Final Invasive Species Project Reporting.doc

DOC document 78 KB Posted

Attached to
Herbaceous/Herbicide at four state parks
Solicitation number
RFP 751 180000003068 1
Issued by
Macomb County, Livonia City, Michigan

About this file

This is a Final Project Reporting form issued by the Michigan Department of Natural Resources (DNR) for invasive species control contracts. The form serves as a cumulative reporting document for work completed throughout the entire project duration and must be submitted to Glenn Palmgren within two weeks of project completion. The report captures essential project information including the park or BAS name, project number, activity description, task details, and specific site locations. Contractors must document total days worked on site, total acres treated across all designated areas, and provide detailed dates of work by treatment area or zone. The form requires submission of supporting documentation including Invasive Mapping Forms for invasive points and GPS data for brush piles and invasive points as applicable. Additionally, if pesticides were used during the project, a completed Pesticide Treatment Record Form must be attached for each treatment area.

The reporting form requires detailed time tracking information organized by employee, job title, and work area, as well as hours billed by task and treatment zone. Contractors must document all equipment used on the project, including heavy machinery, ATVs, cutting tools, herbicide applicators, and sprayers. The form also requires contractors to comment on anticipated work effectiveness, describe any problems or issues encountered, and report any unusual or unexpected non-target damage with detailed descriptions and locations. The template is customized and partially pre-filled upon contract award, with fields for contract cost, cost per acre, funding sources, and purchase order information. Final reporting is directed to Glenn Palmgren via email at PalmgrenG@michigan.gov or fax to 517-241-2273.

View the file

Other files

File Type Posted
ld_herb_2018_P1.pdf PDF
Invasive Mapping Protocols.pdf PDF
Issued Pesticide COC MIG031030.pdf PDF
wd_phragknotweed_2018.pdf PDF
Copy of ld_herbaceous_2018_treatmentform.xls XLS spreadsheet
gm_phrag_2018.pdf PDF
Copy of gm_phragmites_2018_treatmentform.xls XLS spreadsheet
Copy of wd_phragknotweed_2018_treatmentform.xls XLS spreadsheet
PDMP - Pesticide Discharge Management Plan for PRD_2017.doc DOC document
Copy of mu_phrag_2018_treatmentform.xls XLS spreadsheet
DEQ ANC Permit PRD Statewide 2015 - COC ANC9400043.pdf PDF
Work Statement.docx DOCX document
Contractor Response Form.docx DOCX document
ld_herb_2018_P3-5.pdf PDF
Pricing Sheet.xlsx XLSX spreadsheet
mu_phrag_2018.pdf PDF
ld_herb_2018_P2.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DNR office use only STR File #

Invasive Species Control Contract Final Project Reporting This report is for cumulative work accomplished during the entire project This report is due within 2 weeks following completion of the project

Send to Glenn Palmgren (PalmgrenG@michigan.gov or Fax to 517-241-2273)

FORMCHECKBOX

Project Database

FORMCHECKBOX

GIS

FORMCHECKBOX

Management History

Park/BAS Name:

Project:

Activity:

Task:

Total Contract Cost:
$
Project Number:
DRAFT – FOR EXAMPLE PURPOSES ONLY
Contract Cost per Acre:
$

Funding Source(s):

Purchase Order #
CUSTOMIZED TEMPLATE (PARTIALLY PRE-FILLED) WILL BE PROVIDED WHEN CONTRACT IS AWARDED
Match For:

FORMCHECKBOX

Task Complete for Season

Datafile Names/Notes:

Contractor Name:

Project Description:

Project Site:

Reporting Period:
Project

Start Date:

Project End Date:

Total # Days Worked on Site:

Total Acres (all treatment areas/zones):

Area _____
Area _____
Area _____

Area _____

Area _____

Area _____
Area _____
Area _____
Area _____

Date(s) of work by area/zone:

***IF PESTICIDES WERE USED ON THIS PROJECT, A COMPLETED PESTICIDE TREATMENT RECORD FORM MUST BE ATTACHED FOR EACH TREATMENT AREA/ZONE

Types of equipment used on the project (heavy machinery, ATVs, cutting tools, herbicide applicators, sprayers, etc):

Were Invasive Mapping Forms submitted for invasive points as required?

__Yes (attached) __Yes (sent separately) __Not required Were GPS data submitted for brush piles, invasive points, etc. as required?

__Yes (attached) __Yes (sent separately) __Not required Model/type of GPS used:

Comment on the anticipated effectiveness of the work:

Description of problems/issues that were encountered during the project:

Description of any unusual or unexpected non-target damage (detailed description of damage and location):

Time Information: Hours by employee by area/zone

Employee Name
Title
Hours Billed

Area _____ Hours Billed

Area _____ Hours Billed

Area _____

Hours Billed

Hours Billed

Hours Billed

Hours Billed

Area _____ Hours Billed

Area _____ Hours Billed

Time Information: Total Hours by task by area/zone

Task
Hours Billed

Area _____ Hours Billed

Area _____ Hours Billed

Hours Billed

Hours Billed

Hours Billed

Hours Billed

Area _____ Hours Billed

Area _____ Hours Billed

Total Hours per area/zone:

Total Hours for all areas/zones and tasks:

File details come from the government source that posted it. Updated .