Final_RFB_758_2600000417_1_SO_FORM.PDF
PDF 386 KB Posted
- Attached to
- Night Muck Removal, Loading and Hauling
- Solicitation number
- RFB 758 2600000417 5
- Issued by
- Fayette County, Kentucky
About this file
This is a Request for Bid (RFB) issued by the Commonwealth of Kentucky for night muck removal, loading, and hauling services at the Kentucky Horse Park. The solicitation, numbered RFB 758 2600000417, was issued on February 20, 2026, with bids due by March 12, 2026, at 1:30 p.m. The project encompasses two primary service areas: removal of muck (stall bedding shavings and horse manure) from designated storage locations within barn complexes at the Kentucky Horse Park's event areas, with material to be dumped in the central muck disposal area behind the Alltech Arena, and loading and hauling of accumulated muck from the disposal area off the premises. All work must occur between 6:00 p.m. and 6:00 a.m. each night. The contractor is responsible for providing all necessary equipment and coordinating daily scheduling with Kentucky Horse Park staff to minimize disruption to park activities. The location for all services is Kentucky Horse Park, 4089 Ironworks Parkway, Lexington, Kentucky 40511.
Bidders must demonstrate a minimum of five years of experience performing similar services to be considered. Pricing is to be submitted on a per-unit basis, though specific unit costs and contract amounts have not been predetermined in this solicitation document. The contractor must ensure equipment operators are experienced in low-light machinery operation and possess knowledge of working safely around horses. Online bidding is permitted for this solicitation. Additional terms and conditions are detailed in Attachment A of the solicitation document, and vendors must affirm their understanding and compliance with all specified requirements and any subsequent addenda upon bid submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document ID: RFB 758 2600000417 Page: 1
Commonwealth of Kentucky
SOLICITATION
Modification: No Version #:
TITLE: Night Muck Removal, Loading and Hauling
Date Issued:
02/20/2026 Record Date:
02/20/2026
Solicitation Closes Date:
03/12/2026 Time:
13:30
Solicitation No:
RFB 758 2600000417
Online Bidding Prohibited: No For Information Call:
Keith Srutowski 502-564-7007
Bid Receiving Location:
Bid Receiving
See Terms & Conditions for Bid Submission Instructions
Other KY
Vendor Customer Number:
Vendor Name:
Phone Number:
Fax Number:
Email Address:
Ordering
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Payment
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Ownership Type
__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________
SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE
IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER
THE BID INVALID.
Signature X_________________________________________ FEIN#____________________ Date____________
All offers subject to all terms and conditions contained in this solicitation.
Document ID: RFB 758 2600000417 Page: 2
Line Items
Commodity Group: Default Commodity Group
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
1 Night Muck Removal 0.00000 EA
Comm Code Comm Description Manufacturer Model # Manuf Part #
98807 Cleaning of Amusement Areas, Exposition Centers, Grounds, Pa
Extended Description Remove muck (stall bedding shavings and horse manure) from designated muck storage locations within the barn complexes in the event areas of the Kentucky Hore Park. Once loaded into dump trucks, the material should be dumped in the central muck disposal area at the rear of the property behind the Alltech Arena.
Work may not commence prior to 6:00 p.m. and must be completed no later than 6:00 a.m. each night.
The contractor shall provide all equipment necessary to perform the work. Equipment operators must be experienced in operating machinery in low-light conditions and accustomed to working safely in environments with horses.
The contractor shall coordinate daily scheduling and operational details with Kentucky Horse Park staff to minimize disruption to Park activities and events.
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
2 Loading and Hauling Muck Off KHP Premises 0.00000 EA
Comm Code Comm Description Manufacturer Model # Manuf Part #
96239 Hauling Services
Extended Description Loading and Hauling
The contractor shall load material located at the muck disposal area behind the Alltech Arena onto hauling equipment and remove the material from the premises.
All equipment necessary to load and transport the material off-site shall be provided by the contractor.
The contractor shall coordinate daily activities and scheduling with Kentucky Horse Park staff to ensure minimal disruption to Park operations.
Shipping Information Kentucky Horse Park
4089 Ironworks Parkway
Lexington KY 40511
Billing Information Kentucky Horse Park
4089 Ironworks Parkway
Lexington KY 40511
Document ID: RFB 758 2600000417 Page: 3
Submission Checklist
The following items will be required to be submitted with bid:
Item Bid Information-Completed Best Price Pass/Fail - minimum of five years of experience required
See “Attachment A” for Terms and Conditions. The terms and conditions set out in “Attachment A”, and any subsequent addenda, are incorporated into and are a part of the Solicitation. By signing the face of the Solicitation document, the vendor affirms that they have read and understood the Solicitation and the terms and conditions (Attachment A) and any subsequent addenda. Should the vendor fail to comply with the provisions of the Solicitation and the terms and conditions (Attachment A) and any subsequent addenda, then the Finance and Administration Cabinet reserves the right and retains the ability to deem the vendor ineligible from further participation in the Solicitation in question.
Document Phase Document Description Page 4
2600000417 Final Night Muck Removal, Loading and Hauling Total Pages: 4
File details come from the government source that posted it. Updated .