Figure_1-_432-28_Fueling_System_Schematic.pdf

PDF 139 KB Posted

Attached to
Airport Fuel Farm Fuel and Equipment
Solicitation number
RFCSP-27-2023
Issued by
Rutherford County, Newport City, Tennessee

About this file

This document is a detailed schematic diagram for a new bulk fuel farm loading/unloading system located at the Murfreesboro Municipal Airport in Tennessee, prepared by Griggs & Maloney, Inc. The schematic depicts a comprehensive fuel dispensing and transfer infrastructure featuring two double-walled storage tanks (20,000 and 15,000 gallon capacities) with separate dispensing pumps, multiple valve configurations, and connections for both aviation gas and jet fuel distribution to customers and transport trucks. The system includes fully enclosed pump houses, transfer pumps, strainers, check valves, and a specific valve sequence for loading and unloading operations.

The technical diagram provides a precise engineering layout with a valve schedule detailing the operational sequence for transport truck loading and unloading processes. The schematic includes specific instructions for valve positioning during different operational phases, ensuring safe and efficient fuel transfer. The design incorporates 3-inch components including Y-strainers, check valves, butterfly valves, and loading connections with dust caps, along with 200 GPM flow meters. The project number 432-28 suggests this is a structured municipal infrastructure improvement for the Murfreesboro Airport's fuel management system, designed to enhance fuel handling capabilities and operational safety.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

20,000 GALLON AV GAS DOUBLE WALLED AST

AutoCAD SHX Text

15,000 GALLON JET A DOUBLE WALLED AST

AutoCAD SHX Text

TO LOADING HOSE FOR MOBILE REFUELING TRUCK

AutoCAD SHX Text

TRANSPORT TRUCK UNLOADING/LOADING CONNECTION

AutoCAD SHX Text

AV GAS DISPENSING TO CUSTOMERS

AutoCAD SHX Text

JET A DISPENSING TO CUSTOMERS

AutoCAD SHX Text

±15 GPMDISPENSING PUMP

AutoCAD SHX Text

±15 GPMDISPENSING PUMP

AutoCAD SHX Text

FULLY ENCLOSED PUMP HOUSE

AutoCAD SHX Text #2

AutoCAD SHX Text #4

AutoCAD SHX Text #3

AutoCAD SHX Text #5

AutoCAD SHX Text

BYPASS LINE

AutoCAD SHX Text #2

AutoCAD SHX Text #4

AutoCAD SHX Text #3

AutoCAD SHX Text #5

AutoCAD SHX Text

BYPASS LINE

AutoCAD SHX Text VALVE SCHEDULE AND SEQUENCE OF OPERATIONS 1. TRANSPORT TRUCK UNLOADING: OPEN VALVES #1 AND #4. TRANSPORT TRUCK UNLOADING: OPEN VALVES #1 AND #4. CLOSE VALVES #2 AND #5. TURN PUMP ON. #3 VALVE OPEN. 2. MOBILE REFUELING TRUCK LOADING: CLOSE VALVES #1 AND #4. MOBILE REFUELING TRUCK LOADING: CLOSE VALVES #1 AND #4. OPEN VALVES #2 AND #5. TURN PUMP ON. #3 VALVE OPEN. 3. ALL VALVES SHALL BE LOCKABLE VALVES.ALL VALVES SHALL BE LOCKABLE VALVES.

AutoCAD SHX Text

VALVE ID

AutoCAD SHX Text

DESCRIPTION AND USEAGE

AutoCAD SHX Text #1

AutoCAD SHX Text

TRANSPORT UNLOADING VALVE NORMALLY CLOSED

AutoCAD SHX Text #2

AutoCAD SHX Text

BYPASS VALVE NORMALLY OPEN DURING MOBILE TRUCK LOADING OPERATIONS

AutoCAD SHX Text #3

AutoCAD SHX Text PUMP DISCHARGE VALVE NORMALLY OPEN DURING MOBILE TRUCK LOADING AND TANKER UNLOADING OPERATIONS; CLOSE FOR PUMP REPAIR ONLY

AutoCAD SHX Text #4

AutoCAD SHX Text

PUMP DISCHARGE/TANK VALVE NORMALLY CLOSED DURING MOBILE TRUCK LOADING OPERATIONS

AutoCAD SHX Text #5

AutoCAD SHX Text

LOADING VALVE NORMALLY OPEN DURING MOBILE LOADING OPERATIONS

AutoCAD SHX Text #1

AutoCAD SHX Text

10 HP, 3 PHASE TRANSFER PUMP

AutoCAD SHX Text

STRAINER, TYP.

AutoCAD SHX Text

CHECK VALVE, TYP.

AutoCAD SHX Text #1

AutoCAD SHX Text

10 HP, 3 PHASE TRANSFER PUMP

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text LEGEND PUMP 3" Y-STRAINER 3" CHECK VALVE 3" BUTTERFLY VALVE CAMLOCK LOADING CONNECTION WITH DUST CAP TEE FITTING 200 GPM FLOW METER (VEEDER ROOT OR EQUIVALENT)

AutoCAD SHX Text M

AutoCAD SHX Text

NEW BULK FUEL FARM CITY OF MURFREESBORO MURFREESBORO MUNICIPAL AIRPORT

AutoCAD SHX Text

MURFREESBORO AIRPORT FUELING FARM SYSTEM LOADING/UNLOADING SCHEMATIC

AutoCAD SHX Text

PROJECT NO. 432-28

AutoCAD SHX Text

MARCH 2023

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text

LAF

AutoCAD SHX Text

RWM

AutoCAD SHX Text

RWM

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DATE BY NO. DESCRIPTION

AutoCAD SHX Text

SUBMITTALS AND REVISIONS

AutoCAD SHX Text

P.O. BOX 2968, MURFREESBORO, TN 37133-2968 (615) 895-8221 * FAX (615) 895-0632

AutoCAD SHX Text

FIGURE 11

AutoCAD SHX Text L:\Engineering\432 Murfreesboro Airport\432-28 New Bulk Fuel Farm\Drawings\Design Drawings\432-28 Fueling System Schematic.dwg LAYOUT: 1 SAVED: 3/17/2023 1:14 PM PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 LAYOUT: 1 SAVED: 3/17/2023 1:14 PM PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 1 SAVED: 3/17/2023 1:14 PM PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 SAVED: 3/17/2023 1:14 PM PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 3/17/2023 1:14 PM PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 PAGESETUP: PDF 11X17 PLOTTED: 3/17/2023 PDF 11X17 PLOTTED: 3/17/2023 PLOTTED: 3/17/2023 3/17/2023

AutoCAD SHX Text C 2023 Griggs & Maloney, Inc.

Sheets and Views
1

File details come from the government source that posted it. Updated .