Floor Plan_CR 7021 HVAC Replacement.pdf

PDF 509 KB Posted

Attached to
Camp Rilea Building 7021 HVAC Replacement Project
Solicitation number
S-24800-00010434
Issued by
Clackamas County, Oregon

About this file

The document provided is a floor plan for the Camp Rilea Building 7021 HVAC Replacement Project, a state and local contract opportunity located in Oregon. The work consists of removing and replacing four (4) existing gas-fired furnaces with new electric heat pump (HP) systems for cooling and heating operations. Specifically, the project requires the installation of three (3) new 3.5T air handlers with heater kits to replace the existing gas-fired furnaces, as well as the installation of two (2) new 5T air handlers with heater kits to replace the existing gas-fired furnaces in the Attic West area.

The project also includes space available for the installation of three (3) new heat pumps (HP1-2 MECH and HP3 ATTIC EAST) and one (1) new heat pump (HP4 - ATTIC WEST). No other pricing terms, set-asides, incumbents, funding requirements, or additional details were provided in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTIC EAST

HWF1

F2

M/E

F3

F4

Floor Plan Scale 3/32" = 1'-0"

F

F

F

F

F

F

EXISTING EQUIPMENT

GAS FIRED FURNACE (FL1, MECH RM, FURNACE #1)

Make: LENNOX Model: G20Q5/6E-125-6

GAS FIRED FURNACE (FL1, MECH RM, FURNACE #2)

Make: LENNOX Model: G20Q3/4E-125-6

GAS FIRED FURNACE (ATTIC EAST, FURNACE #3)

Make: AMERICAN STANDARD Model: ADD080C945C4

GAS FIRED FURNACE (ATTIC WEST, FURNACE #4)

Make: CARRIER Model: 58TUA08014

TRAINING

SITE

MANAGER

WELCOME

CENTER

ENTRY

OFFICE

OFFICE

OFFICE

OFFICE RANGE

OPERATIONS

RANGE

BRIEFING

ROOM

CONFERENCE

ROOM

AUDITORIUM

DISTANCE

LEARNING

CENTER

OFFICE OFFICE OFFICE OFFICE

OFFICE

S-4

CUST

MECH

MENS

RESTROOM

WOMENS

RESTROOM

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

F

Space Available for three (3) new Heat

Pumps

(HP1-2 MECH; AND

HP3 ATTIC EAST)

Space Available for one

(1) new Heat Pump

(HP4 – ATTIC WEST)

F

Remove existing gas fired furnace. Replace with new 3.5T air handler with heater kit.

Remove existing gas fired furnace. Replace with new 3.5T air handler with heater kit.

ATTIC WEST

Remove two (2) existing gas fired furnaces.

Replace with new 5T air handlers with heater kits.