This document is a figure displaying 2022 remedial action analytical results for the National Guard Federal Scout Armory in Savoonga, Alaska. The figure shows soil and groundwater sample locations and results, including concentrations of diesel range organics, benzene, ethylbenzene, xylenes, and polycyclic aromatic hydrocarbons that exceed project action levels. The related state and local contract opportunity is a request for proposals (RFP) from the Alaska Department of Military and Veterans Affairs (DMVA) and Alaska Army National Guard to conduct a data gap analysis for the Savoonga Federal Scout Armory. The RFP has a proposal submission deadline of 2:00 pm Alaska Standard Time on August 22, 2024. Interested offerors must register with the DMVA/DAS Procurement Office to receive any subsequent amendments to the RFP. Pricing details, funding sources, incumbent contractors, and other commercial terms are not provided in the information given.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"J

"J

"J

"J

"J

1,500-gallon

AST

1,500-gallon

AST

Old Federal Scout Armory

New Federal Scout Armory

Walkway

Ramp

Ramp

1,500-gallon

AST

22SAV-B01-3

22SAV-B02-3

22SAV-B03-3

22SAV-SW01-1.5

22SAV-SW02-2.5

22SAV-SW03-2

22SAV-SW04-2

WP-01

WP-02

WP-03

WP-04

WP-05

TP-02

TP-04

TP-05

TP-06

TP-01

6/30/2023

DATE: FIGURE:

MO

P.M.: DRAWN:

T.A.

PROJECT No.:

550501 p

D o cu m e n t P a th

Q

:\B E

L \5

P R

O

JE

C T

S \D o D

\U S

A C

E A

K S

B H

T R

W \5

A K

A R

N G

G

A M

.S A

V .N

O A

\1

S u b m itt a ls

\S a vo o n g a R

A -2

S u p p le m e n ta l\_

G

IS

\1

M X

D \0

R

A _R es u lts .m xd

1 INCH

12 0 126

SCALE IN FEET

VERTICAL DATUM: NAVD88

ALASKA STATE PLANE ZONE 9

HORIZONTAL DATUM: NAD83 (2011)

1. Property boundary displayed is approximate.

Notes:

NATIONAL GUARD FEDERAL

SCOUT ARMORY

REMEDIAL ACTION REPORT

2022 REMEDIAL ACTION

ANALYTICAL RESULTS

SAVOONGA, ALASKA

22SAV-B01-3 7/19/2022 Units Depth (feet bgs) DRO 20,900 mg/kg 3 Benzene 2.08 mg/kg 3 Ethylbenzene 13.7 mg/kg 3 Xylenes (total) 63.3 mg/kg 3 1-Methylnaphthalene 51.2 mg/kg 3 2-Methylnaphthalene 73.9 mg/kg 3 Naphthalene 47.1 mg/kg 3

22SAV-B02-3 7/19/2022 Units Depth (feet bgs) Benzene 0.138 mg/kg 3 Ethylbenzene 2.22 mg/kg 3 1-Methylnaphthalene 5.02 mg/kg 3 Naphthalene 4.77 mg/kg 3

22SAV-B03-3 7/19/2022 Units Depth (feet bgs) Ethylbenzene 1.83 mg/kg 3 1-Methylnaphthalene 8.48 mg/kg 3 Naphthalene 9.54 mg/kg 3

22SAV-SW-1 7/19/2022 Units Depth (feet bgs) DRO 12,500 mg/kg 1.5 Benzene ND [0.199] U mg/kg 1.5 Ethylbenzene 1.79 mg/kg 1.5 1-Methylnaphthalene 38.7 mg/kg 1.5 2-Methylnaphthalene 51.9 mg/kg 1.5 Naphthalene 30.9 mg/kg 1.5

22SAV-SW-2 7/19/2022 Units Depth (feet bgs) DRO 4030 mg/kg 2.5 1-Methylnaphthalene 9.72 mg/kg 2.5 Naphthalene 5.19 mg/kg 2.5

Analyte Project Action Level (mg/kg)

DRO 3,000

Benzene 0.13 Ethylbenzene 1.2 Toluene 47 Xylenes (total) 13 1-Methylnapthalene 4.9 2-Methylnaphthalene 15 Naphthalene 0.43

Soil

Abbreviations:

detection limit diesel range organics limit of detection milligrams per kilogram milligrams per liter not detected project action level record of decision residual range organics result is below detectable limits

DL

DRO

LOD

mg/kg mg/L

ND

PAL

ROD

RRO

U

Chemistry Notes:

1. Only contaminant concentrations that exceed the PAL, or the LOD for a ND result exceeds the PAL, are presented. For full results, refer to Tables 4 and 5.

2. ACLs are defined by the Soil Contaminants of Concern and Cleanup Goals, as approved by ADEC on 30 July 2020 (ROD). PALs are defined by the ACL or the most conservative of the ADEC 18 AAC 75 Method Two Tables B1 and B2 Soil Cleanup Levels for the Under 40-Inch Zone Human Health and Migration to Groundwater (2021) when there is no ACL in place.

3. The higher result of the primary and field duplicate sample pair is presented, when applicable.

4. LOD shown in brackets [ ].

References:

1. Map produced using ESRI ArcMap v. 10.7.1.

2. Imagery source: Brice Engineering, LLC, 07/19/2022.

LEGEND:

Soil Sample Location

WP-01 7/17/2022 Units DRO 5.59 mg/L RRO 1.63 mg/L Benzene 0.016 mg/L

WP-05 7/17/2022 Units RRO 1.27 QN mg/L

Analyte Project Act ion Level (mg/L)

DRO 1.5

RRO 1.1

Benzene 0.0046

W at er

Monitoring Well Locations Visited/Sampled in 2022

Sample Result(s) ≥ Project Action Level!

Not Sampled - Dry Well?

Sample Result(s) > Project Action Level?

Sample Result(s) < Project Action Level!

Excavation Boundary

Property Line

Test Pit"J

D . - -.

I. - -

Blank Page