sciences to attempt to locate any man-made buried objects during the course of this exploration and that no attempt was made by Universal Engineering Sciences to locate any such buried objects. Universal Engineering Sciences cannot be responsible for any buried man-made objects which are subsequently encountered during construction that are not discussed within the text of this report.

TIME

This report reflects the soil conditions at the time of exploration. If the report is not used in a reasonable amount of time, significant changes to the site may occur and additional reviews may be required.

CONSTRAINTS & RESTRICTIONS

The intent of this document is to bring to your attention the potential concerns and the basic limitations of a typical geotechnical report.

APPENDICES
1.0 PROJECT DESCRIPTION
2.0 PURPOSE AND SCOPE
2.1 Purpose
2.2 Field investigation
2.2.1 Borings
2.3 Laboratory Testing
2.3.1 Index Testing
3.0 FINDINGS
3.1 Subsurface Conditions
4.0 BULKHEAD DESIGN RECOMMENDATIONS
5.0 CONSTRUCTION RELATED SERVICES
6.0 LIMITATIONS
Profiles.pdf
Sheets and Views
Layout1
SP-A-2.pdf
Sheets and Views
A-2
SP-A-3.pdf
Sheets and Views
A-3
SP-A-4.pdf
Sheets and Views
A-4
SP-A-5.pdf
Sheets and Views
A-5

File details come from the government source that posted it. Updated .