Flagler Equipment Storage Building Plans 072026.pdf
PDF 790 KB Posted
- Solicitation number
- DQ1 PMAA 2027000022 3
- Issued by
- El Paso County, Colorado Springs City, Colorado
About this file
This document comprises architectural and construction plans for a new equipment storage building project at Flagler State Wildlife Area in Colorado, prepared by Colorado Parks and Wildlife's Southeast Regional Office. The project involves construction of a 30-foot by 64-foot equipment storage building with a monolithic concrete slab foundation, metal frame structure with a 4/12 roof pitch, and ridge ventilation. The facility will include two 12-foot by 14-foot insulated garage doors with commercial operators, one 36-inch by 80-inch exterior door with a metal frame and 5-foot by 5-foot awning at each end, light-penetrating panels on the east and west sides, and an interior truss clearance of 15 feet 8 inches from the concrete floor. The project site is located at coordinates 39.287613, -102.992262 in Flagler, Colorado, on prepared roadbase that has been stripped and compacted as the assumed subgrade.
The base bid requirement includes tying number 4 rebar to the slab rebar mat extended 4 inches above finish floor elevation, with additional bid items covering 100-amp electrical service and panel connection to the adjacent shop electrical panel, exterior concrete flatwork aprons on each end, metal bollards with concrete bases, and garage door installation with commercial operators. The contractor is responsible for excavating and recompacting for the monolithic concrete thickened edge, squaring the concrete forms, finish grading and subgrade compaction, soil compaction to 95 percent maximum dry density per ASTM D 698 for structures and 90 percent for remaining areas, utility verification and protection, debris removal and disposal, site safety and security, concrete protection from damage, and compliance with Colorado Department of Transportation construction standards and OSHA regulations. No permitting is expected, and the site preparation work has been completed as the assumed baseline for construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDENDUM 1.pdf | ||
| 2018 CPW GCs 071818 FINAL.pdf | ||
| BID DOCUMENTS 072026.pdf | ||
| ADDENDUM 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET INDEX
COV COVER
SP-1 OVERALL SITE PLAN
SP-2 PLAN VIEW
SP-3 SIDE ELEVATIONS
SP-4 END ELEVATIONS
SD-1 SITE DETAILS
VACINITY MAPS
Flagler State Wildlife Area - Area 14 Equipment Storage Building
July 20, 2026
NORTH
PROJECT SITE
39.287613, -102.992262
1. THE COLORADO PARKS AND WILDLIFE PROJECT MANAGER WILL ASSIST THE CONTRACTOR IN LAYOUT AND SETTING FINISH GRADES.
2. CONTRACTOR SHALL BE FAMILIAR WITH THE EXISTING CONDITIONS. BID SHALL BE BASED ON ACTUAL SITE CONDITIONS.
3. CONTRACTOR SHALL VERIFY LOCATION AND BURY DEPTHS OF ALL UTILITIES ON THE SITE. EXISTING UTILITIES SHALL BE PROTECTED FROM DAMAGE BY
THE CONTRACTOR. DAMAGED UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
4. ALL CUT AND FILL SLOPES SHALL BE GRADED AS SHOWN IN THE DETAILS. THE MAXIMUM SLOPE IS 4:1 UNLESS OTHERWISE NOTED.
5. ALL WORK AND MATERIALS SHALL CONFORM TO COLORADO DEPARTMENT OF TRANSPORTATION CONSTRUCTION STANDARDS AND SPECIFICATIONS.
6. NO PERMITTING IS EXPECTED.
7. WASTE HAZARDOUS OR SOLID: IF THE PROJECT INVOLVES OIL OR FUEL USAGE, TRANSFER OR STORAGE, AN ADEQUATE SPILL KIT AND SHOVELS ARE REQUIRED TO BE ONSITE DURING PROJECT IMPLEMENTATION. IF CONCRETE IS PROPOSED, ALL CONCRETE WASHOUT WATER NEEDS TO BE CONTAINED
AND PROPERLY DISPOSED OF AT A PERMITTED OFFSITE DISPOSAL FACILITY.
8. THE CONTRACTOR SHALL MAINTAIN THROUGH TRAFFIC, ON ALL ROADWAYS AT ALL TIMES, VIA FLAGGING IF NECESSARY.
9. ANY DAMAGE TO PROPERTY WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
10. CONTRACTOR SHALL PROTECT ALL TREES AND OTHER VEGETATION NOT DESIGNATED FOR REMOVAL. ALL DISTURBED AREAS SHALL BE PROPERLY PREPARED AND FENCE SECTIONS SHALL BE CAREFULLY REMOVED AND REPLACED AS NECESSARY.
11. CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFETY AND SECURITY OF THE SITE DURING CONSTRUCTION, INCLUDING BUT NOT
LIMITED TO FLAGGING, BARRIERS AND TEMPORARY FENCING.
12. ALL RUBBLE AND DEBRIS WITHIN THE PROJECT LIMITS OF WORK WILL BE HAULED FROM SITE AND DISPOSED OF PROPERLY AT CONTRACTOR'S EXPENSE
UNLESS OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS.
13. THE CONTRACTOR SHALL HAVE ONE (1) FULL SET OF THE PLANS AND SPECIFICATIONS AT THE JOB SITE AT ALL TIMES.
14. SOIL COMPACTION REQUIREMENTS BENEATH STRUCTURES, AND EARTHWORK ARE 95% OF THE MAXIMUM DRY DENSITY MEASURED IN ACCORDANCE WITH ASTM D 698 (STANDARD PROCTOR) UNLESS OTHERWISE NOTED. SOILS WITHIN REMAINDER OF THE PROJECT SHALL BE COMPACTED TO 90% OF
THE MAXIMUM DENSITY, MEASURED AS REFERENCED.
15. ALL PROPOSED FINISH GRADES SHALL ABUT EXISTING CURBS, PAVEMENT, ETC. IN BOTH LINE AND GRADE. THE CONTRACTOR SHALL NOTIFY THE
OWNER'S REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCIES.
16. CONTRACTOR MUST PROTECT NEWLY POURED CONCRETE FROM VANDALS AND OTHER PERILS. DAMAGED CONCRETE WILL BE REMOVED AND
REPLACED AT CONTRACTOR'S EXPENSE.
17. CONTRACTOR SHALL BACKFILL IMPROVEMENTS TO MATCH CROSS SECTION DETAIL HEREIN. CONTRACTOR WILL STORE NEEDED FILL DURING GRADING OPERATIONS AND FURNISH AT CONTRACTOR'S EXPENSE, ANY ADDITIONAL FILL NEEDED IN ORDER TO PROPERLY BACK FILL IMPROVEMENTS.
18. STARTING WORK CONSTITUTES ACCEPTANCE OF THE CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. AFTER SUCH ACCEPTANCE, THE CONTRACTOR SHALL AT HIS EXPENSE, BE RESPONSIBLE FOR CORRECTING ALL UNSATISFACTORY AND DEFECTIVE WORK RESULTING FROM SUCH
UNSATISFACTORY CONDITIONS.
19. THE CONTRACTOR WARRANTS THAT HIS EMPLOYEES, AGENTS, AND SUBCONTRACTORS POSSESS THE EXPERIENCE, KNOWLEDGE, AND CHARACTER NECESSARY TO QUALIFY THEM INDIVIDUALLY FOR THE PARTICULAR CONSTRUCTION TECHNIQUES THEY PERFORM UNDER THIS CONTRACT. THE CONTRACTOR SHALL INSURE THAT ALL CONSTRUCTION BE PERFORMED IN STRICT COMPLIANCE WITH OSHA, STATE AND LOCAL HEALTH AND SAFETY
CODES.
20. THE PARK MAY (AT THEIR DISCRETION) CHOOSE TO SALVAGE AND RETAIN SOME ITEMS DESIGNATED FOR REMOVAL AND DISPOSAL. HOWEVER, THE
CONTRACTOR SHOULD ASSUME REMOVAL OF ALL ITEMS AS PART OF THEIR BID.
21. The State of Colorado is committed to providing equitable access to our services to all. Please contact our Colorado Parks and Wildlife Accessibility Specialist (accessdnr@state.co.us or 303-297-1192) for personalized accessibility assistance with project construction layouts and details below. We will contact you directly within two business days. Visit our accessibility webpage for more information and services, including AIRA, our free service for blind and low-vision users.
GENERAL NOTES:
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
C O
V
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co .u s pa rk s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
C O
V E
R
Fl ag le r
S ta te W ild lif e A re a
E qu ip m en t S to ra ge B ui ld in g
Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
B
ID
D O
C U
M E
N
TS
7/
/2
EXISTING ELECTRICAL SUPPLY LINE TO
REMAIN (LOCATION APPROXIMATE).
NEW 30' X 64' EQUIPMENT STORAGE
BUILDING. LOCATION WILL BE IDENTIFIED IN
THE FIELD AND CONTRACTOR SHALL SQUARE
THE LAYOUT OF THE MONOLITHIC CONCRETE
SLAB AND THICKENED EDGE.
EXISTING GARAGE TO REMAIN
EXISTING BUILDINGS TO
REMAIN
GENERAL NOTES:
1. THE BUILDING SITE HAS BEEN STRIPPED,
COMPACTED AND OTHERWISE PREPARED
WITH ROADBASE FOR THE NEW BUILDING AS
AN ASSUMED "SUBGRADE".
2. CONTRACTOR WILL BE RESPONSIBLE FOR
EXCAVATING AND RE-COMPACTING FOR THE
MONOLITHIC CONCRETE THICKENED EDGE.
3. CONTRACTOR WILL BE RESPONSIBLE FOR
SQUARING THE FORMS FOR THE
MONOLITHIC CONCRETE SLAB AND
THICKENED EDGE.
4. CONTRACTOR WILL BE RESPONSIBLE FOR
THE FINISH GRADING AND COMPACTION OF
THE SUBGRADE FOR THE CONCRETE SLAB.
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
S P
-1
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
SCALE : 1" = 30'-0"
NORTH
30'15'
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
O V
E R
A
LL
S
IT
E P
LA
N
Fl ag le r S ta te
W ild lif e
A re a E qu ip m en t S to ra ge
B ui ld in g Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
B
ID
D O
C U
M E
/2
ADDITIONAL BID ITEM #6 - 100 amp
ELECTRICAL SERVICE & PANEL. (INCLUDES
SECONDARY SUPPLY SERVICE CONNECTION
TO ADJACENT SHOP ELECTRICAL PANEL)
30'-0"
64'-0"
36x80 EXTERIOR DOOR W/ METAL FRAME
WITH A 5' X 5' AWNING CENTERED OVER
THE DOOR. (TYPICAL EACH END)
ADDITIONAL BID ITEM #7 - EXTERIOR CONCRETE
FLATWORK APRON (RE DETAIL: 2/SD1)
64'-0"
12'-0"
5'-0"
5'-0"
ADDITIONAL BID ITEM #7 - EXTERIOR
CONCRETE FLATWORK APRON (TYPICAL
EACH END) (RE DETAIL: 2/SD1)
MONOLITHIC CONCRETE SLAB &
FOUNDATION (RE DETAIL: 1/SD1)
ADDITIONAL BID ITEM #4 - GARAGE
DOORS 12' X 14', INSULATED, W/
LIFTMASTER COMMERCIAL DOOR
OPERATOR. WIRING FOR THE OPERATOR,
PHOTO EYES AND WALL CONTROL TO THE
ELECTRICAL SERVICE PANEL IS INCLUDED.
12" ROOF LINE OVERHANG (MINIMUM)
BASE BID REQUIREMENT - TIE A #4 REBAR
TO SLAB REBAR MATT AND EXTEND 4"
ABOVE FINISH FLOOR ELEVATION.
ADDITIONAL BID ITEM #5 - METAL
BOLLARDS INCLUDING CONCRETE BASE
(RE DETAIL: 4/SD1)
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
S P
-2
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
SCALE : 1" = 5'-0"
0 5'2.5'
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
P
LA
N V
IE
W
Fl ag le r S ta te
W ild lif e
A re a E qu ip m en t S to ra ge
B ui ld in g Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
NORTH
B
ID
D O
C U
M E
/2
3 FOOT SECTION OF LIGHT PENETRATING
PANELS
EAST SIDE
WEST SIDE
ADDITIONAL BID ITEM #4 - GARAGE
DOORS 12' X 14', INSULATED, W/
LIFTMASTER COMMERCIAL DOOR
OPERATOR. WIRING FOR THE OPERATOR,
PHOTO EYES AND WALL CONTROL TO THE
ELECTRICAL SERVICE PANEL IS INCLUDED.
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
S P
-3
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
S
ID
E E
LE
V
A
TI
O N
S
Fl ag le r
S ta te W ild lif e A re a
E qu ip m en t S to ra ge B ui ld in g
Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
B
ID
D O
C U
M E
/2
NORTH AND SOUTH ENDS
5 FOOT AWNING CENTERED OVER DOOR
(TYPICAL EACH END)
PROVIDE RIDGE VENT
4/12 ROOF PITCH
36x80 EXTERIOR DOOR W/ METAL FRAME
17'-4"
EAVE
HEIGHT
15'-8"
INTERIOR
TRUSS
CLEARANCE
FROM
CONCRETE
FLOOR
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
S P
-4
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
E N
D E
LE
V
A
TI
O N
S
Fl ag le r
S ta te W ild lif e A re a
E qu ip m en t S to ra ge B ui ld in g
Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
B
ID
D O
C U
M E
/2
2'-0" MIN.
BELOW
GRADE
6" MIN.
ABOVE
GRADE
1'-0"
6"
2" ANCHOR BOLTS A MINIMUM OF 7" EMBEDMENT IN
CONCRETE WITHIN 12" OF CORNER & PLATE SPLICES AND 4
FOOT MAXIMUM SPACING. INSTALL WITH 3" X 3" X 732" MIN.
WASHERS.
PREPPED EXISTING
ROAD-BASE/STRUCTURAL FILL
MONOLITHIC CONCRETE SLAB & FOUNDATION1
SD1 SECTION
SD1 SECTION
#4 REBAR @ 24" O.C.,
CONTINUOUS EACH WAY
(2) #4 REBAR CONTINUOUS
#4 REBAR @ 24" O.C.,
CONTINUOUS EACH WAY
PROVIDE A SMOOTH FORM FINISH
ON EXPOSED SECTIONS OF
FOUNDATION.
EXTERIOR CONCRETE FLATWORK APRON2
SD1 SECTION
6"
CONCRETE SET FLUSH WITH ADJACENT SLAB. MAX 1/16"
DISPARITY BETWEEN SLABS.
DRILL & INSTALL REBAR INTO EXISTING CONCRETE.
HOLD EXPANSION MATERIAL 1" BELOW FINISH GRADE.
WATERPROOF SEALENT TO BE FLUSH WITH CONCRETE (COLOR
TO MATCH CONCRETE) APPLY AFTER CONCRETE HAS CURED.
1'-0"
2"
3"
LC
CONCRETE JOINT @ EXISTING CONCRETE
EXISTING PREPARED MATERIAL / ROAD BASE - COMPACTED
TO 95% STANDARD PROCTOR. (TYPICAL UNDER ALL
CONCRETE PAVING)
SAWCUT OR 14" RADIUS TOOLED CONTRACTION JOINTS TO A
DEPTH EQUAL TO 14 OF CONCRETE THICKNESS. REPEAT
GROOVING OF CONTRACTION JOINTS AFTER APPLYING A
MEDIUM BROOM FINISH. ELIMINATE GROOVER TOOL MARKS ON
CONCRETE SURFACES.
SPACE JOINTS EQUAL TO THE WIDTH OF THE WALK, BUT
EQUALLY SPACED ALONG ANY GIVEN RUN - OR AS OTHERWISE
DIRECTED BY THE PROJECT MANAGER.
6"
SUBGRADE-COMPACTED TO 95% STANDARD PROCTOR.
CONCRETE WALK REINFORCED WITH FIBER MESH. (4,000 PSI @
28 DAYS & #4 REBAR @ MAXIMUM 24" O.C. EACH WAY)
4" RADIUS TOOLED EDGES. ELIMINATE GROOVER TOOL MARKS
ON CONCRETE SURFACES.
1"
EXTERIOR CONCRETE FLATWORK APRON
SD-1
BACK FILL & COMPACT TO PREVENT DROP-OFF WITH ONSITE
SOILS & REVEG. UNLESS OTHERWISE SHOWN OR DIRECTED BY
THE PROJECT MANAGER.
CONCRETE WALK REINFORCED WITH FIBER MESH. (4,000 PSI @
28 DAYS & REBAR AS SHOWN)
CONCRETE ENCASEMENT
FINISHED GRADE
6" DIA.
SCHEDULE 40 STEEL PIPE.
GRIND SMOOTH, FILL WITH
CONCRETE
GROUT CAP OR SUFFICIENTLY
SMOOTH CONCRETE FILL AS A DOME.
1. PAINT EXPOSED PORTIONS OF BOLLARD WITH ONE COAT OF RED
OXIDE OR ZINC CHROMATE TYPE PRIMER AND TWO COATS OF
RUST-OLEUM K7744-402 SAFETY YELLOW PAINT.
3'-6"
2'-0"
3"
1'-6"
BOLLARD4
SD1 SECTION
CONCRETE FLATWORK
6"
D R
A W
N
D E
S
IG
N E
D
D A
TE
FI
LE
S C
G
S C
G
P R
O
JE
C T
S D
-1
S H
E E
T C
O
LO
R A
D O
P A
R K
S
W
IL
D
LI
FE
S ou th ea st
R eg io na l O ffi ce
S in to n R oa d
C ol or ad o S pr in gs , C
O
P ho ne
9)
-5
F ax
9)
-5 w ild lif e.
st at e.
co s.
st at e.
co .u s
R E
V
IS
IO
N
C O
M M
E N
T D
A
TE
R E
V
1 2 3 4 5
A re a
Fl ag le r
S ta te W ild lif e A re a
C o R d U
Fl ag le r, C O
S
IT
E D
E
TA
IL
S
Fl ag le r S ta te
W ild lif e
A re a E qu ip m en t S to ra ge
B ui ld in g Ju ly
7, Fl ag le r
E qu ip m en t
S
W S
E -8
S to ra ge
B ui ld in g.
dw g
B
ID
D O
C U
M E
/2
| Sheets and Views |
| Flagler Equipment Storage Building-COVER |
| Flagler Equipment Storage Building-SP1 |
| Flagler Equipment Storage Building-SP2 |
| Flagler Equipment Storage Building-SP3 |
| Flagler Equipment Storage Building-SP4 |
| Flagler Equipment Storage Building-SD1 |
File details come from the government source that posted it. Updated .