FINAL SPECIFICATIONS ARFQ DEP22-81 STEELE RUN II WELL PLUG.pdf
PDF 2 MB Posted
- Attached to
- Steele Run II Well Plugging Package
- Solicitation number
- ARFQ 0313 DEP2200000081 2
- Issued by
- Randolph County, West Virginia
About this file
File Summary
This is a Final Specifications document for ARFQ DEP22-81 issued by the West Virginia Department of Environmental Protection (WVDEP), Office of Oil and Gas, for the plugging and reclamation of five abandoned oil and natural gas wells located in Ritchie County near Petroleum, West Virginia. The project, designated the Steele Run II Well Plugging Package, involves the complete plugging of wells with API numbers 47-085-80603, 47-085-80604, 47-085-80605, 47-085-80608, and 47-085-90094, all drilled prior to 1929 with estimated depths of approximately 825 to 850 feet. The scope of work includes site preparation, cleaning wells to total depth, setting cement plugs with gel spacers, removing free pipe, and comprehensive site reclamation in accordance with the West Virginia Erosion and Sediment Control Field Manual. The contractor must provide all equipment, materials, labor, and professional services necessary for plugging operations and land reclamation, with work conducted Monday through Friday during standard ten-hour workdays unless otherwise approved by the Department. A WVDEP Project Coordinator will oversee the contract and serve as the primary point of contact for all matters related to project execution.
The specifications detail over 42 line items for bidding, including rig and crew operations (minimum three-person crew), mobilization and demobilization, heavy equipment rental, specialized drilling tools, casing and cement purchases, disposal services for gel and liquid waste, site reclamation materials, and administrative costs capped at three percent of the total bid amount. Payment is structured on an hourly, daily, per-unit, or lump-sum basis depending on the line item, with mobilization payments split fifty percent upon completion and fifty percent with final invoice. The Department will obtain and pay for all local, state, and federal permits required for project completion, and all permit conditions become mandatory contract inclusions. No specific bid deadline, award date, or contract term is stated in this specifications document, which serves as the technical foundation for contractor proposals under the ARFQ procurement process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STEELE RUN II WELL PLUGGING PACKAGE
WEST VIRGINIA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
OFFICE OF OIL AND GAS
COUNTY
OF
RITCHIE
API# 47-085-80603
API# 47-085-80604
API# 47-085-80605
API# 47-085-80608
API# 47-085-90094
Site Reclamation
TECHNICAL SPECIFICATIONS
Table of Contents
Table of Contents
I. PROJECT DESCRIPTION
1.0 Location/Site Description
2.0 Directions to site:
II. SCOPE OF WORK
III. GENERAL CONDITIONS
1.0 Administrative
2.0 Permitting
3.0 Work
IV. WELL DESCRIPTIONS
ASSIGNED #47-085-80603
ASSIGNED #47-085-80604
ASSIGNED #47-085-80605
ASSIGNED #47-085-80608
ASSIGNED #47-085-90094
RECLAMATION PROJECT
V. REMEDIATION AND/OR PLUGGING WORK PLAN
VI. TECHNICAL SPECIFICATIONS
1.0 Rig and Crew -Three (3) Man Crew (minimum)
2.0 Mobilization & Demobilization
2.5 Field Move
3.0 Additional Labor
4.0 Vacuum Water Truck
5.0 Heavy Equipment
5.5 Light Duty Equipment
6.0 Power Tongs
7.0 Pipe Cutting
8.0 Casing and Tubing Purchase
9.0 Casing, Tubing, and Pipe Rentals
10.0 Tri-Cone Drill Bit
11.0 Trash Pump
12.0 On-Site Water Storage Container(s)
13.0 Disposal of Gel
14.0 Disposal of Liquid Waste
15.0 Disposal of Solid Waste
16.0 Aqua Gel
17.0 Cement
18.0 Gravel
19.0 Steel Mud Pit
20.0 Site Reclamation
21.0 Silt Fence
22.0 Monument
23.0 Welder/Cutting Torch
24.0 Oil Absorbent Supplies
25.0 Sand Pump
26.0 Cherry Picker
27.0 Casing/Tubing Spear
28.0 Overshot
29.0 Impression Block
30.0 Subs
31.0 Power Swivel
32.0 Concave Mill
33.0 Logging, Bond with CCL
34.0 Mud/mixing pump
35.0 Tie Mats
36.0 Administrative Cost
37.0 Solid waste profiling
VII. APPENDIX A – WELL RECORDS
I. PROJECT DESCRIPTION
This project involves the plugging and/or remediation of abandoned oil and/or natural gas wells and sites at the location described below.
1.0 Location/Site Description
Physical Address: 31 Oil Springs Rd. (Co. Road 11)
Petroleum, WV 26161
Parcel Description: WACO OIL & GAS COMPANY INC. / MIKE ROSS, INC.
ID: 43-05-0027-0007-0000
DESC: SUR 397.175 AC OIL SPRING RUN (1/2 INT)
GPS Coordinates: 39.20966 °E, -81.27588 °W
2.0 Directions to site:
From the Charleston Area:
Traveling north on I-77, take exit 176. At the bottom of the ramp, turn right onto Route 50
East. Turn right onto Goose Creek Road (Ritchie County 18) travel approximately 6 6/10 miles turn right onto (Ritchie County 11) Volcano Road proceed 9/10 mile and turn right onto Oil Spring Run (Ritchie County Route 11/9) proceed 6/10 mile to the site.
Approaching from the Parkersburg Area:
Heading south on I-77, take exit 176 and turn left on Rt. 50 East. Turn right onto Goose
Creek Road (Ritchie County 18) travel approximately 6 6/10 miles turn right onto (Ritchie
County 11) Volcano Road proceed 9/10 mile and turn right onto Oil Spring Run (Ritchie
County Route 11/9) proceed 6/10 mile to the site.
II. SCOPE OF WORK
The Contractor, the Contractor’s agents, representatives, and subcontractors (“Contractor”) shall provide all equipment, materials, labor, and professional services for the plugging of the oil and/or natural gas well(s) identified herein, and the reclaiming of all land disturbed in association with those plugging operations in accordance with West Virginia Code §§ 22-6-23, 22-6-24, and all rules promulgated thereunder.
This project is defined by, and subject to, the following documents attached hereto or included as part of supplemental documentation made available as part of the solicitation request (“Contract”):
I. Project Description
II. Scope of Work
III. General Conditions
IV. Well Description
V. Remediation and Plugging Work Plan
VI. Technical Specifications
VII. Appendix A – Well Records
III. GENERAL CONDITIONS
In addition to the Standard Terms & Conditions for Construction and Reclamation, the following conditions govern this Contract:
1.0 Administrative
A. The Contract shall be overseen by DEP by an inspector specialist/project coordinator from the Abandoned Well Plugging Program. DEP may, situationally, assign alternate or assistant coordinators as staffing needs vary.
B. The Project Coordinator for the contract will be designated at the time of the issuance of the Notice to Proceed.
C. The Project Coordinator shall serve as the first point of contact for the Contractor in all matters related to the Contract.
D. The Contractor shall notify the Project Coordinator of any work stoppages or changes to planned operators at soon as practically possible.
E. All change order requests shall be submitted to the Project Coordinator for approval prior to the initiation of any work related to that change order request.
2.0 Permitting
A. Upon award of the Contract to the successful bidder, the Department shall transfer the well to and issue the plugging permit under the responsible party name, UNKNOWN
- DEP PAID PLUGGING CONTRACT.
B. The plugging portion of the Remediation and Plugging Work Plan included herein
(Section V) shall be incorporated as part of the plugging permit. This plan is developed based on best available information. Should field observations during plugging operations necessitate deviations from this plan, the Department and Contractor shall cooperate to develop alternate plans in full compliance with all applicable rules and regulations.
C. All work performed under the Contract must be completed in accordance with the most current version of the Erosion and Sediment Control Field Manual.
D. Unless otherwise specified in the Technical Specifications and/or Bid Sheet, the
Department will obtain and pay for all Local, State, and Federal permits necessary for the completion of the Contract. Any permit conditions contained within said permits shall become mandatory inclusions in the Contract.
3.0 Work
A. Contractor shall perform Contract work (i.e., site preparation and permitted well work) during the days of Monday through Friday. Work will not be conducted on weekends or state/national holidays except with Department approval or during emergency situations. A workday is defined as a maximum of ten (10) hours; however, additional hours may be worked with Department approval or during emergency situations.
B. Contractor is responsible for tracking daily time and material utilization for the purpose of invoicing. The Department shall confirm daily expenditures at the conclusion of each workday. Any disputes related to time and/or material usage determinations should be made in writing to the Project Coordinator.
C. All in-stream work required in association with the project shall be performed in accordance with all applicable local, state, and federal requirements.
D. Toilet facilities will be provided by the vendor but will not be a separate line item in the contract.
IV. WELL DESCRIPTIONS
Site-based considerations:
The Steele Run area has a long history of extensive oil and gas exploration and development, as can be seen from the well location plat associated with the plugging of Steel Run No. 4 (API# 47-
085-10056). As illustrated in Figure 1, the wells in this project focus in the area generally to the west of the Steel Run #4. Future plugging projects may address additional wells.
Figure 1 Steele Run
Well-specific considerations:
The Steele Run II Plugging Package consists of five (5) wells and one cleanup project. The wells were drilled prior to 1929 and have no associated well records.
Based on the recent plugging of the proximate Steel Run No. 4 well (API# 47-085-100556), the wells are all believed to be approximately 850’ in depth. Individual well observations are noted in the subsequent pages but can be summarized as follows.
• At least four of the wells contain straight 6” casing and will need to be cleaned out to total depth (TD).
• At least two (2) of the wells (80603, 80604) will need to be extended and filled around to accommodate the rig. These wells will need 24” culverts placed with Steele Run and covered with limestone. The 6” casing will need to be extended and a control head installed. Additionally, they will require 24” culverts placed vertically over the casing to create a workable cellar to control returns from the well bore. Once the wells are plugged, the limestone and culverts will be removed from Steele Run and reclaimed to contour.
• One of the wells (80605) in this package will need to be excavated around because the 6” casing is bent over. This well is also along Steele Run and will require culverts to be placed with limestone placed over top of the culverts in the run.
• One well (80608) contains 2 ⅜” tubing and 6” casing. One well (90094) in the package contains a 3 ½” tubing and no other visible casing was observed.
For each well, all free pipe needs removed. The preferred method of removing such casing is to free-point the casing and rip pipe at the casing collar. All wells in the package will be reclaimed in accordance with the West Virginia Erosion and Sediment Control Field Manual – May 2012.1
1 https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf
ASSIGNED #47-085-80603
NAD 83 (39.2095686, -81.2785287) UTM 475953. E, 4340070. N
● This well is the first documented and yet unplugged well located along Steele Run.
● This well contains straight 6” casing and is filled with debris.
● This well is estimated to be approximately 825’ in depth, according to off-set well API 47-
085-10056 with a plugging completion date of 8/27/2013. That well also, contained this odd 6” casing.
ASSIGNED #47-085-80604
NAD 83 (39.2097568, -81.2789580) UTM 475916. E, 4340091. N
● This well is the second documented and yet unplugged well located along Steele Run.
● This well contains straight 6” casing and has free standing oil in the well at approximately 10’.
● This well is estimated to be approximately 825’ in depth, according to off-set well API 47-
085-10056 with a plugging completion date of 8/27/2013. That well also contained this odd 6’
ASSIGNED #47-085-80605
NAD 83 (39.2101971, -81.2794694) UTM 475872. E, 4340140. N
● This well is the third documented and yet unplugged well located along Steele Run and is located just above the run on the southern bank. This well is bent over at the surface.
● This well has straight 6” casing.
● This well is estimated to be approximately 825’ in depth, according to off-set well API 47-
085-10056 with a plugging completion date of 8/27/2013. That well also contained this odd 6”
ASSIGNED #47-085-80608
NAD 83 (39.2106919, -81.2798073) UTM 475843. E, 4340195. N
● This well is located up on the northern bank of Steele Run and contains a string of 2 3/8’ tubing along with the straight 6” casing.
● This well is estimated to be approximately 825’ in depth, according to off-set well API 47-
085-10056 with a plugging completion date of 8/27/2013. That well also contained this odd 6”
ASSIGNED #47-085-90094
NAD 83 (39.2110342, -81.2790928) UTM 475904.8 E, 4340232.8 N
● This well is located to the NE of well 80608 and only has 3 1/2” casing visible at the surface.
WVDEP has yet to encounter a well in this area that contained 3 ½” casing in recent years.
● This well is estimated to be approximately 850’ in depth.
RECLAMATION PROJECT
NAD 83 (39.20966 °E, -81.27588 °W)
• Project specifications are to excavate, remove and dispose of oil contaminated soil and liquids contained at the site.
• Reset the elevation of the 36” culvert used to create the underflow. This is to maximize the effects of the structure.
• Lime, fertilize, seed and mulch the disturbed area in accordance with West Virginia Erosion and Sediment Control Field Manual.
V. REMEDIATION AND/OR PLUGGING WORK PLAN
Contract work may require site remediation of the well site prior to the commencement of plugging operations.
Project will commence, generally, as follows:
1. Pre-mobilization site remediation, if necessary,
2. Site preparation,
3. Connect rig to well,
4. Clean out well to total depth,
5. Set prescribed plugs and monument,
6. Reclaim site including removal of stream crossings, and
7. Submit invoice to DEP.
Proposed Work Plan:
1. Notify Project Coordinator within 24 hours of plugging commencement.
2. Brush location build site stone as needed.
3. Nipple up on existing well.
4. Pull rods and tubing as needed.
5. Clean out wells to TD.
6. Spot 6% gel as required.
7. Set minimum of 100 ft. bottom hole cement plugs.
8. Check top of all cement plugs to ensure proper height.
9. If wells are found to go below elevation set minimum 100’ cement plug across elevation.
10. If wells do not extend below elevation run 6% gel and set minimum 100’ bottom hole plug.
11. If well bores allow set cement plugs from 450’-350’.
12. Pull all free pipe from well bores.
13. Tag all cement plugs and ensure all wells have 6% gel spacers between all plugs.
14. Set minimum 100’ cement plugs minimally from 100’ to surface.
15. Move rig off well and reclaim site in accordance with West Virginia Erosion and
Sediment Control Field Manual.
NOTE: Any casing found in the well without cement in the annulus that cannot be retrieved must be perforated and cement at all saltwater, freshwater, coal, oil, gas, casing shoe and elevation points.
VI. TECHNICAL SPECIFICATIONS
1.0 Rig and Crew -Three (3) Man Crew (minimum)
Description:
The rig is a mobile platform from which well work is performed. The rig crew are the persons needed to adequately operate the rig.
Functional/performance requirements:
The rig must be a mobile rig, capable of pulling 150 percent of the heaviest hook load anticipated. Rig shall have the ability to use both cable tools and rotary type equipment.
Rig will be equipped with a walking beam and cable tools such as stinger, drill stem, jars, bailers of various sizes, an assortment of cable tool bits, a sinker bar, and well control devices. The rig crew will consist of, at a minimum, three persons – a rig operator, two hands, and a pickup truck.
Measurement and Payment:
Item is bid per hour of operation. Hours charged will be for on-site work only. Daily transportation to and from the job site is not included and will not be charged separately.
At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Additional Labor’ or ‘Heavy Equipment.’)
Labor hours for Rig and Crew are payable only after the point in time in which the rig has been set up and connected to the well. Rig set up prior to well connection is considered
Mobilization.
2.0 Mobilization & Demobilization
Mobilization and demobilization, collectively, encompasses the labor and equipment necessary to transport all contract equipment, tools, and materials to and from the project site. Mobilization and demobilization pricing includes all equipment on the contract at the time of the bid. Mobilization of the rig includes all setup up to the point that the rig is connected to the well. Transportation costs for any other unanticipated equipment needs that may arise will be resolved through the Change Order process, if necessary.
Functional requirements:
All necessary trucking must include operator with a valid Commercial Driver’s License
(CDL).
Item is bid as a service, with half the total bid amount payable after mobilization has occurred (50.0%), and the remainder payable with the final invoice.
2.5 Field Move
A field move is the complete relocation of field equipment and/or materials between successive project sites contained within the same contract. The field move includes all the labor, equipment, and materials necessary to demobilize from one site, transport all equipment and/or materials to the next location, and setup the rig to the point that the rig is connected to the next well.
All necessary trucking must include operator with a valid Commercial Driver’s License
(CDL).
Measurement and payment:
Item is bid as a lump sum inclusive of all labor, equipment, and materials.
3.0 Additional Labor
Additional labor is general labor performing tasks not included in the rig crew bid. This labor may be assisting by performing tasks the rig crew does not have time to complete or may be performing tasks not included in the actual well work.
This item is bid per worker per hour. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy Equipment.’)
4.0 Vacuum Water Truck
A vacuum truck is a tank truck that has a pump and a tank designed to pneumatically suck liquids, sludges, slurries, or similar fluids into the tank of the truck for the purposes of transporting that material to another location. In this contract, the vacuum water truck will be used to deliver water to site, dispose of plugging fluids and may assist in controlling fluid returns from the well bore site.
Vacuum water truck must include all hoses and connections needed as well as operator.
This item is bid per hour of operation and includes operator. At no time may an individual worker’s hours be billed simultaneously for work completed under this item and any other labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew’ or ‘Heavy
Equipment.’)
5.0 Heavy Equipment
Heavy equipment shall be used in construction and reclamation of site and access road, and in the moving of tools and equipment during the plugging operations. The use of heavy equipment requires a qualified operator.
Bulldozer must have winches and tilt blades and will be used for grading and the spotting of equipment. Excavator must be a tracked machine. Note: horsepower and weight will be verified by reviewing the specifications of the model(s) selected by the vendor.
1. Bulldozer (minimum 85 horsepower and minimum weight 16,000 pounds.)
2. Excavator (minimum 85 horsepower and minimum weight 25,000 pounds.)
This item is bid per hour of operation and includes labor. At no time may an individual labor-based item allowing for hourly rate payments (e.g., ‘Rig and Crew or ‘Additional
Labor.’)
5.5 Light Duty Equipment
Certain light duty equipment may be beneficial to move dirt, debris, and equipment at the well site. Light duty equipment generally does not require a qualified operator.
1. Skid Steer (minimum 24 HP, 700# rated capacity or equivalent.)
This item is bid per hour of operation and does not include specific operator labor. Labor while using this equipment is to be billed under “Additional Labor.” Transportation costs of light duty equipment are to be considered part of the “Mobilization & Demobilization” line item.
6.0 Power Tongs
Power tongs are large-capacity self-locking wrenches used to grip drill string components and apply torque. Power tongs are used to assemble and disassemble tubulars and casings.
The following sizes may be needed for this project.
1. Up to 4 ½ inches
2. Over 4 ½ inches up to 8 5/8 inches
3. Over 8 5/8 inches up to 10 3/4 inches
This item is bid per day of use.
7.0 Pipe Cutting
Pipe cutting is the separation of tubing and casing found in the well bore. This may be accomplished in various way including, but not limited to, the use of cable tools with a knife and rotary type cutting tools which require the use of the rig.
Functional Requirements:
The sizes listed below may be needed for this project.
1. 3 ½ inches or smaller
2. 4 1/2 inches to 8 5/8 inches
This item is bid per cut.
8.0 Casing and Tubing Purchase
Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing and tubing purchase is necessary when casing and tubing must be left in the well bore, and when casings need to be lengthened to nipple up for physical connection to the rig. Slips and elevators will be provided by the contractor.
The following sizes may be needed.
1. 6-inch conductor casing
This item is bid per foot.
9.0 Casing, Tubing, and Pipe Rentals
Casing and tubing are pipes of a specified diameter lowered into the borehole to serve as a conduit for fluids or to provide borehole structural stability. The casing, tubing, drill pipe, and drill collar rentals are needed when tubing and casings may be used in the well bore and recovered in such instances.
This will include various sizes that will be determined by the well bore. Slips and elevators will be provided by the contractor.
1. Tubing: 1 ½ inches to 2 3/8 inches
2. Drill Pipe: 3 ½ inches PAC 50 or equivalent
3. Drill Pipe: 2 7/8 inches PAC 50 or equivalent
4. Drill Collar: 2 7/8 inches
10.0 Tri-Cone Drill Bit
The drill bit is the tool used to cut or crush rock during well drilling. A Tri-cone bit will be used to drill out fill-up found in the well bore.
Tri-cone bit include bit sub and a float.
1. 2 ¾ inches to 4 ¾ inches
2. 4 ¾ inches to 6 1/4 inches
Drill bit shall be in used condition.
This item is bid per bit.
11.0 Trash Pump
The trash pump is used to transfer water and other plugging fluids between locations.
Functional and Performance requirements:
The trash pump must be a minimum three (3) inches and shall be of industrial grade with all hoses and fittings included.
This item is bid per hour of use.
12.0 On-Site Water Storage Container(s)
The water storage container(s) must hold at a minimum one hundred (100) barrels and will be used for the storage of fresh water for use in the plugging operation.
This item is bid per container.
13.0 Disposal of Gel
There are instances where gel fluids from the plugging operations may need to be disposed of, in which case they shall be hauled to an approved solid waste facility.
This item is bid per barrel and does not include trucking cost. Copies of scale tickets from an approved solid waste facility shall be provided to the Department.
14.0 Disposal of Liquid Waste
There are instances where saltwater or other Class II fluids are returned to the surface due to the plugging operations and must be disposed of at an Underground Injection Control
(UIC) well. The contactor will transport the saltwater or other Class II fluids to a UIC well for disposal.
This item is bid per barrel and does not include trucking cost. Manifest and invoice from an approved disposal facility shall be provided to the Department.
15.0 Disposal of Solid Waste
Solid waste, including contaminated soil, disposal will be the responsibility of the contractor.
This item is bid per ton and does include trucking cost. Copies of scale tickets from an approved solid waste facility shall be provided to the Department.
16.0 Aqua Gel
Gel is a mixture of water and bentonite clay mixed to desired weight. Aqua gel will have dual use, it will be used to increase the viscosity of the drill fluid and as spacers between the cement plugs. The Aqua Gel will be mixed, pumped, and delivered to site.
This item is bid per fifty (50) pound sack. Larger unit quantities of gel may be used on-site but bid prices should be standardized to the fifty (50) pound sack.
17.0 Cement
Portland Class A Cement shall be used to cement casings and tubulars in the well bore and for cement plugs.
Performance requirements:
Cement will be a Portland Class A cement with no other additives.
This item is bid per standard ninety-four (94) pound sack delivered to site. Pricing is to include mixing and pumping. Larger unit sizes of cement may be used on-site (i.e., “Super
Sacks”), but bid prices and payment shall be standardized to the ninety-four-pound sack equivalent.
18.0 Gravel
Gravel is used for a variety of applications including roadbuilding and site stabilization.
Functional requirement:
Gravel will be limestone and size will be determined by the application for which it is being used.
This item is bid per ton delivered to site. This price will include trucking to site.
19.0 Steel Mud Pit
The mud pit is a large tank that contains drilling fluids on-site. Mud pits may also be used to store plugging fluids from the well.
Functional requirement:
The mud pit shall be constructed of steel and have a divider to expedite the settling of cuttings and debris flushed from the well bore.
This item is bid per mud pit.
20.0 Site Reclamation
Site reclamation is the process of restoring the well site area back to original condition.
Site reclamation generally requires earth work and a combination of lime, fertilizer, seed, and mulch, as appropriate.
Performance Requirements:
Site reclamation shall be completed in accordance with the provisions described in the
West Virginia Erosion and Sediment Control Field Manual – May 2012. Note that Section
III of this manual establishes minimum quantities for reclamation materials including lime, fertilizer, seed, and mulch based on site acreage. Site reclamation performance will be evaluated against these parameters.
https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf.
This item is bid as a lump sum for all materials needed to complete site reclamation including the soil borrow area, if applicable. Labor for the completion of site reclamation activities shall be billed as ‘additional labor.’
21.0 Silt Fence
https://dep.wv.gov/oil-and-gas/Documents/Erosion%20Manual%2004.pdf
A silt fence is a temporary sediment control device used on construction sites to protect water quality in nearby streams, rivers, lakes, and seas from sediment in stormwater runoff.
Silt Fence shall be supplied with stakes pre-attached and will be installed prior to site construction. Silt fence will also be removed at the completion of reclamation.
22.0 Monument
The monument is the permanent marker indicating the location of the plugged well.
Monument and its installation will meet all the requirements in 35 CSR 4 – 5.5.b.
• The monument will be a minimum of six (6) inches in outside diameter.
• The monument will extend minimum of thirty (30) inches above final grade and not less than ten (10) feet below the surface.
• The monument will have the well’s API Number attached.
http://apps.sos.wv.gov/adlaw/csr/readfile.aspx?DocId=16899&Format=PDF.
This item is bid per monument.
23.0 Welder/Cutting Torch
A welder/cutting torch is necessary for the fusing or cutting of metal components.
This item is bid per hour of use and includes operator. At no time may an individual labor-based item allowing for hourly rate payments (e.g., ‘Additional Labor’ or ‘Heavy
Equipment.’)
24.0 Oil Absorbent Supplies
Oil Absorbent Supplies are used to absorb and contain oil as directed by the DEP.
1. Booms will be bid per boom and must be a minimum of ten (10) feet in length.
2. Absorbent pads will be bid by the bundle, pads must be a minimum of two
(2) feet by two (2) feet.
3. Peat sorb will be bid per fifty (50) pound bag.
4. Plastic roll - (100 feet by 50 feet), twenty (20) mil (0.02inch) minimum thickness, bid per roll.
Items are bid as described above.
25.0 Sand Pump
A sand pump is a syringe-type cable tool typically between four (4) and six (6) inches in diameter used to pump sand and cuttings from the well bore.
The well bore size will determine the size of the sand pump used.
Item is bid per pump.
26.0 Cherry Picker
A cherry picker is a tool used to retrieve items from the well bore and drill out wooden plugs. This tool is run on the stem and is used in conjunction with jars.
The cherry picker will be a four (4) to eight (8) in diameter tubular four (4) feet in length with a tapered hole and slot. The well bore diameter will determine the precise size of cherry picker.
Item is bid per cherry picker.
27.0 Casing/Tubing Spear
Casing/Tubing Spear is a grapple tool that will go inside of tubing that is inside of the well bore.
Size will be determined by tubing encountered.
1. Tubing Spear 1inch to 3 ½ inches
2. Casing Spear 4 ½ inches to 10 ¾ inches
Item is bid per spear.
28.0 Overshot
Overshot is a grapple tool used to retrieve tubular pipe and casing by going over the outside of item being fished.
Size to be determined by the size of the fish. All grapples and working components must be included.
1. 1 inch to 3 1/2 inches
2. 4 ½ inches to 8 5/8 inches
Item is bid per tool.
29.0 Impression Block
The impression block is a wax block affixed to the bottom of fishing tools to allow for the creation of an impression of hole contents to assist in fishing operations.
Item is bid per impression block.
30.0 Subs
A sub is a short, threaded piece of pipe used to adapt parts of the drilling string that cannot otherwise be screwed together because of differences in thread size or design. Subs may be needed to change over to drill pipe or to retrieve casing from the well bore.
This item is bid per sub.
31.0 Power Swivel
The power swivel is a mechanical device that suspends the weight of the drill string. It is designed to allow rotation of the drill string beneath it, conveying high volumes of high-pressure drilling mud between the rig's circulation system and the drill string.
The power swivel must be a minimum of a twenty-five (25) ton hydraulic unit. The Power
Swivel must include the Power Unit with hoses and connections, also includes two Saver
Subs (one for Drill Pipe and one for Drill Collars).
This item is bid per hour of use.
32.0 Concave Mill
A mill is a tool that grinds metal downhole, typically to remove junk or parts of a casing string.
Mills will include subs needed.
1. 4 3/4-inch mill
Item is bid per mill.
33.0 Logging, Bond with CCL
Logging includes all labor, equipment, and material necessary to determine various characteristics of the well and using probative tools suspended from a wire line. Bond logs with casing collar locator (CCL) allows for a determination of the cement bond quality behind the casing and identify the free point of any casing strings present in the well.
Additionally, shots (e.g., collar busters, perf balls) are commonly employed in conjunction with logging runs to cause the perforation or separation of pipe where conventional rig methodologies are impossible or impractical.
Item is bid per log run and will include the cost of shots. Logging includes all labor, equipment, and materials required to complete logging run and perforation/shooting, if necessary.
34.0 Mud/mixing pump
A mud pump is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure down the drill string and back up the annulus.
This pump must have a minimum of five (5) inch diameter with a seven (7) inch stroke length or larger, and able to supply volumes and pressure as needed. It will include hoses and connections capable of handling the pump output.
Item is bid per hour of use.
35.0 Tie Mats
Tie mats are portable structures used to support the weight of heavy equipment.
Minimum size 4’ x 12’. Tie mats may be constructed of natural or synthetic materials.
Item is bid per mat for the duration of the project.
36.0 Administrative Cost
In execution of the contract, the contractor may encounter various required administrative costs, including, but not limited to insurance or bonding premiums. These costs may be billed back under this line item.
Items is bid as a service, not exceeding 3.00% of total bid amount. Bid amount is fixed for the life of the contract and may not be modified.
37.0 Solid waste profiling
The disposal of contaminated soils may require characterization of contaminants prior to disposition in an approved solid waste facility.
The Contractor will acquire grab samples, where necessary, for analysis by a state-certified laboratory, as identified in the following list:
https://dep.wv.gov/WWE/Programs/lab/Documents/2019/Commercial%20Labs%20Official%20List.pdf
Specific parameters for analysis will typically be specified by the solid waste facility, but will generally include semi-volatile organics, volatile organics, metals, and total petroleum hydrocarbons – oil range organics, gasoline range organics, and diesel range organics.
38.0 Culvert
A culvert is commonly utilized to function as a well cellar or as a conduit through which water may be channeled around an obstacle.
Functional Requirements:
Culverts may be constructed of plastic and must be available in the following sizes.
1. 36” x 20’
2. 24” x 20’
Item is bid per culvert.
https://dep.wv.gov/WWE/Programs/lab/Documents/2019/Commercial%20Labs%20Official%20List.pdf
39.0 Roll-Off Box Rental
Roll-off boxes are used to hold and transport solid waste generated from the site for disposal.
Roll-off box rental will be bid per day for each box used.
40.0 Roll-Off Box Liner
Roll-off box liners are used to line roll-off boxes to prevent leakage and cover materials during transport. Liners may also be used for containment while bulking materials.
Liners will be bid for each liner used.
41.0 Roll-Off Truck
Roll-off trucks are used to haul roll-off boxes, equipment and materials.
Roll-off trucks are bid per hour and include a licensed driver.
42.0 Straw mulcher
Straw mulchers are mobile devices used to spread straw from bales over a large surface area.
This item is bid per day of operation and does not include specific operator labor. Labor while using this equipment is to be billed under “Additional Labor.” Transportation costs associated with this item are to be incorporated into the “Mobilization & Demobilization” line item.
VII. APPENDIX A – WELL RECORDS
The wells were drilled prior to 1929 and have no associated well records. The following are records associated from reference well API# 47-085-10056.
File details come from the government source that posted it. Updated .