Form 66 Submittal Schedule B3323 Fire Riser.pdf

PDF 80 KB Posted

Attached to
B3323 Fire Riser
Solicitation number
FA303025Q0020
Issued by

About this file

This is a Schedule of Material Submittals form (AF Form 66) for Project B3323 Pre-Action Fire Riser at Opportunity Number 1148284. The form details 13 required submittals for the project, including manufacturer's specifications, safety documentation, warranties, and environmental compliance records.

Key submittal requirements include: CPM manufacturer's specifications, company safety policy and accident prevention plan, warranties and certificates (due upon final government acceptance), parking and storage plans, work clearance requests, utility outage notifications (14 days prior), waste disposal documentation, hazardous waste records, asbestos-free certifications, hazardous material lists with SDS worksheets, air emissions reports, construction waste management forms, and EMS awareness training certificates. The form specifies submission timing requirements ranging from "prior to start of work" to "as soon as possible but no later than 45 calendar days after NTP." Most items require 1-2 copies and are marked for either Government Approval (GA) or For Information Only (FIO).

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Para 1.5 CPM:

Manufacturer's Specifications 1 x (e) GA

Para 1.7.1 Company Safety Policy and Accident Prevention Plan

1 x (c) FIO

Para 1.12 List of Warranties and Certificates 1

Upon Final Acceptance by

Gov

GA

Para 1.13.1 Parking & Storage 1 (e) GA

Para 1.14.1.1 IMT Form 103 Base Work Clearance Request

1 (e) GA

Para 1.14.2 Utility Outages 1 14 Days Prior

(e) GA

Para 1.15 Waste Disposal 1 (d) GA

Para 2.2 Hazardous Waste Records 2 x (a) GA

Para 2.4.1 No Asbestos Containing Materials 2 x (b) GA

Para 2.5 Haz. Material List with worksheet for each SDS 2 x (c) GA

Para 2.8 Air Emissions Reports 2 x (b) FIO

Para 2.9 Construction Waste Management Form 2 (b) FIO

PROJECT: B3323 Pre-Action Fire RiserOPPORTUNITY NUMBER: 1148284 Capital Project: 1142505

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CONTRACT-

TOR RE-

SUBMIT-

TAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

IN

ST

RU

CT

IO

NS

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

OP

ER

AT

IN

G

FINAL

APPROVAL REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

PROJECT: B3323 Pre-Action Fire RiserOPPORTUNITY NUMBER: 1148284 Capital Project: 1142505

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

CONTRACT-

TOR RE-

SUBMIT-

TAL

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

IN

ST

RU

CT

IO

NS

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

OP

ER

AT

IN

G

FINAL

APPROVAL REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

Para 2.10 EMS Awareness Training Certificate 2 (e) FIO

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

(e) Prior to start of work.

(f) Daily.

FORM66.xls

Sheet1

File details come from the government source that posted it. Updated .